This amendment provides responses to questions submitted under solicitation W912WJ20B0005 to replace the electrical conduits at a dam site. The Army Corps of Engineers issued the amendment to describe the work locations from 3 to 4 feet deep in manholes. Interior inspections of manholes require approval but exterior site visits are permitted. A virtual site visit was held with representatives from multiple construction companies and government agencies attending. The presentation from the virtual visit will be made available online and questions can still be submitted to the contracting specialist. The agency intends to issue a notice to proceed after awarding the contract, with work expected to occur later in the summer or early fall.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912WJ20B0005 Bid Abstract.pdf | ||
| Virtual Site Visit Drawings _2.png | PNG image | |
| Amendment 0003.pdf | ||
| Virtual Site Visit Drawings.pdf | ||
| Electric.jpeg | JPEG file | |
| Data.jpeg | JPEG file | |
| Virtual Site Visit Presentation.pdf | ||
| Solicitation W912WJ20B0005 Amendment 0001.pdf | ||
| North Springfield Dam Conduits - Photos.pdf | ||
| Solicitation W912WJ20B0005.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide responses to RFI's, provide Virtual Site Visit presentation, and Virtual Site Visit attendees list.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jun-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ20B0005
X 9B. DATED (SEE ITEM 11)
29-May-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2020
CODE
US ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA ROAD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ20B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
P00002
1. How deep is work in manholes?
Response: 3 to 4 feet
2. If we inspect the exterior of the dam site will we be allowed to open any manholes?
Response: We are providing pictures of the manholes in lieu of allowing opening during a visit.
3. Will you issue an addendum with any questions received today and in the future before the bid?
Response: Yes, an amendment will be issue to respond to all RFI’s submitted.
4. Can we receive a copy of virtual site visit video whether we attend or not?
Response: Due to technical issues, there is no recording, but the power point presentation will be posted and any questions can be submitted to the Contract Specialist Sara J. Torres at sara.j.torres@usace.army.mil
5. Can we arrange our own site visit, at least to see the exterior work?
Response: Yes the site is open to the public. Interior inspection would require a request to be coordinated through the Contract Specialist.
6. When do you tentatively plan to have the work done?
Response: We intend to issue a Notice to Proceed coincident with or shortly after the Award of the Contract. The Period of Performance would start from then. Therefore we anticipate the work to be done in the late summer and/or early fall.
VIRTUAL ATTENDEES LIST
NAME COMPANY
1. Jay Harris Colony Construction
2. Daniel Teague Gracon LLC
3. Jason Rooney Ready Power USA
4. Kurt Davis Ready Power USA
5. Nathan Mangelson USACE Lead Office Engineer
6. Carl Niemitz USACE Engineer
7. Benjamin Hoell USACE Contracting Officer
8. Sara J. Torres USACE Contract Specialist
9. Eva Marie Dantuono USACE Deputy for Small Business
10. Henry Phillip USACE Technical Lead
11. Frederick Pike USACE Project Engineer
W912WJ20B0005
(End of Summary of Changes)