Attachment B - 2015 Cross Sections.pdf
PDF 620 KB Posted
- Solicitation number
- W912WJ23B0008A
About this file
This document package includes drawings and specifications for repairs to the North Jetty in Hampton Harbor, New Hampshire. The Army Corps of Engineers is soliciting bids to remove existing armor stone from sections of the jetty crest and side slopes, install new core stone as needed, and rebuild sections by resetting and supplementing the existing armor stone with additional new armor stone weighing between 3-10 tons. Bidders should note repair limits, typical sections, general notes describing the scope of work, and definitions for repair area toes. The solicitation number for this opportunity is W912WJ23B0008 and it can be viewed on the Procedures, Instructions, and Events & Editing system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912WJ23B0008 Bid Abstract.pdf | ||
| Attachment A - As-Builts.pdf | ||
| W912WJ23B0008 Amendment 0002.pdf | ||
| W912WJ23B0008 Amendment 0001.pdf | ||
| W912WJ23B0008.pdf | ||
| Specs.pdf | ||
| Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
-10
E L
E V
A T I
O N
I
N
F E
E T
M L
L W
0 10 20 30 40 50-10-20-30-40-50
-10
E L
E V
A T I
O N
E T
M L
L W
-10
E L
E V
A T I
O N
E T
M L
L W
0 10 20 30 40 50-10-20-30-40-50
-10 E
L E
V A
T I
O N
E T
M L
L W
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S U
B M
IT
T E
D B
Y : P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
D R
A W
IN
G C
O D
E
IDENTIFICATION
SHEET
District
New England of Engineers
US Army Corps
S
IZ
E
F
IL
E N
A M
E
P L
O T S
C A
L E
SHEET OF
C O
N C
O R
D
M A
S S
A C
H U
S E
T T S
N E
W E
N G
L A
N D D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
H A
M P
T O
N
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
H A
M -2
R E
P A
IR
S T
O T
H E N
O R
T H J
E T
T Y
W
W J -1
-B -0
/1
/2
1" = 10'
10 0 10 20
GRAPHIC SCALE:
C-301
M E
C M
E T
A N
S I
D
S C
A L E
T Y
P
IC
A L S
E C
T
IO
N S A
N D N
O T
A
M -2
C -3
.d g n
OCEAN SIDE
OCEAN SIDE
CHANNEL SIDE
5'
NEW ARMOR STONE
AS NEEDED
NEW CORE STONE
C
C
SCALE: 1" = 10'
TYPICAL SECTION - WORK AREA 1
SCALE: 1" = 10'
TYPICAL SECTION - WORK AREA 2
CHANNEL SIDE
THE CHANNEL SIDE SLOPE AND WITHIN THE LIMITS SHOWN ON THE TYPICAL SECTION.
1. REHANDLE EXISTING ARMOR STONE IN ORDER TO INTERLOCK NEW 3-4 TON ARMOR STONE ALONG
WORK AREA 1 :
W O
R K A
R E
A
1.5
EL 12.3'
EL 12.3'
M
IN
.5
ARMOR STONE
NEW AND EXISTING
M .C
U L L E
N
THEY APPEAR INTEGRAL TO THE STRUCTURE OR NOT.
7. THE CONTRACTOR SHALL NOT HARVEST ANY EXISTING ARMOR STONES THAT ARE LOCATED AT THE TOE OF THE JETTY WHETHER
AND ALL FACES OF EXISTING ARMOR STONES ARE IN CONTACT WITH ADJACENT ARMOR STONES.
DISPLACED OR LOOSE AND THE EXISTING ARMOR STONES PROVIDE A BASE WHERE THE STONES ARE STABLE, WELL INTERLOCKED, ON PLAN, PROFILE OR SECTIONS. THE LIMIT SHALL BE TO THE LOCATION WHERE THE EXISTING ARMOR STONES ARE NO LONGER
6. FOR CLARITY, LIMITS FOR HANDLING EXISTING ARMOR STONE PER SPEC SECTION 35 31 19. PARAGRAPH 3.4 ARE NOT DEPICTED
5. SEE GENERAL NOTE #7 ON SHEET G-101 FOR ESTABLISHING REPAIR SECTION CREST WIDTH, ELEVATION, TOE AND SHAPE.
BE ACCEPTED AS MEETING THE REQUIRED FINISHED CREST ELEVATION.
WITH SPEC SECTION 35 31 19. VARIATIONS IN FINISHED GRADE WITHIN THE TOLERANCES STATED IN THE SPECIFICATIONS WILL
4. NEW ARMOR STONES INSTALLED WITHIN THE REPAIR SECTIONS MAY VARY IN ELEVATION FROM DESIGN GRADE IN ACCORDANCE
WITH SPECIFICATION SECTION 35 31 19. REHANDLING OF EXISTING ARMOR STONE IS INCIDENTIAL TO ALL REPAIR AREAS.
MAXIMUM INTERLOCKING BETWEEN THE REPAIR AND NON-REPAIR AREAS. INTERLOCKING SHALL BE IN ACCORDANCE
RESET ARMOR STONES WITHIN A REPAIR AREA SHALL BE REHANDLED OR READJUSTED AS NECESSARY TO PROVIDE FOR
3. UNLESS OTHERWISE NOTED, ALL EXISTING ARMOR STONES OUTSIDE OF A REPAIR AREA THAT INTERFACE WITH NEW OR
SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
2. PREVIOUSLY ACCEPTED AREAS WHICH ARE SUBSEQUENTLY DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATIONS
JETTY IN ORDER TO PROVIDE A SMOOTH TRANSITION
THE CONTRACTOR SHALL TAPER THE WIDTH AND HEIGHT OF THE ADJACENT EXISTING SECTION OF THE
1. NEW ARMOR STONE SHALL BLEND SMOOTHLY WITH ADJACENT EXISTING CREST AND SLOPES OF THE JETTY.
GENERAL NOTES - JETTY REPAIR
9. A MINIMUM THICKNESS OF ONE ARMOR STONE SHALL BE PLACED AT ALL LOCATIONS WITHIN THE REPAIR AREA.
SIDE SLOPES.
SHOULD BE SUFFICIENT ENOUGH TO PROVIDE FOR THE REQUIRED FINISHED CREST ELEVATION AND/OR
8. THE CONTRACTOR SHALL ADD NEW 3-4 TON ARMOR STONES AS NEEDED. THE AMOUNT OF ARMOR STONE ADDED
7. CONTRACTOR SHALL RESET ORIGINAL CREST STONES BACK ON THE CREST TO THE MAXIMUM EXTENT POSSIBLE.
EXISTING STONE."
6. REUSE ALL EXISTING ARMOR STONE IN ACCORDANCE WITH SPEC SECTION 35 31 19, PARAGRAPH 3.5 "REUSE OF
LAYER OF ARMOR STONE. SEE SPEC SECTION 35 31 19, PARAGRAPH 2.2 FOR CORE STONE GRADATION.
ALONG THE CREST AND/OR SIDE SLOPES. ALL CORE STONE INSTALLED SHALL BE COVERED BY AT LEAST ONE
5. ADD NEW CORE STONE AS NEEDED TO PROVIDE FOR THE REQUIRED BOTTOM ELEVATION OF THE ARMOR STONE
EXISTING ARMOR STONES ARE IN CONTACT WITH ADJACENT ARMOR STONE.
ARMOR STONES PROVIDE A BASE WHERE THE STONES ARE STABLE, WELL INTERLOCKED, AND ALL FACES OF
LOCATION WHERE THE EXISTING ARMOR STONES ARE NO LONGER DISPLACED OR LOOSE AND THE EXISTING
CREST AND/OR SIDE SLOPES TO THE TOE OF THE REPAIR LIMIT. THE REPAIR AREA TOE OF SLOPE SHALL BE THE
4. IN THESE LOCALIZED AREAS, THE CONTRACTOR SHALL REMOVE THE EXISTING ARMOR STONE ALONG THE
MUST CONTINUE TO CUT THE SIDE SLOPE UNTIL THE CONDITIONS DEFINED IN NOTE 4 ARE FOUND.
UPON EXCAVATION, IF THE MARKED TOE DOES NOT MEET THE DEFINITION IN NOTE 4, THE CONTRACTOR
FOR LIMIT OF CUT. ONCE APPROVED, THE CONTRACTOR SHALL BEGIN STONE REMOVAL.
SEE NOTE 4 FOR REPAIR AREA TOE DEFINITION. THE CONTRACTOR SHALL RECEIVE COR CONCURRENCE
3. PRIOR TO REMOVAL OF ARMOR STONE, THE CONTRACTOR SHALL MARK THE TOE OF THE REPAIR AREA.
DISPLACED OR POORLY INTERLOCKED.
REPAIR AREAS. AREAS OF MINOR REPAIR ARE LOCALIZED AREAS WHERE ARMOR STONES ARE
2. WALK LENGTH OF AREA 2 ON THE NORTH JETTY WITH COR TO DETERMINE THE LOCATION OF MINOR
LOCATIONS OF REPAIRS OCCUR ON CREST AND BOTH OCEAN AND HARBOR SIDE SLOPES.
1. FOR CLARITY SMALL REPAIR AREA IS SHOWN ON CREST AND ON ONE SIDE OF THE JETTY. ACTUAL
WORK AREA 2:
5'
D E
C E
M B
E R
M T
E S
S
IE
R
-10
-20
E L
E V
A T I
O N
E T
M L
L W
0 10 20 30 40 50-10-20-30-40-50
-10
-20
E L
E V
A T I
O N
E T
M L
L W
-10
-20
E L
E V
A T I
O N
E T
M L
L W
0 10 20 30 40 50-10-20-30-40-50
-10
-20
E L
E V
A T I
O N
E T
M L
L W
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S U
B M
IT
T E
D B
Y : P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
O
D R
A W
IN
G C
O D
E
IDENTIFICATION
SHEET
District
New England of Engineers
US Army Corps
S
IZ
E
F
IL
E N
A M
E
P L
O T S
C A
L E
SHEET OF
C O
N C
O R
D
M A
S S
A C
H U
S E
T T S
N E
W E
N G
L A
N D D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
A
M P
T O
N
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
H A
M -2
R E
P A
IR
S T
O T
H E N
O R
T H J
E T
T Y
W
W J -1
-B -0
/1
/2
1" = 10'
10 0 10 20
GRAPHIC SCALE:
C-302
M E
C M
E T
A N
S I
D
S C
A L E
T Y
P
IC
A L S
E C
T
IO
N S A
N D N
O T
E S
W O
R K A
R E
A
A
M -2
C -3
.d g n
CHANNEL SIDE
CHANNEL SIDEOCEAN SIDE
OCEAN SIDE
1.5 1.5
VARIES
10'
1.5
1.5
ARMOR STONE
NEW AND EXISTING
ARMOR STONE
NEW AND EXISTING
C
C
SCALE: 1" = 10'
TYPICAL SECTION - WORK AREA 3
SCALE: 1" = 10'
TYPICAL SECTION - WORK AREA 4
SEE SHEET C-101 FOR CREST WIDTHEL 12.3'
EL 12.3'
NEEDED
STONE AS
NEW CORE
M
IN
.0
M .C
U L L E
N
AREA.
9. A MINIMUM THICKNESS OF ONE ARMOR STONE SHALL BE PLACED AT ALL LOCATIONS WITHIN THE REPAIR
REQUIRED FINISHED CREST ELEVATION AND SIDE SLOPES.
BE PLACED IN WORK AREA 4. THE AMOUNT OF ARMOR STONE ADDED SHALL BE SUFFICIENT TO MEET THE
8. THE CONTRACTOR SHALL ADD NEW 6-10 TON ARMOR STONES AS NEEDED. THE UPPER 50% OF SIZE RANGE SHALL
7. CONTRACTOR SHALL RESET ORIGINAL CREST STONES ON THE CREST TO THE MAXIMUM EXTENT POSSIBLE.
OF EXISTING STONE."
6. REUSE ALL EXISTING ARMOR STONE IN ACCORDANCE WITH SPEC SECTION 35 31 19, PARAGRAPH 3.5 "REUSE
AND/OR NEW ARMOR STONE AT THE CREST AND ALONG THE SIDE SLOPES.
5. AFTER SUFFICIENT NEW CORE STONE HAS BEEN ADDED, REBUILD THE JETTY BY SETTING EXISTING
AT LEAST ONE ARMOR STONE. SEE SPEC SECTION 35 31 19, PARAGRAPH 2.2 FOR CORE STONE GRADATION.
ALONG THE CREST AND SIDE SLOPES. ALL CORE STONE INSTALLED SHALL BE COVERED BY A LAYER OF
4. ADD NEW CORE STONE AS NEEDED TO FILL THE REQUIRED BOTTOM ELEVATION OF THE ARMOR STONE
OF EXISTING ARMOR STONES ARE IN CONTACT WITH ADJACENT ARMOR STONE.
ARMOR STONES PROVIDE A BASE WHERE THE STONES ARE STABLE, WELL INTERLOCKED, AND ALL FACES
WHERE THE EXISTING ARMOR STONES ARE NO LONGER DISPLACED OR LOOSE AND THE EXISTING
CREST TO THE TOE OF THE REPAIR LIMIT. THE REPAIR AREA TOE OF SLOPE SHALL BE TO THE LOCATION
3. REMOVAL OF ARMOR STONE ALONG THE SIDE SLOPES SHALL BE FROM THE TOP OF THE SLOPE AT THE
MUST CONTINUE TO CUT THE SIDE SLOPE UNTIL THE CONDITIONS DEFINED IN NOTE 3 ARE FOUND.
UPON EXCAVATION, IF THE MARKED TOE DOES NOT MEET THE DEFINITION IN NOTE 3, THE CONTRACTOR
FOR LIMIT OF CUT. ONCE APPROVED, THE CONTRACTOR SHALL BEGIN STONE REMOVAL.
SEE NOTE 3 FOR REPAIR AREA TOE DEFINITION. THE CONTRACTOR SHALL RECEIVE COR CONCURRENCE
2. PRIOR TO REMOVAL OF ARMOR STONE, THE CONTRACTOR SHALL MARK THE TOE OF THE REPAIR AREA.
OF EXCAVATION SHOWN ON THIS SECTION IS APPROXIMATE.
STONE ALONG THE CREST AND LIMIT OF REPAIR SIDE SLOPES TO THE CORE STONE LAYER. THE LIMIT
1. FOR THE ENTIRE LENGTH OF WORK AREA 3, THE CONTRACTOR SHALL REMOVE THE EXISTING ARMOR
WORK AREA 3:
8. CORE STONE SHALL NOT BE INSTALLED WITHIN THE LIMITS OF WORK AREA 4.
REQUIRED FINISHED CREST ELEVATION AND SIDE SLOPES.
BE PLACED IN WORK AREA 4. THE AMOUNT OF ARMOR STONE ADDED SHALL BE SUFFICIENT TO MEET THE
7. THE CONTRACTOR SHALL ADD NEW 6-10 TON ARMOR STONES AS NEEDED. THE UPPER 50% OF SIZE RANGE SHALL
6. CONTRACTOR SHALL RESET ORIGINAL CREST STONES ON THE CREST TO THE MAXIMUM EXTENT POSSIBLE.
OF EXISTING STONE."
5. REUSE ALL EXISTING ARMOR STONE IN ACCORDANCE WITH SPEC SECTION 35 31 19, PARAGRAPH 3.5 "REUSE
AND NEW ARMOR STONE AS SHOWN ON THE TYPICAL SECTION.
4. AFTER THE STABLE BASE IS EXPOSED, THE CONTRACTOR SHALL REBUILD THE JETTY BY RESETTING EXISTING
OF EXISTING ARMOR STONES ARE IN CONTACT WITH ADJACENT ARMOR STONE.
ARMOR STONES PROVIDE A BASE WHERE THE STONES ARE STABLE, WELL INTERLOCKED, AND ALL FACES
WHERE THE EXISTING ARMOR STONES ARE NO LONGER DISPLACED OR LOOSE AND THE EXISTING
CREST TO THE TOE OF THE REPAIR LIMIT. THE REPAIR AREA TOE OF SLOPE SHALL BE TO THE LOCATION
3. REMOVAL OF ARMOR STONE ALONG THE SIDE SLOPES SHALL BE FROM THE TOP OF THE SLOPE AT THE
CONTINUE TO CUT THE SIDE SLOPE UNTIL THE CONDITIONS DEFINED IN NOTE 3 ARE FOUND.
EXCAVATION, IF THE MARKED TOE DOES NOT MEET THE DEFINITION IN NOTE 3, THE CONTRACTOR MUST
FOR LIMIT OF CUT. ONCE APPROVED, THE CONTRACTOR SHALL BEGIN STONE REMOVAL. UPON
SEE NOTE 3 FOR REPAIR AREA TOE DEFINITION. THE CONTRACTOR SHALL RECEIVE COR CONCURRENCE
2. PRIOR TO REMOVAL OF ARMOR STONE, THE CONTRACTOR SHALL MARK THE TOE OF THE REPAIR AREA.
OF EXCAVATION SHOWN ON THIS SECTION IS APPROXIMATE.
STONE ALONG THE CREST AND LIMIT OF REPAIR SIDE SLOPES TO THE CORE STONE LAYER. THE LIMIT
1. FOR THE ENTIRE LENGTH OF WORK AREA 4, THE CONTRACTOR SHALL REMOVE THE EXISTING ARMOR
WORK AREA 4:
D E
C E
M B
E R
M T
E S
S
IE
R
| G-001 |
| G-101 |
| C-101 |
| C-301 |
| C-302 |
File details come from the government source that posted it. Updated .