Drawings.pdf
PDF 4 MB Posted
- Solicitation number
- W912WJ22B0014
About this file
This solicitation package outlines requirements for a generator replacement project at Hodges Village Dam in Oxford, Massachusetts. The project includes installing a new 60kW diesel standby generator, coordinating with National Grid to install a new underground utility service, constructing underground duct banks and utility vaults, and upgrading existing electrical systems and equipment to comply with NFPA 70 standards. The solicitation was issued by the U.S. Army Corps of Engineers New England District. The package provides design drawings, specifications and schedules for the electrical work. Responses were due on June 10, 2022. The project aims to replace aging infrastructure and improve reliability of power supply to critical dam operations.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
C O
VE
R
S H
EE
T
AN
D
IN
D
EX
T
O D
R
AW
IN
G
S
J.
N
EW
TO
N /R
. G U
G O
J.
N
EW
TO
N /R
. G U
G O
M .G
O D
FR
EY
J.
N
EW
M
AN
AN
SI
D 1:
JU
N
E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
New England District
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET
APPROVED FOR TECHNICAL ADEQUACY BY:
TECHNICAL LEAD ENGINEER DATE
DATE
DATE
DATE
DATE
APPROVED BY:
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.
REVIEWED BY:
CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH
REVIEWED BY:
CHIEF, DESIGN BRANCH
CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCH
STANDBY GENERATOR INSTALLATION
AND ELECTRICAL UPGRADES
HODGES VILLAGE DAM
OXFORD, MASSACHUSETTS
W912WJ22B0014
JUNE 2022
GENERAL PLAN
ELECTRICAL NOTES
ELECTRICAL NEW WORK PART PLANS
ELECTRICAL DETAILS I
ELECTRICAL DETAILS II
ELECTRICAL DETAILS III
ELECTRICAL DEMOLITION ONELINE DIAGRAM
ELECTRICAL PROPOSED ONELINE DIAGRAM
ELECTRICAL SCHEDULES
DESIGN FILESHEET NO.
G-001
INDEX TO DRAWINGS
SHEET TITLE
G-101
E-001
E-101
E-501
E-502
E-503
ED601
E-601
E-602
THA-HV-129_G-001.DWG COVER SHEET AND INDEX TO DRAWING
THA-HV-129_G-101.DWG
THA-HV-129_E-001.DWG
THA-HV-129_E-101.DWG
THA-HV-129_E-501.DWG
THA-HV-129_E-502.DWG
THA-HV-129_E-503.DWG
THA-HV-129_ED-601.DWG
THA-HV-129_E-601.DWG
THA-HV-129_E-602.DWG
ELECTRICAL SITE DEMOLITION PLAN12 ESD101 THA-HV-129_ESD-101.DWG
ELECTRICAL DEMOLITION FLOOR PLANS13 ED101 THA-HV-129_ED-101.DWG
CIVIL DETAILS
C-501 THA-HV-129_C-501.DWG
CIVIL SITE PLAN NEW WORK
C-101 THA-HV-129_C-101.DWG
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
HODGES
VILLAGE
VERMONT
MASSACHUSETTS
NEW HAMPSHIRE
NORWICH
POND
HUNTINGTON
HOLYOKE
NORTHAMPTON
QUABBIN
RESERVOIR
WORCESTER
CHARLTON
SPRINGFIELD
CONNECTICUT
MASSACHUSETTS
WESTFIELD
R H
O D
E
IS
LA
N
D
QUABOAG
POND
PROJECT
LOCATION
VICINITY MAP
NOT TO SCALEC3
N
LOCATION PLAN
NOT TO SCALEC1
N
MAINE
AUGUSTA
BANGOR
ATLANTIC
OCEAN
HAMPSHIRE
NEW
PORTLAND
CONCORD
PORTSMOUTH
VT.
MASSACHUSETTS
BOSTON PROJECT
LOCATION
PROV.
R.I.
HARTFORD
CONN.
CAPE COD
CANADA
J.
N
N/A
N/A
Matt Tessier Text Box
1 JUN 22
CONFERENCE BUILDING
AUGUTTEBACK POND
HO
W
AR
TH
R O
AD
FR
EN
C H
R
IVER
OLD HOW
ARTH RD
C-101
HODGES VILLAGE POND
TEMPORARY CONSTRUCTION
STAGING AND STORAGE AREA
(10,000SF)
GATE TOWER
RV PARKING AREA
COMFORT STATION
NN
EXISTING UTILITY METER
ENTRANCE ROAD
PR
O D
U C
TI
O
N D
AT
A
1%
PR
O
D U
C
TI
O N
D
AT
A 2%
PR
O D
U C
TI
O
N D
AT
A
3%
PR
O
D U
C
TI
O N
D
AT
A 4%
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
B1 SCALE: 1" = 100'
GENERAL PLAN
SYMBOL DESCRIPTION
LEGEND
PROPOSED UTILITY POLE
EXISTING 6-FOOT CHAINLINK FENCE
EXISTING GUARDRAIL
STAGING AND STORAGE AREAS
LIMIT OF WORK
X X X X
EEE E EXISTING OVERHEAD PRIMARY ELECTRICAL
NEW UNDERGROUND PRIMARY ELECTRICAL AND COMMUNICATION LINE
EXISTING STRUCTURES
NEW UNDERGROUND SECONDARY ELECTRICAL LINE ES ES
GENERAL NOTES:
1. ALL WORK AND MATERIALS PROVIDED SHALL CONFORM WITH THE LINES, GRADES, ELEVATIONS, DIMENSIONS, MATERIAL REQUIREMENTS, AND TESTING REQUIREMENTS THAT ARE SPECIFIED IN THE CONTRACT DRAWINGS AND SPECIFICATIONS.
2. THE GOVERNMENT WILL NOT BE RESPONSIBLE FOR MEANS, METHODS, PROCEDURES, TECHNIQUES, OR SEQUENCES OF CONSTRUCTION
THAT ARE NOT SPECIFIED IN THE CONTRACT DOCUMENTS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT AND FIELD ENGINEERING REQUIRED FOR COMPLETION OF THIS PROJECT. THE
GOVERNMENT WILL NOT PROVIDE SURVEY SERVICES.
4. THE CONTRACTOR SHALL VERIFY THAT ACTUAL SITE CONDITIONS ARE CONSISTENT WITH THE EXISTING CONDITIONS DEPICTED ON THE CONTRACT DRAWINGS. DISCREPANCIES, OMISSIONS, AND ERRORS SHALL BE REPORTED TO THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) PRIOR TO THE START OF CONSTRUCTION.
5. THE CONTRACTOR SHALL PROTECT ALL AREAS IN AND AROUND THE WORK AREAS. THIS INCLUDES THE PAVEMENT, STRUCTURES, VEGETATION, UTILITIES AND ANY OTHER SITE FEATURES AT THE PROJECT LOCATION. DAMAGES TO THE EXISTING PAVEMENT, OR CONCRETE, SHALL INCLUDE, BUT ARE NOT LIMITED TO, CHIPPING, CRACKING, INDENTATIONS AND SCUFFING. THE CONTRACTOR SHALL ALSO MINIMIZE DISTURBANCE TO LIMIT REMOVAL OF TREES AND OTHER EXISTING VEGETATION. AREAS NOT SPECIFICALLY DESIGNATED FOR REMOVAL SHALL BE PRESERVED AND PROTECTED WHETHER SHOWN OR NOT SPECIFICALLY SHOWN ON THE CONTRACT DRAWINGS.
ANY DAMAGES CAUSED BY THE CONTRACTOR, SHALL BE REPAIRED AND RESTORED TO ORIGINAL CONDITIONS OR BETTER AT THE CONTRACTOR'S EXPENSE. REFER TO SPECIFICATION SECTION 01 11 00, SUBPART DAMAGED PROPERTY FOR MORE DETAILS.
6. ALL PRECAST CONCRETE PRODUCTS SHALL BE INSPECTED AT THE LOCATION OF MANUFACTURER. APPROVED PRECAST CONCRETE PRODUCTS WILL BE STAMPED OR HAVE SUCH IDENTIFICATION NOTING THAT INSPECTION HAS BEEN CONDUCTED BY THE PRECASTER.
PRECAST CONCRETE PRODUCTS WITHOUT PROOF OF INSPECTION SHALL NOT BE APPROVED FOR INSTALLATION.
7. DISPOSAL OF ALL DEMOLISHED MATERIALS INCLUDING EXISTING MISCELLANEOUS CONSTRUCTION DEBRIS AND FILL IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE DISPOSED OF OFFSITE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL MUNICIPAL REQUIREMENTS AT NO ADDITIONAL COST TO THE GOVERNMENT. RECYCLE DEMOLISHED MATERIALS TO THE GREATEST EXTENT POSSIBLE. REFER TO SPECIFICATION SECTION 01 74 19 AND SPECIFICATION SECTION 31 23 00.
8. AT COMPLETION OF WORK ALL DISTURBED AREAS AND NEW PAVEMENT SHALL BE SMOOTH AND FREE OF DEPRESSIONS WITH
SUFFICIENT SLOPE TO ENSURE POSITIVE DRAINAGE AND NO PONDING.
8. THE CONTRACTOR SHALL CALL DIG SAFE AT 811 OR 1-888-DIG-SAFE NOT LESS THAN 72 HOURS PRIOR TO THE START OF ANY EXCAVATION FOR VERIFICATION OF UNDERGROUND UTILITY LOCATIONS. SINCE DIG SAFE MAY NOT IDENTIFY ALL BELOW GRADE UTILITIES ON GOVERNMENT PROPERTY, THE CONTRACTOR SHALL ENGAGE THE SERVICES OF THE HODGES VILLAGE DAM PROJECT MANAGER, COR, AND PRIVATE UTILITY LOCATING COMPANIES FOR ADDITIONAL ASSISTANCE WITH LOCATING UNDERGROUND UTILITIES. REFER TO
SPECIFICATION SECTION 31 23 00, SUBPART UNDERGROUND UTILITIES FOR MORE DETAILS.
C EXISTING COMMUNICATION MANHOLE
SS SS EXISTING SANITARY SEWER
G-101
G
EN
ER
AL
P
LA
N
J.
N
EW
TO
N /R
.G U
G O
J.
N
EW
TO
N /R
.G U
G O
M .G
O D
FR
EY
L.
TH
IB
O
D
EA
U
AN
SI
D 1"
JU
N
E
EXISTING UNDERGROUND SECONDARY ELECTRIC LINE
SLOPE OF BANK
100' 200'0
ES ES
E/C
NEW OVERHEAD PRIMARY ELECTRICAL LINEE E
NEW UNDERGROUND PRIMARY ELECTRICAL LINEE E
EXISTING TREES
E EXISTING ELECTRICAL MANHOLE
1 PHOTO DIRECTION AND LOCATION INDICATOR
PHOTOS ATTACHED TO SPECIFICATIONS
EXISTING PAVEMENT
EXISTING UNDERGROUND COMMUNICATION LINE COMM
NEW UNDERGROUND COMMUNICATION LINE COMM
D EXISTING UTILITY STORM DRAINAGE
L.
T.
SS
SS
SS
SS
SS
SS
SS
COMM
COMM
COMM
COMM
COMM
COMM
COMM
D
D
D
D
D
D
D D
D
DD515
CC
CC
CC
W W
W W
E
STONE PROTECTION
BOTTOM OF SLOPE/EDGE
RIPRAP SLOPE
HOWARTH RD
STONE PROTECTION
SLOPE
EXISTING
GATE BOLLARD
EXISTING
GUARDRAIL
EDGE OF
PAVEMENT
NN
EXISTING
UTILITY POLE
PROPOSED UTILITY POLE
(INSTALLED BY NATIONAL GRID)
(NATIONAL GRID P-27-3) PROPOSED ELEC
HAND HOLE
(NATIONAL GRID PB-1)
(USACE EH-1)
PROPOSED OH BY UTILITY
(INSTALLED BY NATIONAL
GRID)
GRASS AREA
LIMITS OF WORK
6"
6"
6"
EDGE OF
PAVEMENT
DAM CREST
VEGETATED
AREA
PARKING AREA
GRASS AREA
ES ES
ES ES ES ES ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES ES ES ES ES ES ES ES ES
VEGETATED
AREA
E
E
E
E
E E
E E
E E
E E
E/C
E/C
E/C
E/C
E/C
E/C E/C
E/C
E/C
E E
PROPOSED COMM
HAND HOLE
(USACE CH-1)
ES
/C
ES
ES
ES
ES
COMFORT
STATION
EXISTING
ENTRANCE GATE
EXISTING
SIDEWALK
EXISTING
SIDEWALK
10.6
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
DBDB
DA
DA
DA
DA
9(TYPICAL)
10 (TYPICAL)
STONE PROTECTION
AREA
CONFERENCE BUILDING
EXISTING
ACCESS GATE
BU
SH
TREE
TREE
SIGN
SIGN
SS
SS
SS
SS
SS
SS
SS
W W
W W
PROPOSED
COMM HAND HOLE
(USACE CH-2)
PROPOSED
ELEC MANHOLE
(NATIONAL GRID MH-2)
(USACE MH-2)
PROPOSED
COMM HAND HOLE
(USACE CH-3)
EXISTING
PIEZOMETER
PROPOSED TRANSFORMER CONCRETE PAD
WITH OIL CONTAINMENT SYSTEM
(NATIONAL GRID PAD-1)
PROPOSED GENERATOR CONCRETE PAD
PROPOSED GENERATOR
REPLACE EXISTING
BUILDING MOUNTED
PULL BOXES
REPLACE EXISTING
DISTRIBUTION PANEL
PROPOSED BOLLARDS (14)
REPLACE CONDUCTORS
IN EXISTING CONDUIT
(COMFORT STATION
TO RV PEDESTAL)
EXISTING UNDERGROUND
INSTRUMENTATION CONDUIT
COMM BOX
6.0
EXISTING 150A
SERVICE
DISCONNECT
NEW UTILITY METER
AND METER SOCKET
M
NEW UTILITY
METER
REFER TO A1 ON SHEET E-101
REFER TO E8
ON SHEET E-101
REPLACE EXISTING CONDUIT
FITTING RV PEDESTAL
SEE SHEET E-601
RV PARKING AREA
M
PROPOSED TRANSFORMER
(INSTALLED BY NATIONAL GRID)
E
E
COMM
COMM
COMM
CA
CA
CONCRETE ENCASED
DUCTBANK SECTION
CC-CC
CONCRETE ENCASED
DUCTBANK SECTION
CC-CC
PRIMARY CONDUCTORS FROM UTILITY POLE TO
TRANSFORMER TO BE INSTALLED BY NATIONAL
GRID.
EXISTING
UTILITY POLE
ES
ES
ES
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C
C
C
E
E
E C
CA
CA
CA
CA
COMM
CB
CB
CONCRETE ENCASED
DUCTBANK SECTION
CA-CA
REFER TO C8 ON
SHEET E-101
SEE DETAILS B8 AND E8 ON SHEET E-504.
SEE DETAILS A1 AND D1 ON SHEET E-503.
SCALE:1"= 30'
SITE PLAN - NEW WORKB1
C-101
C
IV
IL
S
IT
E
PL
AN
N
EW
W O
R K
R .G
U G
O /J
.N
EW
TO
N
R .G
U G
O /J
.N
EW
TO
N
M .G
O D
FR
EY
L.
TH
IB
O
D
EA
U
AN
SI
D 1"
0'
JU
N
E
SEE DETAILS A1 AND D1 ON SHEET E-504.
SEE DETAIL A4 ON SHEET E-503.
SEE DETAIL D4 ON SHEET E-503.
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
6 SEE DETAIL E8 ON SHEET E-101.
7 SEE DETAIL A1 ON SHEET E-101.
SEE DETAIL D5 ON SHEET E-501 FOR
REINFORCED CONCRETE DUCTBANK SECTIONS.
SEE DETAIL B5 ON SHEET E-501 FOR DIRECT
BURIED DUCTBANK SECTIONS.
11 EXISTING STONE PROTECTION ON SITE, REMOVE
AND STOCKPILE PRIOR TO TRENCH DIGGING.
AFTER WORK IS COMPETE RESET THE STONE TO
MATCH EXISTING GRADE. STONE PROTECTION
SIZE RANGES FROM 50 TO 500 POUNDS. SEE
DETAIL D4 ON SHEET E-504 FOR DUCTBANK
TRENCH DETAIL.
KEYED NOTES:
8 SEE DETAIL A1 ON SHEET E-601.
NOTES:
1. REFER TO SHEET E-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS,
AND GENERAL NOTES.
2. UNLESS OTHERWISE INDICATED, ALL EXISTING ELECTRICAL
EQUIPMENT AND DISTRIBUTION SHALL REMAIN (XM).
3. REFER TO ED-601 AND E-601 FOR RISER DIAGRAMS DEMOLITION AND
NEW WORK RESPECTIVELY.
4. UTILITY POLE, PRIMARY CONDUCTORS, TRANSFORMER, AND
ELECTRICAL METERS TO BE INSTALLED BY NATION GRID. REFER TO
SPEC SECTION 01 11 00 PARAGRAPH 1.2 FOR WORK COVERED BY
CONTRACT.
12 UTILITY METER INSTALLED NY NATIONAL GRID,
REFER ON SHEET E-601 FOR METER SOCKET
INSTALLATION.
30' 60'0
13 SEE DETAIL C8 ON SHEET E-101
EXISTING CONDUIT COUPLING AT RV
PEDESTAL, NOT LISTED OR SUITABLE FOR
THE APPLICATION, SHALL BE REPLACED
WITH NEW SCHEDULE 40 PVC CONDUIT
EXPANSION COUPLING. PROVIDE NEW PVC
CONDUIT PIPE STRAPS ON EXISTING
WOODEN POST TO REPLACE EXISTING
CONDUIT SUPPORTS.
6' -0
UNPAVED RIPRAP SLOPE
STABLE SLOPE OR
TRENCH PROTECTION
(SEE NOTE 4)
FINISHED GRADE
6" TOPSOIL AND SEED
(SEE NOTE 3)
SEE NOTE 5 SEE NOTE 6
6" PLASTIC WARNING TAPE
SEE NOTE 7
REFER TO DETAILS A7
AND D7 ON SHEET E-501
SEE NOTE 8
B*
A*
2'-0"
1' -6
4' -0
6"
#6@12 T&B EW
COMPACT
STRUCTURAL
FILL
ANCHOR BOLTS SIZE SPACING.
LOCATION EMBEDMENT DEPTH AND
TYPE BY EQUIPMENT NFG
UNDISTURBED SUBGRADE
1. REINFORCED CONCRETE SHALL COMPLY WITH ACI 318.
2. MINIMUM CONCRETE STRENGTH AT 28 DAYS: STRUCTURAL CONCRETE: f'c = 5000PSI
3. REINFORCING STEEL SHALL BE NEW BILLET STEEL CONFORMING TO ASTM SPECIFICATION A615 GRADE 60.
4. REINFORCING STEEL FABRICATION SHALL BE IN COMPLIANCE WITH THE CRSI MANUAL OF STANDARD PRACTICE.
5. NO BAR SPLICES WILL BE PERMITTED FOR USE AS REINFORCEMENT OF THE PAD.
6. DETERMINE CLEAR CONCRETE COVER BASED ON EXPOSURE TO THE ENVIRONMENT. REINFORCING STEEL SHALL
HAVE THE FOLLOWING MINIMUM CLEAR CONCRETE COVER UNLESS OTHERWISE NOTED.
CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3 INCHES
CONCRETE SURFACES IN CONTACT WITH SOIL, WATER OR EXPOSED TO WEATHER: 2 INCHES
7. ALL EXPOSED CORNERS OF CONCRETE TO HAVE A 3/4" MINIMUM CHAMFER UNLESS OTHERWISE NOTED.
8. PIPE SLEEVES, CONDUITS OR OTHER ITEMS TO BE EMBEDDED OR PASS THROUGH THE CONCRETE ARE NOT SHOWN
AND SHALL BE COORDINATED BY THE CONTRACTOR.
9. PLACE 6 INCHES OF TOPSOIL AND SEED IN ALL AREAS WITH EXISTING LANDSCAPING. ALONG THE WIDTH OF THE TRENCH, MOUND TOPSOIL TO A HEIGHT OF 4 INCHES ABOVE FINISHED GRADE TO ALLOW FOR SETTLEMENT.
10. REUSE SUITABLE EXCAVATED MATERIAL AS BACKFILL. IF NONE IS SUITABLE THEN BACKFILL WITH SELECTED FILL.
BACKFILL IN LAYERS.
CAST-IN PLACE CONCRETE NOTES:
CONCRETE GENERATOR PAD PLAN
SCALE: N.T.SD1
CONCRETE GENERATOR PAD SECTION
SCALE: N.T.SA1
E-504 A1
A
10'-6" 5'-6"
TOP OF
CONCRETE
LOCATION
NEW GENERATOR
FOUNDATION SCHEDULE
B
FOUNDATION NOTES:
1. A MINIMUM OF 2 FOOT CLARENCE AROUND THE EQUIPMENT IS REQUIRED.
2. *INDICATES DIMENSIONS AND /OR INFORMATION TO BE COORDINATED BY THE
CONTRACTOR WITH THE MANUFACTURERS OF THE APPROVED EQUIPMENT PRIOR
TO FABRICATION AND CONSTRUCTION.
3. FOUNDATIONS SHALL NOT BE FABRICATED OR CONSTRUCTED UNTIL THE
EQUIPMENT LOADS HAVE BEEN SUBMITTED AND ADJUSTED TO THE FOUNDATION
DESIGN, IF REQUIRED BY THE COR, HAVE BEEN COMPLETED.
4. FOR FOUNDATION LOCATIONS AND OPERATIONS ORIENTATION SEE CIVIL AND
ELECTRICAL, UNLESS OTHER WISE INDICATED.
5. COMPACTED STRUCTURAL FILL SHALL BE PLACED IN LIFTS NO GREATER THAN 12"
AND COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY. STRUCTURAL FILL
SHALL MEET THE REQUIREMENTS OF MASSDOT STANDARD SPECIFICATIONS FOR
HIGHWAYS AND BRIDGES M1.03.1 PROCESSED GRAVEL FOR SUBBASE IN
ACCORDANCE WITH ASTM D-1557 TEST PROCEDURE.
C-501
C
IV
IL
D
ET
AI
LS
R .G
U G
O
R .G
U G
O
M .G
O D
FR
EY
L.
TH
IB
O
D
EA
U
AN
SI
D N
.T .S
JU
N
E
D4 SCALE: N.T.S
DUCTBANK TRENCH DETAIL
1. SELECT MATERIAL AND COMPACTION REQUIREMENTS SHALL MEET THE REQUIREMENTS OF SECTION 31 23 00.
2. TRENCHES SHALL BE COMPLETELY DEWATERED PRIOR TO PLACEMENT OF CONDUIT BEDDING MATERIAL AND KEPT DEWATERED
DURING INSTALLATION OF PIPE AND BACKFILL.
3. PLACE 6 INCHES OF TOPSOIL AND SEED IN ALL AREAS WITH EXISTING LANDSCAPING. ALONG THE WIDTH OF THE TRENCH, MOUND
TOPSOIL TO A HEIGHT OF 4 INCHES ABOVE FINISHED GRADE TO ALLOW FOR SETTLEMENT
4. WHERE STABLE SLOPES CANNOT BE MAINTAINED TO MEET THE REQUIREMENTS OF EM 385-1-1, BRACING AND SHEETING OR OTHER TRENCH PROTECTION SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH EM 385-1-1.
ALL SUCH TRENCH PROTECTION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
5. REUSE SUITABLE EXCAVATED MATERIAL AS BACKFILL. IF NONE IS SUITABLE THEN BACKFILL DUCTBANK WITH SELECTED FILL.
BACKFILL IN LAYERS.
6. SAND BACKFILL. WHEN PLACING SAND POUR SLOWLY AND DISTRIBUTE IT CAREFULLY SO AS NOT TO DISLODGE THE SPACERS.
7. PLASTIC WARNING TAPE SHALL BE "EXTRA STRETCH," 6" WIDE. COLOR CODE SHALL BE AS FOLLOWS: RED-ELECTRIC, ORANGE-COMMUNICATIONS. IMPRINTED TEXT SHALL IDENTIFY DUCTBANK SERVICE. UTILIZE NON-DETECTABLE TAPE FOR
ELECTRIC DUCTS AND METALLIZED DETECTABLE TAPE FOR COMMUNICATION DUCTS.
8. REINSTALL EXISTING STONE PROTECTION TO MATCH EXISTING GRADE. STONE PROTECTION RANGES FROM 50 TO 500 POUNDS.
" M
IN
" M
AX
3' -0
E8 SCALE: N.T.S
STEEL PIPE BOLLARD (IN GRASS)
CONCRETE FILLED
6" RIGID GALVANIZED STEEL
PIPE OR PAINTED STEEL
(SEE NOTE 2)
FINISHED
GRADE
12" DIAMETER (MIN)
CONCRETE FOOTING
(SEE NOTE 1)
12" MIN
6"
9.0' MIN
6"
6"
4.0' MIN
1" 10"
35"
60"
7.35" OUTSIDE DIAMETER
7.10" INSIDE DIAMETER
NOMINAL WALL 0.125"
B8 SCALE: N.T.S
STEEL PIPE BOLLARD LAYOUT
NOTES:
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
NOTES:
1. CONCRETE: 4000 PSI AT 28 DAYS.
2. STEEL PIPE SHALL MEET ASTM A53/A53M, GRADE B, SCHEDULE 40, HOT-DIP GALVANIZED FINISH.
GALVANIZED FINISH SHALL BE A ZINC COATING WITH A MINIMUM THICKNESS OF 2.0 OUNCES PER
SQUARE FOOT AND BE IN COMPLIANCE WITH ASTM A123/123M.
3. THE BOLLARD COVER SHALL BE YELLOW AND MADE OF HDPE PLASTIC AND HAVE A NOMINAL
WALL THICKNESS OF 1/4 INCH. THE PLASTIC SHALL HAVE ULTRAVIOLET AND ANTISTATIC
ADDITIVES. THE BOTTOM OF THE BOLLARD COVER SHALL SIT FLUSH WITH TOP OF
PAVEMENT/EXISTING GRADE.
5.0'
CL
CL
SEE NOTE 9
SEE NOTE 10
EQUIPMENT LEGEND
DISCONNECT SWITCH (UNFUSED)
DISCONNECT SWITCH (FUSED)
FLUSH MOUNTED PANELBOARD, REFER TO SCHEDULES
XL
XD
XN
XR
XM
RESPONSIBLE FOR MAINTAINING CIRCUITRY TO DEVICES
TO POWER SOURCE AND LABEL BREAKER IN
PANELBOARD AS SPARE. CONTRACTOR SHALL BE
CONDUIT AS REQUIRED SO AS TO PROVIDE A
COMPLETE OPERATIONAL INSTALLATION.
TO BE REMOVED. CUT BACK AND MAKE SAFE ALL
ASSOCIATED BRANCH CIRCUIT WIRING CONDUIT BACK
EQUIPMENT TO BE REMOVED AND REPLACED WITH NEW.
"XL" ADJACENT TO EQUIPMENT DENOTES RELOCATED
EXISTING AT NEW LOCATION
UNAFFECTED BY DEMOLITION.
"XD" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XR" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XN" ADJACENT TO EQUIPMENT DENOTES EXISTING
"XM" ADJACENT TO EQUIPMENT DENOTES EXISTING
SYMBOLS OUT OF FUNCTION DENOTES EXISTING
TO BE RELOCATED AS SHOWN. CUT BACK AND/OR
EXTEND EXISTING BRANCH CIRCUIT WIRING AND
EQUIPMENT TO REMAIN.
EXISTING EQUIPMENT LEGEND
BUILDING GROUNDING GRID LEGEND
BOLTED CONNECTION
EXOTHERMICALLY WELDED CONNECTION
GROUND ROD
GROUNDING CONDUCTOR
GENERAL NOTES
TRANSFER SWITCH
AMPERES
AMERICANS WITH DISABILITIES ACT
AMPERE INTERRUPTING CAPACITY
AUTOMATIC TRANSFER SWITCH
ALUMINUM
INSTITUTE
ARCHITECT
AMERICAN NATIONAL STANDARDS
AUTHORITY HAVING JURISDICTION
ABOVE FINISH GRADE
AIR HANDLING UNIT
ABOVE FINISH FLOOR
AMERICAN WIRE GAUGE
AUTOMATIC TEMPERATURE CONTROL
CONDUIT
CIRCUIT
COLUMN
CONTROL POWER TRANSFORMER
CIRCUIT BREAKER
CENTERLINE
CATALOG
CURRENT LIMITING FUSE
BUILDING
COPPER
DRAWING
CURRENT TRANSFORMER
ELECTRICAL CONTRACTOR
EXHAUST FAN
EMERGENCY
ELECTRICAL METALLIC TUBING
GROUND FAULT INTERRUPTER
GROUND OR GROUNDING
FLEXIBLE METAL CONDUIT
FULL LOAD AMPERES
ISOLATED GROUND
HAND, OFF, AUTOMATIC SWITCH
INTERLOCK
INSTITUTE OF ELECTRICAL AND
THOUSAND CIRCULAR MILS
ELECTRONIC ENGINEERS
GALVANIZED RIGID METALLIC CONDUIT
HOA
IG
IEEE
INT
KCMIL
FLA
FT
FMC
GFI
GRMC
GND,G
FEET
EM
EMT
F FUSE
CU
CT
DWG
EC
EF
CB
CKT
CPT
CLF
COL
CL
ATC
AWG
CAT
C
BLDG
AHU
AIC
AL
ATS
ARCH
ANSI
A
AFG
AFF
AHJ
PT POTENTIAL TRANSFORMER
PHASE
QUANTITY
REQUIRED
ROOF TOP UNIT
TELEPHONE
POLYVINYL CHLORIDE
RIGID METAL CONDUIT
ROOT MEAN SQUARED
RIGID NON-METALLIC CONDUIT
BREAKER
UNIT HEATER
TRANSFORMER
WEATHERPROOF
WATER HEATER
UNLESS OTHERWISE NOTED
UNDERGROUND OR UNDERGRADE
UNDERWRITERS LABORATORIES
UNINTERRUPTIBLE POWER SUPPLY
THERMAL MAGNETIC CIRCUITTMCB
WH
XFMR
WP
W V
DELTA
WYE
WIRE
VOLT
UG
UL
UPS
UH
UON
S
RTU
RNMC
SW
TEL
SWITCH
SPARE
PWR
QTY
PVC
RMC
RMS
REQ'D
POWER
KILOWATTS
CONDUIT
LIGHTING
MISCELLANEOUS
MAIN LUGS ONLY
KILOVOLT AMPERES
NORMALLY CLOSED
MAIN CIRCUIT BREAKER
MOTOR CONTROL CENTER
MOTOR CIRCUIT PROTECTOR
LIQUIDTIGHT FLEXIBLE METAL
ASSOCIATION
NOT TO SCALE
PUSHBUTTON, PULL BOX
NOT IN CONTRACT
NATIONAL ELECTRICAL
NATIONAL ELECTRIC CODE (NFPA 70)
MANUFACTURES ASSOCIATION
NATIONAL FIRE PROTECTION
PROVIDED UNDER OTHER SECTIONS
NORMALLY OPEN OR NUMBERNO
NTS
POS
PNL
P
PB
PANEL
POLE
NEC
NEMA
NIC
NFPA
MCB
MCC
MCP
MLO
NC
MISC
kVA,KVA
LFMC
GENERAL ABBREVIATIONS
DOWN CONDUCTOR WITH GROUND ROD
AIR TERMINAL
BOLTED BONDING CONNECTION
LIGHTNING PROTECTION CABLE
EXOTHERMIC BONDING CONNECTION
LP
CABINET UNIT HEATERCUH
IN EXISTING LOCATION.
TO BE REMOVED, STORED, CLEANED AND REINSTALLED
"XS" ADJACENT TO EQUIPMENT DENOTES EXISTINGXS
LIGHTNING PROTECTION LEGEND
G
Ø Y
BUILDING SYSTEM GROUND BUS
HPF HIGH POWER FACTOR
N E
L
TS*
"ATS" DENOTES AUTOMATIC TRANSFER SWITCH
"MTS" DENOTES MANUAL TRANSFER SWITCH
CIRCUITRY, RACEWAYS
AND FEEDERS LEGEND
M
CB1 ENCLOSED CIRCUIT BREAKER. "1" INDICATES GATE NUMBER
UTILITY METER OR PANELBOARD METER
EPO EMERGENCY POWER OFF BUTTON. "WP" INDICATES
WEATHERPROOF
WP
1. ELECTRICAL CONTRACTOR SHALL PROVIDE TEMPORARY BACK UP GENERATOR TO
FULLY SUPPORT THE SITE FOR THE ENTIRETY OF INTERRUPTIONS EXCEEDING
24-HOURS TO EXISTING ELECTRIC SERVICES AND SYSTEMS. REFER TO SPECIFICATION
SECTION 01 11 00, PARAGRAPH 1.2.1 FOR ADDITIONAL INFORMATION. ANY
INTERRUPTIONS SHALL BE APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR).
2. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO HAVE THE PROPOSED
ELECTRICAL MATERIAL IN PLACE PRIOR TO DE-ENERGIZING POWER TO ANY USACE
EQUIPMENT IN ORDER TO MINIMIZE ELECTRICAL CUT-OVER SHUT DOWN. AS NOTED
ABOVE, TEMPORARY BACKUP POWER SHALL BE PROVIDED TO MITIGATE ANY
INTERRUPTIONS TO EXISTING ELECTRICAL SERVICES AND SYSTEMS. THE
CONTRACTOR SHALL COORDINATE SHUT DOWN REQUIREMENTS WITH THE DISTRICT
OFFICE TO BETTER UNDERSTAND CONSTRUCTION EXPECTATIONS. REFER TO
SPECIFICATION SECTION 01 11 00, PARAGRAPH 1.2.1 FOR ADDITIONAL INFORMATION.
3. ALL WIRING SHALL BE RUN CONCEALED UNLESS SPECIFIED OTHERWISE.
4. ALL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER,
RECTILINEAR TO BUILDING STRUCTURE.
5. ALL COMPONENTS SHOWN ON THE RISER DIAGRAMS, BUT NOT ON THE PLAN OR VICE
VERSA, SHALL BE INCLUDED AS IF SHOWN ON BOTH.
6. CONDUIT HOMERUNS SHOWN ON THE DRAWING WITH MORE THAN 3 CURRENT
CARRYING CONDUCTORS ARE SHOWN DIAGRAMMATICALLY. CONTRACTOR SHALL NOT
INSTALL MORE THAN 3 CURRENT CARRYING CONDUCTORS IN A RACEWAY UNLESS
INSTALLATION COMPLIES WITH ARTICLE 310 OF THE NFPA 70, NOTES TO AMPACITY
TABLES REGARDING CONDUCTOR ADJUSTMENT FACTORS. ELEMENTS OF THE
ELECTRICAL WORK SHALL BE INSTALLED SUCH THAT AT COMPLETION THE ELEMENT
SHALL BE "FULLY AND REASONABLY ACCESSIBLE".
7. ELEMENTS OF THE ELECTRICAL WORK INCLUDE, BUT ARE NOT LIMITED TO PANELS,
SWITCHBOARDS, MOTOR CONTROLS, TRANSFORMER, DISCONNECTS, JUNCTION
BOXES, AND ALL MAINTENANCE ACCESS POINTS INCLUDING CABLE PULL SPACE.
8. "FULLY AND REASONABLE ACCESSIBLE" SHALL BE DEFINED AS; CAPABLE OF BEING
ACCESSED FOR SERVICE, REPAIR OR REPLACEMENT BY AN AVERAGE SIZED
INDIVIDUAL, ON A LADDER IF NECESSARY, AND CAPABLE OF BEING SERVICED OR
REMOVED WITHOUT REMOVING, MODIFYING OR DISTORTING OTHER COMPONENTS OF
THE WORK OF OTHER TRADES. CONFLICTS WITH MEETING THIS REQUIREMENT SHALL
BE BROUGHT TO THE ATTENTION OF THE COR IN A TIMELY MANNER.
9. EACH BRANCH CIRCUIT SHALL INCLUDE A SEPARATE NEUTRAL CONDUCTOR FOR EACH
BRANCH CIRCUIT, UNLESS NOTED OTHERWISE.
10. THE ELECTRICAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS TO INSURE THAT
THE SCOPE WILL FIT WITHIN THE EXISTING SITE AND STRUCTURE IN THE MANNER
INTENDED AND SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE COR
PRIOR TO ANY ROUGH-INS, FABRICATION, OR PERFORMING ANY WORK IN THE AREA
INVOLVING DIFFERENCES. NOTIFICATION SHALL BE IN THE FORM OF A DRAWING OR
SKETCH INDICATING FIELD MEASUREMENTS AND NOTES RELATED TO THE AREA.
11. PROVIDE ITEMS REFERRED TO IN SINGULAR NUMBER IN CONTRACT DOCUMENTS IN
QUANTITIES NECESSARY TO COMPLETE WORK.
12. REFER TO NFPA 70E AND THE CONTRACT DOCUMENTS FOR REQUIRED ARC FLASH
LABELING REQUIREMENTS.
13. PERFORM WORK AND PROVIDE MATERIALS AND EQUIPMENT AS SHOWN IN THE
CONTRACT DOCUMENTS. COORDINATE ELECTRICAL WORK WITH ALL TRADES AND
SPECIFICATION SECTIONS.
14. GIVE NOTICES, FILE PLANS, OBTAIN PERMITS AND LICENSES, PAY FEES AND BACK
CHARGES, AND OBTAIN NECESSARY APPROVALS FROM AUTHORITY HAVING
JURISDICTION (AHJ) PRIOR TO INSTALLATION OF EQUIPMENT.
15. PERFORM WORK AS SHOWN IN THE CONTRACT DOCUMENTS, AS REQUIRED BY CODES,
REGULATIONS, STANDARDS, AND LAWS OF LOCAL, STATE, AND FEDERAL
GOVERNMENTS.
16. MATERIAL AND EQUIPMENT SHALL BE UL, NEMA, ANSI, IEEE, ADA & ABA LISTED FOR
INTENDED SERVICE. MATERIAL AND INSTALLATION SHALL MEET REQUIREMENTS OF
NATIONAL AND STATE ELECTRICAL CODES.
17. MAINTAIN RECORD DRAWINGS ON SITE. RECORD SET MUST BE COMPLETE, CURRENT,
AND AVAILABLE FOR INSPECTION AS REQUESTED BY THE COR.
18. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS.
PROVIDE INFORMATION AND COMPONENTS SHOWN ON RISER DIAGRAMS BUT NOT
SHOWN ON PLANS, AND VICE VERSA, AS IF EXPRESSLY REQUIRED ON BOTH.
19. ADDRESS QUESTIONS REGARDING DRAWINGS TO COR IN WRITING BEFORE AWARD OF
CONTRACT. OTHERWISE, COR INTERPRETATION OF MEANING AND INTENT OF
DRAWINGS SHALL BE FINAL.
20. DEVIATION FROM CONTRACT DOCUMENTS, OR PROPOSED SUBSTITUTION OF
MATERIALS OR EQUIPMENT FOR THOSE SPECIFIED, SHALL BE REQUESTED IN
SEPARATE LETTER, WHETHER DEVIATIONS ARE DUE TO FIELD CONDITIONS, STANDARD
SHOP PRACTICE, OR OTHER CAUSE.
21. BRANCH CIRCUIT WIRING MAY NOT BE SHOWN GRAPHICALLY ON DRAWINGS AND MAY
BE INDICATED BY CIRCUIT NUMBERS BESIDE FIXTURES, DEVICES AND EQUIPMENT.
PROVIDE COMPLETE WIRING SYSTEM WHETHER OR NOT INDICATED GRAPHICALLY.
PHASE BALANCE ALL PANELBOARDS IN THE FIELD.
22. ALL FIREPROOFING FOR ELECTRICAL PENETRATIONS SHALL BE PROVIDED BY THE
ELECTRICAL CONTRACTOR.
23. SYSTEMS FEEDERS AND BRANCH CIRCUITS WHICH PASS THROUGH ALTERED AREAS
AND SERVE OTHER AREAS SHALL BE MAINTAINED AS REQUIRED AND AS DIRECTED BY
THE ENGINEER.
24. FURNISH AND INSTALL NAMEPLATES ON ALL ELECTRICAL EQUIPMENT (SCREW ON
TYPE) AND TYPEWRITTEN SCHEDULES OF CIRCUITS IN ALL DISTRIBUTION
PANELBOARDS, PANELBOARDS, TRANSFER SWITCHES, TRANSFORMERS, AND
DISCONNECT SWITCHES.
25. ALL GROUNDING SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 70.
EP EP
ES ES
ELECTRIC PRIMARY OVERHEAD
ELECTRIC SECONDARY UNDERGROUND
ELECTRIC BRANCH FEEDER
UNDERGROUND
ES ES ELECTRIC SECONDARY OVERHEAD
PV PV PHOTOVOLTAIC FEEDER CONDUCTORS
CIRCUIT BREAKER. SIZE AS INDICATED ON SCHEDULES
SCR SHORT CIRCUIT INTERRUPTING RATINGEMERGENCY POWER OFFEPO
EXISTING TO BE DEMOLISHEDETD
EXISTING TO REMAINETR
EXISTING TO REMOVED AND RELOCATEETRL
SURFACE MOUNTED PANELBOARD, REFER TO SCHEDULES
DECIBELdB,DB
CONNECTION FROM JUNCTION BOX TO ELECTRICAL EQUIPMENT
MAGNETIC MOTOR STARTER
MOTOR, "2" INDICATES HORSEPOWER2
XXKVA/XXKW DIESEL GENERATOR, 208Y/120V, 3 PHASE, 4W,
60HZ WITH WEATHERPROOF SOUND ATTENUATED ENCLOSURE
AND BASE MOUNTED FUEL TANK
kW,KW
LGT
J
BRANCH CIRCUIT WIRING NOTES
1. ALTHOUGH ALL BRANCH CIRCUIT WIRING AND CONDUIT IS NOT SHOWN, IT IS THE
INTENT OF THESE DOCUMENTS THAT A COMPLETE BRANCH CIRCUIT WIRING SYSTEM
BE INSTALLED.
2. WIRING AND CONDUIT SHALL BE REQUIRED BETWEEN ALL OUTLETS INDICATED WITH
CIRCUIT NUMBERS AND PANELBOARD DESIGNATIONS.
3. WIRING IS SHOWN ON SHEETS ONLY FOR SPECIFIC ROUTES OR SPECIAL CONDITIONS.
4. ALL SWITCH CONTROLS SHALL BE PROVIDED WITH WIRING AND CONDUIT AS
REQUIRED.
5. A GREEN GROUNDING CONDUCTOR SHALL BE ROUTED WITH ALL BRANCH CIRCUITS.
VERIFY CONDUIT SIZE TO ENSURE IT CAN ACCOMMODATE ALL PHASES, NEUTRAL, AND
GROUND CONDUCTOR.
LP-1,3
RACEWAYS AND WIRING
PHASE CONDUCTORS (ONE PER PHASE) PLUS NEUTRAL AND GROUND
2. HOMERUNS TO PANELBOARDS SHALL HAVE A MAXIMUM OF THREE (3)
RACEWAY. SIZE SHALL BE #12AWG UNLESS INDICATED OTHERWISE.
MARKS INDICATE 2#12 & 1#12G-3/4"C UNLESS OTHERWISE INDICATED.
INDICATE NUMBER OF #12AWG CONDUCTORS IN MINIMUM 3/4"C. NO SLASH
NUMBERS, (20A, 1P, UNLESS OTHERWISE INDICATED) NUMBER OF SLASH MARKS
HOMERUN TO PANELBOARD. "LP" INDICATES PANEL, "1,3" INDICATES CIRCUIT
1. GREEN GROUND CONDUCTOR NOT INDICATED BUT SHALL BE INCLUDED IN EACH
CONDUCTORS IN EACH CONDUIT.
NOTES:
SPD SURGE PROTECTIVE DEVICE (SPD).
SPD SHALL NOT BE MOUNTED WITHIN PANELBOARD
ENCLOSURE.
CONCRETE ENCASED DUCTBANK
IDENTIFIER
DIRECT BURIED DUCTBANK
IDENTIFIER
CA
CA
DA
DA
E-001
EL
EC
TR
IC
AL
LE
G
EN
D , S
YM
BO
LS
, A
BB
R
EV
IA
TI
O
N S, AN
D
G
EN
ER
AL
N O
TE
S
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
J.
N
LADDER
L16
L15
LOCKER
LADDER
ACCESS
COVER
DOWN
GUARD RAIL
FLOAT WELL
CABINET
UNIT
HEATER
UP TO R7 AND R8
FUEL TANK
HATCH COVER
IN FLOOR
XM
XM
XM
XM
XM
PANELBOARD MDP
AUTOMATIC TRANSFER SWITCH
AUTOMATIC BATTERY CHARGER
EXISTING GENERATOR
XM
XM
D
D
BM
C
E
T M
W
W
W
CONFERENCE PANEL
XM
XN
XN
ATS
ES
ES
REMOTE GENERATOR
ANNUNCIATOR
MDP
SPD
REFER TO
SHEET C-101
FOR CONTIN-
UATION
DA
DA
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
CO
M
M
CO
M
M
COMM
COMM
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
NEW CONCRETE PAD.
DB DB
REFER TO DETAILS A1
AND D1 ON SHEET E-503..
(TYPICAL)
UPPER MANHOLE
60kW/75kVA GENSET IN
SOUND-ATTENUATED,
WEATHERPROOF ENCLOSURE
EPO
WP
ES
ES
ES COMM
EXISTING
ES
ES
ES
ES
ES
ES
C
C
CB
CB
TELECOM
JCT. BOX
CEILING HEIGHT 114"
LADDER
ACCESS
DOWN
LADDER
HATCH
THROUGH
CEILING
LADDER
ACCESS
DOWN
GUARD RAIL
GUARD RAIL
UP TO R7 AND R8
EXISTING 2" TEL. CONDUIT
AND WIRING TO REMAIN
EXISTING 3" CONDUITS
TO REMAIN
XM
XM
XM
EXISTING
SERVICE
DISCONNECT
PULL
BOX
FUEL
TANK
XM
D
XN
CMFRT-PNL
E
E
E
E
E E
E
COMM
CO
M
M
RE
FE
R
TO
SH
EE
T C-
FO
R
CO
NT
IN
UA
TI
ON
CB
CB
CB
CB
CB
CB
PROPOSED COMM
HAND HOLE
(USACE CH-1)
[SEE DETAIL A4 ON
SHEET E-503]
PROPOSED ELEC
HAND HOLE
(NATIONAL GRID PB-1)
(USACE EH-1)
[SEE DETAIL A4 ON
SHEET E-503]
PROPOSED UTILITY
POLE (INSTALLED BY
NATIONAL GRID)
(NATIONAL GRID
P-27-3)
HH
HH
E-101
EL
EC
TR
IC
AL
N
EW
W
O R
K
PA
R T
PL
AN
S
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D
AS
N O
TE
D
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
D1 GATE TOWER OPERATORS FLOOR (FOR REFERENCE ONLY)
SCALE: 1/2" = 1' - 0" D5 GATE TOWER LOWER LEVEL (FOR REFERENCE ONLY)
SCALE: 1/2" = 1' - 0"
N
0 2' 4'1'
N
0 2' 4'1'
KEYED NOTES:
EXISTING STORAGE SHELVING IN CONFERENCE BUILDING GARAGE WILL BE REMOVED
BY THE GOVERNMENT TO ACCOMMODATE INSTALLATION OF NEW INFRASTRUCTURE
AND ANCILLARY EQUIPMENT.
CONTRACTOR SHALL PROVIDE NEW NEMA 4X PULL BOXES ON EXTERIOR CONFERENCE
BUILDING TO REPLACE EXISTING IN SAME LOCATION(S). CONSTRUCT OF AT LEAST
MINIMUM SIZE REQUIRED BY NFPA 70 AND COMPATIBLE WITH EXISTING RACEWAY
SYSTEMS. REFER TO THE ELECTRICAL SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
EXISTING COMFORT STATION PANEL SHALL BE REMOVED AND REPLACED IN ITS
EXISTING LOCATION. RECONNECT FEEDER AND BRANCH CIRCUIT WIRING TO NEW
POWER PANEL. REFER TO PANELBOARD SCHEDULES ON SHEET E-602 AND ELECTRICAL
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
N
0 8'4' 16'
N
0 8'4' 16'E8 COMFORT STATION PART PLAN
SCALE: 1/8" = 1' - 0"
A1 CONFERENCE BUILDING PART PLAN
SCALE: 1/8" = 1' - 0"
NOTES:
1. REFER TO SHEET E-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
2. UNLESS OTHERWISE INDICATED, ALL EXISTING ELECTRICAL EQUIPMENT AND
DISTRIBUTION SHALL REMAIN (XM).
3. ALL EXISTING INSTRUMENTATION EQUIPMENT AND CABLING WITHIN THE GATEHOUSE
SHALL BE PROTECTED AS REQUIRED TO REMAIN UNDISTURBED THROUGHOUT THE
ENTIRETY OF DEMOLITION AND CONSTRUCTION.
PHOTO DIRECTION AND LOCATION INDICATOR PHOTOS ATTACHED TO
SPECIFICATIONS
N
C8 NEW UTILITY POLE PART PLAN
SCALE: 1/8" = 1' - 0" 0 8'4' 16'
J.
12"
A7 SCALE: N.T.S
CONSTRUCTION DETAIL
NOTES:
3"
3" 2" 3"
MIN.
2"
MAX.
30"
12"
FINISHED GRADE
24"
SEE NOTE #2
SEE NOTE #1
ELECTRICAL DUCT. REFER TO
IDENTIFICATIONS SCHEDULE
AND DUCT BANK SECTIONS
FOR SIZE AND QUANTITY
CONDUIT SPACERS, 5'-0" ON
CENTER. SPACERS SHALL BE
INTERLOCKED HORIZONTALLY
ONLY. SPACERS SHALL BE
STAGGERED VERTICALLY
6" PLASTIC WARNING TAPE.
SEE NOTE #3
1. BACKFILL DUCT BANK WITH SELECT MATERIAL. BACKFILL IN LAYERS.
2. SAND BACKFILL. WHEN PLACING SAND POUR SLOWLY AND DISTRIBUTE IT CAREFULLY SO AS NOT TO
DISLODGE THE SPACERS.
3. PLASTIC WARNING TAPE SHALL BE "EXTRA STRETCH," 6" WIDE. COLOR CODE SHALL BE AS FOLLOWS:
RED-ELECTRIC, ORANGE-COMMUNICATIONS. IMPRINTED TEXT SHALL IDENTIFY DUCTBANK SERVICE.
UTILIZE NON-DETECTABLE TAPE FOR ELECTRIC DUCTS AND METALLIZED DETECTABLE TAPE FOR
COMMUNICATION DUCTS.
4. PROVIDE 6 INCHES OF TOPSOIL TO GRADE AND SEED ABOVE THE BACKFILL.
SEE NOTE 4
NOTES:NOTES:
1. REFER TO DETAIL D7 "TYPICAL REINFORCED CONCRETE
DUCTBANK CONSTRUCTION DETAIL" FOR ADDITIONAL
INFORMATION.
2. REFER TO SHEET E-601 "ELECTRICAL PROPOSED ONELINE
DIAGRAM" FOR CONDUCTOR REQUIREMENTS.
3. PROVIDE 15INCH MINIMUM SPACING BETWEEN THESE TWO
CONDUITS IN ACCORDANCE WITH REQUIRED SPACING
BETWEEN POWER AND COMMUNICATIONS IN THE SAME
DUCTBANK.
1 4" SCHEDULE 40 PVC - ACTIVE
CONDUIT IDENTIFICATION SCHEDULE
D5 SCALE: N.T.S
REINFORCED CONCRETE DUCTBANK SECTIONS
#4 REBAR AT 18" O.C. IN PAIRS (TYP.)
FINISH GRADE
NOTES:
SEE NOTE 3
(MIN.)
3"
(MIN.)
7 1/2"
3" (MIN.) 7 1/2" (MIN.)
30"
(MAX.)
3"
(MIN.)
12"
(MIN.)
CL
LC
LC
24"
(MIN.)
D7 SCALE: N.T.S
6" PLASTIC WARNING TAPE
HOLD DOWN BAR. ANGLE IRON WITH
0.5" DIA (APPROX.) HOLES
CONDUIT SPACERS, 5'-0" ON CENTER. SPACERS
SHALL BE INTERLOCKED HORIZONTALLY ONLY.
SPACERS SHALL BE STAGGERED VERTICALLY
CONTINUOUS #5 REBAR AT 7 1/2"
TOP, BOTTOM & SIDES. SEE NOTE 2
ELECTRICAL DUCT. REFER TO SPECIFICATIONS
FOR TYPE AND DUCT BANK SECTIONS AND
SCHEDULES FOR SIZE
GROUND CONDUCTOR. REFER TO BUILDING
GROUNDING ELECTRODE SYSTEM DETAIL.
SEE NOTE 9
NO. 3, DRIVEN AT 15°
ANGLE. SEE NOTE 5
1. REFER TO DUCTBANK TRENCH DETAIL D4 ON SHEET C-501.
2. DUCT BANK SHALL BE ENCASED IN CONCRETE WITH A LEAST THREE INCHES OF CONCRETE AT THE TOP, BOTTOM AND SIDES. THIS IS A TYPICAL EXAMPLE OF DUCT BANK CONSTRUCTION. FOR ADDITIONAL COLUMN
AND/OR ROW OF CONDUIT PROVIDE AN ADDITIONAL #5 REBAR SPACED AS NOTED ABOVE.
3. THE CONCRETE SHALL INCORPORATE 3/8" AGGREGATE WITH A NOMINAL COMPRESSIVE STRENGTH OF 2,500 LBS. PER SQUARE INCH. THE SLUMP SHALL BE AT THE UPPER END OF THE RANGE, PREFERABLY 7 TO 8 INCHES. IT SHOULD HAVE JUST ENOUGH SLUMP TO FLOW TO THE BOTTOM OF THE DUCT BANK AND YET NOT BE SO WET AS TO CAUSE THE CONDUITS TO FLOAT EXCESSIVELY. COORDINATE EXACT REQUIREMENTS WITH
CIVIL ENGINEER.
4. WHEN PLACING CONCRETE AROUND CONDUITS ADJUST THE DELIVERY CHUTE SO THE FALL OF THE CONCRETE INTO THE TRENCH IS MINIMAL. POUR THE CONCRETE SLOWLY AND DISTRIBUTE IT EVENLY SO AS NOT TO
DISLODGE THE SPACERS.
5. THE REBAR STAKES AND HOLD DOWN BARS ARE REQUIRED TO PREVENT THE FLOTATION OF THE DUCT BANK.
FLOTATION IS CAUSED BY DUCT BUOYANCY AND CHURNING OF THE CONCRETE DURING THE POUR. FOUR SETS OF REBAR STAKES AND HOLD DOWN BARS SHOULD BE USED PER 20 FEET OF DUCT BANK. THE 3" EXTENSION
OF THE REBAR ABOVE THE DUCTS IS TO BE USED AS A CONCRETE GAUGE.
6. STEEL REINFORCING RODS SHALL BE INTERFACED WITH BUILDING FOUNDATION AND MANHOLE WALLS TO
MINIMIZE SHEARING.
7. CONCRETE CONSTRUCTION JOINTS SHALL NOT BE SPACED LESS THAN 40 FEET O.C.
8. REQUIRED FOR SERVICE ENTRANCE DUCTBANK ONLY. REFER TO DETAIL A3 ON SHEET E-502.
TYPICAL REINFORCED CONCRETE DUCTBANK
CONSTRUCTION DETAIL
NOTES:NOTES:
1. REFER TO DETAIL A7 "TYPICAL DIRECT BURIED DUCTBANK
CONSTRUCTION DETAIL" FOR ADDITIONAL INFORMATION.
2. REFER TO SHEET E-601 "ELECTRICAL PROPOSED ONELINE
DIAGRAM" FOR CONDUCTOR REQUIREMENTS.
4" SCHEDULE 40 PVC - ACTIVE
4" SCHEDULE 40 PVC - SPARE WITH PULL
STRING
CONDUIT IDENTIFICATION SCHEDULE
B5 SCALE: N.T.S
DIRECT BURIED DUCTBANK SECTIONS
SECTION DB-DB
SECTION DA-DA
2 2
SECTION CA-CA
3 2" SCHEDULE 40 PVC - GENERATOR
CONTROLS
3 3
4 2-1/2" SCHEDULE 40 PVC - ACTIVE
5 2-1/2" SCHEDULE 40 PVC - SPARE
WITH PULL STRING
2 4" SCHEDULE 40 PVC - SPARE
WITH PULLSTRING
TYPICAL DIRECT BURIED DUCTBANK
4" SCHEDULE 40 PVC - COMMUNICATION
SECTION CB-CB
15" (MIN.)
CL
SEE NOTE 3
SECTION CC-CC
E-501
EL
EC
TR
IC
AL
D
ET
AI
LS
I
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
J.
MAXIMUM HEIGHT
OF PANEL
SHALL BE SUCH
THAT THE
HIGHEST
BREAKER
OPERATING
POSITION IS NO
MORE THAN
6'-6" AFF
PANELS (FRONT VIEW) SINGLE PANEL SIDE VIEW
1. REFER TO E-001 FOR LEGEND, SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
NOTES:
PANEL CABINET
SECURE CHANNEL TO SLAB
A1 SCALE: N.T.S
TYPICAL PANEL MOUNTING DETAIL
5/8" CHANNEL
SUPPORT (TYP)
SECURE CHANNEL TO STRUCTURE
UTILIZING APPROPRIATE ANCHOR
BOLTS WITH 3/4" WAFFLE/SPACERS
(TYP)
5/8" CHANNEL
SUPPORT (TYP)
CONDUITS (TYP)
5/8" CHANNEL
SUPPORT (TYP)
SECURE PANEL TO
CHANNEL FRAME
C8 SCALE: N.T.S
POWER POLE RISER REQUIREMENTS
NOTE:
POLE
FINISHED
GRADE
PVC TO STEEL
ADAPTER
1. THIS DETAIL IS TYPICAL FOR ALL CONDUIT TERMINATIONS AT THE
ELECTRICAL EQUIPMENT AND AT RISER POLES.
2. INSTALL LISTED "U" BOLT WITHIN 6 INCHES FROM TOP OF STEEL
CONDUIT.
3. PROVIDE 30 INCHES OF GROUND WIRE PER NATIONAL ELECTRICAL
CODE REQUIREMENTS. MINIMUM #4AWG COPPER FOR GROUNDING
CONNECTIONS.
4. UTILITY POLE OR USACE WOOD POLE ARE EXISTING TO REMAIN.
"U" BOLT TO BE PROVIDED
AT 30INCH INTERVALS
RIGID STEEL CONDUIT.
PROVIDE GROUNDING
PVC CONDUIT
DIRECT BURIED
DEPTH OF BURIAL
PER DETAIL D6 ON
THIS SHEET
10FEET
PROVIDE 30FEET OF EXCESS
SECONDARY CONDUCTORS
FOR OVERHEAD CONNECTION
GROUND
WIRE
A8 SCALE: N.T.S
CONVERSION FROM PVC TO STEEL CONDUIT
NOTE:
FINISHED
GRADE
PVC TO STEEL
ADAPTER
1. THIS DETAIL IS TYPICAL FOR
ALL CONDUIT TERMINATIONS
AT THE AT THE ELECTRICAL
EQUIPMENT AND AT RISER
POLES.
2. INSTALL LISTED "U" BOLT
WITHIN 6INCHES FROM TOP
OF STEEL CONDUIT.
"U" BOLT TO BE PROVIDED
AT 30INCH INTERVALS
RIGID STEEL CONDUIT
PVC CONDUIT
DIRECT BURIED
DEPTH OF BURIAL
PER DETAIL D6 ON
THIS SHEET
BUILDING EXTERIOR OR
POLE
METER
N G
CBA
TO
NEU
SERVICE- ENTRANCE
RATED AUTOMATIC
TRANSFER SWITCH
SYSTEM BONDING JUMPER
#2 AWG MIN.
(CONTRACTOR TO VERIFY)
PHASE AND NEUTRAL
#250 KCMIL
PHASE AND NEUTRAL
#250 KCMIL
EQUIPMENT
GROUNDING
CONDUCTOR
PHASE AND NEUTRAL
CONDUCTORS
PANEL MDP
SEE PANEL
SCHEDULE
SHEET E-603.
PHASE AND NEUTRAL
#250 KCMIL
#4 EQUIPMENT
GROUNDING
CONDUCTOR
TO LOADS - REFER TO
ONE-LINE DIAGRAM
(TYPICAL)
GROUNDING ELECTRODE
CONDUCTOR
PAD MOUNTED
UTILITY TRANSFORMER
SECONDARY
PHASE AND NEUTRAL
#250 KCMIL
60 KW GENERATOR SET
#4 AWG EQUIPMENT
GROUNDING
CONDUCTOR
(BY UTILITY)
A3 SCALE: N.T.S
PARTIAL SYSTEM THREE-LINE DIAGRAM AND GROUNDING DETAIL - NEW SERVICE
GROUNDING
ELECTRODE
C1 SCALE: N.T.S
GENERATOR PAD
GROUNDING DETAIL
EXOTHERMIC WELD
CONNECTION TO
GENERATOR
ENCLOSURE
3/4"x10'-0" LONG
COPPERCLAD DRIVEN
GROUND ROD (TYPICAL)
#4/0 BARE COPPER GROUND
LOOP BURIED 30"MIN BELOW
FINISHED GRADE
CONCRETE PAD
GENERATOR ENCLOSURE
OPENING FOR GENERATOR
POWER CONDUITS
OPENING FOR CONTROLS
AND ENCLOSURE WIRING
BOND TO GENERATOR
GROUND TERMINAL
EXOTHERMIC WELD
CONNECTION
#4 AWG
EQUIPMENT
GROUNDING
CONDUCTOR
E-502
EL
EC
TR
IC
AL
D
ET
AI
LS
II
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
J.
N
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text C
#5@12" MAXIMUM
SPACE ON CENTER
EACH WAY
MID-DEPTH
8"
15"
AA
SECONDARY
PRIMARY
FRONT ACCESS
PLAN
81"
12"
8" 15" 22"
6"
64"
6"
6"
3" TYP.
3" TYP.
CONCRETE SLAB
REINFORCING
3" TYP.
6" CONDUITS
MAX
12"
A1 SCALE: N.T.S
TRANSFORMERS - 15kV CIRCUITS CONCRETE SLAB FOR 75-500kVA THREE PHASE
NOTES:
1. REFER TO NATIONAL GRID UNDERGROUND CONSTRUCTION STANDARD FOR ADDITIONAL
REQUIREMENTS.
CONCRETE SLAB
FINISHED
GRADE
SAND
GRAVEL
4"
4" CHAMFER
10"
REBAR DIAGRAM
1"GROUND
CLAMP
4" CHAMFER
10"
12"
2"
SECTION A-A
D4 SCALE: N.T.S
MANHOLE DETAIL
NOTES:
1. REFER TO NATIONAL GRID UNDERGROUND CONSTRUCTION STANDARD FOR ADDITIONAL
REQUIREMENTS.
2. REFER TO SPECIFICATION SECTION 33 71 02, PARAGRAPH 3.5.2 FOR BEDDING REQUIREMENTS.
D1 SCALE: N.T.S
OIL CONTAINMENT INSTALLATION DETAIL
NOTES:
1. REFER TO NATIONAL GRID UNDERGROUND CONSTRUCTION STANDARD FOR ADDITIONAL
REQUIREMENTS.
2. CONCRETE FOR OIL CURB: 4000 PSI AT 28 DAYS.
1'-6"
6"
9" 30"
6" 10" 4" 6"
9"
30"SEAL
12" DEEP 1 12" UNIFORMLY
GRADED CRUSHED ROCK
SLAB ON 4" SAND &
12" GRAVEL BASE
CONCRETE SLAB
OIL CURB
GRADE
16 oz. NON-WOVEN
POLYPROPOLENE
GEOTEXTILE LINER PER
ASTM D 5261
CONDUIT SWEEP
6" COMPOSITE BASE SILTY SAND MIX (SOIL CLASSIFICATION
A-2-4 OR A-2-5 PER AASHTO M 145)
GROUND ROD
CONCRETE SLAB
GROUND GRID
REBAR REINFORCING
AA
2'-6"
2'-0"
1'-0"
2'-6"
2'-6" 2'-6" 1'-0" 1'-0"
SECTION - "A-A"
TYPICAL CROSS SECTION OF CONTAINMENT PAD
3'-2" OPENING IN ROOF
PULL EYE (TYP.)
12" X 12" SUMP
4" DEEP
3" BEVEL IN ROOF
OPENING
10'-0" 9'-0"
4'-6" 4'-6" 1'-8"
1'-0"
6" 6"
6"
6"
2'-6"
2'-6"
5'-0"6'-0"
2"
2"
1'-0" 2'-0"
PLAN
6" 6" 10'-0"
9'-0" 4'-6" 4'-6"
A
A
6" 3" 3"3'-2"
3'-8"
6" 6"
8"
2"
2"
1'-11"
1'-11"
7'-0"
HEADROOM
8'-2" 3'-2"
12" X 12" SUMP
PULL EYE (TYP.)
COPPER GROUND
WIRE
1 58" X 1 58" GALVANIZED UNISTRUT
(TYPICAL AS SHOWN)
1" GROUT BRICK CHIMNEY OR
PRECAST RING. MINIMUM 12"
CHIMNEY HEIGHT.
GRADE
SECTION - "A-A"
1. REFER TO E-001 FOR LEGEND, SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
NOTES:
2X Ø 78 THRU HOLE
W/ Ø 1 38" X 58"
DEEP COUNTERBORE
4" X 4"
PULL SLOT W/ Ø 14"
CENTER PIN (4 PLACES)
1" X 1" PRYBAR SLOT
(1 CENTERED EACH END)
1" X 1" PRYBAR SLOT
(1 CENTERED EACH END)
2 - 13 UNC
LIFTING BOLT
(4 PLACES)
16 X 34" KNOCKOUTS
FOR 4" SCH 40 PIPE
[4 EA. END/4 EA. SIDE]
10,000 LB
CAPACITY PULLEYE
(1 CENTERED EACH END)
BOTTOM OPENING
27" X 57"
34" 4 X 5 78"
4 X 6" 64"
4 X 6" 2 X 28 34"
37"
18" X 30"
62 14"
32 38"
SKID RESISTANT
SURFACE
3"
29 58"
59 58"
PRYBAR DETAIL
COVER
BOX
8" HEX PRYBAR SUPPLIED BY
OTHERS INSERTED @ 45°
BOLT DOWN DETAIL
BOX
COVER
2 - 13 UNC SS CAPTIVE
PENTA HEAD BOLT
SELF-CENTERING
CORROSION RESISTANT NUT
A4 SCALE: N.T.S
ELECTRICAL HANDHOLE - RECTANGULAR 30" x 60"
NOTES:
1. REFER TO NATIONAL GRID UNDERGROUND CONSTRUCTION STANDARD FOR ADDITIONAL
REQUIREMENTS.
E-503
EL
EC
TR
IC
AL
D
ET
AI
LS
II
I
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
J.
BASIN OFFICE PNL [XM]PANEL
2.7 kVA
CONFERENCE PANEL [XM]PANEL
2.7 kVA
1-1/C
-3 AW
G
1-1/C
-3 AW
G
1-1/C
-2/0 AW
G
0.2 kV
0.208 kV
0.208 kV
0.2 kV
0.2 kV
1-1/C
-3 AW
G C
U , 15', (C onduit) [XM
C U
, 300', (C onduit) [XM
EXTERIOR [XM] 0.2
kV
UPPER MANHOLE [XM]
EXTERIOR BOX [XN]
CMFRT-PNL [XN]
RV PEDESTAL [XM] 0.2
kV
SQD - 2P
100/100A
SQD - 2P
60/20A
SQD - 1P
60/20A
RR HEATER
[XM]
RR LIGHTS
[XM]
C U
, 50', (C onduit) [XM
C U
, 50', (C onduit) [XM
A1 SCALE: N.T.S
PROPOSED ONELINE DIAGRAM
GENERATOR
60kW/75kVA 0.208kV
400AF/250AT
GENERATOR
0.2 kV
250A-3P SERVICE
ENTRANCE RATED
AUTOMATIC TRANSFER
SWITCH
UTILITY SECONDARY 0.2
kV
UTILITY XFMR
75 kVA
13.2 - 0.208 kV
PAD MOUNTED
UTILITY PRIMARY
400AF/250AT
100AF/
70AT
100AF/
100AT 100AF/
70AT
100AF/
100AT
4#250 KCMIL, 1#4 AWG GND. - 4"C.
4#250 KCMIL, 1#4 AWG GND. - 4"C.4#250 KCMIL - 4"C.
3#3 AWG, 1#8 AWG GND. 1
2 (TYPICAL)
SQD QD
250/150A
OPEN EPD-2P
60/15A
EPD-2P
60/15A
SQD QO-EPD - 1P
60/20A
SQD QO-EPD - 1P
60/20A
SQD QO-EPD
60/20A
30.1 Amps
GATE HOIST #1 [XM]
SQD QO-EPD
60/60A SQD QO-EPD
60/40A
SQD QO-EPD
60/40A
GATE HOIST #2 [XM]
0.2 kV
0.2 kV
1-1/C
-10 AW
G C
U , 25', (C onduit) [XM
GATE TOWER [XM] 0.2
kV
SQD QO- SQD QD
250/100A
SPD [XM]GAUGING
STATION [XM]
UNIT HEATER [XM]
SINGLE PHASE LOADS [XM]
6.18 kVA
5 HP
Induction
16.7%
5 HP
Induction
16.7%
1-1/C
-10 AW
G C
U , 18', (C onduit) [XM
GATE HOIST#1
GATE HOIST #2
OPEN EPD-2P
60/15A
SQD QO- SQD QO-
OPEN EPD-2P
60/15A
SQD QO-
SPARE SPARE
SPAR
E
SPAR
E
SPAR
E
SPAR
E
OPEN 250AF/
150ATOPEN OPEN
2P-2P-
3 3
250AF/
150ATOPEN
MDP
(APPROX. 100'-0")
1-1/C-2/0 AWG
CU, 20', (Conduit [XM]
ATS [XM]
1-1/C
-2/0 AW
G C
U , 720', (C onduit) [XM
1-1/C -350 kcm il 1-1/C
-350 kcm il
1-1/C
-2/0 AW
G
UTILITY [XM]
0.48 + j1.786
1.482 + j4.277
UTILITY XFMR [XM]
45 kVA
13.2 - 0.208 kV 1%
UTILITY PRI [XM] 13
.2 kV
UTILITY SEC [XM] 0.2
kV
0.2 kV
POLE 26-2 [XM]
C U
, 225', (Air) [XM
C U
, 100', (Air) [XM
USACE POLE [XM] 0.2
kV
SERVICE
BUSS FRS-R(RK5)
150A~ [XM]
XN
SERVICE GATE
BUSS FRS-R(RK5)
150A~ [XM]
0.208 kV
GATE TOWER [XM]
GENERATOR [XM]
55 kVA 9% 15% 20%
0.2 kV
(Generic) 150 AF
150/125A [XM]
GENERATOR [XM]
C U
, 30', (C onduit) [XD
C
U , 10', (C onduit) [XM
1-1/C
-2/0 AW
G
OPEN
OPEN
1-1/C-3 AWG
CU, 50', (Conduit) [XM]
4#1 AWG, 1#8 AWG GND. - 4"C.
NO. 12677966
0.2 kV
100AF/
30AT
SPD
E-601
EL
EC
TR
IC
AL
PR
O
PO
SE
D
O N
EL
IN
E D
IA
G
R
AM
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AR
C
H D
N .T
.S
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
NOTES:
1. REFER TO SHEET E-001 FOR LEGEND, SYMBOLS, ABBREVIATIONS, AND GENERAL
NOTES.
KEYED NOTES:
ROUTE WITHIN EXISTING DIRECT BURIED CONDUIT FROM COMFORT PANEL TO
EXISTING RV PEDESTAL LOCATION. EXISTING CONDUIT FITTING AT RV PEDESTAL
SHALL BE REMOVED AND REPLACED WITH ONE THAT IS LISTED AND FOUND SUITABLE
FOR THE SPECIFIED PURPOSE.
RECONNECT EXISTING BRANCH CIRCUIT WIRING TO BRANCH CIRCUIT BREAKERS IN
NEW COMFORT STATION PANELBOARD.
FOR CONNECTION TO FUTURE LEVEL 2 FLEET CHARGING STATION.
PROVIDE CONDUCTOR SPLICE IN EXISTING UPPER MANHOLE PER SPECIFICATION
SECTION 26 20 00. SPLICE OF NEW FEEDER AND EXISTING CONDUCTORS (TO
CONFERENCE BUILDING/COMFORT PANEL AND BASIN OFFICE) SHALL BE COVERED
WITH AN INSULATION EQUIVALENT TO THAT OF THE CONDUCTORS OR WITH AN
IDENTIFIED INSULATING DEVICE. SPLICING MEANS INSTALLED ON CONDUCTORS
SHALL BE APPROVED FOR WET LOCATIONS.
FOR FUTURE CONNECTION TO EXISTING GATE TOWER DISTRIBUTION.
INSTALLATION OF NEW METER SOCKET SHALL BE COORDINATED WITH THE UTILITY
(NATIONAL GRID) PRIOR TO EXECUTING WORK. ANY INTERRUPTIONS TO THE GATE
TOWER UTILITY SOURCE SHALL BE AS DEFINED BY THE CONTRACTING OFFICER (CO)
AND AT A SCHEDULE APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE
(COR).
SURGE PROTECTIVE DEVICE SHALL BE LOCATED AS CLOSE AS PRACTICAL TO THE
BREAKER WITH A MAXIMUM LEAD LENGTH OF 3'-0". DO NOT INSTALL SPD INSIDE A
PANELBOARD ENCLOSURE.
LINETYPE DENOTES EXISTING EQUIPMENT TO REMAIN.
LINETYPE DENOTES NEW EQUIPMENT.
J.
ARC FLASH LABEL NOTES:
1. ARC FLASH WARNING LABELS SHALL BE PROVIDED FOR ALL EXISTING AND NEW TRANSFORMERS, DISCONNECT SWITCHES, SWITCHBOARDS, AND PANELBOARDS AT THE SITE. REFER TO SPECIFICATION SECTION 26 28 01
COORDINATED POWER SYSTEM PROTECTION FOR FURTHER REQUIREMENTS.
2. LABELS SHALL BE 4 INCH X 6 INCH THERMAL TRANSFER TYPE OF HIGH ADHESION POLYESTER FOR EACH WORK LOCATION ANALYZED AND SHALL BE MACHINE PRINTED WITH NO FIELD MARKING. THESE LABELS ARE SHOWN AS
EXAMPLE ONLY AND DO NOT REFLECT THE ACTUAL DATA FOR THIS PROJECT.
3. THE LABEL SHALL HAVE AN ORANGE HEADER WITH THE WORDING, "WARNING:SHOCK & ARC FLASH HAZARD" IF THE CAL/CM2 IS LESS THAN 40 OR RED HEADER WITH THE WORDING "DANGER-DO NOT WORK ON LIVE " IF CAL/CM2 IS
GREATER THAN 40.
VOLTAGE: 120/208V, 1Ø, 3WIRE
PANELBOARD SCHEDULE - POWER PANEL "CMFRT-PNL"
DESCRIPTION
EXISTING RR HEATER
DESCRIPTION
MOUNTING: SURFACE
LOAD SUB-TOTALS: kVA
TOTAL CONNECTED LOAD = 15.5 kVA DEMAND + 25% SPARE = 18.5 kVA
AIC RATING: 10,000
A B A B A
12.5 3
BUSSING: COPPER
AMPERE RATING: 100A
MAINS: 100A MLO
GROUND BUS: EQUIPMENT
TUB: SINGLENEUTRAL BUS: 100%
9 10-1 11 12-1 B
FED FROM: PANEL "MDP"
EXISTING RR LIGHTS SPARE201
SPARE SPARE201
PREPARED SPACE PREPARED SPACE-1
PREPARED SPACE PREPARED SPACE-1
LOCATION: COMFORT STATION
0.5
1002RV PEDESTAL 12
TRIP
BREAKER
POLE Ø CKT.
NO.
CKT.
NO.
LOAD
kVA
LOAD
kVATRIP
BREAKER
POLE
ENCLOSURE: NEMA 4X
VOLTAGE: 120/208V, 3Ø, 4WIRE
TRIP
BREAKER
PANELBOARD SCHEDULE - POWER PANEL "MDP"
DESCRIPTION
FUTURE GATE TOWER (27.7kVA)
POLE
OFFICE/CONFERENCE/COMFORT
Ø
DESCRIPTION
MOUNTING: SURFACE
AIC RATING: 10,000
CKT.
NO.
A B C A B
CKT.
NO.
LOAD
kVA
LOAD
kVA
BUSSING: COPPER
AMPERE RATING: 400A
MAINS: 250A-3P MCB
GROUND BUS: EQUIPMENT
TUB: SINGLENEUTRAL BUS: 100%
9 10
C A B15 16
18C
A B21 22
23 24C
TRIP
BREAKER
POLE
FED FROM: AUTOMATIC TRANSFER SWITCH
SPARE SURGE PROTECTIVE DEVICE303
SPARE
LOCATION: EXTERIOR
30.70
.25
25 26A 27 28B 29 30C
201-SPARE
TOTAL CONNECTED LOAD = 30.95kVA DEMAND LOAD = 27.1kVA DEMAND + 25% SPARE = 33.88kVA
LOAD SUB-TOTALS: kVA- 30.95
31 32A 33 34B 35 36C 37 38A 39 40B 41 42C
FUTURE FLEET EV CHARGER (12kVA)702 -
201-SPARE
201-SPARE
201-SPARE
201-SPARE
201-SPARE
-1-PREPARED SPACE
-1-PREPARED SPACE
-1-PREPARED SPACE
-1-PREPARED SPACE
-1-PREPARED SPACE
-1-PREPARED SPACE
SPARE201 -
SPARE201 -
SPARE201 -
SPARE201 -
PREPARED SPACE-1 -
PREPARED SPACE-1 -
PREPARED SPACE-1 -
PREPARED SPACE-1 -
PREPARED SPACE-1 -
PREPARED SPACE-1 -
ENCLOSURE: NEMA 4
FUTURE FLEET EV CHARGER (12kVA)702 -
SPARE201 -
E-602
EL
EC
TR
IC
AL
SC
H
ED
U
LE
S
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D N
.T .S
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
J.
D
D
515.42
CONC COVER
514.43
CONC VAULT
M
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
BM
D
D
D
D
D
D
D
512.53
GND
D
D
D D
512.60
BTBK101 END
C
D
E
C
E
T M
SS
SS
SS
SS
SS
SS
SS
W
W
EXISTING MH#6
[XM]
EXISTING MH#4
[XM]
EXISTING MH#5
[XM]
COMM
COMM
COMM
COMM
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
COMM
COMM
COMM
COMM
COMM
COMM
COMM
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
EXISTING MH#3
[XM]
COMM
COMM
COMM
COMM
ES
ES
ES
ES
ES
ES
ES
ES
ES
COMM
COMM
COMM
COMM
COMM
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
C
O M
M
ES
EXISTING MH#2
[XM]
EXISTING MH#1
[XM]
EXISTING GATE TOWER
[XM]
EXISTING COMFORT STATION
[XM]
ES
ES
EXISTING CONFERENCE
BUILDING [XM]
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
ES
EXISTING RV PEDESTAL
[XM]
EXISTING EXTERIOR
BOX [XN]
EXISTING UPPER
MANHOLE [XM]
ES
ES
ES
ES
ES
ES
ES CO
M
M
M
EXISTING UTILITY POLE WITH POLE MOUNTED
UTILITY TRANSFORMERS [XM]
EXISTING UTILITY POLE
26-2 [XM]
EXISTING USACE WOOD
POLE [XM]
EXISTING UTILITY METER
AND METER SOCKET [XN]
EXISTING 150A SERVICE
DISCONNECT [XM]
EXISTING BASIN
OFFICE [XM]
EXISTING COMFORT PANEL
[XN]
4 4
C
E
C
E
C
E
C
E
C
C E
C
E
ESD101
EL
EC
TR
IC
AL
S
IT
E
D
EM
O
LI
TI
O
N P
LA
N
J.
N
EW
TO
N
J.
N
EW
TO
N
J.
C
LI
N
E
J.
N
EW
M
AN
AN
SI
D 1"
0'
JU
N
E
SO
LI
C
IT
AT
IO
N
N O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
ST
AN
D
BY
G
EN
ER
AT
O R
IN
ST
AL
LA
TI
O
N
AN
D E
LE
C
TR
IC
AL
U
PG
R
AD
ES
H O
D G
ES
V
IL
LA
G E
D
AM
O
XF
O R
D , M
AS
SA
C H
U
SE
TT
S
W
2W J2
2B
TH
A-
H V-
A1 ELECTRICAL SITE DEMOLITION PLAN
SCALE: 1" = 50' - 0"
NOTES:
1. REFER TO SHEET E-001 FOR LEGEND, SYMBOLS,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .