Amendment W912WJ21Q0009-0004.pdf

PDF 674 KB Posted

Attached to
Reclamation and Paving, Westville Lake, Southbridge, MA
Solicitation number
W912WJ21Q0009
Issued by

View the file

Other files

File Type Posted
Amendment W912WJ21Q0009-0005.pdf PDF
Amendment W912WJ21Q0009-0003.pdf PDF
Amendment W912WJ21Q0009-0002.pdf PDF
As Built.pdf PDF
Amendment W912WJ21Q0009-0001.pdf PDF
Solicitation W912WJ21Q0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W13G86028304920001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to answ er questions from industry. Questions and answ ers #7-9 are applicable to this amendment.

Closing is extended until December 14, 2020 at 5:00 PM Eastern.

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Dec-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21Q0009

X 9B. DATED (SEE ITEM 11)

17-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Dec-2020

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:

SHEILA M WINSTONVINCUILLA / CHIEF, CONTRACTING DIVISION

W912WJ21Q0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

REQUEST FOR INFORMATION

QUESTIONS AND ANSWERS:

1. Please confirm the grade of the new HMA pavement will match the grade of the existing pavement. With the 4” new pavement section, there will be several hundred cubic yards of material removed and stockpiled on-site. Does the Government have room to store this quantity of material on-site as stated in 3.B on page 13 of 38?

Answer: The grade of the new HMA pavement will match the grade of the existing pavement. Yes, the Government has room to store this quantity of material on-site as stated in section 3.B.

2. Is any survey required to verify the pre- and post-construction locations of the settlement monuments?

Answer: No, a settlement survey will not be necessary as the monuments are on the other side of the guardrail and outside of the paving area.

3. Are wattles or other erosion conrol measures required?

Answer: No erosion control measures are required unless conditions exist or would be created that meet the language as included in II. Technical Requirements, Part 1: General, Section 5. Environmental Protection.

4. SOW indicates depth of reclamation to be 12 inches. Could you please confirm the existing subsurface utilities are deep enough to achieve this depth of reclamation?

Answer: The depth of reclamation will be changed to 9 inches as indicated by the revised Statement of Work.

5. Could you please provide a specific product for the crush gravel shoulders?

Answer: The product for the crushed gravel shoulders shall be ¾” processed gravel.

6. Can you confirm that only the asphalt pavement mix for the base and wearing (top) courses as specified in the Statement of Work will accepted? Is this mix available?

Answer: The mix as specified in the Statement of Work has been confirmed as available, therefore, only mixes that meet these requirements will be accepted. The mixes shall not contain any recycled asphalt products, only new material. The awarded vendor will be required to submit products that meet these specifications for acceptance by the Government. Products that do not meet these specifications will not be accepted for use and shall be replaced by those that do at no additional expense to the Government.

7. A 2.5” lift thickness of PMA S-1 does not meet the 3” minimum thickness shown on Figure 5 of the HMA Pavement Type and Selection Guide by the US DOT/FHA Information Series 128 for a 1’ mix. Will the Contractor be able to use a ¾” Polymer Modified Superpave mix to pave the 2.5” lift?

Answer: The spefications will be changed to require a 3” minimum lift for the binder base coat, along with S-

0.75 mix rather than S-1. In addition, PG64-22 will be changed to PG64-28.

8. Please provide a list of HMA Plants that produce PMA S-1.

Answer: The following link is provided from the Mass DOT website: https://www.mass.gov/info-details/hot-mix-asphalt-production-facility-m3117

9. What is the traffic level of the proposed Superpave mixes?

Answer: Traffic level is low to moderate, but on occasion can be very heavy with crane work, drill rigs, cement mixers, etc.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 07-Dec-2020 05:00 PM to 14-Dec-2020 05:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

PAVEMENT RECLAMATION AND REPAVING

U.S. ARMY CORPS OF ENGINEERS

WESTVILLE DAM

SOUTHBRIDGE, MA

STATEMENT OF WORK

I. General

1. Statement of work

Contractor shall furnish all labor, materials, equipment, and testing necessary to provide a full depth reclamation of approximately 23,550 square feet of existing asphalt road. This includes placement of new pavement, removal of concrete aprons, removal and replacement of curbing at flagpole, from the Westville Office parking area, circle around flagpole and out to the Westville Dam Control Structure.

2. Location The Westville Dam is a flood control project located at Westville Lake in Southbridge, Massachusetts. The project office is located at 200 Marjorie Lane, in the Town of Southbridge, Massachusetts 01550.

3. Site Visit Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact for the project is Project Manager Keith W. Beecher at 978-318-8405 or keith.w.beecher@usace.army.mil.

4. Schedule

The period of performance shall be 180 days from Notice to Proceed. The Government shall be given 7 days’ notice prior to the start of work. Work shall commence within 14 days after Notice to Proceed. The project area will be open to the Contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.

5. Safety

a) General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable OSHA, federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_3 85-1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b) Accident Prevention Plan:

The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below.

A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A.

A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact (TPOC) upon request.

c) Activity Hazard Analysis:

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work.

The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

Note: As part of the APP and AHAs include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:

Procedures for periodic sanitation inspections.

Procedures for disinfecting project sites in accordance with CDC guidelines.

Site specific measures to practice social distancing while working on the project.

Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.

A list of PPE to be used in accordance with CDC and state guidelines.

d) Emergency Response:

Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.

e) Required Personnel:

The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.

In addition, when emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers onsite, at least 2 employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.

*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the characteristics of the project*

f) Accident Reporting:

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.

The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.

6. Preconstruction Conference

Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference.” The Contractor’s Project Manager and Quality Control Personnel shall attend this meeting. This conference will be held at the time and location agreeable to the Government and Contractor. No work shall be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction Conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Preconstruction Conference:

I. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

II. Contractor’s Safety Program (including sub-contractors).

III. Accident Prevention Plan and Activity Hazard Analysis (AHA) submitted

& accepted prior to start of work on site.

IV. Weekly Safety Meetings (Documented on NED Form 251) V. Accident Reporting (ENG Form 3394)

VI. COVID-19

VII. Safety Data Sheet (SDS) requirements

VIII. Correspondence, Communication and Administrative Procedures.

IX. Invoice and payment.

X. First Aid / CPR Requirements.

7. Traffic Control

During construction the Contractor shall provide access as necessary to maintain traffic. The Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Technical Point of Contact. Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the state and local authorities having jurisdiction.

The traveling public shall be protected from damage to person and property. The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic. The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible for the repair of any damage to roads caused by construction operations. The Contractor shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.

8. Permits

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security

The Contractor shall comply with all established security policies at Westville Lake. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24 hour notice of any such closure.

10. Payment

Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor shall submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the Contractor may request progress payment.

All invoices may be mailed to:

U.S. Army Corps of Engineers East Brimfield Lake 24 Riverview Avenue Fiskdale, MA 01518

Or emailed to keith.w.beecher@usace.army.mil

11. Damage to Government and Private Property The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the firms’ operation.

12. Point of Contact Requirements

The Contractor shall provide to the Technical Point of Contact a telephone number and a point of contact for discussion of any contractual matters.

II. Technical Requirements:

Part 1 General:

All paving, reclamation, drainage, and curbing references are defined by ASTM and AASHTO standards, current editions; and HMA Pavement Mix Type and Selection Guide by the U.S.

DOT/ FHA Information Series 128.

All measurements and volumes are estimates and the contractor is responsible for determining actual amounts needed. The contractor is also responsible for denoting manholes, locations, and depths of electrical lines, water lines, piezometer lines, phone lines, and other pavement boxes prior to start of reclamation and paving work.

Attachments are included to show approximate locations, and not necessarily all locations or all buried utilities.

1. Existing Conditions:

a. Approximately 23,550 square feet (Segment #1) of existing asphalt pavement with variable surface thickness of 1 to 5 inches, majority thickness of 3-5 inches, with a road gravel base depth of an estimated 18 inches.

b. Existing gravel surfaces to be newly paved, approximately 1,000 square feet (Refer to photos 4 & 9).

c. Buried electrical, high and low voltage lines; phone lines, sewer lines, piezometer lines, drain lines throughout (Refer photo 11).

d. There are several 4-inch diameter settlement monuments on the crest of the dam. These shall not be disturbed but protected in place (Refer to photo 12 & 13).

e. Concrete curbing at flagpole, 135 feet approximate. (remove and replace).

f. Existing Concrete aprons will be removed and replaced with pavement, estimated thickness, 4-6 inches throughout, 400 square foot approximate.

2. Submittals:

Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities.

a. Accident Prevention Plan and Activity Hazard Analysis (AHA)

b. Project Work Schedule

c. Concrete curbing, with radius appropriate for flagpole, sample

d. Submit the results of all field tests

e. SDS (Safety Data Sheets) of any materials are listed

f. First Aid / CPR certifications

g. Job Mix Formula

h. Manufacturer and installer service record of previous, similar service

3. Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area the Contractor shall remove any tools, equipment, and materials that are not the property of the Government and properly dispose of them. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.

4. Government Resources:

The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, water, electricity, telephone services, or other resources. The Contractor will provide temporary restrooms for his/her employees.

5. Environmental Protection:

The contractor shall prevent all erosion, pollution, and damage to the environment resulting from construction during this contract. The contractor will receive no additional payment for environmental protection work. Prevention of pollution and environmental damage is a contractor obligation under current State and Federal laws and regulations.

Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.

The Contractor is also responsible for sediment control during any earth-disturbing activities. Select and maintain temporary sediment controls such that water quality standards are not violated as a result of construction activities. Areas of bare soil shall be kept to a minimum during construction operations. Prevent sediment laden runoff from entering water bodies, drainage inlets, and environmentally sensitive areas. Sediment controls may include, but are not limited to, entrenched staked straw bales, entrenched sediment (silt) fence, compost filter socks, or wattles. Remove all temporary sediment controls during final clean-up and prior to demobilization.

6. Sustainability:

All products provided by the contractor must meet the recycled content requirements set forth by the Environmental Protection Agency. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials, and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

Furthermore, the contractor should also meet the BioPreferred Program requirements. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

7. Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable and functional product.

8. Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

9. Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

10. Receiving and Storing Materials:

The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods.

Government employees will not receive material or supplies for the Contractor and will not be responsible for damage to Contractor equipment or material.

Part 2 Products:

1. Sub-base Course:

Reclaimed base course material shall consist of a uniform blend of the onsite cold-milled or pulverized existing asphalt pavement and gravel base course materials.

2. Asphalt Pavement:

Asphalt pavement materials and mixtures for the base and wearing (top) courses are as follows: binder (base) coat: Superpave PMA S-1 S-0.75with a thickness of 2.5 3 inches after rolling; tack coat shall be emulsified asphalt conforming to ASTM D977, grade RS- 1; binder will be PG64-2228; top coat will be Superpave PMA S0.375 and will be 1.5 inches thick after rolling. No reclaimed asphalt products (RAP) from this site or elsewhere will be used in the mix. The mix will be all new materials.

3. Concrete Curbing:

Concrete Curbing will be of adequate height to retain the topsoil in the circle prescribed by the grass of the flagpole and depth to be placed in a concrete base for stability. The concrete curbing will be properly curved to meet current radius around flagpole. Curbing will also be removed and replaced on the road edge prior to the flagpole in a concrete base. Curbing will have a minimum width of 6 inches at top.

4. Topsoil:

No foreign material such as glass or metal shall be found in the topsoil.

5. Manhole covers and frames for existing utilities:

These may be reused.

Part 3 Execution:

1. Quality Assurance:

a. Manufacturer Qualifications: A firm experienced in manufacturing asphalt pavement similar to that indicated for this Project and with a record of successful in-service performance.

b. Installer Qualifications: An experienced installer who has completed hot-mix asphalt paving similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance.

c. Laboratory and Field Density Tests: The densities of the completed pavement shall not be less than 95 percent of the density obtained from laboratory compaction of a mixture composed of the same materials in like proportions. Laboratory compaction shall be performed per industry standard. A minimum of one set of laboratory tests shall be performed for the surface course mixture used for each placement. Field tests shall be performed in sufficient numbers to ensure that the specified field density is being obtained. For each course placed, a minimum of two field density tests shall be performed for every 300 linear feet of pavement along the road. The locations of the field density tests shall be approved by the Technical Point of Contact prior to performing the test.

d. Reporting Test Results: Copies of all laboratory and field tests shall be submitted to the Technical Point of Contact (TPOC) within 48 hours of completion of the test.

The recording forms shall include all data collected, calculations, final test results, compaction equipment, number of passes, layer thicknesses, recommendations and changes made in the field based on the test results, the weather conditions, type and number of tests, test instrument calibration data, and any other pertinent data. The Contractor shall maintain current copies of the test reports at the project field office for the duration of the project.

2. Location of Underground Utilities:

Prior to the start of reclaiming operations, the Contractor shall locate and protect existing drainage and utility structures and underground pipes, culverts, conduits and other appurtenances.

Numerous penetrations exist, for electrical, phone manholes, piezometers, cable trenches for the piezometers, and conduit (plastic/rubber) from piezometer road boxes to metal boxes outside of guardrail (Refer to photos 2, 5 & 11).

3. Reclamation, Pre-asphalt placement Work:

a. The Contractor shall provide a stabilized pavement sub-base course through the recycling of the existing pavement structure to a specified, uniform depth of sub-base material. This combination of existing pavement and sub-base material is to be uniformly crushed, pulverized, and blended, then spread, graded, and compacted. Depth of reclamation will be

12 nine (9) inches. All material will be crushed and blended into sub base. Lifts to be graded in 6 4.5-inch levels and be at acceptable level of moisture. Elevations may need to be reduced throughout to ensure water drains away from parking lots and buildings.

b. Any reclaimed base course material excess to the completion of the project or that not found to be suitable for use in the work shall remain the property of the government and will be placed on-site. Site location will be determined by Technical Point of Contact.

c. Gravel Base Material. If there is insufficient reclaimed material available for grading to the appropriate elevations, new gravel base material shall be used. Gravel base material shall be added and blended with the reclaimed base course prior to compaction. This will be discussed with the Technical Point of Contact before implementation. Elevations will match the original installation elevations when road was initially built as closely as possible. Utility covers (electric, phone, water, piezometers, etc.) throughout can be reused unless damaged.

d. Existing concrete curbing around flagpole will be removed and replaced.

e. Existing concrete aprons in parking lot will be removed and replaced with pavement.

4. Bituminous Concrete (Asphalt) Pavement Placement:

f. Place the binder course in one 2.5-3 inch compacted thick layer. The wearing (top) course shall be placed in one 1.5-inch compacted thick layer. Tack coat in between the two courses. Thicknesses shall not be less than indicated after compaction. Road will be crowned. All asphalt shall be pitched to drain away from buildings. Finished elevations shall match the original installation elevations when road was initially built as closely as possible. Utility covers (electric, phone, water, piezometers, etc.) throughout can be reused unless damaged.

a. At the Interpretive Kiosk at Westville Dam, asphalt shall be tied in with concrete slab of the kiosk and proceed 5 feet beyond the downhill edge of the concrete kiosk, the full width of the road, ending with a swale draining to the south-western edge of the dam.

b. Asphalt to the west and south (behind) of the Westville Office shall extend 150 feet beyond the gate and swale off to lake edge. Care will be taken to allow for level placement of motor homes (Refer to Photo 9).

c. At the Westville Office, asphalt at the front side will be pitched to drain to edge of pavement.

d. New pavement width shall match the current width of road pavement throughout, unless otherwise specified above.

5. Crushed Gravel Shoulders

a. Prior to placement of crushed aggregate, prepare and compact the shoulder subgrade along the edges of the newly paved areas.

b. Place, grade, and compact crushed aggregate along the shoulders of the newly paved areas to the finished elevation of the asphalt pavement, except in the area of mowed lawn which will receive topsoil. The crushed aggregate shall be spread, feathered, and compacted to match the outer edge of the shoulders.

6. Topsoil Shoulders, flagpole:

Topsoil will be placed down and seeded for grass.

7. Curbing Placement:

Curbing will be placed to retain existing height of topsoil surrounding the flagpole in the same footprint of existing curbing. Curbing pieces will have a radius that matches current curbing of the flagpole.

(End of Summary of Changes)