Drawings.pdf
PDF 1 MB Posted
- Attached to
- NSL Replace the Electrical Conduits Federal contract opportunity
- Solicitation number
- W912WJ20B0005
About this file
This package includes design drawings and specifications for the replacement of electrical conduits at the North Springfield Lake Dam in North Springfield, Vermont under Solicitation Number W912WJ20B0005 from the U.S. Army Corps of Engineers, New England District. The project involves demolishing existing conduits and installing new power and communication conduits between the gatehouse, spillway access bridge, and project office. Drawings show existing conditions, demolition plans, new conduit routing and details. Specifications require furnishing and installing copper telephone cable, fiber optic cable, schedule 40 and 80 PVC coated galvanized steel conduit, junction boxes, and disconnect switches. The contractor must coordinate work with the utility providers and ensure emergency power is available during disruptions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912WJ20B0005 Bid Abstract.pdf | ||
| Amendment 0002.pdf | ||
| Virtual Site Visit Drawings.pdf | ||
| Virtual Site Visit Drawings _2.png | PNG image | |
| Amendment 0003.pdf | ||
| Electric.jpeg | JPEG file | |
| Data.jpeg | JPEG file | |
| Virtual Site Visit Presentation.pdf | ||
| Solicitation W912WJ20B0005 Amendment 0001.pdf | ||
| North Springfield Dam Conduits - Photos.pdf | ||
| Solicitation W912WJ20B0005.pdf | ||
| Specifications.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G-001
C O
VE
R
S H
EE
T
AN
D
IN
D
EX
D .N
G U
YE
N
D .N
G U
YE
N
B.
H
EA
D
J.
SW
AL
LE
Y /S
AN
SI
D 1:
AP
R
IL
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
New England District
ELECTRICAL ABBREVIATIONS, GENERAL NOTES AND LEGEND
SITE PLAN, EXISTING CONDITIONS AND DEMOLITION
SITE PLAN AND NEW WORK
BRIDGE TRANSITION PLAN, DEMOLITION AND SERVICE BRIDGE SECTION
BRIDGE TRANSITION PLAN AND NEW WORK AND SERVICE BRIDGE SECTION
SPILLWAY ACCESS BRIDGE PLAN, ELEVATION FACING SOUTH SPILLWAY ACCESS BRIDGE SECTION
DESIGN FILESHEET NO.
G-001
INDEX TO DRAWINGS
SHEET TITLE
E-001
ED101
E-101
ED401
E-501
E-502
CON-NS-436_G-001.DWG COVER SHEET AND INDEX
CON-NS-436_E-001.DWG
CON-NS-436_ED101.DWG
CON-NS-436_E-101.DWG
CON-NS-436_ED401.DWG
CON-NS-436_E-501.DWG
CON-NS-436_E-502.DWG
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION AND APPROVAL
OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET
APPROVED FOR TECHNICAL ADEQUACY BY:
TECHNICAL LEAD ENGINEER DATE
DATE
DATE
DATE
DATE
APPROVED BY:
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING DIVISION
This project was designed by the U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents, within the scope of their employment as required by ER 1110-1-8152.
REVIEWED BY:
CHIEF, GEOTECHNICAL/WATER RESOURCES BRANCH
REVIEWED BY:
CHIEF, DESIGN BRANCH
CHIEF, GEO-ENVIRONMENTAL ENGINEERING BRANCHW912WJ20B0005
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
NORTH SPRINGFIELD LAKE DAM
NORTH SPRINGFIELD, VERMONT
ED601
E-601
CON-NS-436_ED601.DWG
CON-NS-436_E-601.DWG
RISER DIAGRAM AND DEMOLITION
RISER DIAGRAM AND NEW WORK
REPLACE CONDUITS AND WIRING
DATE
APPROVED BY:
CHIEF, TECHNICAL SUPPORT BRANCH/DEPUTY CHIEF ENG DIV
PROJECT
LOCATION
CHESTER
LONDONDERRY
10030
131 91
CLAREMONT
SPRINGFIELD
CHARLESTOWN
BELLOW
FALLS
JAMAICARAWSONVILLE
WINDSOR
BRATTLEBORO
KEENE
NOT TO SCALE
TOWNSHEND
121 12A
10 89
NEW
HAMPSHIRE
VERMONT
SHEET NO. SHEET TITLE
61 SPILLWAY ACCESS BRIDGE GENERAL PLAN AND ELEVATION
REPAIR AND PAINT SPILLWAY BRIDGE CONCRETE AND REINFORCEMENT DETAILS2
DRAWING NUMBER
CON-337
CON-276
REPLACE SUSPENDED FUEL TANK SITE PLAN AND INDEX
CT-1-5097
INDEX TO INFORMATION DRAWINGS
GATE
RUNWAY
LOG BOOM
LOG BOOM
FIELD OFFICE
UTILITY BUILDING
RE
SE
RV
O
IR
R
O
AD
RIVER
BLACK
SPILLWAY
ACCESS
BRIDGE
OUTLET WORKS
SERVICE BRIDGE
NOT TO SCALE
LOCATION PLANVICINITY MAP
PROPERTY LINE
PROJECT
LOCATION
MAPLE
S
TR
EET
TOP OF DAM
DATE
FEB 1958
OCT 1987
MAY 1994
3 APRIL 2020
13 April 2020
13 April 2020
PHILLIPS.HENRY.S.1491053
Digitally signed by
PHILLIPS.HENRY.S.1491053662
Date: 2020.04.13 08:17:25 -04'00'
TESSIER.MATTHEW.E.1377053
Digitally signed by
TESSIER.MATTHEW.E.1377053253
Date: 2020.04.13 09:35:00 -04'00'
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
DISCONNECT SWITCH
AMPERES
AMPERE INTERRUPTING CAPACITY
AUTHORITY HAVING JURISDICTION
ABOVE FINISH GRADE
AIR HANDLING UNIT
ABOVE FINISH FLOOR
AMERICAN WIRE GAUGE
CONDUIT
CIRCUIT
CIRCUIT BREAKER
CENTERLINE
BUILDING
COPPER
ELECTRICAL CONTRACTOR
ELECTRICAL METALLIC TUBING
GROUND FAULT INTERRUPTER
GROUND OR GROUNDING
FULL LOAD AMPERES
THOUSAND CIRCULAR MILS
GALVANIZED RIGID METALLIC CONDUIT
kcmil
FLA
FT
GFI
GRMC
GND,G
FEET
EMT
F FUSE
CU
EC
CB
CKT
CL
AWG
C
BLDG
AHU
AIC
A
AFG
AFF
AHJ
PHASE
QUANTITY
TELEPHONE
SYMMETRICAL
POLYVINYL CHLORIDE
RIGID METAL CONDUIT
TRANSFORMER
WEATHERPROOF
UNLESS OTHERWISE NOTED
UNDERGROUND OR UNDERGRADE
UNDERWRITERS LABORATORIES
XFMR
WP
W
V
DELTA
WYE
WIRE
VOLT
UG
UL
U.O.N.
SP
TEL
SYM
SPARE
PWR
QTY
PVC
RMC
POWER
KILOWATTS
LIGHTING
MISCELLANEOUS
KILOVOLT AMPERES
MAIN CIRCUIT BREAKER
ASSOCIATION
NOT TO SCALE
PUSHBUTTON
NATIONAL ELECTRICAL
NATIONAL ELECTRIC CODE
NATIONAL FIRE PROTECTION
NTS
PNL
P
PB
PANEL
POLE
NEC
NEMA
NFPA
MCB
MISC
kW kVA
LTG
GENERAL ABBREVIATIONS
Ø Y
LEGEND
GENERAL NOTES:
MANUFACTURERS ASSOCIATION
ATS AUTOMATIC TRANSFER SWITCH
PRI PRIMARY
RCPT RECEPTACLE
RGS RIDGE GALVANIZED STEEL
SEC
S.E. SERVICE ENTRANCE
SECONDARY
TWR TOWER
FS FUSED SWITCH (DISCONNECT)
E-001
EL
EC
TR
IC
AL
A
BB
R
EV
IA
TI
O
N S
G
EN
ER
AL
N O
TE
S
AN
D
L
EG
EN
D
D .N
G U
YE
N
D .N
G U
YE
N
B.
H
EA
D
J.
SW
AL
LE
Y
AN
SI
D 1:
AP
R
IL
COMM
E
NEW COMMUNICATION CONDUIT / WIRE / EQUIPMENT
NEW POWER CONDUIT / WIRE/ EQUIPMENT
EXISTING CONDUIT / WIRE / EQUIPMENT TO BE DEMOLISHED AND REPLACED
EXISTING CONDUIT / WIRE / EQUIPMENT TO REMAIN
EXISTING MANHOLE TO REMAIN
EXISTING UTILITY POLE TO REMAIN
ALL NECESSARY ADDITIONS AND ALTERATIONS TO EXISTING WORK SHALL BE INCLUDED IN THE CONTRACT AS REQUIRED TO
PROVIDE AND MAINTAIN A COMPLETE AND PROPER ELECTRICAL INSTALLATION.
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY RELOCATION OF EQUIPMENT TO ALLOW FOR WORK.
2. DURING DISCONNECTION/RECONNECTION/REINSTALLATION OF EQUIPMENT THAT WILL RESULT IN ELECTRICAL POWER BEING DOWN, CONTRACTOR SHALL KEEP NAE PERSONNEL INFORMED (JASON FARNSWORTH, PROJECT MANAGER). CONTRACTOR SHALL ENSURE THAT THE EMERGENCY ELECTRICAL POWER GENERATOR CAN BE ENGAGED TO ENSURE OPERATION AS NEEDED
DURING THIS WORK.
3. THE CONTRACTOR IS RESPONSIBLE FOR RELOCATION OF PIPING AND DUCTWORK TO ALLOW FOR WORK.
4. EQUIPMENT TO BE TURNED OVER TO THE CONTRACTING OFFICER'S REPRESENTATIVE FROM THE CONTRACTOR SHALL BE
CLEAN AND IN WORKING ORDER.
5. CONTRACTOR SHALL REMOVE AND DISPOSE OF UNUSED CONDUIT OR CONDUCTORS.
6. ABANDONMENT IN PLACE OF UNUSED CONDUIT WHERE CONCEALED IN FLOORS OR WALLS IS THE RESPONSIBILITY OF THE
CONTRACTOR.
7. THE REMOVAL OF UNUSED CONDUIT FROM CEILINGS, EXPOSED AREAS, AND ACCESSIBLE LOCATIONS IS REQUIRED IN THIS
CONTRACT.
8. AS PART OF THIS CONTRACT THE REMOVAL AND DISPOSAL OF ALL EQUIPMENT INDICATED TO BE DEMOLISHED SHALL BE
PERFORMED BY THE CONTRACTOR.
9. VERIFICATION THAT THE EXISTING EQUIPMENT SHALL BE RESTORED TO ITS ORIGINAL OPERATING CONDITION AFTER THE WORK
OF THIS CONTRACT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
10. THE CONTRACTOR SHALL FILL, SEAL AND REPAIR THE EXISTING BUILDING PENETRATIONS, EXPOSED FROM DEMOLITION, TO
MATCH EXISTING ADJACENT BUILDING FINISHES.
11 WHERE THE PLANS CALL FOR DEMOLITION OF CONDUIT OR REPLACEMENT OF CONDUIT, EXISTING SUPPORTS MUST BE
DEMOLISHED AND NEW SUPPORTS PROVIDED.
12. CONDUITS WITHIN EXISTING DUCTBANKS ARE TO REMAIN IN PLACE.
13. CONTRACTOR SHALL COORDINATE WORK WITH UTILITY PROVIDERS GREEN MOUNTAIN POWER AND VTEL VERMONT
TELEPHONE COMPANY AS REQUIRED.
E
P1
ED101
SI
TE
P
LA
N
EX
IS
TI
N G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N
D .N
G U
YE
N
D .H
AS
SE
TT
B.
H
EA
D
J.
SW
AL
LE
Y
AN
SI
D 1:
AP
R
IL
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
A1 SITE PLAN EXISTING CONDITIONS AND DEMOLITION
SCALE: 1/32" = 1'-0"
N
DEMOLISH EXISTING TELEPHONE CABLE EXTENDING FROM THE PROJECT
OFFICE ALONG OVERHEAD UTILITY POLES THROUGH THE CONDUIT
SYSTEM TO THE GATEHOUSE. SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING POWER CONDUCTORS EXTENDING FROM THE
UTILITY TRANSFORMERS TO THE GATEHOUSE. SEE NOTES ON SHEET
ED-601.
DEMOLISH EXISTING CONDUITS UNDER THE SPILLWAY ACCESS BRIDGE
TO INCLUDE PULL BOXES, EXPANSION JOINTS, AND HANGERS. SEE
NOTES ON SHEET ED-601.
DEMOLISH EXISTING STRONG MOTION POWER CONDUIT AND
ASSOCIATED DISCONNECT SWITCH. RETAIN CONDUCTORS FOR REUSE.
SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING STRONG MOTION COMMUNICATION CONDUIT.
RETAIN CONDUCTORS FOR REUSE. SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING ABANDONED CONDUIT AND ASSOCIATED
CONDUCTORS IF PRESENT.
DEMOLISH EXISTING INSTRUMENTATION CONDUIT FROM THE DAM CREST
ABUTMENT TO THE GATEHOUSE. SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING COMMUNICATION CONDUIT FROM THE DAM CREST
ABUTMENT TO THE GATEHOUSE. SEAL WALL PENETRATION AT THE
GATEHOUSE AS NECESSARY.
DEMOLISH EXISTING POWER CONDUIT FROM THE DAM CREST ABUTMENT
TO THE GATEHOUSE. RETAIN SUFFICIENT CONDUIT LENGTH AT THE
GATEHOUSE TO ALLOW FOR INTERFACING WITH THE NEW CONDUIT TO
BE INSTALLED. DEMOLISH ASSOCIATED JUNCTION BOX AND DISCONNECT
SWITCH. RETAIN CONDUCTORS TO/FROM DISCONNECT SWITCH FOR
REUSE PER SHEET E-601 KEY NOTE 9. SEE NOTES ON SHEET ED-601.
SHEET KEY NOTES
R
ES
ER
VO
IR
R
O
AD
SPILLWAY ACCESS BRIDGE
EAST ABUTMENT
WEST ABUTMENT
EXISTING STRONG
MOTION SENSOR
SP
IL
LW
AY
C
EN
TE
R
LI
NE
ELECTRIC
MANHOLE
EMH-1 TELEPHONE
MANHOLE
CMH-1
GATE
HOUSE
PR
O
JE
C
T O
FF
IC
E
SE
R
VI
C
E
BR
ID
G
E
COMMUNICATION CONDUIT
POWER CONDUIT
POWER CONDUIT
COMMUNICATION CONDUIT
INSTRUMENTATION CONDUIT
R
ES
ER
VO
IR
R
O
AD
UTILTY TRANSFORMER
POLE P4
TELEPHONE POLE
P5
P1
P2
P3
N.
T.
S.
AP
PR
O
X.
F
T
NO
T
SH
O W
N
0 16' 64'32'
METER MANHOLE
ED401
D1
LEGEND
CABLES OVERHEAD OR IN EXPOSED
CONDUITS MOUNTED ON BRIDGES
CABLES IN BURIED CONDUIT
SE
R
VI
C
E
BR
ID
G
E
WEST ABUTMENT
ELECTRIC
MANHOLE
EMH-1
TELEPHONE
MANHOLE
CMH-1
TO EXISTING INSTRUMENTATION
ALONG DAM CREST
EXISTING
DISCONNECT
SWITCH
EXISTING
PULL BOX
EXISTING
PULL BOX
13'-2 5/16"
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
D1 BRIDGE TRANSITION PLAN DEMOLITION
SCALE: 3/32" = 1'-0"
N
A1 SERVICE BRIDGE SECTION
SCALE: 1/2" = 1'-0"
A1
ED401
ED401
BR
ID
G E
TR
AN
SI
TI
O N
P
LA
N D
EM
O
LI
TI
O N
A N
D
SE
R
VI
C E
BR
ID
G E
SE
C
TI
O
N
D .N
G U
YE
N
D .H
AS
SE
TT
B.
H
EA
D
J.
SW
AL
LE
Y
AN
SI
D 1:
AP
R
IL
SHEET KEY NOTES
POWER CONDUIT
COMMUNICATION CONDUIT
INSTRUMENTATION CONDUIT
COMMUNICATION CONDUIT
POWER CONDUIT
EXISTING INDIVIDUAL 22AWG PAIRS RUN FROM PIEZOMETERS IN THE DAM
CREST, THROUGH MANHOLE CMH-1, ACROSS THE SERVICE BRIDGE, AND
TERMINATE IN A PANEL INSIDE THE GATEHOUSE. CUT EXISTING
INSTRUMENTATION CABLES IN CMH-1 AND DEMOLISH FROM THE
GATEHOUSE TO CMH-1 WHILE RETAINING FROM CMH-1 TO THE
PIEZOMETERS. RECORD EACH CABLE CONNECTION BEFORE
DEMOLISHING TO CMH-1 TO ENSURE ACCURACY OF NEW CONNECTIONS
PER E-601. LEAVE ENOUGH SLACK ON THE EXISTING CABLES IN THE
MANHOLE TO INTERFACE WITH THE NEW CABLE TO BE INSTALLED PER
E-601. SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING INSTRUMENTATION CONDUIT FROM THE DAM CREST
ABUTMENT TO THE GATEHOUSE. RETAIN SUFFICIENT CONDUIT LENGTH
AT THE GATEHOUSE TO ALLOW FOR INTERFACING WITH THE NEW
CONDUIT TO BE INSTALLED. SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING COMMUNICATION CONDUIT FROM THE DAM CREST
ABUTMENT TO THE GATEHOUSE. SEAL WALL PENETRATION AT THE
GATEHOUSE AS NECESSARY. SEE NOTES ON SHEET ED-601.
DEMOLISH EXISTING POWER CONDUIT FROM THE DAM CREST ABUTMENT
TO THE GATEHOUSE. RETAIN SUFFICIENT CONDUIT LENGTH AT THE
GATEHOUSE TO ALLOW FOR INTERFACING WITH THE NEW CONDUIT TO
BE INSTALLED. DEMOLISH ASSOCIATED JUNCTION BOX AND DISCONNECT
SWITCH. RETAIN CONDUCTORS TO/FROM DISCONNECT SWITCH FOR
REUSE PER SHEET E-601 KEY NOTE 9. POWER SOURCE FOR THIS
DISCONNECT IS UNKNOWN, CONTRACTOR SHALL SURVEY CIRCUIT PRIOR
TO STARTING DEMOLITION. SEE NOTES ON SHEET ED-601.
0 8' 32'16'
0 2' 4'1'
A1
ED101
D1
ED401
SPARE
GATEHOUSE
ENTRANCE FLOOR SERVICE BRIDGE DAM CREST SPILLWAY ACCESS BRIDGE
SPILLWAY
EARTH
EA
R
TH
EAR
TH
ABUTMENT
PROJECT OFFICE
GROUND FLOORGRADE
STRONG
MOTION
SENSOR
CMH-1
EMH-1
(3) UTILITY
TRANSFORMERS
LOWER FLOOR
ABUTMENT
EAR
TH
EA
R
TH
TO EXISTING INSTRUMENTATION
ALONG DAM CREST
P1P2P3P4P5
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
D2 RISER DIAGRAM - DEMOLITION
SCALE: NOT TO SCALE
ED601
R
IS
ER
D
IA
G
R
AM
D
EM
O
LI
TI
O
N
D .N
G U
YE
N
D .N
G U
YE
N
B.
H
EA
D
J.
SW
AL
LE
Y
AN
SI
D 1:
AP
R
IL
DEMOLISH EXISTING TELEPHONE CABLE EXTENDING FROM THE PROJECT
OFFICE ALONG OVERHEAD UTILITY POLES THROUGH THE CONDUIT
SYSTEM TO THE GATEHOUSE. DISCONNECTING THE CABLES AT EACH
END TO BE DONE BY OTHERS.
DEMOLISH EXISTING POWER CONDUCTORS EXTENDING FROM THE
UTILITY TRANSFORMERS TO THE GATEHOUSE SWITCHBOARD.
CONTRACTOR SHALL FURNISH SERVICES FROM THE UTILITY PROVIDER
AS REQUIRED.
DEMOLISH EXISTING CONDUITS UNDER THE SPILLWAY ACCESS BRIDGE
TO INCLUDE PULL BOXES, EXPANSION JOINTS, AND HANGERS.
DEMOLISH EXISTING STRONG MOTION POWER CONDUIT FROM THE PULL
BOX TO APPROXIMATELY 10FT PAST THE POINT OF BURIAL. PROVIDE
EXCAVATION AS REQUIRED. EXCAVATION MUST BE COMPLETED USING
HAND TOOLS. DEMOLISH ASSOCIATED DISCONNECT SWITCH. RETAIN
CONDUCTORS FOR REUSE.
DISCONNECT STRONG MOTION COMMUNICATION WIRING IN THE SENSOR
AND PULL COMMUNICATION WIRING BACK TO CMH-1. LEAVE
COMMUNICATION WIRING NEATLY COILED IN CMH-1 FOR REUSE.
DEMOLISH COMMUNICATION CONDUIT FROM JUNCTION BOX TO TEN FEET
PAST THE POINT OF BURIAL.
DEMOLISH EXISTING ABANDONED CONDUIT AND ASSOCIATED
CONDUCTORS IF PRESENT.
EXISTING INDIVIDUAL 22AWG PAIRS RUN FROM PIEZOMETERS IN THE DAM
CREST, THROUGH MANHOLE CMH-1, ACROSS THE SERVICE BRIDGE, AND
TERMINATE IN A PANEL INSIDE THE GATEHOUSE. CUT EXISTING
INSTRUMENTATION CABLES IN CMH-1 AND DEMOLISH FROM THE
GATEHOUSE TO CMH-1 WHILE RETAINING FROM CMH-1 TO THE
PIEZOMETERS. RECORD EACH CABLE CONNECTION BEFORE
DEMOLISHING TO CMH-1 TO ENSURE ACCURACY OF NEW CONNECTIONS
PER E-601. LEAVE A LOOP AROUND THE INTERIOR OF THE MANHOLE ON
THE EXISTING CABLES TO PROVIDE SUFFICIENT SLACK TO INTERFACE
WITH THE NEW CABLE TO BE INSTALLED PER E-601.
DEMOLISH EXISTING INSTRUMENTATION CONDUIT FROM THE DAM CREST
ABUTMENT TO THE THREADED COUPLING NEAREST THE GATEHOUSE.
ENSURE SUFFICIENT CONDUIT LENGTH AT THE GATEHOUSE TO ALLOW
FOR INTERFACING WITH THE NEW CONDUIT TO BE INSTALLED.
DEMOLISH EXISTING COMMUNICATION CONDUIT FROM THE DAM CREST
ABUTMENT TO THE GATEHOUSE. SEAL WALL PENETRATION AT THE
GATEHOUSE AS NECESSARY.
DEMOLISH EXISTING POWER CONDUIT FROM THE DAM CREST ABUTMENT
TO THE THREADED COUPLING NEAREST THE GATEHOUSE. ENSURE
SUFFICIENT CONDUIT LENGTH AT THE GATEHOUSE TO ALLOW FOR
INTERFACING WITH THE NEW CONDUIT TO BE INSTALLED. DEMOLISH
ASSOCIATED JUNCTION BOX AND DISCONNECT SWITCH. RETAIN
CONDUCTORS TO/FROM DISCONNECT SWITCH FOR REUSE PER SHEET
E-601 KEY NOTE 9.
SHEET KEY NOTES
4 5
O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
C O
M M
C O
M M
E E
E E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E E
E
C O
M M
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
E-101
S I T
E
P
L A
N
A
N D
W
R
K
D
N G
U Y
E N
D
H A
S S
E T
T
B
H E
A D
J S
W A
L L E
Y
A N
S I
D
A P
R I L
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
T
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
N E
W
E
N G
L A
I S
T R
I C
T
V
I R
G I N
A
A
D
C O
N C
O R
D
M
A
S C
A L E
S
H E
E T
D R
A W
I N
G
C
O D
E
O F
N O
R T
H
S
P R
I N
G F
I E
L
K
M
N O
R T
H
S
P R
I N
G F
I E
L D
V
E R
M O
N T
R E
P L A
N
D U
I T
S
A
R
I N
G
W W
J B
C O
N N
S
A1
SITE PLAN AND NEW WORK
SCALE: 1/32" = 1'-0"
N
METER MANHOLE
E
A
B
U
T
M
E
N
T
P
R
O
J
E
F
I C
E
S E
R V
I C
E
B
R I D
G E
PROVIDE COPPER TELEPHONE CABLE AND FIBER OPTIC CABLE PER SPEC
26 05 19.10 10. CABLES ARE TO RUN ADJACENT TO EACH OTHER FROM
THE TELECOMMUNICATIONS CLOSET IN THE PROJECT OFFICE ALONG
OVERHEAD UTILITY POLES THROUGH THE CONDUIT SYSTEM TO THE UL
APPROVED BREAKOUT BOXES ON THE OPERATING FLOOR OF THE
GATEHOUSE.
PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER
AND COMMUNICATION TO INCLUDE PVC COATED
EXPANSION/DEFLECTION FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.
PROVIDE PVC COATED GALVANIZED STEEL CONDUIT FOR STRONG
MOTION COMMUNICATION FROM THE NEW JUNCTION BOX TO THE
EXISTING STRONG MOTION COMMUNICATION CONDUIT. RECONNECT
EXISTING CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER
PREVIOUS CONDITION.
PROVIDE PVC COATED STEEL GALVANIZED CONDUIT FOR STRONG
MOTION POWER FROM THE NEW JUNCTION BOX TO THE EXISTING
STRONG MOTION POWER CONDUIT. PROVIDE NEW 30A FUSED STAINLESS
STEEL NEMA 4X DISCONNECT SWITCH. RECONNECT EXISTING
CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER PREVIOUS
CONDITION.
PROVIDE STAINLESS STEEL NEMA 4X ENCLOSURE TO BE MOUNTED
INSIDE MANHOLE CMH-1. PROVIDE A TERMINAL STRIP INSIDE THE
ENCLOSURE TO INTERFACE EXISTING INDIVIDUAL 22AWG CABLES
COMING FROM THE DAM CREST WITH NEW 25-PAIR 22AWG CABLE.
PROVIDE NEW 25-PAIR 22AWG CABLE PER SPEC 26 05 19.10 10 FROM THE
TERMINAL STRIP TO THE GATEHOUSE PANEL. RECONNECT CABLE PAIRS
TO GATEHOUSE PANEL PER PREVIOUS CONFIGURATION PER ED601 KEY
NOTE 7.
SHEET KEY NOTES
COMMUNICATION CONDUIT
POWER CONDUIT
P3
R
E
S
E
R
V
O
A
D
S
P
I
L
L
W
Y
C
E
B
I
D
G
E
WEST ABUTMENT
EXISTING STRONG
MOTION SENSOR
S
P
I
L
L
W
Y
N
T
N
E
ELECTRIC
MANHOLE
EMH-1
TELEPHONE
MANHOLE
CMH-1
GATE
HOUSE
POWER CONDUIT
R E
S E
R V
O
A
D
UTILITY TRANSFORMER
POLE P4
TELEPHONE POLE
P5
P1
P2
0 16' 64'32'
N
T
S
E-401
D1
E-402
E1
INSTRUMENTATION/COMMUNICATION CONDUIT
JS
E
C O
M M
C O
M M
E E E E E E E E E E E
COMM COMM COMM COMM COMM COMM
SE
R
VI
C
E
BR
ID
G
E
SPILLWAY ACCESS BRIDGE
ELECTRIC
MANHOLE
EMH-1
TELEPHONE
MANHOLE
CMH-1
C O
M M
E E
TO EXISTING INSTRUMENTATION
ALONG DAM CREST EXISTING CONDUITS
AND CONDUCTORS
TO REMAIN
EXISTING CONDUITS
AND CONDUCTORS
TO REMAIN
13'-2 5/16"
E-501
BR
ID
G E
TR
AN
SI
TI
O N
P
LA
N , N
EW
W
O R
K
AN
D S
ER
VI
C E
BR
ID
G E
SE
C
TI
O
N
D .N
G U
YE
N
D .H
AS
SE
TT
B.
H
EA
D
J.
SW
AL
LE
Y
AN
SI
D 1:
AP
R
IL
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
D1 BRIDGE TRANSITION PLAN, NEW WORK
SCALE: 3/32" = 1'-0"
N
A1 SERVICE BRIDGE SECTION
SCALE: 1/2" = 1'-0"
A1 E-501
PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER
AND COMMUNICATION TO INCLUDE PVC COATED
EXPANSION/DEFLECTION FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.
PROVIDE STAINLESS STEEL NEMA 4X PULL BOXES SIZED PER NFPA 70.
PROVIDE STAINLESS STEEL NEMA 4X ENCLOSURE TO BE MOUNTED
INSIDE MANHOLE CMH-1. PROVIDE A TERMINAL STRIP INSIDE THE
ENCLOSURE TO INTERFACE EXISTING INDIVIDUAL 22AWG CABLES
COMING FROM THE DAM CREST WITH NEW 25-PAIR 22AWG CABLE.
PROVIDE NEW 25-PAIR 22AWG CABLE PER SPEC 26 05 19.10 10 FROM THE
TERMINAL STRIP TO THE GATEHOUSE PANEL. RECONNECT CABLE PAIRS
TO GATEHOUSE PANEL PER PREVIOUS CONFIGURATION UTILIZING
LABELS MADE PER ED601 KEY NOTE 7.
PROVIDE NECESSARY EQUIPMENT TO INTERFACE NEW PVC COATED
GALVANIZED STEEL CONDUITS WITH EXISTING CONCRETE ENCASED
CONDUITS.
PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X DISCONNECT
SWITCH. PROVIDE FLEXIBLE CONDUIT TO INTERFACE WITH NEW
JUNCTION BOX. RECONNECT EXISTING CONDUCTORS IN PRIOR
CONFIGURATION.
SHEET KEY NOTES
2" INSTRUMENTATION/
COMMUNICATION
2" POWER
0 8' 32'16'
0 2' 4'1'
DO NOT WELD TO ANY BRIDGE MEMBER.
SHEET GENERAL NOTES
A1 C-101
D1 E-501
SPARESPARE
FL
W
WEST
ABUTMENT
DRAIN (TYP.)
R
ES
ER
VO
IR
R O
AD
MAPLE STREET
B
R
ID
G E
S
PI
LL
W
AY
D
IS
C H
AR
G
E C
H
AN
N
EL
EAST
ABUTMENT
℄ BRIDGE
METER MANHOLE
UTILITY TRANSFORMER
POLE P4
TELEPHONE
POLE P5
EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
E E
E E
E
COMM
C O
M M
C O
M M
E E
SPILLWAY ACCESS BRIDGE
EXISTING CONDUITS
AND CONDUCTORS
TO REMAIN
E E E
E
E E
COMM COMM
C O
M M
C O
M M
COMME E
℄ BRIDGE
SO
LI
C
IT
AT
IO
N N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
C O
N
TR
AC
T
N O
C
H
EC
KE
D
B Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U .S
.A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
N
EW
E N
G
LA
N D
D
IS
TR
IC
T
VI
R G
IN
IA
R O
AD
C
O N
C O
R D
, M A
2-
SC
AL
E:
SH
EE
T
D R
AW
IN
G C
O D
E:
O F
N O
R
TH
S
PR
IN
G
FI
EL
D L
AK
E
D
AM
N O
R
TH
S
PR
IN
G
FI
EL
D , V
ER
M
O N
T R
EP
LA
C E
C O
N D
U
IT
S
AN
D W
IR
IN
G W
2W
J2 0B
C O
N -N
S-
E1 SPILLWAY ACCESS BRIDGE PLAN
SCALE: 3/32" = 1'-0"
N
A1 ELEVATION FACING SOUTH
SCALE: 1/8" = 1'-0" A6 SPILLWAY ACCESS BRIDGE SECTION
SCALE: 1/4" = 1'-0"
E-502
SP
IL
LW
AY
A C
C
ES
S
BR
ID
G
E
PL
AN
EL
EV
AT
IO
N
F
AC
IN
G
S O
U
TH
A N
D
SP
IL
LW
AY
A
C C
ES
S
BR
ID
G E
SE
C
TI
O
N
D .N
G U
YE
N
D .H
AS
SE
TT
B.
H
EA
D
J.
SW
AL
LE
Y
AN
SI
D 1:
AP
R
IL
A6 E-402
PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER
AND COMMUNICATION TO INCLUDE PVC COATED
EXPANSION/DEFLECTION FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.
PROVIDE STAINLESS STEEL NEMA 4X PULL BOXES SIZED PER NFPA 70.
PROVIDE SCHEDULE 80 PVC CONDUIT FOR STRONG MOTION
COMMUNICATION FROM THE NEW JUNCTION BOX TO THE EXISTING
STRONG MOTION COMMUNICATION CONDUIT. RECONNECT EXISTING
CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER PREVIOUS
CONDITION.
PROVIDE SCHEDULE 80 PVC CONDUIT FOR STRONG MOTION POWER
FROM THE NEW JUNCTION BOX TO THE EXISTING STRONG MOTION
POWER CONDUIT. PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X
DISCONNECT SWITCH. RECONNECT EXISTING CONDUCTORS IN PRIOR
CONFIGURATION. BURY CONDUIT PER PREVIOUS CONDITION.
PROVIDE NECESSARY EQUIPMENT TO INTERFACE NEW PVC COATED
GALVANIZED STEEL CONDUITS WITH EXISTING CONCRETE ENCASED
CONDUITS.
SHEET KEY NOTES
0 8' 32'16'
0 8'4' 16' 0 4' 8'2'
A1 E-402
DO NOT WELD TO ANY BRIDGE MEMBER.
SHEET GENERAL NOTES
A1 C-101
E1 E-402
E1 E-402
GATEHOUSE
ENTRANCE FLOOR SERVICE BRIDGE DAM CREST SPILLWAY ACCESS BRIDGE
SPILLWAY
E
A
R
T
H
E
A
R
T
H
EAST ABUTMENT
PROJECT OFFICE
GROUND FLOORGRADE
STRONG
MOTION
SENSOR
CMH-1
EMH-1
(3) UTILITY
TRANSFORMERS
LOWER FLOOR
WEST ABUTMENT
E
A
R
T
H
E
A
R
T
H
TO EXISTING INSTRUMENTATION
ALONG DAM CREST
P1P2P3P4P5
G
G
GATE TOWER
SERVICE DISCONNECT
UTILITY
GROUNDING
ELECTRODE
GROUNDING
ELECTRODE
G
GATE TOWER
DISTRIBUTION PANEL
G
GATE TOWER
GENERATOR
EQUIPMENT
GROUNDING
CONDUCTOR
#4 AWG
EQUIPMENT
GROUNDING
CONDUCTOR
#4 AWG
EQUIPMENT
GROUNDING
CONDUCTOR
EXISTING
GROUNDING
ELECTRODE
CONDUCTOR
#4 AWG
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P
E
N G
I N
E E
R S
N E
W
E
N G
L A
S
T R
I C
T
V
I R
G I N
A
D
C O
N C
O R
D
M
A
S C
A L E
S
H E
E T
D R
A W
I N
G
C
O D
E
O F
N O
R T
H
S
P R
I N
G F
I E
K
M
N O
R T
H
S
P R
I N
G F
I E
L D
V
E R
M O
N T
R E
P L A
N
D U
I T
S
A
R
I N
G
W W
J B
C O
N N
S
D2
RISER DIAGRAM AND NEW WORK
SCALE: NOT TO SCALE
E-601
R I S
A
G R
A M
A N
D
N
R
K
D
N G
U Y
E N
D
N G
U Y
E N
B
H E
A D
J S
W A
L L E
Y
A N
S I
D
A P
R I L
PROVIDE COPPER TELEPHONE CABLE AND FIBER OPTIC CABLE PER SPEC 26
05 19.10 10. CABLES ARE TO RUN ADJACENT TO EACH OTHER FROM THE
TELECOMMUNICATIONS CLOSET IN THE PROJECT OFFICE ALONG OVERHEAD
UTILITY POLES THROUGH THE CONDUIT SYSTEM TO UL APPROVED
BREAKOUT BOXES ON THE OPERATING FLOOR OF THE GATEHOUSE. POLES
ARE OWNED BY THE UTILITY, AND CONTAIN AN EXISTING SUPPORTING
CABLE. COORDINATE WORK WITH UTILITY. TERMINATIONS AT EACH END TO
BE PROVIDED BY OTHERS.
PROVIDE (3) 2/0 THWN AND (1) #4 THWN GROUND CONDUCTORS FROM THE
UTILITY TRANSFORMERS TO THE GATEHOUSE.
PROVIDE (2) 2" PVC COATED GALVANIZED STEEL CONDUITS FOR POWER
AND COMMUNICATION TO INCLUDE PVC COATED EXPANSION/DEFLECTION
FITTINGS, HUBS, COUPLINGS, HANGERS, ETC.
PROVIDE STAINLESS STEEL NEMA 4X PULL BOXES SIZED PER NFPA 70.
PROVIDE PVC COATED STEEL GALVANIZED STEEL CONDUIT FOR STRONG
MOTION COMMUNICATION FROM THE NEW JUNCTION BOX TO THE EXISTING
STRONG MOTION COMMUNICATION CONDUIT. RECONNECT EXISTING
CONDUCTORS IN PRIOR CONFIGURATION. BURY CONDUIT PER PREVIOUS
CONDITION.
PROVIDE PVC COATED GALVANIZED STEEL CONDUIT FOR STRONG MOTION
POWER FROM THE NEW JUNCTION BOX TO THE EXISTING STRONG MOTION
POWER CONDUIT. PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X
DISCONNECT SWITCH. RECONNECT EXISTING CONDUCTORS IN PRIOR
CONFIGURATION. BURY CONDUIT PER PREVIOUS CONDITION.
PROVIDE STAINLESS STEEL NEMA 4X ENCLOSURE MINIMUM SIZE 16" X 16" TO
BE MOUNTED INSIDE MANHOLE CMH-1 OFFSET FROM WALLS WITH STRUT TO
ALLOW WATER TO FLOW BEHIND. PROVIDE A TERMINAL STRIP INSIDE THE
ENCLOSURE TO INTERFACE EXISTING INDIVIDUAL 22AWG CABLES COMING
FROM THE DAM CREST WITH NEW 25-PAIR 22AWG CABLE. PROVIDE NEW
25-PAIR 22AWG CABLE PER SPEC 26 05 19.10 10 FROM THE TERMINAL STRIP
TO THE GATEHOUSE PANEL. RECONNECT CABLE PAIRS TO GATEHOUSE
PANEL PER PREVIOUS CONFIGURATION UTILIZING LABELS MADE PER ED601
KEY NOTE 7.
PROVIDE NECESSARY EQUIPMENT TO INTERFACE NEW PVC COATED
GALVANIZED STEEL CONDUITS WITH EXISTING CONCRETE ENCASED
CONDUITS.
PROVIDE NEW 30A FUSED STAINLESS STEEL NEMA 4X DISCONNECT SWITCH.
PROVIDE FLEXIBLE CONDUIT TO INTERFACE WITH NEW JUNCTION BOX.
RECONNECT EXISTING CONDUCTORS IN PRIOR CONFIGURATION.
PROVIDE SERVICE ENTRANCE DISCONNECT WITH 100A FUSES PER
SPECIFICATION 26 20 00. PROVIDE CONDUIT AND WIRE FROM DISCONNECT
TO MAIN SWITCHBOARD.
SHEET KEY NOTES
B2
GROUNDING RISER
SCALE: NOT TO SCALE
JS
| 2020-04-20T07:40:32-0400 | |
| MARGOLIS.DAVID.I.1228573805 |
File details come from the government source that posted it. Updated .