About this file

This amendment modifies the solicitation for wire rope replacement services at the Woonsocket Falls Dam in Woonsocket, Rhode Island. The U.S. Army Corps of Engineers Engineering District New England seeks to replace aging wire ropes at the dam under solicitation number W912WJ24Q0001. The amendment announces a second site visit on October 24, 2023 and provides responses to industry questions. It removes the magnetic flux leakage testing requirement from specifications and retains pre-stretching and tension testing requirements. The response deadline is extended to October 27, 2023. A bid schedule attachment was also added to require line item pricing.

View the file

Other files for this federal contract opportunity

Other files attached to Wire Rope Replacement, Woonsocket Falls Dam, Woonsocket, RI, newest first.
File Type Posted
Amendment W912WJ24Q0001-0005.pdf PDF
Amendment W912WJ24Q0001-0004.pdf PDF
Photographs_Plans_Drawings.pdf PDF
Specifications_Revised 25 Oct.pdf PDF
Bid Schedule_Revised.pdf PDF
Specifications and Plans_Revised 16 Oct.pdf PDF
Specifications and Plans_Revised.pdf PDF
Amendment W912WJ24Q0001-0002.pdf PDF
Amendment W912WJ24Q0001-0001.pdf PDF
Specifications and Plans.pdf PDF
Solicitation W912WJ24Q0001.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Notify of a second formal site visit on Tuesday October 24, 2023 at 10:00 am Eastern at Woonsocket Falls Dam, 80 River Street, Woonsocket, RI.

2. Provide responses to questions from industry and revise the Statement of Work.

3. Include a Bid Schedule as a separate attachment.

4. Solicitation closing has been extended until October 27, 2023 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Oct-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0001

X 9B. DATED (SEE ITEM 11)

13-Sep-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Oct-2023

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:

JENNIFER M SAMELA / ADDED BY UPASS

W912WJ24Q0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

QUESTION 1: Can the wire rope testing requirements in Specification 35 01 70.13 sections

2.1.3 Pre-Stretching, 2.1.6 Magnetic Flux Leakage Testing, and 2.1.13 Tension Testing be removed from the requirements?

RESPONSE 1: The Magnetic Flux Leakage Testing requirement has been removed from the specifications. The requirements for Pre-Stretching and Tension Testing of the wire rope remain.

Please see revised specifications for further details.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 20-Oct-2023 05:00 PM to 27-Oct-2023 05:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

BID SCHEDULE

BID SCHEDULE WILL BE INCLUDED AS A SEPARATE ATTACHMENT. THE BID SCHEDULE SHALL

BE COMPLETED IN ITS ENTIRETY (EACH LINE ITEM). FAILURE TO DO SO MAY RESULT IN A

QUOTE BEING DEEMED NON-RESPONSIVE.

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

Applicable to Contract Line Items 0002-0004 0003-0005

(a) The Government may extend the term of this contract by written notice to the Contractor within 0 days; provided that the Government gives the Contractor a preliminary written notice of its intent to extend before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed the

W912WJ24Q0001

contract period of performance.

(End of clause)

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- October 2, 2023 at 10:00 am Eastern.

Second Site Visit: Tuesday, October 24, 2023 at 10:00 am Eastern.

(c) Participants will meet at-- Woonsocket Falls Dam, 80 River Street, Woonsocket, RI.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .