Amendment 0007_THA-HV-129 E-501.pdf

PDF 376 KB Posted

Attached to
Generator Replacement at Hodges Village Dam in Oxford, MA
Solicitation number
W912WJ22B0014
Issued by

About this file

This solicitation package includes plans and specifications for upgrades to electrical systems and installation of a new standby generator at the Hodges Village Dam in Oxford, Massachusetts. The major work components involve installing a new diesel generator; coordinating an underground utility service connection with the local power company; constructing concrete duct banks, vaults, and equipment pads; and performing selective upgrades to existing electrical equipment to comply with safety standards. The solicitation was issued by the U.S. Army Corps of Engineers New England District for a fixed-price construction contract. The closing date for proposals is not specified in the documents provided.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005_National Grid Easement and SA.pdf PDF
Amendment 0005_National Grid Cover Letter.pdf PDF
W912WJ22B0014.pdf PDF
Amendment 0005.pdf PDF
Specs_Revised.pdf PDF
Amendment 0004_ESB No. 750.pdf PDF
Amendment 0004_Figure 20.0-1 Typical Trenches.pdf PDF
Amendment 0004_Trench Sketch from National Grid.pdf PDF
Amendment 0004.pdf PDF
Amendment 0004_ESB No. 759B.pdf PDF
Amendment 0003.pdf PDF
W912WJ22B0014.pdf PDF
Drawings.pdf PDF
Specs.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12"

A7 SCALE: N.T.S

CONSTRUCTION DETAIL

NOTES:

3"

3" 2" 3"

MIN.

2"

MAX.

30"

12"

FINISHED GRADE

24"

SEE NOTE #2

SEE NOTE #1

ELECTRICAL DUCT. REFER TO

IDENTIFICATIONS SCHEDULE

AND DUCT BANK SECTIONS

FOR SIZE AND QUANTITY

CONDUIT SPACERS, 5'-0" ON

CENTER. SPACERS SHALL BE

INTERLOCKED HORIZONTALLY

ONLY. SPACERS SHALL BE

STAGGERED VERTICALLY

6" PLASTIC WARNING TAPE.

SEE NOTE #3

1. BACKFILL DUCT BANK WITH SELECT MATERIAL. BACKFILL IN LAYERS.

2. SAND BACKFILL. WHEN PLACING SAND POUR SLOWLY AND DISTRIBUTE IT CAREFULLY SO AS NOT TO

DISLODGE THE SPACERS.

3. PLASTIC WARNING TAPE SHALL BE "EXTRA STRETCH," 6" WIDE. COLOR CODE SHALL BE AS FOLLOWS:

RED-ELECTRIC, ORANGE-COMMUNICATIONS. IMPRINTED TEXT SHALL IDENTIFY DUCTBANK SERVICE.

UTILIZE NON-DETECTABLE TAPE FOR ELECTRIC DUCTS AND METALLIZED DETECTABLE TAPE FOR

COMMUNICATION DUCTS.

4. PROVIDE 6 INCHES OF TOPSOIL TO GRADE AND SEED ABOVE THE BACKFILL.

SEE NOTE 4

NOTES:NOTES:

1. REFER TO DETAIL D7 "TYPICAL REINFORCED CONCRETE

DUCTBANK CONSTRUCTION DETAIL" FOR ADDITIONAL

INFORMATION.

2. REFER TO SHEET E-601 "ELECTRICAL PROPOSED ONELINE

DIAGRAM" FOR CONDUCTOR REQUIREMENTS.

3. PROVIDE 12INCH MINIMUM SPACING BETWEEN PRIMARY AND

COMMUNICATIONS DUCTBANKS (FACE OF CONCRETE) IN

ACCORDANCE WITH UTILITY COMPANY REQUIREMENTS.

1 4" SCHEDULE 40 PVC - ACTIVE

CONDUIT IDENTIFICATION SCHEDULE

D5 SCALE: N.T.S

REINFORCED CONCRETE DUCTBANK SECTIONS

#4 REBAR AT 18" O.C. IN PAIRS (TYP.)

FINISH GRADE

NOTES:

SEE NOTE 3

(MIN.)

3"

(MIN.)

7 1/2"

3" (MIN.) 7 1/2" (MIN.)

30"

(MAX.)

3"

(MIN.)

12"

(MIN.)

CL

LC

LC

24"

(MIN.)

D7 SCALE: N.T.S

6" PLASTIC WARNING TAPE

HOLD DOWN BAR. ANGLE IRON WITH

0.5" DIA (APPROX.) HOLES

CONDUIT SPACERS, 5'-0" ON CENTER. SPACERS

SHALL BE INTERLOCKED HORIZONTALLY ONLY.

SPACERS SHALL BE STAGGERED VERTICALLY

CONTINUOUS #5 REBAR AT 7 1/2"

TOP, BOTTOM & SIDES. SEE NOTE 2

ELECTRICAL DUCT. REFER TO SPECIFICATIONS

FOR TYPE AND DUCT BANK SECTIONS AND

SCHEDULES FOR SIZE

GROUND CONDUCTOR. REFER TO BUILDING

GROUNDING ELECTRODE SYSTEM DETAIL.

SEE NOTE 9

NO. 3, DRIVEN AT 15°

ANGLE. SEE NOTE 5

1. REFER TO DUCTBANK TRENCH DETAIL D4 ON SHEET C-501.

2. DUCT BANK SHALL BE ENCASED IN CONCRETE WITH A LEAST THREE INCHES OF CONCRETE AT THE TOP, BOTTOM AND SIDES. THIS IS A TYPICAL EXAMPLE OF DUCT BANK CONSTRUCTION. FOR ADDITIONAL COLUMN

AND/OR ROW OF CONDUIT PROVIDE AN ADDITIONAL #5 REBAR SPACED AS NOTED ABOVE.

3. THE CONCRETE SHALL INCORPORATE 3/8" AGGREGATE WITH A NOMINAL COMPRESSIVE STRENGTH OF 2,500 LBS. PER SQUARE INCH. THE SLUMP SHALL BE AT THE UPPER END OF THE RANGE, PREFERABLY 7 TO 8 INCHES. IT SHOULD HAVE JUST ENOUGH SLUMP TO FLOW TO THE BOTTOM OF THE DUCT BANK AND YET NOT BE SO WET AS TO CAUSE THE CONDUITS TO FLOAT EXCESSIVELY. COORDINATE EXACT REQUIREMENTS WITH

CIVIL ENGINEER.

4. WHEN PLACING CONCRETE AROUND CONDUITS ADJUST THE DELIVERY CHUTE SO THE FALL OF THE CONCRETE INTO THE TRENCH IS MINIMAL. POUR THE CONCRETE SLOWLY AND DISTRIBUTE IT EVENLY SO AS NOT TO

DISLODGE THE SPACERS.

5. THE REBAR STAKES AND HOLD DOWN BARS ARE REQUIRED TO PREVENT THE FLOTATION OF THE DUCT BANK.

FLOTATION IS CAUSED BY DUCT BUOYANCY AND CHURNING OF THE CONCRETE DURING THE POUR. FOUR SETS OF REBAR STAKES AND HOLD DOWN BARS SHOULD BE USED PER 20 FEET OF DUCT BANK. THE 3" EXTENSION

OF THE REBAR ABOVE THE DUCTS IS TO BE USED AS A CONCRETE GAUGE.

6. STEEL REINFORCING RODS SHALL BE INTERFACED WITH BUILDING FOUNDATION AND MANHOLE WALLS TO

MINIMIZE SHEARING.

7. CONCRETE CONSTRUCTION JOINTS SHALL NOT BE SPACED LESS THAN 40 FEET O.C.

8. REQUIRED FOR SERVICE ENTRANCE DUCTBANK ONLY. REFER TO DETAIL A3 ON SHEET E-502.

TYPICAL REINFORCED CONCRETE DUCTBANK

CONSTRUCTION DETAIL

NOTES:NOTES:

1. REFER TO DETAIL A7 "TYPICAL DIRECT BURIED DUCTBANK

CONSTRUCTION DETAIL" FOR ADDITIONAL INFORMATION.

2. REFER TO SHEET E-601 "ELECTRICAL PROPOSED ONELINE

DIAGRAM" FOR CONDUCTOR REQUIREMENTS.

4" SCHEDULE 40 PVC - ACTIVE

4" SCHEDULE 40 PVC - SPARE WITH PULL

STRING

CONDUIT IDENTIFICATION SCHEDULE

B5 SCALE: N.T.S

DIRECT BURIED DUCTBANK SECTIONS

SECTION DB-DB

SECTION DA-DA

2 2

SECTION CA-CA

3 2" SCHEDULE 40 PVC - GENERATOR

CONTROLS

3 3

4 2-1/2" SCHEDULE 40 PVC - ACTIVE

5 2-1/2" SCHEDULE 40 PVC - SPARE

WITH PULL STRING

2 4" SCHEDULE 40 PVC - SPARE

WITH PULLSTRING

TYPICAL DIRECT BURIED DUCTBANK

4" SCHEDULE 40 PVC - COMMUNICATION

SECTION CB-CB

SEE NOTE 3

SECTION CC-CC

12" (MIN.)

E-501

EL

EC

TR

IC

AL

D

ET

AI

LS

I

J.

N

EW

TO

N

J.

N

EW

TO

N

J.

C

LI

N

E

J.

N

EW

M

AN

AN

SI

D N

.T .S

JU

N

E

SO

LI

C

IT

AT

IO

N

N O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

ST

AN

D

BY

G

EN

ER

AT

O R

IN

ST

AL

LA

TI

O

N

AN

D E

LE

C

TR

IC

AL

U

PG

R

AD

ES

H O

D G

ES

V

IL

LA

G E

D

AM

O

XF

O R

D , M

AS

SA

C H

U

SE

TT

S

W

2W J2

2B

TH

A-

H V-

-0

5-

R

EV

IS

IO

N

S W

IT

H

A M

EN

D

M

EN

T

Sheets and Views
E-501

File details come from the government source that posted it. Updated .