This amendment to a solicitation provides responses to vendor questions regarding utility building rehabilitation requirements for the U.S. Army Corps of Engineers New England District. The scope of work includes scraping and painting the building exterior, louvers, and fuel tank enclosure; mortar repointing of CMU walls; replacing three windows, two doors, and roof fascia trim; minor concrete repairs; and hazardous material abatement during demolition. The contractor must furnish all equipment, labor, and materials to complete rehabilitation in accordance with the revised statement of work. Pricing is between $100,000 to $250,000, and the NAICS code is 238390 with a small business size standard of $19 million. The solicitation closing date remains unchanged, and the amendment incorporates additional photos into the attachments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to provide responses to questions from industry.
Question #6 is applicable to this amendment.
Solicitation closing remains March 22, 2024 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0057
X 9B. DATED (SEE ITEM 11)
15-Feb-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Mar-2024
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:
JENNIFER M SAMELA / ADDED BY UPASS
W912WJ24Q0057
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
REQUEST FOR INFORMATION
QUESTION 1: It appears as though the sizes provided are in inches only, not feet and inches.
The way they are written, 3084 and 6084, in the door industry, translates to 3'-0" x 8'-4" and 6'- 0" x 8'-4". Looking at the pictures however, you can clearly see these doors are not those sizes.
The (11) rows of 8" block is a dead giveaway. We believe the single door is 30" x 84" and the double door is 60" x 84". Please confirm if this is correct?
RESPONSE 1: The single wide door has an approximate rough opening of 39-1/2” x 89- 1/2”. Existing single door to be removed is 36” wide with a 12” x 12” door lite. Contractor shall provide a single door that is 36" x 84" with a minimum size 24” x 30” insulated door lite with security wire. The double door has an approximate rough opening of 64” x 88-1/2”. Existing double doors to be removed are 30” wide with a 12” x 12” door lite. Contractor shall provide double doors that are each 30" x 84" with a minimum size of 16” x 30” insulated door lite with security wire. Contractor shall verify all dimensions and layout of openings prior to providing door and frame product submittal.
QUESTION 2: Due to these sizes, the 24" x 30" lite they call for in each door will simply not fit.
Instead, the exposed glass size of the lites will be 16" x 30". Please confirm if this is acceptable?
RESPONSE 2: For the single door, the Contractor shall provide a minimum size of 24” x 30” top half insulated door lite with security wire. For each of the doors on the double door, the Contractor shall provide a minimum size of 16” x 30” top half insulated door lite with security wire.
QUESTION 3: Are we to provide wire in both panes of glass in each insulated glass unit, or one pane of wire glass and one pane of tempered glass?
RESPONSE 3: The Contractor shall provide one pane of wire glass and one pane of tempered glass.
QUESTION 4: Is the painting of the interior walls included in the scope of work?
RESPONSE 4: Yes, the Statement of Work has been revised to include painting of the interior walls. Please see the revised Statement of Work for further information. Additional photos have been included in the revised Attachments.
QUESTION 5: Is painting or epoxying the interior floors included in the scope of work?
W912WJ24Q0057
RESPONSE 5: Yes, the Statement of Work has been revised to include epoxying the interior floors. Please see the revised Statement of Work for furhter information. Additional photos have been included in the revised Attachments.
QUESTION 6: Please indicate if the government provided Medeco cores are Large or Small format, and please provide the specific series of core that will be provided for the door hardware?
RESPONSE 6: Contractor shall provide mortise housing to accept Medeco Large Format Interchangeable Cores.