Amendment 0004.pdf
PDF 639 KB Posted
- Attached to
- Maintenance Dredging, Kennebec River, Maine
- Solicitation number
- W912WJ22B0019
About this file
This document is an amendment to a solicitation for maintenance dredging of the Kennebec River in Maine. The U.S. Army Corps of Engineers Engineering District New England issued the solicitation to dredge the river and transport dredged materials to designated placement sites using a previously established haul route. The amendment provides responses to contractor questions regarding equipment identification systems, notification procedures to lobster fishermen, and waiver of 30-day notice requirements due to the expedited procurement schedule. Eligible offerors must submit responses by the amended due date to be considered for the dredging work, which supports congressionally authorized navigation projects in the area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| Amendment 0004.pdf | ||
| Amendendment 0003.pdf | ||
| Specs.pdf | ||
| Drawings - KEN-SP-2022.pdf | ||
| W912WJ22B0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide responses to Requests for Information (RFIs). All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22B0019
X 9B. DATED (SEE ITEM 11)
01-Sep-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Sep-2022
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ22B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFIs
1. Specifications Section 01 54 50, page 3, paragraph 1.5 (AUTOMATIC IDENTIFICATION SYSTEM REQUIREMENTS) states; “All dredge and plant equipment shall be registered with the AUTOMATIC IDENTIFICATION SYSTEM (AIS) in order to ensure that the entire footprint of the Contract's working vessels and scows are available on marine trafficker's electronic chart displays.”
Q: Does this only apply to vessels exceeding 26’ in length, excluding sheer? Does it apply to survey vessels and crew boats?
GOVERNMENT RESPONSE: The specifications require the hopper dredge plant to be equipped with an Automatic Identification System. All other vessels operated by the contractor should be furnished with safety equipment in accordance with all Federal, State, Regional, and local laws and regulations.
2. In the State of Maine DEP Department Order (specifications pdf page 139 of 246), it includes the following requirements (Order page 10 of 14):
b. Clearly mark or designate the dredging area, the disposal area, and the transportation route;
c. No less than 30 days prior, provide written notice specifying the haul route and time periods of dredging operations to all members of Lobster Zone Council E for timely notice to move gear in the Haul route and or dredge envelope.
d. No less than 30 days prior, publish in a newspaper of general circulation in the area adjacent to the route the approved transportation route of the dredge spoils;
e. No less than 30 days prior, publish in a newspaper of general circulation in the area adjacent to the route a procedure that the applicant will use to respond to inquiries regarding the loss of fishing gear during the dredging operation.
Further, it states; “The applicant submitted a map that outlines the proposed transportation routes to the Bluff Head Disposal Area and the Jack Knife Ledge Disposal Area which was reviewed by DMR.”
Questions:
a) Is there an approved transportation (haul) route that has been previously established for the Popham Beach dredging? If so, please provide a map depicting the approved haul route.
GOVERNMENT RESPONSE: The previously established haul route for Popham Beach dredged material placement can be found at the end of Section 35 20 23.
b) For item b above, is there a specific (approved) method required for marking the dredging areas, the disposal area, and the transportation routes?
W912WJ22B0019
GOVERNMENT RESPONSE: The US Navy is the applicant for this permit and is required to comply with the requirements. The dredging work is being performed within the limits of a congressionally authorized FNP and delineation of the dredging areas is not required. The contractor will be required to remain in the designated haul route for the transportation of dredged material from the channel at Popham Beach to the Jackknife Ledge placement site
c) For items c-e above, there will not be a 30-day period available to accomplish these notifications, due to the expedited procurement and short dredging window. Will these 30-day requirements be waived for this procurement?
GOVERNMENT RESPONSE: The US Navy is the applicant for this permit and is required to comply with the requirements. The contractor is only responsible for publishing the Public Notice per Section 01 11 00 of the specifications. The contractor shall notify the public of this dredging project approximately four weeks before commencement of dredging operations at the site. This will require the contractor to publish the Public Notice shortly after the contract is awarded.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .