Amendment W912WJ24Q0001-0004.pdf
PDF 376 KB Posted
- Attached to
- Wire Rope Replacement, Woonsocket Falls Dam, Woonsocket, RI Federal contract opportunity
- Solicitation number
- W912WJ24Q0001
About this file
This is an amendment to a solicitation for wire rope replacement services at the Woonsocket Falls Dam in Woonsocket, Rhode Island. The U.S. Army Corps of Engineers Engineering District New England is seeking to replace approximately 50 feet of existing wire rope at the dam. The amendment provides responses to contractor questions, revised specifications and photos, and a list of site visit attendees. The response date is extended to October 31, 2023 at 5:00 PM Eastern for all interested contractors to acknowledge and submit final proposals. Magnetic flux leakage testing is no longer required but pre-stretching and tension testing of new wire rope remains mandatory. Public boat access is available nearby to support work on the dam as needed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ24Q0001-0005.pdf | ||
| Specifications_Revised 25 Oct.pdf | ||
| Photographs_Plans_Drawings.pdf | ||
| Amendment W912WJ24Q0001-0003.pdf | ||
| Bid Schedule_Revised.pdf | ||
| Specifications and Plans_Revised 16 Oct.pdf | ||
| Specifications and Plans_Revised.pdf | ||
| Amendment W912WJ24Q0001-0002.pdf | ||
| Amendment W912WJ24Q0001-0001.pdf | ||
| Solicitation W912WJ24Q0001.pdf | ||
| Specifications and Plans.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to provide responses to questions from industry (questions/responses #2-#5 are applicable to this amendment), provide revised specif ications and additional photos, and provide a site visit attendee list. *Note - The "Specif ications and Plans_Revised 16 Oct" document has been seperated into 2 documents due to formating issues. The 2 documents are named the follow ing:
1. Specifications_Revised 25 Oct
2. Photographs, Plans & Draw ings
Solicitation closing has been extended until October 31, 2023 at 5:00 PM Eastern.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Oct-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0001
X 9B. DATED (SEE ITEM 11)
13-Sep-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Oct-2023
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:
JENNIFER M SAMELA / ADDED BY UPASS
W912WJ24Q0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
SITE VISIT
SITE VISIT ATTENDEES
NAME ORGANIZATION
Jeremy Regan Maverick Construction LLC David Zoppo R. Zoppo Corp.
Alicia LaCrosse U.S. Army Corps of Engineers, NAE Joe Zanca U.S. Army Corps of Engineers, NAE Jason Montiero U.S. Army Corps of Engineers, NAE Bryan Paul U.S. Army Corps of Engineers, NAE Pat Devine U.S. Army Corps of Engineers, NAE John Kedzierski U.S. Army Corps of Engineers, NAE
The following have been modified:
REQUEST FOR INFORMATION
QUESTION 1: Can the wire rope testing requirements in Specification 35 01 70.13 sections
2.1.3 Pre-Stretching, 2.1.6 Magnetic Flux Leakage Testing, and 2.1.13 Tension Testing be removed from the requirements?
RESPONSE 1: The Magnetic Flux Leakage Testing requirement has been removed from the specifications. The requirements for Pre-Stretching and Tension Testing of the wire rope remain.
Please see revised specifications for further details.
QUESTION 2: Is there a public boat ramp for boat access?
RESPONSE 2: Yes, there is public boat launch 1 mile upstream at Cold Springs Park. The Government has launched small boats from this launch (see photos included in this amendment), however, Contractors should consider that this launch may not be suitable for the launch of larger boats.
QUESTION 3: Is the tree that is currently lodged in Gate 1 included in the work for the Gate 1 Option or with the Option for the Tree Removal also be exercised to cover tree removal costs?
W912WJ24Q0001
RESPONSE 3: If any trees remain once on-site work is in progress, then the Government would consider the exercise of the included option for tree removal.
QUESTION 4: Can the 4 manhole covers/hatches that are above each gate operator, on top of the service bridge, be used as overhead access to the catwalk platform?
RESPONSE 4: Yes, the manhole covers/hatches can be used as overhead access from the service bridge to the catwalk platform (see photos included in this amendment and drawing BE-1-1138 of the Plans, Drawings, and Photos attachment), but must be re-seated and requires replacement with a sealant approved for use by the COR (contracting office representative). Sealant shall be ASTM C920, Type M, Grade NS, use T, NT.
QUESTION 5: What length of wire rope is required?
RESPONSE 5: Approximate length of existing wire rope is 50 feet. Contractor shall field verify required lengths of rope prior to fabrication and installation. See revised specifications for further details.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Oct-2023 05:00 PM to 31-Oct-2023 05:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK
PLEASE REFER TO REVISED PLANS AND SPECIFICATIONS DATED AUGUST
OCTOBER 2023 INCLUDED AS A SEPARATE FILE.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .