About this file

This set of construction drawings and related documents outline requirements for replacing electrical conduits and wiring at the North Springfield Lake Dam in North Springfield, Vermont under solicitation number W912WJ20B0005 from the U.S. Army Corps of Engineers, New England District. The scope of work involves demolishing existing conduits and installing new PVC-coated galvanized steel conduits for power, communications, instrumentation and strong motion sensors. Additional requirements include installing new telephone cable and fiber optic cable from the project office to the gatehouse, upgrading instrumentation cables and reconnecting to the existing system, and providing a new service entrance disconnect. The contractor must coordinate work with the utility providers and ensure emergency power is maintained. The drawings depict existing conditions, demolition plans, new work plans including conduit routing and details, riser diagrams and general notes.

View the file

Other files for this federal contract opportunity

Other files attached to NSL Replace the Electrical Conduits, newest first.
File Type Posted
W912WJ20B0005 Bid Abstract.pdf PDF
Electric.jpeg JPEG file
Data.jpeg JPEG file
Virtual Site Visit Presentation.pdf PDF
Amendment 0002.pdf PDF
Virtual Site Visit Drawings _2.png PNG image
Amendment 0003.pdf PDF
Solicitation W912WJ20B0005 Amendment 0001.pdf PDF
North Springfield Dam Conduits - Photos.pdf PDF
Drawings.pdf PDF
Solicitation W912WJ20B0005.pdf PDF
Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-001

C O

VE

R

S H

EE

T

AN

D

IN

D

EX

D .N

G U

YE

N

D .N

G U

YE

N

B.

H

EA

D

J.

SW

AL

LE

Y /S

AN

SI

D 1:

AP

R

IL

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

New England District

ELECTRICAL ABBREVIATIONS, GENERAL NOTES AND LEGEND

SITE PLAN, EXISTING CONDITIONS AND DEMOLITION

SITE PLAN AND NEW WORK

BRIDGE TRANSITION PLAN, DEMOLITION AND SERVICE BRIDGE SECTION

BRIDGE TRANSITION PLAN AND NEW WORK AND SERVICE BRIDGE SECTION

SPILLWAY ACCESS BRIDGE PLAN, ELEVATION FACING SOUTH SPILLWAY ACCESS BRIDGE SECTION

DESIGN FILESHEET NO.

G-001

INDEX TO DRAWINGS

SHEET TITLE

E-001

ED101

E-101

ED401

E-501

E-502

CON-NS-436_G-001.DWG COVER SHEET AND INDEX

CON-NS-436_E-001.DWG

CON-NS-436_ED101.DWG

CON-NS-436_E-101.DWG

CON-NS-436_ED401.DWG

CON-NS-436_E-501.DWG

CON-NS-436_E-502.DWG

SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL

OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET

APPROVED FOR TECHNICAL ADEQUACY BY:

TECHNICAL LEAD ENGINEER DATE

DATE

DATE

DATE

DATE

APPROVED BY:

APPROVAL RECOMMENDED BY:

CHIEF, ENGINEERING DIVISION

This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.

REVIEWED BY:

CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH

REVIEWED BY:

CHIEF, DESIGN BRANCH

CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCHW912WJ20B0005

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

NORTH SPRINGFIELD LAKE DAM

NORTH SPRINGFIELD, VERMONT

ED601

E-601

CON-NS-436_ED601.DWG

CON-NS-436_E-601.DWG

RISER DIAGRAM AND DEMOLITION

RISER DIAGRAM AND NEW WORK

REPLACE CONDUITS AND WIRING

DATE

APPROVED BY:

CHIEF, TECHNICAL SUPPORT BRANCH/DEPUTY CHIEF ENG DIV

PROJECT

LOCATION

CHESTER

LONDONDERRY

10030

131 91

CLAREMONT

SPRINGFIELD

CHARLESTOWN

BELLOW

FALLS

JAMAICARAWSONVILLE

WINDSOR

BRATTLEBORO

KEENE

NOT TO SCALE

TOWNSHEND

121 12A

10 89

NEW

HAMPSHIRE

VERMONT

SHEET NO. SHEET TITLE

61 SPILLWAY ACCESS BRIDGE GENERAL PLAN AND ELEVATION

REPAIR AND PAINT SPILLWAY BRIDGE CONCRETE AND REINFORCEMENT DETAILS2

DRAWING NUMBER

CON-337

CON-276

REPLACE SUSPENDED FUEL TANK SITE PLAN AND INDEX

CT-1-5097

INDEX TO INFORMATION DRAWINGS

GATE

RUNWAY

LOG BOOM

LOG BOOM

FIELD OFFICE

UTILITY BUILDING

RE

SE

RV

O

IR

R

O

AD

RIVER

BLACK

SPILLWAY

ACCESS

BRIDGE

OUTLET WORKS

SERVICE BRIDGE

NOT TO SCALE

LOCATION PLANVICINITY MAP

PROPERTY LINE

PROJECT

LOCATION

MAPLE

S

TR

EET

TOP OF DAM

DATE

FEB 1958

OCT 1987

MAY 1994

3 APRIL 2020

13 April 2020

13 April 2020

PHILLIPS.HENRY.S.1491053

Digitally signed by

PHILLIPS.HENRY.S.1491053662

Date: 2020.04.13 08:17:25 -04'00'

TESSIER.MATTHEW.E.1377053

Digitally signed by

TESSIER.MATTHEW.E.1377053253

Date: 2020.04.13 09:35:00 -04'00'

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

DISCONNECT SWITCH

AMPERES

AMPERE INTERRUPTING CAPACITY

AUTHORITY HAVING JURISDICTION

ABOVE FINISH GRADE

AIR HANDLING UNIT

ABOVE FINISH FLOOR

AMERICAN WIRE GAUGE

CONDUIT

CIRCUIT

CIRCUIT BREAKER

CENTERLINE

BUILDING

COPPER

ELECTRICAL CONTRACTOR

ELECTRICAL METALLIC TUBING

GROUND FAULT INTERRUPTER

GROUND OR GROUNDING

FULL LOAD AMPERES

THOUSAND CIRCULAR MILS

GALVANIZED RIGID METALLIC CONDUIT

kcmil

FLA

FT

GFI

GRMC

GND,G

FEET

EMT

F FUSE

CU

EC

CB

CKT

CL

AWG

C

BLDG

AHU

AIC

A

AFG

AFF

AHJ

PHASE

QUANTITY

TELEPHONE

SYMMETRICAL

POLYVINYL CHLORIDE

RIGID METAL CONDUIT

TRANSFORMER

WEATHERPROOF

UNLESS OTHERWISE NOTED

UNDERGROUND OR UNDERGRADE

UNDERWRITERS LABORATORIES

XFMR

WP

W

V

DELTA

WYE

WIRE

VOLT

UG

UL

U.O.N.

SP

TEL

SYM

SPARE

PWR

QTY

PVC

RMC

POWER

KILOWATTS

LIGHTING

MISCELLANEOUS

KILOVOLT AMPERES

MAIN CIRCUIT BREAKER

ASSOCIATION

NOT TO SCALE

PUSHBUTTON

NATIONAL ELECTRICAL

NATIONAL ELECTRIC CODE

NATIONAL FIRE PROTECTION

NTS

PNL

P

PB

PANEL

POLE

NEC

NEMA

NFPA

MCB

MISC

kW kVA

LTG

GENERAL ABBREVIATIONS

Ø Y

LEGEND

GENERAL NOTES:

MANUFACTURERS ASSOCIATION

ATS AUTOMATIC TRANSFER SWITCH

PRI PRIMARY

RCPT RECEPTACLE

RGS RIDGE GALVANIZED STEEL

SEC

S.E. SERVICE ENTRANCE

SECONDARY

TWR TOWER

FS FUSED SWITCH (DISCONNECT)

E-001

EL

EC

TR

IC

AL

A

BB

R

EV

IA

TI

O

N S

G

EN

ER

AL

N O

TE

S

AN

D

L

EG

EN

D

D .N

G U

YE

N

D .N

G U

YE

N

B.

H

EA

D

J.

SW

AL

LE

Y

AN

SI

D 1:

AP

R

IL

COMM

E

NEW COMMUNICATION CONDUIT / WIRE / EQUIPMENT

NEW POWER CONDUIT / WIRE/ EQUIPMENT

EXISTING CONDUIT / WIRE / EQUIPMENT TO BE DEMOLISHED AND REPLACED

EXISTING CONDUIT / WIRE / EQUIPMENT TO REMAIN

EXISTING MANHOLE TO REMAIN

EXISTING UTILITY POLE TO REMAIN

ALL NECESSARY ADDITIONS AND ALTERATIONS TO EXISTING WORK SHALL BE INCLUDED IN THE CONTRACT AS REQUIRED TO

PROVIDE AND MAINTAIN A COMPLETE AND PROPER ELECTRICAL INSTALLATION.

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY RELOCATION OF EQUIPMENT TO ALLOW FOR WORK.

2. DURING DISCONNECTION/RECONNECTION/REINSTALLATION OF EQUIPMENT THAT WILL RESULT IN ELECTRICAL POWER BEING DOWN, CONTRACTOR SHALL KEEP NAE PERSONNEL INFORMED (JASON FARNSWORTH, PROJECT MANAGER). CONTRACTOR SHALL ENSURE THAT THE EMERGENCY ELECTRICAL POWER GENERATOR CAN BE ENGAGED TO ENSURE OPERATION AS NEEDED

DURING THIS WORK.

3. THE CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF PIPING AND DUCTWORK TO ALLOW FOR WORK.

4. EQUIPMENT TO BE TURNED OVER TO THE CONTRACTING OFFICER'S REPRESENTATIVE FROM THE CONTRACTOR SHALL BE

CLEAN AND IN WORKING ORDER.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF UNUSED CONDUIT OR CONDUCTORS.

6. ABANDONMENT IN PLACE OF UNUSED CONDUIT WHERE CONCEALED IN FLOORS OR WALLS IS THE RESPONSIBILITY OF THE

CONTRACTOR.

7. THE REMOVAL OF UNUSED CONDUIT FROM CEILINGS, EXPOSED AREAS, AND ACCESSIBLE LOCATIONS IS REQUIRED IN THIS

CONTRACT.

8. AS PART OF THIS CONTRACT THE REMOVAL AND DISPOSAL OF ALL EQUIPMENT INDICATED TO BE DEMOLISHED SHALL BE

PERFORMED BY THE CONTRACTOR.

9. VERIFICATION THAT THE EXISTING EQUIPMENT SHALL BE RESTORED TO ITS ORIGINAL OPERATING CONDITION AFTER THE WORK

OF THIS CONTRACT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

10. THE CONTRACTOR SHALL FILL, SEAL AND REPAIR THE EXISTING BUILDING PENETRATIONS, EXPOSED FROM DEMOLITION, TO

MATCH EXISTING ADJACENT BUILDING FINISHES.

11 WHERE THE PLANS CALL FOR DEMOLITION OF CONDUIT OR REPLACEMENT OF CONDUIT, EXISTING SUPPORTS MUST BE

DEMOLISHED AND NEW SUPPORTS PROVIDED.

12. CONDUITS WITHIN EXISTING DUCTBANKS ARE TO REMAIN IN PLACE.

13. CONTRACTOR SHALL COORDINATE WORK WITH UTILITY PROVIDERS GREEN MOUNTAIN POWER AND VTEL VERMONT

TELEPHONE COMPANY AS REQUIRED.

E

P1

ED101

SI

TE

P

LA

N

EX

IS

TI

N G

C O

N D

IT

IO

N S

AN

D

D

EM

O

LI

TI

O

N

D .N

G U

YE

N

D .H

AS

SE

TT

B.

H

EA

D

J.

SW

AL

LE

Y

AN

SI

D 1:

AP

R

IL

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

A1 SITE PLAN EXISTING CONDITIONS AND DEMOLITION

SCALE: 1/32" = 1'-0"

N

DEMOLISH EXISTING TELEPHONE CABLE EXTENDING FROM THE PROJECT

OFFICE ALONG OVERHEAD UTILITY POLES THROUGH THE CONDUIT

SYSTEM TO THE GATEHOUSE. SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING POWER CONDUCTORS EXTENDING FROM THE

UTILITY TRANSFORMERS TO THE GATEHOUSE. SEE NOTES ON SHEET

ED-601.

DEMOLISH EXISTING CONDUITS UNDER THE SPILLWAY ACCESS BRIDGE

TO INCLUDE PULL BOXES, EXPANSION JOINTS, AND HANGERS. SEE

NOTES ON SHEET ED-601.

DEMOLISH EXISTING STRONG MOTION POWER CONDUIT AND

ASSOCIATED DISCONNECT SWITCH. RETAIN CONDUCTORS FOR REUSE.

SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING STRONG MOTION COMMUNICATION CONDUIT.

RETAIN CONDUCTORS FOR REUSE. SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING ABANDONED CONDUIT AND ASSOCIATED

CONDUCTORS IF PRESENT.

DEMOLISH EXISTING INSTRUMENTATION CONDUIT FROM THE DAM CREST

ABUTMENT TO THE GATEHOUSE. SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING COMMUNICATION CONDUIT FROM THE DAM CREST

ABUTMENT TO THE GATEHOUSE. SEAL WALL PENETRATION AT THE

GATEHOUSE AS NECESSARY.

DEMOLISH EXISTING POWER CONDUIT FROM THE DAM CREST ABUTMENT

TO THE GATEHOUSE. RETAIN SUFFICIENT CONDUIT LENGTH AT THE

GATEHOUSE TO ALLOW FOR INTERFACING WITH THE NEW CONDUIT TO

BE INSTALLED. DEMOLISH ASSOCIATED JUNCTION BOX AND DISCONNECT

SWITCH. RETAIN CONDUCTORS TO/FROM DISCONNECT SWITCH FOR

REUSE PER SHEET E-601 KEY NOTE 9. SEE NOTES ON SHEET ED-601.

SHEET KEY NOTES

R

ES

ER

VO

IR

R

O

AD

SPILLWAY ACCESS BRIDGE

EAST ABUTMENT

WEST ABUTMENT

EXISTING STRONG

MOTION SENSOR

SP

IL

LW

AY

C

EN

TE

R

LI

NE

ELECTRIC

MANHOLE

EMH-1 TELEPHONE

MANHOLE

CMH-1

GATE

HOUSE

PR

O

JE

C

T O

FF

IC

E

SE

R

VI

C

E

BR

ID

G

E

COMMUNICATION CONDUIT

POWER CONDUIT

POWER CONDUIT

COMMUNICATION CONDUIT

INSTRUMENTATION CONDUIT

R

ES

ER

VO

IR

R

O

AD

UTILTY TRANSFORMER

POLE P4

TELEPHONE POLE

P5

P1

P2

P3

N.

T.

S.

AP

PR

O

X.

F

T

NO

T

SH

O W

N

0 16' 64'32'

METER MANHOLE

ED401

D1

LEGEND

CABLES OVERHEAD OR IN EXPOSED

CONDUITS MOUNTED ON BRIDGES

CABLES IN BURIED CONDUIT

SE

R

VI

C

E

BR

ID

G

E

WEST ABUTMENT

ELECTRIC

MANHOLE

EMH-1

TELEPHONE

MANHOLE

CMH-1

TO EXISTING INSTRUMENTATION

ALONG DAM CREST

EXISTING

DISCONNECT

SWITCH

EXISTING

PULL BOX

EXISTING

PULL BOX

13'-2 5/16"

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

D1 BRIDGE TRANSITION PLAN DEMOLITION

SCALE: 3/32" = 1'-0"

N

A1 SERVICE BRIDGE SECTION

SCALE: 1/2" = 1'-0"

A1

ED401

ED401

BR

ID

G E

TR

AN

SI

TI

O N

P

LA

N D

EM

O

LI

TI

O N

A N

D

SE

R

VI

C E

BR

ID

G E

SE

C

TI

O

N

D .N

G U

YE

N

D .H

AS

SE

TT

B.

H

EA

D

J.

SW

AL

LE

Y

AN

SI

D 1:

AP

R

IL

SHEET KEY NOTES

POWER CONDUIT

COMMUNICATION CONDUIT

INSTRUMENTATION CONDUIT

COMMUNICATION CONDUIT

POWER CONDUIT

EXISTING INDIVIDUAL 22AWG PAIRS RUN FROM PIEZOMETERS IN THE DAM

CREST, THROUGH MANHOLE CMH-1, ACROSS THE SERVICE BRIDGE, AND

TERMINATE IN A PANEL INSIDE THE GATEHOUSE. CUT EXISTING

INSTRUMENTATION CABLES IN CMH-1 AND DEMOLISH FROM THE

GATEHOUSE TO CMH-1 WHILE RETAINING FROM CMH-1 TO THE

PIEZOMETERS. RECORD EACH CABLE CONNECTION BEFORE

DEMOLISHING TO CMH-1 TO ENSURE ACCURACY OF NEW CONNECTIONS

PER E-601. LEAVE ENOUGH SLACK ON THE EXISTING CABLES IN THE

MANHOLE TO INTERFACE WITH THE NEW CABLE TO BE INSTALLED PER

E-601. SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING INSTRUMENTATION CONDUIT FROM THE DAM CREST

ABUTMENT TO THE GATEHOUSE. RETAIN SUFFICIENT CONDUIT LENGTH

AT THE GATEHOUSE TO ALLOW FOR INTERFACING WITH THE NEW

CONDUIT TO BE INSTALLED. SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING COMMUNICATION CONDUIT FROM THE DAM CREST

ABUTMENT TO THE GATEHOUSE. SEAL WALL PENETRATION AT THE

GATEHOUSE AS NECESSARY. SEE NOTES ON SHEET ED-601.

DEMOLISH EXISTING POWER CONDUIT FROM THE DAM CREST ABUTMENT

TO THE GATEHOUSE. RETAIN SUFFICIENT CONDUIT LENGTH AT THE

GATEHOUSE TO ALLOW FOR INTERFACING WITH THE NEW CONDUIT TO

BE INSTALLED. DEMOLISH ASSOCIATED JUNCTION BOX AND DISCONNECT

SWITCH. RETAIN CONDUCTORS TO/FROM DISCONNECT SWITCH FOR

REUSE PER SHEET E-601 KEY NOTE 9. POWER SOURCE FOR THIS

DISCONNECT IS UNKNOWN, CONTRACTOR SHALL SURVEY CIRCUIT PRIOR

TO STARTING DEMOLITION. SEE NOTES ON SHEET ED-601.

0 8' 32'16'

0 2' 4'1'

A1

ED101

D1

ED401

SPARE

GATEHOUSE

ENTRANCE FLOOR SERVICE BRIDGE DAM CREST SPILLWAY ACCESS BRIDGE

SPILLWAY

EARTH

EA

R

TH

EAR

TH

ABUTMENT

PROJECT OFFICE

GROUND FLOORGRADE

STRONG

MOTION

SENSOR

CMH-1

EMH-1

(3) UTILITY

TRANSFORMERS

LOWER FLOOR

ABUTMENT

EAR

TH

EA

R

TH

TO EXISTING INSTRUMENTATION

ALONG DAM CREST

P1P2P3P4P5

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

D2 RISER DIAGRAM - DEMOLITION

SCALE: NOT TO SCALE

ED601

R

IS

ER

D

IA

G

R

AM

D

EM

O

LI

TI

O

N

D .N

G U

YE

N

D .N

G U

YE

N

B.

H

EA

D

J.

SW

AL

LE

Y

AN

SI

D 1:

AP

R

IL

DEMOLISH EXISTING TELEPHONE CABLE EXTENDING FROM THE PROJECT

OFFICE ALONG OVERHEAD UTILITY POLES THROUGH THE CONDUIT

SYSTEM TO THE GATEHOUSE. DISCONNECTING THE CABLES AT EACH

END TO BE DONE BY OTHERS.

DEMOLISH EXISTING POWER CONDUCTORS EXTENDING FROM THE

UTILITY TRANSFORMERS TO THE GATEHOUSE SWITCHBOARD.

CONTRACTOR SHALL FURNISH SERVICES FROM THE UTILITY PROVIDER

AS REQUIRED.

DEMOLISH EXISTING CONDUITS UNDER THE SPILLWAY ACCESS BRIDGE

TO INCLUDE PULL BOXES, EXPANSION JOINTS, AND HANGERS.

DEMOLISH EXISTING STRONG MOTION POWER CONDUIT FROM THE PULL

BOX TO APPROXIMATELY 10FT PAST THE POINT OF BURIAL. PROVIDE

EXCAVATION AS REQUIRED. EXCAVATION MUST BE COMPLETED USING

HAND TOOLS. DEMOLISH ASSOCIATED DISCONNECT SWITCH. RETAIN

CONDUCTORS FOR REUSE.

DISCONNECT STRONG MOTION COMMUNICATION WIRING IN THE SENSOR

AND PULL COMMUNICATION WIRING BACK TO CMH-1. LEAVE

COMMUNICATION WIRING NEATLY COILED IN CMH-1 FOR REUSE.

DEMOLISH COMMUNICATION CONDUIT FROM JUNCTION BOX TO TEN FEET

PAST THE POINT OF BURIAL.

DEMOLISH EXISTING ABANDONED CONDUIT AND ASSOCIATED

CONDUCTORS IF PRESENT.

EXISTING INDIVIDUAL 22AWG PAIRS RUN FROM PIEZOMETERS IN THE DAM

CREST, THROUGH MANHOLE CMH-1, ACROSS THE SERVICE BRIDGE, AND

TERMINATE IN A PANEL INSIDE THE GATEHOUSE. CUT EXISTING

INSTRUMENTATION CABLES IN CMH-1 AND DEMOLISH FROM THE

GATEHOUSE TO CMH-1 WHILE RETAINING FROM CMH-1 TO THE

PIEZOMETERS. RECORD EACH CABLE CONNECTION BEFORE

DEMOLISHING TO CMH-1 TO ENSURE ACCURACY OF NEW CONNECTIONS

PER E-601. LEAVE A LOOP AROUND THE INTERIOR OF THE MANHOLE ON

THE EXISTING CABLES TO PROVIDE SUFFICIENT SLACK TO INTERFACE

WITH THE NEW CABLE TO BE INSTALLED PER E-601.

DEMOLISH EXISTING INSTRUMENTATION CONDUIT FROM THE DAM CREST

ABUTMENT TO THE THREADED COUPLING NEAREST THE GATEHOUSE.

ENSURE SUFFICIENT CONDUIT LENGTH AT THE GATEHOUSE TO ALLOW

FOR INTERFACING WITH THE NEW CONDUIT TO BE INSTALLED.

DEMOLISH EXISTING COMMUNICATION CONDUIT FROM THE DAM CREST

ABUTMENT TO THE GATEHOUSE. SEAL WALL PENETRATION AT THE

GATEHOUSE AS NECESSARY.

DEMOLISH EXISTING POWER CONDUIT FROM THE DAM CREST ABUTMENT

TO THE THREADED COUPLING NEAREST THE GATEHOUSE. ENSURE

SUFFICIENT CONDUIT LENGTH AT THE GATEHOUSE TO ALLOW FOR

INTERFACING WITH THE NEW CONDUIT TO BE INSTALLED. DEMOLISH

ASSOCIATED JUNCTION BOX AND DISCONNECT SWITCH. RETAIN

CONDUCTORS TO/FROM DISCONNECT SWITCH FOR REUSE PER SHEET

E-601 KEY NOTE 9.

SHEET KEY NOTES

4 5

O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M M

C O

M M

E E

E E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E E

E

C O

M M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

E-101

S I T

E

P

L A

N

A

N D

W

R

K

D

N G

U Y

E N

D

H A

S S

E T

T

B

H E

A D

J S

W A

L L E

Y

A N

S I

D

A P

R I L

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

T

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P S

F

E

N G

I N

E E

R S

N E

W

E

N G

L A

I S

T R

I C

T

V

I R

G I N

A

A

D

C O

N C

O R

D

M

A

S C

A L E

S

H E

E T

D R

A W

I N

G

C

O D

E

O F

N O

R T

H

S

P R

I N

G F

I E

L

K

M

N O

R T

H

S

P R

I N

G F

I E

L D

V

E R

M O

N T

R E

P L A

N

D U

I T

S

A

R

I N

G

W W

J B

C O

N N

S

A1

SITE PLAN AND NEW WORK

SCALE: 1/32" = 1'-0"

N

METER MANHOLE

E

A

B

U

T

M

E

N

T

P

R

O

J

E

F

I C

E

S E

R V

I C

E

B

R I D

G E

PROVIDE COPPER TELEPHONE CABLE AND FIBER OPTIC CABLE PER SPEC

26 05 19.10 10. CABLES ARE TO RUN ADJACENT TO EACH OTHER FROM

THE TELECOMMUNICATIONS CLOSET IN THE PROJECT OFFICE ALONG

OVERHEAD UTILITY POLES THROUGH THE CONDUIT SYSTEM TO THE UL

APPROVED BREAKOUT BOXES ON THE OPERATING FLOOR OF THE

GATEHOUSE.

PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER

AND COMMUNICATION TO INCLUDE PVC COATED

EXPANSION/DEFLECTION FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.

PROVIDE PVC COATED GALVANIZED STEEL CONDUIT FOR STRONG

MOTION COMMUNICATION FROM THE NEW JUNCTION BOX TO THE

EXISTING STRONG MOTION COMMUNICATION CONDUIT. RECONNECT

EXISTING CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER

PREVIOUS CONDITION.

PROVIDE PVC COATED STEEL GALVANIZED CONDUIT FOR STRONG

MOTION POWER FROM THE NEW JUNCTION BOX TO THE EXISTING

STRONG MOTION POWER CONDUIT. PROVIDE NEW 30A FUSED STAINLESS

STEEL NEMA 4X DISCONNECT SWITCH. RECONNECT EXISTING

CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER PREVIOUS

CONDITION.

PROVIDE STAINLESS STEEL NEMA 4X ENCLOSURE TO BE MOUNTED

INSIDE MANHOLE CMH-1. PROVIDE A TERMINAL STRIP INSIDE THE

ENCLOSURE TO INTERFACE EXISTING INDIVIDUAL 22AWG CABLES

COMING FROM THE DAM CREST WITH NEW 25-PAIR 22AWG CABLE.

PROVIDE NEW 25-PAIR 22AWG CABLE PER SPEC 26 05 19.10 10 FROM THE

TERMINAL STRIP TO THE GATEHOUSE PANEL. RECONNECT CABLE PAIRS

TO GATEHOUSE PANEL PER PREVIOUS CONFIGURATION PER ED601 KEY

NOTE 7.

SHEET KEY NOTES

COMMUNICATION CONDUIT

POWER CONDUIT

P3

R

E

S

E

R

V

O

A

D

S

P

I

L

L

W

Y

C

E

B

I

D

G

E

WEST ABUTMENT

EXISTING STRONG

MOTION SENSOR

S

P

I

L

L

W

Y

N

T

N

E

ELECTRIC

MANHOLE

EMH-1

TELEPHONE

MANHOLE

CMH-1

GATE

HOUSE

POWER CONDUIT

R E

S E

R V

O

A

D

UTILITY TRANSFORMER

POLE P4

TELEPHONE POLE

P5

P1

P2

0 16' 64'32'

N

T

S

E-401

D1

E-402

E1

INSTRUMENTATION/COMMUNICATION CONDUIT

JS

E

C O

M M

C O

M M

E E E E E E E E E E E

COMM COMM COMM COMM COMM COMM

SE

R

VI

C

E

BR

ID

G

E

SPILLWAY ACCESS BRIDGE

ELECTRIC

MANHOLE

EMH-1

TELEPHONE

MANHOLE

CMH-1

C O

M M

E E

TO EXISTING INSTRUMENTATION

ALONG DAM CREST EXISTING CONDUITS

AND CONDUCTORS

TO REMAIN

EXISTING CONDUITS

AND CONDUCTORS

TO REMAIN

13'-2 5/16"

E-501

BR

ID

G E

TR

AN

SI

TI

O N

P

LA

N , N

EW

W

O R

K

AN

D S

ER

VI

C E

BR

ID

G E

SE

C

TI

O

N

D .N

G U

YE

N

D .H

AS

SE

TT

B.

H

EA

D

J.

SW

AL

LE

Y

AN

SI

D 1:

AP

R

IL

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

D1 BRIDGE TRANSITION PLAN, NEW WORK

SCALE: 3/32" = 1'-0"

N

A1 SERVICE BRIDGE SECTION

SCALE: 1/2" = 1'-0"

A1 E-501

PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER

AND COMMUNICATION TO INCLUDE PVC COATED

EXPANSION/DEFLECTION FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.

PROVIDE STAINLESS STEEL NEMA 4X PULL BOXES SIZED PER NFPA 70.

PROVIDE STAINLESS STEEL NEMA 4X ENCLOSURE TO BE MOUNTED

INSIDE MANHOLE CMH-1. PROVIDE A TERMINAL STRIP INSIDE THE

ENCLOSURE TO INTERFACE EXISTING INDIVIDUAL 22AWG CABLES

COMING FROM THE DAM CREST WITH NEW 25-PAIR 22AWG CABLE.

PROVIDE NEW 25-PAIR 22AWG CABLE PER SPEC 26 05 19.10 10 FROM THE

TERMINAL STRIP TO THE GATEHOUSE PANEL. RECONNECT CABLE PAIRS

TO GATEHOUSE PANEL PER PREVIOUS CONFIGURATION UTILIZING

LABELS MADE PER ED601 KEY NOTE 7.

PROVIDE NECESSARY EQUIPMENT TO INTERFACE NEW PVC COATED

GALVANIZED STEEL CONDUITS WITH EXISTING CONCRETE ENCASED

CONDUITS.

PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X DISCONNECT

SWITCH. PROVIDE FLEXIBLE CONDUIT TO INTERFACE WITH NEW

JUNCTION BOX. RECONNECT EXISTING CONDUCTORS IN PRIOR

CONFIGURATION.

SHEET KEY NOTES

2" INSTRUMENTATION/

COMMUNICATION

2" POWER

0 8' 32'16'

0 2' 4'1'

DO NOT WELD TO ANY BRIDGE MEMBER.

SHEET GENERAL NOTES

A1 C-101

D1 E-501

SPARESPARE

FL

W

WEST

ABUTMENT

DRAIN (TYP.)

R

ES

ER

VO

IR

R O

AD

MAPLE STREET

B

R

ID

G E

S

PI

LL

W

AY

D

IS

C H

AR

G

E C

H

AN

N

EL

EAST

ABUTMENT

℄ BRIDGE

METER MANHOLE

UTILITY TRANSFORMER

POLE P4

TELEPHONE

POLE P5

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE

COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM

E E

E E

E

COMM

C O

M M

C O

M M

E E

SPILLWAY ACCESS BRIDGE

EXISTING CONDUITS

AND CONDUCTORS

TO REMAIN

E E E

E

E E

COMM COMM

C O

M M

C O

M M

COMME E

℄ BRIDGE

SO

LI

C

IT

AT

IO

N N

O

D

ES

IG

N

ED

B

Y:

D

ES

C R

IP

TI

O N

M

AR

K

SI

ZE

SU

BM

IT

TE

D B

Y:

D

AT

E

C O

N

TR

AC

T

N O

C

H

EC

KE

D

B Y:

D R

AW

N

B Y:

IS

SU

E D

AT

E:

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U .S

.A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N

EW

E N

G

LA

N D

D

IS

TR

IC

T

VI

R G

IN

IA

R O

AD

C

O N

C O

R D

, M A

2-

SC

AL

E:

SH

EE

T

D R

AW

IN

G C

O D

E:

O F

N O

R

TH

S

PR

IN

G

FI

EL

D L

AK

E

D

AM

N O

R

TH

S

PR

IN

G

FI

EL

D , V

ER

M

O N

T R

EP

LA

C E

C O

N D

U

IT

S

AN

D W

IR

IN

G W

2W

J2 0B

C O

N -N

S-

E1 SPILLWAY ACCESS BRIDGE PLAN

SCALE: 3/32" = 1'-0"

N

A1 ELEVATION FACING SOUTH

SCALE: 1/8" = 1'-0" A6 SPILLWAY ACCESS BRIDGE SECTION

SCALE: 1/4" = 1'-0"

E-502

SP

IL

LW

AY

A C

C

ES

S

BR

ID

G

E

PL

AN

EL

EV

AT

IO

N

F

AC

IN

G

S O

U

TH

A N

D

SP

IL

LW

AY

A

C C

ES

S

BR

ID

G E

SE

C

TI

O

N

D .N

G U

YE

N

D .H

AS

SE

TT

B.

H

EA

D

J.

SW

AL

LE

Y

AN

SI

D 1:

AP

R

IL

A6 E-402

PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER

AND COMMUNICATION TO INCLUDE PVC COATED

EXPANSION/DEFLECTION FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.

PROVIDE STAINLESS STEEL NEMA 4X PULL BOXES SIZED PER NFPA 70.

PROVIDE SCHEDULE 80 PVC CONDUIT FOR STRONG MOTION

COMMUNICATION FROM THE NEW JUNCTION BOX TO THE EXISTING

STRONG MOTION COMMUNICATION CONDUIT. RECONNECT EXISTING

CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER PREVIOUS

CONDITION.

PROVIDE SCHEDULE 80 PVC CONDUIT FOR STRONG MOTION POWER

FROM THE NEW JUNCTION BOX TO THE EXISTING STRONG MOTION

POWER CONDUIT. PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X

DISCONNECT SWITCH. RECONNECT EXISTING CONDUCTORS IN PRIOR

CONFIGURATION. BURY CONDUIT PER PREVIOUS CONDITION.

PROVIDE NECESSARY EQUIPMENT TO INTERFACE NEW PVC COATED

GALVANIZED STEEL CONDUITS WITH EXISTING CONCRETE ENCASED

CONDUITS.

SHEET KEY NOTES

0 8' 32'16'

0 8'4' 16' 0 4' 8'2'

A1 E-402

DO NOT WELD TO ANY BRIDGE MEMBER.

SHEET GENERAL NOTES

A1 C-101

E1 E-402

E1 E-402

GATEHOUSE

ENTRANCE FLOOR SERVICE BRIDGE DAM CREST SPILLWAY ACCESS BRIDGE

SPILLWAY

E

A

R

T

H

E

A

R

T

H

EAST ABUTMENT

PROJECT OFFICE

GROUND FLOORGRADE

STRONG

MOTION

SENSOR

CMH-1

EMH-1

(3) UTILITY

TRANSFORMERS

LOWER FLOOR

WEST ABUTMENT

E

A

R

T

H

E

A

R

T

H

TO EXISTING INSTRUMENTATION

ALONG DAM CREST

P1P2P3P4P5

G

G

GATE TOWER

SERVICE DISCONNECT

UTILITY

GROUNDING

ELECTRODE

GROUNDING

ELECTRODE

G

GATE TOWER

DISTRIBUTION PANEL

G

GATE TOWER

GENERATOR

EQUIPMENT

GROUNDING

CONDUCTOR

#4 AWG

EQUIPMENT

GROUNDING

CONDUCTOR

#4 AWG

EQUIPMENT

GROUNDING

CONDUCTOR

EXISTING

GROUNDING

ELECTRODE

CONDUCTOR

#4 AWG

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U S

A

R M

Y

C

O R

P

E

N G

I N

E E

R S

N E

W

E

N G

L A

S

T R

I C

T

V

I R

G I N

A

D

C O

N C

O R

D

M

A

S C

A L E

S

H E

E T

D R

A W

I N

G

C

O D

E

O F

N O

R T

H

S

P R

I N

G F

I E

K

M

N O

R T

H

S

P R

I N

G F

I E

L D

V

E R

M O

N T

R E

P L A

N

D U

I T

S

A

R

I N

G

W W

J B

C O

N N

S

D2

RISER DIAGRAM AND NEW WORK

SCALE: NOT TO SCALE

E-601

R I S

A

G R

A M

A N

D

N

R

K

D

N G

U Y

E N

D

N G

U Y

E N

B

H E

A D

J S

W A

L L E

Y

A N

S I

D

A P

R I L

PROVIDE COPPER TELEPHONE CABLE AND FIBER OPTIC CABLE PER SPEC 26

05 19.10 10. CABLES ARE TO RUN ADJACENT TO EACH OTHER FROM THE

TELECOMMUNICATIONS CLOSET IN THE PROJECT OFFICE ALONG OVERHEAD

UTILITY POLES THROUGH THE CONDUIT SYSTEM TO UL APPROVED

BREAKOUT BOXES ON THE OPERATING FLOOR OF THE GATEHOUSE. POLES

ARE OWNED BY THE UTILITY, AND CONTAIN AN EXISTING SUPPORTING

CABLE. COORDINATE WORK WITH UTILITY. TERMINATIONS AT EACH END TO

BE PROVIDED BY OTHERS.

PROVIDE (3) 2/0 THWN AND (1) #4 THWN GROUND CONDUCTORS FROM THE

UTILITY TRANSFORMERS TO THE GATEHOUSE.

PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER

AND COMMUNICATION TO INCLUDE PVC COATED EXPANSION/DEFLECTION

FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.

PROVIDE STAINLESS STEEL NEMA 4X PULL BOXES SIZED PER NFPA 70.

PROVIDE PVC COATED STEEL GALVANIZED STEEL CONDUIT FOR STRONG

MOTION COMMUNICATION FROM THE NEW JUNCTION BOX TO THE EXISTING

STRONG MOTION COMMUNICATION CONDUIT. RECONNECT EXISTING

CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER PREVIOUS

CONDITION.

PROVIDE PVC COATED GALVANIZED STEEL CONDUIT FOR STRONG MOTION

POWER FROM THE NEW JUNCTION BOX TO THE EXISTING STRONG MOTION

POWER CONDUIT. PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X

DISCONNECT SWITCH. RECONNECT EXISTING CONDUCTORS IN PRIOR

CONFIGURATION. BURY CONDUIT PER PREVIOUS CONDITION.

PROVIDE STAINLESS STEEL NEMA 4X ENCLOSURE MINIMUM SIZE 16" X 16" TO

BE MOUNTED INSIDE MANHOLE CMH-1 OFFSET FROM WALLS WITH STRUT TO

ALLOW WATER TO FLOW BEHIND. PROVIDE A TERMINAL STRIP INSIDE THE

ENCLOSURE TO INTERFACE EXISTING INDIVIDUAL 22AWG CABLES COMING

FROM THE DAM CREST WITH NEW 25-PAIR 22AWG CABLE. PROVIDE NEW

25-PAIR 22AWG CABLE PER SPEC 26 05 19.10 10 FROM THE TERMINAL STRIP

TO THE GATEHOUSE PANEL. RECONNECT CABLE PAIRS TO GATEHOUSE

PANEL PER PREVIOUS CONFIGURATION UTILIZING LABELS MADE PER ED601

KEY NOTE 7.

PROVIDE NECESSARY EQUIPMENT TO INTERFACE NEW PVC COATED

GALVANIZED STEEL CONDUITS WITH EXISTING CONCRETE ENCASED

CONDUITS.

PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X DISCONNECT SWITCH.

PROVIDE FLEXIBLE CONDUIT TO INTERFACE WITH NEW JUNCTION BOX.

RECONNECT EXISTING CONDUCTORS IN PRIOR CONFIGURATION.

PROVIDE SERVICE ENTRANCE DISCONNECT WITH 100A FUSES PER

SPECIFICATION 26 20 00. PROVIDE CONDUIT AND WIRE FROM DISCONNECT

TO MAIN SWITCHBOARD.

SHEET KEY NOTES

B2

GROUNDING RISER

SCALE: NOT TO SCALE

JS

2020-04-20T07:40:32-0400
MARGOLIS.DAVID.I.1228573805