Amendment 0004.pdf

PDF 435 KB Posted

Attached to
Generator Replacement at Hodges Village Dam in Oxford, MA
Solicitation number
W912WJ22B0014
Issued by

About this file

This document contains an amendment to a solicitation for a generator replacement project at Hodges Village Dam in Oxford, Massachusetts. The amendment provides responses to requests for information about the project scope, including coordinating with National Grid for a new underground electric service connection. It also modifies the bidding schedule by including an allowance of $37,727.25 for electric utility coordination activities. The response date remains unchanged, with all work to be completed within the time period specified in the special contract requirements. Relevant documents from National Grid pertaining to specifications for electrical installations and underground commercial distribution are also attached.

View the file

Other files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0007.pdf PDF
Amendment 0007_THA-HV-129 E-501.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005_National Grid Easement and SA.pdf PDF
Amendment 0005_National Grid Cover Letter.pdf PDF
W912WJ22B0014.pdf PDF
Amendment 0005.pdf PDF
Specs_Revised.pdf PDF
Amendment 0004_ESB No. 750.pdf PDF
Amendment 0004_Figure 20.0-1 Typical Trenches.pdf PDF
Amendment 0004_Trench Sketch from National Grid.pdf PDF
Amendment 0004_ESB No. 759B.pdf PDF
Amendment 0003.pdf PDF
W912WJ22B0014.pdf PDF
Drawings.pdf PDF
Specs.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is necessary to respond to requests for information, to update the bid schedule, and to make changes to Specifications to add National Grid's Work Easement and Service Agreement and other relevant attachments. All other aspects remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jul-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ22B0014

X 9B. DATED (SEE ITEM 11)

27-Jun-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jul-2022

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ22B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

Requests for Information

1. The National Grid Scope of Work is not included in specifications.

See updated Scope of Work attached to this amendment and “CHANGES TO SPECIFICATIONS” below.

2. The National Grid Service agreement and cost is not included in specifications.

See updated Scope of Work and Bid Schedule included in this amendment and “CHANGES TO SPECIFICATIONS” below.

3. Is the duct bank required to be concrete encased, National Grid will not allow communications conduits within the same concrete encasement as electrical conduits, both sets of conduits will be required to be encased separately?

Figure 20.0-1 Typical Trenches in the National Grid Underground Commercial Distribution (UCD) Installation and Responsibility Guide indicates a 12” minimum separation between primary electric duct and a communication duct or cable. See attachment for referenced sketch. This separation is more than maintained in Section CB-CB of Detail D5 on Sheet E-501 of the electrical construction drawings with a 15” minimum separation to be kept between the two systems.

4. To maintain required separation of standby generator and conference building it will require cutting into the banking, is grading sufficient or will a retaining wall be necessary?

The generator pad will need to be constructed on a small 1-2' high embankment that ties into the existing slope to the north. A retaining wall is not necessary.

5. Will the USACE be providing the National Grid Three Phase Construction Specifications that they would have received from national Grid?

The latest trench sketch which the Government has received from National Grid on this project is included as an attachment to this amendment. Beyond that, the design references National Grid ESB No. 750 – Specifications for Electrical Installations 2022 and ESB No. 759B – UCD Installation & Responsibility Guide which are both included as an attachment to this amendment.

6. From experience National Grid usually requires transformers to be reachable from a paved surface or maintained road, the transformer appears to be in the middle of the lawn?

The transformer should be located within the required distance from the edge of pavement as specified by National Grid. This is shown to be 10’ from an accessible paved way, with minimum clearance to other structures in the National Grid specifications.

7. There was supposed to be an addendum with a possible bid extension, has that been distributed.

Yes, the bid opening was extended per Amendment 0003.

CHANGES TO SPECIFICATIONS

W912WJ22B0014

At the end of the specification, the page titled "National Grid Work Easement" has been replaced with National Grid’s Work Easement and the page titled "National Grid Service Agreement" has been replaced with National Grid’s Service Agreement.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BIDDING SCHEDULE

BIDDING SCHEDULE

Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.

Item Unit No. Description Quantity Unit Price Amount

0001 All Work 1 Job Job $_ _____

0002 Allowance for Electric Utility Activities 1 Job Job $37,727.25

TOTAL AMOUNT $_ ______

Note 1: The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Item 0001.

Note 2: All work shall be completed within the time period specified in Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10.

Note 3: Identify a point of contact e-mail for all correspondence related to this bid: ______________________@______________.

-- End of Document --

(End of Summary of Changes)

File details come from the government source that posted it. Updated .