This amendment modifies a solicitation for dewatering services at the New Bedford Hurricane Barrier. The amendment provides responses to requests for information, extends the response deadline to August 6, 2021 at 1:00 PM, and attaches a water quality certificate. Key services required include dewatering of gate structures, removal and replacement of gates, and surface preparation and painting of gates and structural components. The solicitation is issued by the U.S. Army Corps of Engineers, New England District. No state sales tax is applicable. Treatment of dewatering discharge and additional costs under the water quality certificate are not anticipated.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| Water Quality Certificate.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| Amendment_0001.pdf | ||
| 0001.pdf | ||
| Prebid Site Visit - Meeting Location.pdf | ||
| Drawings.pdf | ||
| Solicitation W912WJ21B0007.pdf | ||
| Specifications.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to Requests for Information and to extend the bid opening. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Aug-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ21B0007
X 9B. DATED (SEE ITEM 11)
23-Jun-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Aug-2021
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ21B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
1. Please provide an estimate of the infiltration leakage that will have to be pumped?
a. The Government does not have an estimate. This will depend on how well the gate guide seats against the gates guide beams.
2. Please confirm that Government clause 52.229-3 applies and that the project is exempt from state of Massachusetts Sales Tax?
a. It is the contractor’s responsibility to determine tax liability. If applicable, the contractor may submit the applicable tax exemption documentation for a particular state to the Government for signature.
3. Please confirm that no Treatment of dewatering discharge is required?
a. Correct, no treatment required.
4. Can the Government provide the dimension of the existing sump pits shown on Drawing NBF-1-1105 as it is difficult to read? Is it 3-ft x 3-ft x 6” deep?
a. For bidding purposes, assume 3' X 3' X 2'-6" deep, but this will be confirmed at the pre-construction meeting.
5. Can the Government provide an estimate of the time it takes to re-fill the Gate Structure using the 24” Sluice Gate?
a. The government does not have an estimate.
6. Please reference Drawing S-101 and note that there are some inaccessible locations (near the ends of the Gate) of Gate Painting. For those areas, will the Government accept best possible blast and paint practices in lieu of the Specified Procedures?
a. Variances to the specifications can be submitted for review during construction, no change to specifications for bidding purposes.
7. For the Grating and Handrail that sits inside the Truss I horizontal girder, we assume that removal of grating will be necessary to paint the girder. However, the handrail posts are welded to the girder. Is it acceptable to mask off the vertical handrails attached to this girder? Alternatively, we could cut the post free and reweld to the girder and touch up paint. Which would the Government prefer?
a. The Government recommends not removing the handrails. Mask the handrails off to protect them during the painting process but leave them in place.
8. Please confirm that for the Walkway that sit on top of Truss I, the limit of Truss I painting will be the bottom of the W-shape post that supports this Walkway?
a. Yes, that is correct.
9. Per the project specifications, a Water Quality Certificate will be provided by the Government. Will the Water Quality Certificate be provided before the bid date and are additional costs anticipated under the certificate provisions?
a. Bids will not be opened prior to receiving the Water Quality Certificate. Additional costs are not anticipated due to Water Quality Certification conditions.
W912WJ21B0007
NOTE: Water Quality Certificate attached separately.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 05-Aug-2021 01:00 PM to 06-Aug-2021 01:00 PM.