Rev1_Bid Schedule _ 00 41 00.docx
DOCX document 15 KB Posted
- Attached to
- Littleville Electrical Service Upgrades
- Solicitation number
- W912WJ21B0005
About this file
This bidding schedule outlines the requirements for a solicitation to complete electrical service upgrades at Littleville. The contractor will be selected based on a lump sum bid for all work specified in Item 0001 and an allowance for Eversource electrical service work in Item 0002. The total estimated cost will determine the low bidder. All work must be completed within the timeframe specified in the special contract requirements. Bidders must provide a point of contact email for correspondence related to the bid. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District New England as number W912WJ21B0005 for the Littleville Electrical Service Upgrades project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0004.pdf | ||
| Amendment 0003.pdf | ||
| Site Photos.pdf | ||
| Rev1_Specifications Section _01 22 00.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Drawings_Final.pdf | ||
| Specifications.pdf | ||
| Solicitation W912WJ21B0005.pdf | ||
| Drawings_Information.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDING SCHEDULE
Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.
Item No.
Description
Quantity
Unit Unit Price
Amount
| 0001 |
| All Work |
| 1 |
| Job |
| Job |
| $ |
| 0002 |
| Eversource Electrical Service Work Allowance |
Job
Job
$10,000
TOTAL AMOUNT $
Note 1: Bidders must bid all items. The work will be awarded as a whole to one bidder.
Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 and 0002.
Note 2: All work shall be completed within the time period specified in Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK
(APR 1984) FAR 52.211-10.
| Note 3: | Identify a point of contact e-mail for all correspondence related to this | ||
| bid: | @ | . |
File details come from the government source that posted it. Updated .