This document is an Abstract of Offers for a construction solicitation. The solicitation is for Electrical Upgrades at the North Hartland Lake Recreation Area in Hartland, Vermont, which is a U.S. Army Corps of Engineers project. The solicitation number is W912WJ24B0007, and it was issued on 3/26/2024 with a bid opening date of 5/3/2024.

The project is a small business set-aside with an estimated magnitude between $250,000-$500,000. The work involves upgrading the existing electrical infrastructure, including a new direct-buried duct bank, new feeders, and replacing the primary circuit breaker, transformer, and other components within an existing tool shed. The period of performance is approximately 210 days, with work restricted during the peak recreation season from the third Friday in May through Columbus Day weekend. Three bids were received, with the lowest responsive bid at $327,000.

View the file

Other files

File Type Posted
Drawings.pdf PDF
RFI 18 - Conduit.docx DOCX document
RFI 1 - Power Pole.docx DOCX document
W912WJ24B0007 Amendment 0003.pdf PDF
Revised Drawings.pdf PDF
W912WJ24B0007 Amendment 0002.pdf PDF
Specifications.pdf PDF
W912WJ24B0007 Amendment 0001.pdf PDF
W912WJ24B0007_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

3/26/2024 5/3/2024 1 2

4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPED)

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. SIGNATURE DATE SIGNED

9. OFFERS

5. PROJECT TITLE (IFB) 8. GOVERNMENT ESTIMATE NO. 1 NO. 2

(Check A, B, C and complete D, E, and F) A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURTIY (TYPE AND AMOUNT) B. BID SECURTIY (TYPE AND AMOUNT) X (Without Profit)

6. NUMBER OF AMENDMENTS ISSUED C. REASONABLE CONTRACT C. AMENDEMENTS ACKNOWLEDGED C. AMENDEMENTS ACKNOWLEDGED

(Including Profit)

7A. ITEM

NUMBER 7B. DESCRIPTION OF OFFERED ITEM

7C. EST.

QUANTITY D. UNIT E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT

Electrical Upgrades at North Hartland Lake Recreation Area 1 JOB $348,092.00 $348,092.00 $468,325.00 $468,325.00 $398,762.00 $398,762.00

ESTIMATED TOTAL AMOUNT $348,092.00 $468,325.00 $398,762.00

W912WJ24B0007

Electrical Upgrades at North Hartland Lake Recreation Area, Hartland, Vermont Small Business Set Aside Kriscorp Electrical Contracting Inc

Erin E. Bradley Bid Opening OfficerUS ARMY ENGINEER DISTRICT, NEW ENGLAND

696 VIRGINIA ROAD

CONCORD, MA 01742

3 3

No acceptable bid bond NONE

Reagent World, Inc

1. SOLICITATION NUMBER PAGE OF PAGES

2 2

ABSTRACT OF OFFERS - CONSTRUCTION INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on CONTINUATION SHEET a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

NO. 3 NO. 4 NO. 5 NO. 6

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT) B. BID SECURITY (TYPE AND AMT)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED A. B. C.

ITEM ESTIMATED UNIT D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED D. UNIT E. ESTIMATED

NO. QUANTITY PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT

0001 1 JOB $327,000.00 $327,000.00 $0.00 $0.00

ESTIMATED TOTAL AMOUNT $327,000.00 $0.00 $0.00

W912WJ24B0007

20% 20% 20%

Midwest Electrical Construction, Inc

Electrical Upgrades at North Hartland Lake Recreation Area, Hartland, Vermont Small Business Set Aside

FRONT
CONTINUATION
2024-05-08T13:32:44-0400
BRADLEY.ERIN.ELIZABETH.1386908440

File details come from the government source that posted it. Updated .