Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- W912WJ19B0011
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_W912WJ19B0011.pdf | ||
| W912WJ19B0011_0004.pdf | ||
| HAM_2018_03_cond_sort20.xyz | XYZ file | |
| W912WJ19B0011_0003.pdf | ||
| HAM_2018_03_cond_vol.xyz | XYZ file | |
| HAM_20181010_CS_2018_058_03avg.xyz | XYZ file | |
| HAM_20181010_CS_2018_058_20min.xyz | XYZ file | |
| Revised_Army_Permit.pdf | ||
| W912WJ19B0011_0002.pdf | ||
| W912WJ19B0011_0001.pdf | ||
| Site_Visit_Attendance_List.pdf | ||
| Solicitation_W912WJ19B0011.pdf | ||
| HAMPTON_MAINT_DREDGE_Final_1_July_2019.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
F
H A
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B pw://coe-naepwp01con.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
7:38:40 AM 6/18/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript.dscript
COVER SHEET AND INDEX
DESIGN FILESHEET NO.
G-001
INDEX TO DRAWINGS
SHEET TITLE
HAM_SP_2018_072_G-001.DGN
N
S I
D
G-001
:1
G-101
C-101
C-102
C-103
C-104
HAM_SP_2018_072_G-101.DGN
HAM_SP_2018_072_C-101.DGN
HAM_SP_2018_072_C-102.DGN
HAM_SP_2018_072_C-103.DGN
HAM_SP_2018_072_C-104.DGN
MASSACHUSETTS
NEW
HAMPSHIRE
MAINE
VT.
CONN.
R.I.
HARTFORD
PROV.
CAPE
COD
BOSTON
PORTSMOUTH
CONCORD
PORTLAND
AUGUSTA
BANGOR
ATLANTIC
OCEAN
CANADA
HARBOR
HAMPTON
HAMPTON AND SEABROOK, NEW HAMPSHIRE
HAMPTON HARBOR
MAINTENANCE DREDGING
C-105
C-106
C-107
C-108
HAM_SP_2018_072_C-105.DGN
HAM_SP_2018_072_C-106.DGN
HAM_SP_2018_072_C-107.DGN
HAM_SP_2018_072_C-108.DGN
HAM_SP_2018_072_C-301.DGN
HAM_SP_2018_072_C-302.DGN
C-301
C-302
CROSS SECTIONS 1, MAINTENANCE DREDGING
CROSS SECTIONS 2, MAINTENANCE DREDGING
N
VICINITY MAP
NOT TO SCALE
LOCATION MAP
NOT TO SCALE
HAM_SP_2018_072_C-303.DGNC-303
HAM_SP_2018_072_C-304.DGNC-304
HAM_SP_2018_072_C-305.DGNC-305
HAMPTON BEACH
CROSS SECTIONS, DREDGED MATERIAL PLACEMENT,
SEABROOK BEACH
CROSS SECTIONS, DREDGED MATERIAL PLACEMENT,
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
E
A R
A M
A Y
O
H A
M P T O
N , N
H
S E A B R
O O
K , N
H
N
H A
M P
T O
N F
A L L S
N H
G-102 HAM_SP_2018_072_G-102.DGN
O C
E A
N B
L V
D
R O
U T
E
A
C O
V E
R S
H E
E T A
N D I
N D
E X
GENERAL PLAN 1
GENERAL PLAN 2
8-FOOT ENTRANCE CHANNEL
CROSS CHANNEL
HAMPTON CHANNEL AND ANCHORAGE, AND 8-FOOT
8-FOOT ENTRANCE AND SEABROOK CHANNELS, 8-FOOT
AND 6-FOOT STATE ANCHORAGE
ANCHORAGE, 6-FOOT HAMPTON ANCHORAGE,
8-FOOT HAMPTON CHANNEL, 8-FOOT HAMPTON
ANCHORAGE
8-FOOT SEABROOK CHANNEL AND 8-FOOT SEABROOK
HAMPTON BEACH
SITE PLAN, DREDGED MATERIAL PLACEMENT,
SOUTHERLY ABUTMENT, BASCULE BRIDGE
SITE PLAN, DREDGED MATERIAL PLACEMENT,
SEABROOK BEACH
SITE PLAN 1, DREDGED MATERIAL PLACEMENT,
SEABROOK BEACH
SITE PLAN 2, DREDGED MATERIAL PLACEMENT,
C-109 HAM_SP_2018_072_C-109.DGN
SOUTHERLY ABUTMENT - BASCULE BRIDGE
CROSS SECTIONS, DREDGED MATERIAL PLACEMENT,
PLACEMENT, DOUBLE SHEET PILE WALL
SITE PLAN AND PROFILE, DREDGED MATERIAL
W912WJ19B0011SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
New England District of Engineers
US Army Corps
ATLANTIC
OCEAN
RIVER
BLACKWATER
HARBOR
HAMPTON
HAMPTON
SEABROOK
HAMPTON FALLS
J U
L Y
JULY 2019
BULKHEAD
WEST
BULKHEAD
EAST
PIER
CO-OP BUILDING AND
YANKEE FISHERMAN'S
STATE PARK
HAMPTON BEACH
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
# EASTING NORTHING
1 1215388.03 143546.29
2 1215084.56 144113.81
3 1214704.96 144459.21
4 1213718.36 144766.77
5 1212276.43 145327.49
6 1212149.75 145351.93
7 1212178.16 145499.21
8 1212318.16 145472.21
9 1213767.93 144908.44
10 1215042.16 144511.21
11 1215520.31 143617.02
12 1212073.18 145430.50
13 1211991.26 145445.04
14 1211890.07 145358.53
15 1211464.14 145234.43
16 1211196.53 144851.20
17 1211247.13 144109.23
18 1211139.01 143489.55
19 1211336.04 143455.17
20 1211180.41 142563.15
21 1210786.36 142631.90
22 1211045.94 144119.76
23 1210986.77 144987.48
24 1211263.96 145384.42
25 1211814.46 145544.82
26 1211964.56 145536.62
27 1211998.25 145484.42
28 1212080.17 145469.88
29 1211124.27 143957.77
30 1211045.43 143505.88
31 1211481.41 145447.78
32 1211426.60 145558.32
33 1211470.19 145913.79
34 1211819.39 146008.21
35 1211366.14 145885.65
36 1211088.20 146447.98
37 1210853.09 146923.66
38 1210624.05 147387.06
39 1210953.29 147623.03
40 1211240.58 147168.78
41 1211521.36 146724.84
42 1211977.28 146011.51
43 1212010.51 145917.27
44 1211857.39 145900.44
45 1211768.54 146152.42
46 1211437.10 146670.98
ATLANTIC
OCEAN
HAMPTON
HARBOR
H A M
PTO
N
H A R B O R
IN LE T
SHEET C-101
N 144000
N 148000
E
E
E
E
E
CHANNEL LIMIT (TYP.)
8-FOOT SEABROOK CHANNEL
8-FOOT HAMPTON CHANNEL
8-FOOT ENTRANCE CHANNEL
INNER SUNK ROCKS
OUTER SUNK ROCKS
FLOOD
EBB
ANCHORAGE
8-FOOT HAMPTON
ANCHORAGE
6-FOOT HAMPTON
ANCHORAGE
6-FOOT STATE
CHANNEL
8-FOOT CROSS
H A
M P T O
N , N
H
S E A B R O
O K , N
H
SEABROOK, NH
ANCHORAGE
8-FOOT SEABROOK
HAMPTON
SEABROOK
SEA-ARM (FEDERAL)
SOUTH STONE JETTY
SHORE-ARM (STATE OF NH)
SOUTH STONE JETTY
SEA-ARM (FEDERAL)
NORTH STONE JETTY
SHORE-ARM (STATE OF NH)
NORTH STONE JETTY
WEST
BULKHEAD
EAST
BULKHEAD
HAMPTON HARBOR
HAMPTON AND SEABROOK
NEW HAMPSHIRE
8-FOOT CHANNELS AND ANCHORAGES
6-FOOT HAMPTON ANCHORAGE
6- FOOT STATE ANCHORAGE
STATE PLANE NAD 1983
SHEET C-104
SHEET C-103
SHEET C-102
pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
6:02:12 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
N S I
D :1
G-101A2
SCALE: 1'' = 400' 800'0 400'
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
E
A R
A M
A Y
O
L T
H
IB
O D
E A
U
G E
N E
R A
L P
L A
N
GENERAL PLAN 1
N
)C-104, AND SHEETS C-301 AND C-302 ONLY
ON SHEETS C-101 THROUGH MATERIAL REQUIRED TO BE DREDGED (
)ON SHEETS C-301 AND C-302 ONLYMATERIAL ALLOWABLE OVERDEPTH (
)ON SHEETS C-102 AND C-104 ONLYNO SPUD ZONE AREA (
)ON SHEETS C-101 THROUGH C-104 ONLYNAVIGATION (NAV) AIDS (
40) ON SHEET G-101 ONLYCHANNEL COORDINATES (
)ON SHEETS C-101 TO C-104 ONLYCHANNEL CENTERLINE (
)C-104 ONLY
ON SHEETS C-101 THROUGHLIMIT OF DREDGING ALONG SIDE SLOPE (
FM
W
G
)ON SHEETS C-102, C-103, C-104 AND C-106 ONLYSANITARY FORCE MAIN (
)ON SHEETS C-102, C-103, C-104 AND C-106 ONLYWATER MAIN (
)ON SHEETS C-102, C-103, C-104 AND C-106 ONLYGAS MAIN (
)ON SHEETS G-101, G-102, C-102, AND C-103GUARD RAIL (
)ON SHEETS G-102 AND C-109 ONLYMIDDLE GROUND SAND FLAT (
LEGEND
)AND C-108 ONLY
ON SHEETS G-101, G-102, C-102, C-103, C-104, C-106,TOWN BOUNDARY (
SYMBOLDESCRIPTION
)ON SHEETS C-105 TO C-109 ONLYMAJOR CONTOUR (
)ON SHEETS C-105 TO C-109 ONLYMINOR CONTOUR (
)ON SHEET G-102 ONLYGRASS DUNE AREA (
)ON SHEETS C-105 THROUGH C-108 ONLYGRASS DUNE AREA (
HPL) ON SHEET G-102 ONLYHYDRAULIC PIPELINE (
)ON SHEET C-109 ONLYSHEET PILE WALLS AT WEST BULKHEAD (
)SHEET G-102 ONLY
ON CONTRACTOR'S TEMPORARY ACCESS TO SOUTH BRIDGE ABUTMENT (
ONLY)C-105 THROUGH C-109
ON SHEETS G-102, AND DREDGED MATERIAL PLACEMENT SITE AND FILL (
)ON SHEET G-102 ONLYCONTRACTOR'S STAGING AND STORAGE AREA (
BM1
)G-102 ONLY
ON SHEETCONTRACTOR'S TEMPORARY ACCESS WAY TO BEACHES (
)ON SHEET G-102 ONLYEXISTING ASPHALT PAVED ROAD AND PARKING (
)ON SHEETS C-102 THROUGH C-109 ONLYSECTION CALLOUT (
)ON SHEET G-102 ONLYROUTE 1A DRAWBRIDGE (
)AND C-102 ONLY
ON SHEETS G-101, G-102, C-101,STONE JETTY; STATE AND FEDERAL (
)C-109 ONLY
ON SHEETS C-105, C-106, ANDSTONE STRUCTURE; JETTY OR GROIN (
)ON SHEET G-102 ONLYBENCHMARK BEACH2018 (
THROUGH C-104 ONLY)
REQUIRED DREDGING DEPTH, 8-FOOT CONTOUR (ON SHEETS C-101
)ON SHEET C-103 ONLYREQUIRED DREDGING DEPTH, 6-FOOT CONTOUR (
GENERAL NOTES:
LIST, VOLUME 1.
ON PUBLISHED LOCATIONS AND DETAILS CAN BE FOUND IN THE USCG LIGHT
AUTHORITATIVE SOURCE OF AIDS TO NAVIGATION. ADDITIONAL INFORMATION
ARE PLOTTED AT THE FIELD-DETERMINED POSITIONS. THE USCG IS THE
9. AIDS TO NAVIGATION WERE LOCATED DURING SURVEY OPERATIONS AND
AND MARCH 2018. MICHAEL J VADNAIS AND CREW ON OCTOBER 2018.
SURVEYED BY: FREDERICK W PERRY AND CREW ON AUGUST 2017
8. FIELD BOOK: R&H 4970, R&H 4562 AND R&H 3535
CONSIDERED AS INDICATING THE CONDITIONS EXISTING AT THAT TIME.
RESULTS OF SURVEYS MADE ON THE DATES INDICATED, AND CAN ONLY BE
7. THE INFORMATION DEPICTED ON THESE MAPS REPRESENTS THE
VOLUME CALCULATION PURPOSES.
2018. THE DATA DEPICTED ON THESE MAPS SHOULD NOT BE USED FOR
SURVEYS CONDUCTED DURING AUGUST 2017, MARCH AND OCTOBER
THE SHOALEST SOUNDINGS OF THOSE OBTAINED FROM HYDROGRAPHIC
6. THE SOUNDING INFORMATION SHOWN ON THESE MAPS REPRESENTS
BOULDER (2006) (2017 SURVEY).
STATIONS USED WERE STATIONS MTS SALISBURY AND TBM BEACH-2018 AND
RECORDED UTILIZING A TRIMBLE SPS 855 RTK GPS SYSTEM. THE RTK BASE
300 KHZ. HORIZONTAL POSITIONING AND REAL TIME TIDE READINGS WERE
AT 200 KHZ AND A R2 SONIC 2024 MULTIBEAM SONAR SYSTEM OPERATING AT
5. SURVEY WAS PERFORMED USING: AN ODOM MK 3 ECHO SOUNDER OPERATING
AND ARE BASED ON U.S. SURVEY FEET.
SYSTEM FOR THE STATE OF NEW HAMPSHIRE (ZONE 2800), NAD 1983
4. COORDINATES SHOWN ARE BASED ON THE TRANSVERSE MERCATOR GRID
RANGE OF TIDE IS 8.3 FEET.
TO MLLW. NO TIDE GAUGES WERE USED ON THIS PROJECT. THE AVERAGE
THEREFORE THE CORRECTION SHOULD BE ADDED TO NAVD 88 TO CONVERT
VICINITY OF HAMPTON HARBOR, NEW HAMPSHIRE. NAVD88 IS ABOVE MLLW;
THE CORRECTION IS REFERENCED FROM NOAA'S V-DATUM MODEL IN THE
THE MLLW TO NAVD 88 CORRECTION FOR THIS PROJECT IS 5.17 FEET.
3. BENCH MARK DATA: TIDES WERE RECORDED USING RTK GPS.
OTHERWISE NOTED AND SHOULD BE USED AS A GENERAL REFERENCE ONLY.
SHORELINE, BRIDGES, PIERS, ETC., IS LOCATED APPROXIMATE UNLESS
IMAGERY AND/OR NOAA CHART NO. 13278. ALL TOPOGRAPHY, INCLUDING
2. TOPOGRAPHY SHOWN IS FROM PREVIOUS SURVEYS (SEE NOTE 8), AERIAL
CONSIDERED NEGATIVE.
ARE BELOW THE REFERENCE PLANE OF MLLW, AND SHOULD BE
THE REFERENCE PLANE OF MLLW. SOUNDINGS WITHOUT A SIGN
TIDAL EPOCH. SOUNDINGS NOTED WITH A (+) ARE ABOVE
MEAN LOWER LOW WATER (MLLW) AND IS BASED ON THE 1983-2001
1. SOUNDINGS ARE IN FEET AND TENTHS. THE REFERENCE PLANE IS
J U
L Y
XX
C-XXX
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
ATLANTIC
OCEAN
SEABROOK, NH
HAMPTON FALLS, NH
HYDRAULIC PIPELINE
50' RIGHT-OF-WAY FOR
50'
ANCHORAGE
6-FOOT HAMPTON
ANCHORAGE
8-FOOT HAMPTON
(STATE MAINTAINED)
6-FOOT ANCHORAGE
ANCHORAGE
8-FOOT SEABROOK
MIDDLE GROUND
SAND FLAT
0'
ENTRANCE CHANNEL
8-FOOT FEDERAL
Q STREET
EPPING AVENUE
DOVER AVENUE
CONCORD AVENUE
BOSTON AVENUE
R
IV
E R
A V
E N
U E
O C E
A N B
O U L E
V A R
D R
O U T E
A
DUNE
HYDRAULIC PIPELINE
50' RIGHT-OF-WAY FOR
HYDRAULIC PIPELINE (TYP)
POTENTIAL ROUTE FOR
CHANNEL
HAMPTON
8-FOOT
DUNE
DUNE
DUNE
TO SHEETS C-107 AND C-108)
AREA AT SEABROOK BEACH (REFER
DREDGED MATERIAL PLACEMENT
(REFER TO SHEET C-105)
AREA AT HAMPTON BEACH
DREDGED MATERIAL PLACEMENT
DUNES
DUNES
DUNES
DUNES
20'
TYP
BM1
SEA-ARM (FEDERAL)
NORTH STONE JETTY
SEA-ARM (FEDERAL)
SOUTH STONE JETTY
OF NH)
SHORE-ARM (STATE
NORTH STONE JETTY
OF NH)
SHORE-ARM (STATE
SOUTH STONE JETTY
WEST BULKHEAD
TO SHEET C-109)
AREA AT WEST BULKHEAD (REFER
DREDGED MATERIAL PLACEMENT
EAST BULKHEAD
VERT. CL 18' MHW
HOR. CL 40' MHW
BASCULE BRIDGE (ROUTE 1A)
DRAW BRIDGE
ROUTE 1A
ATLANTIC
OCEAN
BLACKWATER
RIVER
(80' x 150' = 12,000 SF)
AND STAGING AREA
CONTRACTOR'S STORAGE
THIS SHEET)
EQUIPMENT (SEE NOTES 2 AND 3,
CONSTRUCTION VEHICLES AND
TEMPORARY ACCESS WAY FOR
EQUIPMENT
CONSTRUCTION VEHICLES AND
TEMPORARY ACCESS WAY FOR
END OF SUNCOOK STREET
TO SEABROOK BEACH AT
TEMPORARY ACCESS POINT
N 144178.77
E 1213740.84
N 144132.05
E 1213758.98
N 144010.10
E 1213380.26
N 143973.58
E 1213420.21
N 143157.08
E 1213070.95
N 143140.05
E 1213117.96
N 145807.18
E 1213496.78
N 145798.24
E 1213545.97
N 145754.33
E 1213537.99
N 145765.58
E 1213489.21
(75' X 115' = 8,625 SF)
AND STAGING AREA
CONTRACTOR'S STORAGE
ROCK
OUTCROP
ROCK
OUTCROP
HYDRAULIC PIPELINE (TYP)
50' RIGHT-OF-WAY FOR
CHANNEL
8-FOOT SEABROOK
120' FROM CENTER
LINE OF ROAD
NOTE 7
SEE
DUNE
CONSTRUCTION EQUIPMENT/VEHICLES
TO SOUTH BRIDGE ABUTMENT FOR
CONTRACTOR'S TEMPORARY ACCESS
CO-OP BUILDING AND PIER
YANKEE FISHERMAN'S
H P
L
H P
L
HPL
HPL
HPL
HPL
H P
L
HPL
HPL
HPL
H
PL
H P
L
H P
L
A T
L A
N T
IC
A
V E
N U
E
HOOKSETT STREET
SUNCOOK STREET
PEMBROKE STREET
CONCORD STREET
FRANKLIN STREET
TILTON STREET
BRISTOL STREET
ASHLAND STREET
WOODSTOCK STREET
PLYMOUTH STREET
C A
M P
TO
N S
TR
E E T
P O
R T S
M O
U T
H A
V E
N U
E
ROMA LN
S E
A B
R O
O K B
E A
C H
O C
E A
N A
V E
N U
E
MANCHESTER STREET
HUDSON STREET
NASHUA STREET
TYNGSBORO STREET
CHELMSFORD STREET
LOWELL STREET
DRACUT STREET
ANDOVER STREET
O C
E A
N D
R
IV
E
DUSTON AVENUE
H A
R R
IS
A
V E
N U
E
W H
IT
T E
N S
T R
E E
T
A S
H W
O R
T H A
V E
N U
E
HAMPTON BEACH
STATE PARK
O C
E A
N B
O U
L E
V A
R D
R O
U T E
A
O C
E A
N B
O U
L E
V A
R D
R O
U T E
A
O C
E A
N B
O U
L E
V A
R D
R O
U T E
A
O C
E A
N B
O U
L E
V A
R D
R O
U T E
A
E
IS
E N
H O
W E
R S
T R
E E
T
T H
O R
N T O
N S
T
C R
O S S
R O
A D
B E A C H
H A
M P
T O
N B
E A
C H
HAMPTON BEACH
STATE PARK
CAMPGROUND
SOUTH
BRIDGE
ABUTMENT
H A
M P T O
N , N
H
H A
M P
T O
N
N H
S E A B R
O O
K , N
H
S E
A B
R O
O K
N H
S E A B R O O K
H A M P T O N
H A M P T O N F A L L S
RIVER STREET
(45' X 160' = 7,200 SF)
AND STAGING AREA
CONTRACTOR'S STORAGE
OPEN (SEE NOTE 4)
FUEL PUMPS TO REMAIN
CONTRACTOR USE
LAUNCH RAMP FOR
HOIST AREA TO REMAIN
OPEN (SEE NOTE 4)
FLOATING DOCKS STORAGE
AREA DURING WINTER
MONTHS (NOV-APR)
H A
M P T O
N , N
H
S E A B R
O O
K , N
H
DREDGED MATERIAL PLACEMENT
AREA AT BRIDGE ABUTMENT
(REFER TO SHEET C-106)
TEMPORARY ACCESS
POINT TO HAMPTON
BEACH OFF OF OCEAN
BOULEVARD (RT 1A)
DUNES
DUNES
METHUEN STREET
HAVERHILL STREET
LAWRENCE STREET
A T L
A N
T
IC
A
V E
N U
E pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
6:01:40 AM 6/11/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
800'0 400'
N
A1
SCALE: 1" = 400'
OCEAN
ATLANTIC
VEHICLES AND EQUIPMENT
WAY FOR CONSTRUCTION
30' WIDE TEMPORARY ACCESS
GENERAL PLAN 2
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
M
G O
D F
R E
Y
A N
S I
D :1
G-102
VEHICLES AND EQUIPMENT
WAY FOR CONSTRUCTION
30' WIDE TEMPORARY ACCESS
NORTHING EASTING ELEV. DESCRIPTION
18.37
BM ID
146464.412BM-1
COORD
PLAN
F5
OF CONCRETE WALKWAY
5/8" DRILL HOLE SET IN SOUTH EDGE OF
1213028.119
FOR DREDGED MATERIAL PLACEMENT WORK
BENCHMARK (BM) INFORMATION TABLE
S E A B R O O K
PIPELINE
DISCHARGE
HYDRAULIC
SUBMIT DESIGN)
(CONTRACTOR TO
BAFFLE PLATE
HINGE
F9
SCALE: NONE
BAFFLE PLATE DETAIL
MATCH LINE
(THIS SHEET)
MATCH LINE
(THIS SHEET)
MATCH LINE
(THIS SHEET) (THIS SHEET)
MATCH LINE
PLAN
ELEVATION
PIPE TO PREVENT EROSION OF EXISTING BEACH MATERIAL.
CONTRACTOR SHALL INSTALL BAFFLE PLATE ON END OF DISCHARGE
NOTE:
G
N E
R A
L P
L A
END OF HAVERHILL STREET
TO SEABROOK BEACH AT
TEMPORARY ACCESS POINT
#1
#2
#3
#4
AND DREDGED MATERIAL PLACEMENT) UNDER SUBPARAGRAPH "ORDER OF WORK".
10. ORDER NUMBER FOR PLACEMENT OF DREDGED MATERIAL (TYPICAL AT EACH DREDGED MATERIAL PLACEMENT SITE). REFER TO SECTION 35 20 25 (DREDGING
PLACEMENT OF DREDGED MATERIAL.
9. REFER TO SUBPARAGRAPH "ORDER OF WORK" UNDER SPECIFICATION SECTION 35 20 25 (DREDGING AND DREDGED MATERIAL PLACEMENT) FOR SEQUENCE OF
8. CONTRACTOR SHALL CLEAN AND REMOVE ALL DEBRIS (EXCLUDING SANDS/SEDIMENTS) PUMPED ONTO THE BEACH DURING DREDGING OPERATIONS.
THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REINSTALLATION OF WOOD POSTS AND ROPE BARRIER AT THE END OF CONSTRUCTION.
BOULEVARD (ROUTE 1A) (SEE ATTACHED PHOTOS AT THE END OF SPECIFICATION SECTION 01 11 00) AND STORE THEM AT A LOCATION DESIGNATED BY THE COR.
7. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL REMOVE EXISTING WOOD POSTS AND ROPE BARRIER ALONG THE WEST SIDE OF OCEAN
6. WHEN NOT IN USE CONSTRUCTION EQUIPMENT AND VEHICLES SHALL NOT BE STORED ON ANY PRIVATE PROPERTY.
5. DIMENSION TAKEN FROM EXISTING CHAIN LINK FENCE.
(POVS) SHALL NOT BE STORED OR PLACED OUTSIDE OF THE DESIGNATED STORAGE AND STAGING AREAS.
4. THE HOIST AREA AND FUEL PUMPS MUST BE ACCESSIBLE AT ALL TIMES. ALL EQUIPMENT, MATERIALS, CONSTRUCTION VEHICLES, AND PRIVATELY OWNED VEHICLES
SHALL BE RESTORED TO THEIR ORIGINAL CONDITION PRIOR TO CONSTRUCTION. DAMAGED PAVED DRIVES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
OF EACH WORK DAY. AT THE END OF CONSTRUCTION AND UNTIL THE PROJECT IS CLOSED AND ACCEPTED BY THE CONTRACTING OFFICER, THE PAVED DRIVES
3. PAVED DRIVES USED AS PART OF THE TEMPORARY ACCESS WAYS SHALL NOT BE DAMAGED AND SHALL BE CLEANED OF SAND, MUD, AND TRASH DAILY AT THE END
SHALL SCARIFY TEMPORARY ACCESS WAY ALONG BEACH TO A DEPTH OF 6 INCHES.
PARALLEL TO THE DUNES ALONG SEABROOK BEACH SHALL BE AT LEAST 15 FEET FROM THE DUNE'S TOE. AT COMPLETION OF CONSTRUCTION THE CONTRACTOR
2. THE CONTRACTOR WILL NOT BE ALLOWED TO TRAVEL ON, OVER, OR ACROSS ANY DUNES. THE LANDWARD SIDE EDGE OF THE TEMPORARY ACCESS ROAD RUNNING
CONTRACTOR'S STORAGE AND STAGING AREAS, HYDRAULIC PIPELINE ROUTING, AND LOCATION OF THE FOUR DREDGED MATERIAL PLACEMENT AREAS.
1. GENERAL PLAN 2 PROVIDES INFORMATION FOR TEMPORARY ACCESS WAYS, DESIGNATED STREETS FOR TEMPORARY ACCESS POINTS, LOCATION FOR
GENERAL PLAN 2 NOTES:
PLAN 2 NOTE 10
SEE GENERAL
J U
L Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
24.8
24.7
24.3
24.2 24.2
24.1 24.1
24.0
23.9
23.8
23.7
23.6 23.5
23.3
23.3
23.3
23.3
23.3
23.2
23.0
23.0
23.0
22.9
22.8
22.6
22.6
22.6
22.5
22.4
22.4
22.3
22.3
22.2
22.1
22.0
21.9
21.9
21.8
21.8
21.8
21.7
21.7
21.7
21.5
21.5
21.5
21.4
21.3
21.3
21.2
21.1
21.1
20.5
20.5
20.5
20.4
20.3
20.3
20.2
20.1
19.9
19.9
19.8
19.6
19.5
19.3
19.2
19.1
19.1
19.0
18.9
18.8
18.6
18.5
18.4
18.0
17.4
17.4
17.4
17.3
17.2
17.1
17.1
17.1
17.1
17.0
17.0
17.0 17.0
17.0
16.9
16.9
16.9 16.8
16.8
16.8
16.8
16.8
16.8
16.8
16.8
16.7
16.7
16.6
16.6 16.6
16.6
16.6
16.6
16.6
16.6
16.6
16.6
16.6
16.6
16.5
16.5
16.5
16.5
16.5 16.5
16.4
16.4
16.4
16.4
16.4
16.4
16.4
16.3
16.3
16.3
16.3
16.3
16.3
16.3
16.2
16.2
16.2
16.2
16.2
16.2
16.2
16.2
16.2
16.2
16.2
16.1
16.1
16.1
16.1
16.1
16.1
16.1 16.1
16.1
16.1
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0
16.0 16.0
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.9
15.8
15.8
15.8
15.8
15.8
15.8 15.8
15.8
15.8
15.8
15.8
15.8
15.7
15.7
15.7
15.7
15.7
15.7
15.6
15.6
15.6
15.6
15.6
15.6 15.6
15.6
15.6
15.6
15.6
15.6
15.6
15.5
15.5
15.5
15.5 15.5
15.5
15.4
15.4 15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.2
15.2
15.2
15.2
15.2
15.2
15.2
15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1 15.1
15.1
15.1 15.1
15.1
15.1
15.0
15.0
15.0 15.0
15.0
15.0
15.0
15.0
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.8
14.8
14.8 14.8
14.8
14.8
14.8
14.8
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6 14.6
14.6
14.6
14.6
14.6
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.4 14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.1
14.1 14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.0
14.0
14.0
14.0 14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9 13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.5
13.5
13.5
13.5
13.5
13.4
13.4
13.4
13.4
13.4
13.4 13.4
13.4
13.4
13.4
13.4
13.4 13.4
13.4
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.0
13.0
13.0
13.0 13.0
13.0
13.0
13.0
13.0
13.0
13.0
13.0
13.0
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.8
12.8 12.8
12.8
12.8
12.8
12.8
12.8
12.8 12.8
12.8
12.8
12.8
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.2
12.2
12.2
12.2
12.2
12.2
12.2
12.2
12.2
12.2 12.2
12.2
12.2
12.2
12.2
12.2
12.2
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.1
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.3 11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.3
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1
11.1 11.1
11.1
11.1
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
11.0
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.7 10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.6 10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.4
10.4
10.4
10.4
10.4
10.4 10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3 10.3
10.3
10.3
10.3
10.3
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.2
10.1
10.1
10.1
10.1
10.1
10.1 10.1
10.1
10.1
10.1
10.1
10.1
10.1
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0
10.0 10.0
10.0
10.0
10.0
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.8
9.8
9.8
9.8
9.8
9.8 9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.7
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.5
9.5
9.5
9.5
9.5
9.5
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.7
8.7
8.7
8.7
8.7
8.7
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.5
8.5
8.5
8.5
8.5
8.5
8.5
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.2
8.2 8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.1
8.1
8.1
8.0
8.0
8.0
8.0
8.0
8.0
8.0
7.9
7.9
7.9
7.9
7.9
7.9
7.9
7.9
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.7
7.7
7.7
7.7
7.7
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.4
7.4
7.4
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.2
7.2
7.2
7.2 7.2
7.2
7.2
7.1
7.1
7.0
7.0
7.0
7.0
7.0
7.0
7.0
6.9
6.9
6.9
6.9
6.9
6.9
6.9
6.8
6.8
6.8
6.8
6.8
6.7
6.7
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.5
6.5
6.5 6.5
6.5
6.5
6.5
6.4
6.4
6.4
6.4
6.4
6.3
6.3
6.3
6.3
6.2
6.2
6.1
6.0
6.0
6.0
6.0
5.9
5.8
5.8
5.8
5.7
5.5
5.5
5.4
5.3
5.2
5.2
5.2
4.9
4.8
4.7
0+
5+
INNER SUNK
ROCKS
ATLANTIC
OCEAN
WHITE
ROCKS
M A
T C
H L
IN
E S
H E
E T C
FLOOD
EBB
CHANNEL LIMIT
(TYP.)
N 145000
N 144000 N 144000
E
E
E
E
N 145000
0'
HAMPTON HARBOR
INLET
R-8
GW - H
GC-7
NOTES:
SURVEY OCTOBER 2018.
2. SOUNDINGS ON THIS SHEET ARE BASED ON
1. FOR GENERAL NOTES SEE SHEET G-101.
SIDE SLOPE (TYP)
DREDGING LIMIT ALONG
SEA-ARM (FEDERAL)
NORTH STONE JETTY
SEA-ARM (FEDERAL)
SOUTH STONE JETTY
ATLANTIC
OCEAN
BECKMANS
POINT
- F
O O
T E
N T R
A N
C E C
H A
N N
E L
(O P T
IO
N A L B
ID
IT
E M
E 1214332.83
N 143817.17
SEWER OUTFALL
HAMPTON HARBOR ENTRANCE
CHANNEL (OPTIONAL BID ITEM)
GC-5
GC-3
RN- 4A
pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
4:49:03 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
S I
D :1
C-101100' 200'0A2
SCALE: 1'' = 100'
M
G O
D F
R E
Y
-F
O O
T E
N T
R A
N C
E C
H A
N N
E L
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
E
A R
A M
A Y
HAMPTON HARBOR SITE PLAN
J U
L Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
47.4
47.3
46.7
46.4
45.9
45.8
45.4
45.3
45.1
44.6
44.3
44.3
44.2
43.0
42.6
42.6
42.2
42.0 41.7
41.6
41.2
40.9
40.8 40.2
40.1
39.6
39.2
39.2
39.2
39.0
38.9
38.8
38.6
38.5
38.5
38.4
38.3
38.0
37.9
37.7
37.2
36.9
36.8
36.6
36.2
36.1
35.9
35.7
35.7
35.7
35.4
35.2
35.2
34.8
34.6
34.5
34.5
34.2
33.9 33.7
33.6
33.6
33.5
33.2
33.0
32.8 32.8
32.8
32.2
32.0
31.9
31.9
31.9
31.8
31.6
31.6 31.6
31.1
31.0 30.9
30.7
30.5
30.3
30.3
30.2
29.7 29.5
29.4
28.8
28.7
28.6 28.6
28.6
28.4
28.4
28.4
28.4
28.4
28.1
27.8
27.5
27.4
27.4
27.2
27.2
27.0
26.9
26.9 26.8
26.7
26.6
26.6
26.4
25.8
25.8 25.5
25.4
25.3
25.3 25.3
25.2
25.2
25.1
25.0
24.8
24.7
24.5
24.4
24.1
23.9
23.9
23.8
23.7 23.7
23.6
23.6
23.4
23.4
23.4
23.3 23.3
23.3
23.2
23.2
23.1
23.0
23.0
22.9
22.9
22.9
22.6
22.5
22.2
22.2
21.9
21.8
21.8
21.6
21.5
21.5
21.3
21.2 21.2
21.1
21.1 21.0
20.9
20.9
20.9
20.9
20.8
20.7
20.7
20.7
20.6
20.5
20.5
20.4
20.3
20.1
20.1
20.1
20.1
20.0
19.9 19.9
19.8
19.7
19.7
19.6 19.5
19.5
19.4
19.4
19.3 19.2
19.2
19.1
19.1
19.0
19.0
19.0
18.9
18.8
18.7
18.6
18.6
18.6
18.6
18.5
18.4
18.4
18.4
18.3
18.3
18.3
18.3
18.3
18.3
18.2
18.1
18.1
18.1
18.1
18.1
18.1
18.1
18.1
18.0
18.0 17.9
17.9
17.9
17.9
17.9
17.8
17.8
17.6
17.6
17.6
17.6
17.6
17.5
17.5
17.4
17.4
17.4
17.4
17.4
17.3
17.2
17.2
17.2
17.2
17.2
17.2
17.1
17.1
17.0
16.9
16.9
16.9
16.8
16.7
16.6
16.6
16.6
16.6
16.5
16.4 16.4
16.4
16.4
16.4
16.4
16.4
16.4
16.4
16.3
16.3
16.3
16.3
16.2
16.2
16.2
16.1
16.1
16.1
16.1
16.1 16.1
16.1
16.1
16.1
16.0
16.0 16.0 16.0
15.9
15.9
15.9
15.8
15.8
15.8
15.8
15.8
15.8
15.7
15.7
15.7
15.7
15.7
15.7
15.7
15.6
15.6
15.6
15.6
15.6
15.6
15.5
15.5
15.5
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.4
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.3
15.2
15.2
15.2
15.2
15.2
15.2
15.2
15.2
15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.1 15.1
15.1
15.1
15.1
15.1
15.1
15.1
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
15.0
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9 14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.9
14.8
14.8
14.8
14.8
14.8
14.8
14.8
14.8
14.8 14.8
14.7 14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.7
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.6
14.5
14.5
14.5
14.5
14.5
14.5
14.5
14.5 14.5
14.5
14.5
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.3
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.2
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.1
14.0
14.0
14.0
14.0
14.0
14.0
14.0 14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
14.0
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.9
13.8
13.8 13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8
13.8 13.8
13.8
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.7
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.6
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.5
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.4
13.3
13.3
13.3
13.3
13.3
13.3 13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.3
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.2
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.1
13.0
13.0
13.0
13.0
13.0
13.0 13.0
13.0
13.0
13.0
13.0
13.0
13.0
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.9
12.8
12.8
12.8
12.8
12.8
12.8
12.8
12.8
12.8
12.8
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.7
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.6
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.5
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4
12.4 12.4
12.4
12.4
12.4
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3 12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.3
12.2
12.2
12.2
12.2
12.2
12.2
12.2 12.2
12.2
12.2
12.2
12.1 12.1
12.1
12.1
12.1
12.1
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
12.0
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.9
11.8 11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.8
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7
11.7 11.7
11.7
11.6 11.6
11.6
11.6 11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.6
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.5
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.4
11.3
11.3
11.3 11.3
11.3
11.3
11.3
11.3
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.2
11.1
11.1
11.1 11.1
11.1
11.1
11.1
11.1
11.0
11.0
11.0
11.0
11.0
10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.9 10.9
10.9
10.9
10.9
10.9
10.9
10.9
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.7
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.6
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.5
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.4
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.3
10.2
10.2
10.2
10.2
10.2
10.2
10.1
10.1
10.1
10.1
10.1
10.1
10.1
10.0
10.0
10.0
10.0
10.0
10.0
10.0
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.9
9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.8
9.7
9.7
9.7
9.7
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.6
9.5
9.5
9.5
9.5
9.5
9.5
9.5
9.5 9.5
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.4
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.2
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.1
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
9.0
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.8
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.7
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6
8.6 8.6
8.6
8.6
8.6
8.6
8.5
8.5
8.5
8.5
8.5
8.5
8.5
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
7.9
7.9
7.9
7.9
7.9
7.9
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.8
7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.0
7.0
7.0
7.0
7.0 7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
6.9
6.9
6.9
6.9
6.9
6.9
6.9
6.9
6.9
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.5
6.5
6.5 6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.4
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.2
6.2
6.2
6.2
6.2
6.2
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0 6.06.0
6.0
5.9
5.9
5.9
5.9
5.9
5.9
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.7
5.7
5.7
5.7
5.7 5.6
5.6
5.6
5.6
5.6
5.6
5.6
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.3
5.3
5.3
5.3
5.3
5.3
5.3
5.3
5.2
5.2
5.2
5.2
5.2
5.1
5.1
5.1
5.1
5.1
5.1
5.1
5.0
5.0
5.0
4.9
4.9
4.9
4.94.9
4.8
4.8
4.8
4.8
4.8
4.8
4.7
4.6
4.6
4.6
4.6
4.6
4.6
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.5
4.4
4.4
4.4
4.3
4.3
4.3
4.3
4.3
4.2 4.2
4.2
4.2
4.2
4.2
4.2
4.1
4.1
4.1
4.1
4.1
4.1
4.1 4.1
4.0
4.0
4.0
4.0
4.0
3.9
3.9
3.8
3.8
3.8
3.8
3.8
3.8
3.8
3.7
3.7
3.6
3.6
3.6
3.6
3.6
3.6
3.6
3.5
3.5
3.5
3.5
3.5
3.5
3.4
3.4
3.4
3.4
3.4
3.4
3.3
3.3
3.3
3.3
3.3
3.3
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.2
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.1
3.0
3.0
3.0
3.0
3.0
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.9
2.8
2.8
2.8
2.8
2.8 2.8
2.7
2.7
2.7
2.6
2.6
2.6
2.6
2.5
2.5
2.5
2.5
2.5 2.4
2.4
2.4
2.4
2.4
2.3
2.3
2.3
2.2
2.2
2.2
2.1
2.1
2.1
2.1
2.1
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
1.9
1.9
1.9
1.8
1.8
1.8
1.8
1.8
1.6
1.6
1.6
1.6
1.6
1.5
1.4
1.4
1.4
1.4
1.3
1.3
1.3
1.1
1.1
0.9
0.9
0.9
0.8
0.7
0.7
0.5
0.5
0.2
0.2
0.2
0.0
54+46
+0
5+00
0+00
0+00
5+
+0
+1
S
O C
E A
N B
O U
L E
V A
R D S
T A
T E R
O U
T E
A
S
F M
S T
A T
E R
O U
T
B
R
ID
G E
M
ATCH
LI
NE
SHEET
C -1
MATCH LINE SHEET C - 104
M A
T C
H L
IN
E S
H E
E T C
FLOOD
EBB
HAMPTON
HARBOR
HAMPTON STATE
MARINA
HAMPTON
(TYP.)
CHANNEL LIMIT
8 - FOOT HAMPTON ANCHORAGE
S E A B R
O O
K , N
H
H A
M P T O
N , N
H
E
E
E
N 146000
N 145000
N 146000
N 145000
GC-9
8 - F
OOT S
EABROOK
CHANNEL
150'
GR-HH
50+00
NOTES:
SOUNDINGS BASED ON 2017 SURVEY
CHANNEL
8 - FOOT HAMPTON
54+46
HAMPTON BEACH
PAVILION
HAMPTON BEACH
STATE PARK
HAMPTON BEACH
STATE PARK
CAMPGROUND
INTAKE PIPELINE (DEPTH AT -150' +)
SEABROOK NULCLEAR PLANT
DISCHARGE PIPELINE (DEPTH AT -150' +)
SEABROOK NUCLEAR PLANT
OF NH)
SHORE-ARM (STATE
SOUTH STONE JETTY
OF NH)
SHORE-ARM (STATE
NORTH STONE JETTY
VERT. CL. 18' MHW
HOR. CL. 40' MHW
BASCULE BRIDGE
SEA-ARM (FEDERAL)
NORTH STONE JETTY
(SEE NOTE 5)
NO SPUD ZONE
(SEE NOTE 5)
NO SPUD ZONE
8 - FOOT ENTRANCE CHANNEL
(OPTIONAL BID ITEM)
CHANNEL
8 - FOOT SEABROOK
SLOPE (TYP)
ALONG SIDE
DREDGING LIMIT
SLOPE (TYP)
ALONG SIDE
DREDGING LIMIT
8 - FOOT CROSS CHANNEL
(SEE NOTE 5)
EXISTING UTILITIES
TO EXISTING UTILITIES
"EXISTING UTILITIES" FOR REQUIREMENTS PERTAINING
AND DREDGED MATERIAL PLACEMENT), SUBPARAGRAPH
5. REFER TO SPECIFICATION SECTION 35 20 25 (DREDGING
BRIDGE ARE BASED ON SURVEY AUGUST 2017.
4. SOUNDINGS LOCATED IN THE VICINITY OF BASCULE
ARE BASED ON SURVEY MARCH 2018.
3. SOUNDINGS LOCATED WEST OF BASCULE BRIDGE
ARE BASED ON SURVEY OCTOBER 2018.
2. SOUNDINGS LOCATED EAST OF BASCULE BRIDGE
1. FOR GENERAL NOTES SEE SHEET G-101.
+0.0
0'
250'
200'
+0.0 +0.1
+0.3
+0.5
+0.5
+0.7
+0.9
+1.1 +1.2
+1.3
+1.6
+1.8
+1.9
+2.1
+2.3 +2.4
+2.5
+2.6
+3.5
+3.6
+3.9
+4.0
+4.8
+6.4
+6.5
+6.6
+7.6 +7.6
+8.3
+8.6
+9.0
+9.1
+9.1 +9.2
+9.4
+9.5
+10.1
+10.2 +11.1 +11.2
+11.5
+11.7
+11.7
+11.7 +12.2
+12.3
+12.4
+13.0
FM
F M
F M
F M
F M
F M
F M
F M pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
5:58:40 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
A N
S I
D :1
C-102A4
SCALE: 1'' = 100' 100' 200'0
E
A R
A M
A Y
O
L T
H
IB
O D
E A
U
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
A N
D -F
O O
T C
R O
S S C
H A
N N
E L
-F
O O
T E
N T
R A
N C
E A
N D S
E A
B R
O O
K C
H A
N N
E L S
-F
O O
T H
A M
P T
O N C
H A
N N
E L A
N D A
N C
H O
R A
G E
HAMPTON HARBOR SITE PLAN
N
J U
L Y
B4
C-301
B4
C-301
B7
C-301
B7
C-301
E1
C-301
E1
C-301
E6
C-301
E6
C-301
B1
C-301
B1
C-301
C-302
B6
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
0'
10.8
10.5 10.5
10.4
10.3
10.2
10.1
10.1
10.0
9.7
9.6
9.5
9.5
9.5
9.4
9.3
9.3
9.2
9.2
9.2
9.1
9.1
9.1
9.0
9.0
9.0
9.0
9.0
8.9
8.9
8.9
8.8
8.8
8.8
8.7
8.7
8.7
8.7
8.7
8.6
8.6
8.6
8.6
8.6
8.6
8.5
8.5
8.5
8.5
8.5
8.5
8.5 8.5
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.4
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.3
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.2
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.1
8.0
8.0
8.0
8.0
8.0
8.0
8.0
8.0
7.9
7.9
7.9
7.9 7.9
7.9
7.9
7.9
7.9
7.9
7.8
7.8
7.8
7.8
7.8
7.87.7
7.7
7.7
7.7
7.7
7.7
7.7 7.7
7.7
7.7
7.7
7.7
7.7
7.7
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.6
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5 7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.5
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.4
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.3
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.1
7.1
7.1
7.1
7.1
7.1
7.1
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
7.0
6.9
6.9
6.9
6.9
6.9
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.8
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.7
6.6
6.6
6.6
6.6
6.6
6.6
6.6
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.5
6.4
6.4
6.4
6.4 6.4
6.4
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.3
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.2
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.1
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.9
5.8
5.8
5.8
5.8
5.8
5.8
5.8
5.7
5.7
5.7
5.7
5.7
5.7
5.7
5.6
5.6
5.6
5.6
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.5
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.4
5.3
5.3
5.3
5.3
5.3
5.3
5.3
5.3
5.3
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.2
5.1
5.1
5.1
5.1
5.1
5.1
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
5.0
4.9
4.9
4.9
4.9
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.8
4.7
4.7
4.7
4.7
4.7
4.6
4.6
4.6
4.6
4.6
4.5
4.5
4.4
4.4
4.4
4.4
4.4
4.4
4.4
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.2
4.2
4.2
4.2
4.1
4.1
4.1
4.1
4.0
4.0
4.0
4.0
3.9
3.9
3.9
3.8
3.8
3.8
3.8
3.7
3.7
3.7
3.6
3.6
3.6
3.6
3.6
3.6
3.5
3.4
3.4
3.3
3.3
3.3
3.2
3.2
3.1
3.0
3.0
2.3
2.3
1.3
0.1
+8
5+
+0
+1
S
S
DUSTON AVENUE
H A
R R
IS
A
V E
N U
E
W H
IT
T E
N S
T R
E E
T
A S
H W
O R
T H A
V E
N U
E
O C
E A
N B
O U
L E
V A
R D S
T A
T E R
O U
T E
A
O C E A N B
O U
LE
V A R
D
(N H R
O U T E
A
Q
STREET
DOW AVENUE
FELLOWS AVENUE
P STREET
DOVER AVENUE
EPPING AVENUE
SEABROOK, NH
HAMPTON RIVER
MARINA
HAMPTON STATE
MARINA
HAMPTON BEACH
STATE PARK
H A
M P
T O
N
N H
H A
M P
T O
N F
A L L S
N H
HAMPTON
F L O
O
DE
B B
H A
M P
T
R B
O R
M
ATCH
LI
NE
SHEET
C
- 1
8 - FOOT HAMPTON CHANNEL
N 148000
N 147000
E
E
E
E
E
N 148000
N 147000
HAMPTON FALLS, NH
NOTES:
MARCH 2018.
2. SOUNDINGS ARE BASED ON SURVEY
1. FOR GENERAL NOTES SEE SHEET G-101.
CHANNEL LIMIT (TYP)
+1
S E A B R
O O
K , N
H
H A
M P T O
N , N
H
HAMPTON FALLS
HAMPTON STATE
MARINA
(2006)
BOULDER
STATION
FORCE MAIN
4" DIA SEWER
LIMIT (TYP)
ANCHORAGE
ANCHORAGE
8 - FOOT HAMPTON
ANCHORAGE
6 - FOOT HAMPTON
SIDE SLOPE (TYP)
DREDGING LIMIT ALONG
(OPTIONAL BID ITEM)
6 - FOOT STATE ANCHORAGE
LI
M
IT
O
F
FE
DERAL
ANCHO
RAG
E
+0.3
+1.1
+1.5
+1.8
FM
F M
F M
F M
F M pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
4:54:16 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
A N
S I
D :1
C-103A3
SCALE: 1''-100' 100' 200'0
L T
H
IB
O D
E A
U
E
A R
A M
A Y
O
L T
H
IB
O D
E A
U
M
G O
D F
R E
Y
A N
D -F
O O
T S
T A
T E A
N C
H O
R A
G E
-F
O O
T H
A M
P T
O N C
H A
N N
E L -F
O O
T H
A M
P T
O N
A N
C H
O R
A G
E -F
O O
T H
A M
P T
O N A
N C
H O
R A
G E
HAMPTON HARBOR SITE PLAN
N
J U
L Y
E1
C-302
E1
C-302
E4
C-302
E4
C-302
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
.4
.6
.2
.5
.3
.0
.9 9 .7
.3
.3
.2 9 .2
.1 9 .1
.1
.1
.1
.1
.0
.0 9 .0
.0
.0
.0
.0
.0
.0 9 .0
.0
.9
.9
.9
.9
.9
.9
.9
.9
.9
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.7
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6 8 .6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6 8 .6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4 8 .4 8 .4
.4
.4
.4
.4 8 .4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3 8 .3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.1
.1
.1
.1
.1
.1
.1
.1
.1 8 .1 8 .1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1 8 .1
.1 8 .0
.0
.0
.0
.0
.0
.0
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.97 .8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.7
.7
.7
.7
.7
.7
.7
.7
.7
.6
.6
.6
.6
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.4
.4 7 .3
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.1
.1
.1
.1
.1
.0
.0 7 .0
.0
.0
.0
.0
.0
.0
.9
.8
.8
.8
.7
.7
.7
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.4
.4
.3
.3
.3
.3
.3
.3
.2
.1
.1
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.9
.9
.9
.9
.9
.8
.8
.8
.8
.8
.8
.8
.7
.7
.7
.6
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.4
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.1
.1
.1
.1
.1
.0
.0
.0
.0
.0
.0
.0
.0
.0
.9
.9
.9
.8
.8
.8
.8
.8
.6
.6
.6
.6
.6
.5
.5
.5
.5
.4
.4
.4
.4
.4
.34 .3
.2
.2
.2
.2
.2
.2
.2
.2
.2
.1
.1
.1
.1
.0
.0
.0
.0
.9
.8
.8
.8
.8
.8
.8
.8
.8
.7
.7
.7
.7
.7
.6
.6
.6
.6
.5
.5
.5
.5
.5
.4
.4
.4
.3
.3
.3
.3
.3
.33 .3
.2
.2
.2
.2
.1
.1
.1
.1
.0
.0
.0
.0
.0
.9
.9
.9
.9
.9
.8
.8
.8
.8
.8
.7
.7
.7
.7
.7
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.2
.2
.2
.2
.1
.1
.1
.1
.1 2 .1
.1
.1
.0
.0
.0
.0
.0
.0
.0 1 .9
.9
.9
.9
.8
.8
.8
.8
.8
.8
.8
.8
.8
.8
.7
.7
.7
.7
.7
.6
.6
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.4
.4
.4
.4
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.2
.2
.2
.2
.2
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.0
.0
.0
.0
.0
.0
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.9
.8
.8
.8
.8
.8
.80 .8
.8
.8
.8
.8
.8
.8
.7
.7
.7
.7
.7
.7
.70 .7
.7
.7
.7
.6 0 .60 .6
.6
.6
.6
.6
.6
.6
.6
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.5
.4
.4
.4
.4
.4
.4
.4
.4
.4
.3
.3
.3
.3
.3
.3
.3
.2
.2
.2
.2
.2
.2
.2
.2 0 .2
.20 .2
.2
.2
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.1
.0
.0
.0
S
THORNTON STREET
S
FM
STATE ROUTE 1A BRIDGE
HAMPTON
HAMPTON HARBOR
FLOOD
EBB
M A
T C
H L
IN
E S
H E
E T C -1
S E A B R
O O
K
N H
H A
M P T O
N
N H
EISENHOWER STREET
SEABROOK
8 - FOOT SEABROOK ANCHORAGE
8 - FOOT SEABROOK CHANNEL
N
N
N
E 1211000
E 1212000
N
N
E 1212000
E 1211000
NOTES:
CHANNEL LIMIT (TYP)
(TYP)
ANCHORAGE LIMIT
OCEAN BOULEVARD (NH ROUTE 1A)
YANKEE
FISHERMAN
CO-OP
SIDE SLOPE (TYP)
DREDGING LIMIT ALONG
EAST BULKHEAD
SEE NOTE 3
2017 SURVEY.
BOUNDARY ARE BASED ON AN AUGUST
3. SOUNDINGS WITHIN THE RECTANGULAR
SURVEY, UNLESS OTHERWISE INDICATED.
2. SOUNDINGS ARE BASED ON A MARCH 2018
1. FOR GENERAL NOTES SEE SHEET G-101.
NO SPUD ZONE
SIDE SLOPE (TYP)
DREDGING LIMIT ALONG
.1
.1
.1
.2
.3
.7
.8
.9
.3
.7
M
FM
FM
pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
4:57:50 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
S I
D :1
C-104A4
SCALE: 1'' = 100' 100' 200'0
L T
H
IB
O D
E A
U
E
A R
A M
A Y
O
L T
H
IB
O D
E A
U
M
G O
D F
R E
Y
-F
O O
T S
E A
B R
O O
K C
H A
N N
E L
A N
D
-F
O O
T S
E A
B R
O O
K A
N C
H O
R A
G E
HAMPTON HARBOR SITE PLAN
N
J U
L Y
E8
C-302
E8
C-302
B2
C-302
B2
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
POE
N 145236.477
E 1214736.449
PI
N 145252.015
E 1213906.594
STATION 0+40.00
START BERM AT
STATION 8+10.00
END BERM AT
BOTH ENDS OF BERM)
1V:30H SLOPE (TYP AT
1V:30H SLOPE
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
MATERIAL
DREDGED FILL
MATERIAL
DREDGED FILL
MATERIAL
DREDGED FILL
MATERIAL
DREDGED FILL
LOCATION)
(APPROXIMATE
FILL MATERIAL
TOE OF DREDGED
A1
C-303 A1
C-303
-1
(-1)
(-1) (-1)
(-1
S L
O P
E
V :3
H
S L
O P
E
V :3
H
S L
O P
E
V :3
H
SAND DUNE
SAND DUNE
SAND DUNE
HAMPTON BEACH
HAMPTON BEACH
HAMPTON BEACH
STATE PARK PAVILION
HAMPTON BEACH STATE
PARK CAMPGROUND
HAMPTON HARBOR
C O
N C
R E
T E S
ID
E W
A L
K
HAMPTON BEACH
S A
N D P
A T
H W
A Y
SAND
PATHW
AY
ATLANTIC OCEAN
ATLANTIC OCEAN
EDGE OF SAND
DUNE (TYP)
SAND DUNE
SAND DUNE
-2
(-2) (-2)
POB
N 145327.867
E 1213754.455
100' WIDE BERM AT
ELEVATION 14.0' (MLLW)
100' WIDE BERM AT
ELEVATION 14.0' (MLLW)
S L
O P
E
V :3
H
S L
O P
E
V :3
H
S
LO
P E 1V :30H
S L
O P
E
V :3
H
N O R T H S
T O
N E J E T T Y
S E A -A
R M F E D E R A L)
N O
R T
H S
T O
N E J
E T T
Y
S H
O R
E -A
R M S
T A
T E O
F N
H
D5
C-303
D5
C-303
D1
C-303
D1
C-303
S
TO
N E G
R O
IN
/JE
TTY
pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
5:04:49 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
A1
SITE PLAN - HAMPTON BEACH
SCALE: 1" = 50' 50' 100'0
M
G O
D F
R E
Y
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
A N
S I
D
C-105
:1
N
H A
M P
T O
N B
E A
C H
S
IT
E P
L A
N
D R
E D
G E
D M
A T
E R
IA
L P
L A
C E
M E
N T
2. SEE SHEET G-102 FOR TEMPORARY ACCESS AND HYDRAULIC PIPELINE ROUTES.
HORIZONTAL (1V:10H).
THE NORTH AND SOUTH ENDS OF THE BERM BE GREATER THAN 1 VERTICAL:10
DRAWING. IN NO CASE SHALL THE SIDE SLOPES ON THE SEAWARD (EAST) SIDE AND
1. SIDE SLOPES SHALL BE CONSTRUCTED AT THE SLOPES SHOWN ON THE CONTRACT
NOTES:
J U
L Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
STATION 5+67.32
END BERM AT
STATION 1+00.00
START BERM AT
EACH END OF BERM)
1V:10H SLOPE (TYP AT
DUNE (TYP)
EDGE OF SAND
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
DREDGED FILL MATERIAL
DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
MATERIAL
DREDGED FILL
(SEE NOTE 1, THIS SHEET)
SEWER FORCE MAIN
EXPOSED SANITARY
NOTE 2, THIS SHEET)
WOOD PILES (SEE
(SEE NOTE 1, THIS SHEET)
SEWER FORCE MAIN
EXPOSED SANITARY
E4
C-304
E4
C-304
E8
C-304
E8
C-304
A1
C-304
A1
C-304
BRIDGE PIER
FM
F M
F M
SAND DUNE
SAND DUNE
SAND DUNE
S
S
STEEL
POST
MARKER
STAKE
O L
D W
O O
D P
IL
E S
S L
O P
E
V :1
H
S
LO
P E
V :1 0H
SOUTH
BRIDGE
ABUTMENT
S L O
P E
V :1
H
S L
O P
E
V :1
H
S L O P E
V :1 H
S L
O P
E
V :1
H
60' W
IDE BERM AT
ELEVATION 10.0' (MLLW
60' WIDE BERM AT
ELEVATION 10.0' (MLLW)
60' W
ID
E B
E R
M A
T
E
LE
V A T
IO
N 10.0' (M
LLW
-5
-10
-10
-5
-5
-5
-5
-10
H A M P T O N H A R B O R
H A M P T O N H A R B O R
H A M P T O N H A R B O R
POB
N 145134.818
E 1211603.646
POE
N 144868.527
E 1212231.165
PI
N 144921.564
E 1211931.382
PI
N 145029.732
E 1211818.747
W A
T E
R L
IN
E
S E
W E
R F
O R
C E M
A
IN
G A S L
IN
E
W A
T E
R L
IN
E
E
IS
E N
H O
W E
R S
T
S T
A T E R
O U
T E
A
S T
A T E R
O U
T E
A B
R
ID
G E
H A
M P T O
N , N
E W H
A M P S H
IR
E
S E A B R O
O K , N
E W H
A M P S H
IR
E
STONE REVETMENT
E1
C-304
E1
C-304
RIPRAP
RIPRAP
RIPRAP
S L
O P
E pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
5:03:46 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
M
G O
D F
R E
Y
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
A N
S I
D
C-106
S
IT
E P
L A
N
S O
U T
H A
B U
T M
E N
T B
A S
C U
L E B
R
ID
G E
:1
D R
E D
G E
D M
A T
E R
IA
L P
L A
C E
M E
N T
(-4
30' 60'0A1
SCALE: 1" = 50'
SITE PLAN - SOUTH ABUTMENT, BASCULE BRIDGE
N
4. SEE SHEET G-102 FOR TEMPORARY ACCESS AND HYDRAULIC PIPELINE ROUTES.
SHALL NOT BE GREATER THAN 1 VERTICAL:10 HORIZONTAL (1V:10H).
3. SIDE SLOPES ON THE HARBOR (NORTH) SIDE OF THE BERM AND AT THE WEST AND EAST ENDS OF THE BERM
2. EXISTING WOOD PILES TO REMAIN IN PLACE. DREDGED FILL MATERIAL TO BE PLACED OVER WOOD PILES.
REQUIREMENTS PERTAINING TO EXISTING UTILITIES.
UTILITIES" UNDER SPECIFICATION SECTION 35 20 25 (DREDGING AND DREDGED MATERIAL PLACEMENT) FOR
THE FOOTPRINT AREA OF THE DREDGED MATERIAL PLACEMENT SITE. REFER TO SUB-PARAGRAPH "EXISTING
1. EXISTING SANITARY SEWER FORCE MAIN PIPING IS EITHER EXPOSED OR JUST BELOW THE SURFACE WITHIN
NOTES:
J U
L Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
STATION 2+00.00
START BERM AT
1V:25H SLOPE
POINT (SEE SHEET G-102)
TEMPORARY ACCESS
DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF FILL DREDGED MATERIAL
DREDGED FILL MATERIAL
DREDGED FILL MATERIAL
DUNE (TYP)
EDGE OF SAND
M A
T C
H L
IN
E A
S H
E E
T C -1
M A
T C
H L
IN
E A
S H
E E
T C -1
SAND DUNE
SAND DUNE
SAND DUNE
SAND DUNE
SAND DUNE
SAND DUNE
S U
N C
O O
K S
T R
E E
T
OCEAN AVENUE
SEABROOK BEACH
SEABROOK BEACH
SEABROOK BEACH
SAND DUNE
ATLANTIC OCEAN
ATLANTIC OCEAN
ATLANTIC OCEAN
D1
C-305
D1
C-305
D6
C-305
D6
C-305
(-1)
(-2)
(-3)
(-1)
(-2)
(-3
(-4
(-1
(-1)
(-2)
(-1
(-2)
(-3)
(-4)
(-3)
(-3)
(-6
(-7
(-8
(-9)
(-3)
(-2)
(-5)
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
POB
N 140833.845
E 1212640.184
85' WIDE BERM AT
85' WIDE BERM AT
85' WIDE BERM AT
ELEVATION 20.0' (MLLW)
ELEVATION 20.0' (MLLW)
ELEVATION 20.0' (MLLW)
S L O P E
V :1 H pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
5:07:20 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
50' 100'0
M
G O
D F
R E
Y
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
A N
S I
D
C-107
S
IT
E P
L A
N
S E
A B
R O
O K B
E A
C H
:1
A1
SCALE: 1" = 50'
SITE PLAN 1 - SEABROOK BEACH
D R
E D
G E
D M
A T
E R
IA
L P
L A
C E
M E
N T
N
ROUTES.
2. SEE SHEET G-102 FOR TEMPORARY ACCESS AND HYDRAULIC PIPELINE
HORIZONTAL (1V:10H).
AND SOUTH ENDS OF THE BERM SHALL NOT BE GREATER THAN 1 VERTICAL:10
1. SIDE SLOPES ON THE SEAWARD (EAST) SIDE OF THE BERM AND AT THE NORTH
NOTES:
J U
L Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
DREDGED FILL MATERIAL
(APPROXIMATE LOCATION)
TOE OF DREDGED FILL MATERIAL
DREDGED FILL MATERIAL
ATLANTIC OCEAN
ATLANTIC OCEAN
SAND DUNE
SAND DUNE
SEABROOK BEACH
SEABROOK BEACH
1V:25H SLOPE
S E A B R
O O
K , N
E W H
A M P S H
IR
E
H A
M P T O
N , N
E W H
A M P S H
IR
E
M A
T C
H L
IN
E A
S H
E E
T C -1
M A
T C
H L
IN
E A
S H
E E
T C -1
SEABROOK BEACH
SAND DUNE
SAND DUNE
SAND DUNE
SAND DUNE
SAND DUNE
SAND DUNE
ATLANTIC OCEAN
OCEAN AVENUE
OCEAN AVENUE
A S
L A
N D S
T R
E E
T
T
IL
T O
N S
T R
E E
T
B R
IS
T O
L S
T R
E E
T
F R
A N
K L
IN
S
T R
E E
T
A1 C-305
A1 C-305
(-1
(-2)
(-1)
(-2)
(-3)
(-4)
(-1)
(-2)
(-3)
(-4)
(-5
(-1)
(-2)
(-3)
(-4)
(-5
(-5)
(-4)
(-3)
(-2)
(-6)
(-7)
(-8)
S L
O P
E
V :1
H
85' WIDE BERM AT
85' WIDE BERM AT
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
S L
O P
E
V :1
H
POE
N 143218.253
E 1213175.016
PI
N 142361.879
E 1212900.204
PI
N 142361.879
E 1212900.204
ELEVATION 20.0' (MLLW)
ELEVATION 20.0' (MLLW)
85' WIDE BERM AT
ELEVATION 20.0' (MLLW)
DUNE (TYP)
EDGE OF SAND
A6
C-305
A6
C-305
EACH END OF BERM)
1V:10H SLOPE (TYP AT
STATION 23+05.00
END BERM AT
pw://COE-NAEPWP01CON.nae.ds.usace.army.mil:coe-naepwp01con.nae.ds.usace.army.mil/Documents/Civil Works/Navigation/New Hampshire/Hampton Harbor/Maintenance Dredging FY19 (HAM_SP_2018_072)/30000 - Planning & Engineering & Design/30DA0 - Plans & Specs/CAD_BI
5:09:10 AM 6/10/2019 PD: AEC_pdf.pltcfgDS: AEC_Screen_Color.dscript.dscript
M
G O
D F
R E
Y
M
G O
D F
R E
Y
L T
H
IB
O D
E A
U
L T
H
IB
O D
E A
U
A N
S I
D
C-108
S
IT
E P
L A
N
S E
A B
R O
O K B
E A
C H
:1
50' 100'0A1
SCALE: 1" = 50'
SITE PLAN 2 - SEABROOK BEACH
D R
E D
G E
D M
A T
E R
IA
L P
L A
C E
M E
N T
N
ROUTES.
2. SEE SHEET G-102 FOR TEMPORARY ACCESS AND HYDRAULIC PIPELINE
HORIZONTAL (1V:10H).
AND SOUTH ENDS OF THE BERM SHALL NOT BE GREATER THAN 1 VERTICAL:10
1. SIDE SLOPES ON THE SEAWARD (EAST) SIDE OF THE BERM AND AT THE NORTH
NOTES:
J U
L Y
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
C O
N C
O R
D
M A
-2
V
IR
G
IN
IA
R
O A
D
N E
W E
N G
L A
N D D
IS
T R
IC
T
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
D R
A W
IN
G C
O D
E
S C
A L E
S H
E E
T
M S
P of Engineers
US Army Corps
H A
M P
T O
N A
N D S
E A
B R
O O
K
N E
W H
A M
P S
H
IR
E
H A
M P
T O
N H
A R
B O
R
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
W
W J
B
WEST BULKHEAD
TOP OF EXISTING
WEST BULKHEAD
TOP OF EXISTING
WEST BULKHEAD
TOP OF EXISTING
BULKHEAD WITH DREDGED MATERIAL
GRADE TO TOP OF EXISTING WEST
SHEET PILE WALLS FROM EXISTING
FILL ANNULAR SPACE BETWEEN
DOUBLE SHEET PILE WALLS
BULKHEAD BETWEEN
EXISTING FILL AT WEST
DOUBLE SHEET PILE WALLS
OF ANNULAR SPACE BETWEEN
EXISTING GRADE AT CENTER
PILE WALL
EXISTING SHEET
PILE WALL
EXISTING SHEET
PILE WALL
EXISTING SHEET
SHEET PILE WALLS
AREA TO TOP OF WEST BULKHEAD'S
USING DREDGED MATERIAL, FILL LOW
SHEET PILE WALLS
AREA TO TOP OF WEST BULKHEAD'S
USING DREDGED MATERIAL, FILL LOW
TOP OF WEST BULKHEAD
WALLS; FILL UNTIL MATERIAL REACHES
BETWEEN WEST BULKHEAD'S SHEET PILE
USING DREDGED MATERIAL, FILL SPACE
TOP OF WEST BULKHEAD
WALLS; FILL UNTIL MATERIAL REACHES
BETWEEN WEST BULKHEAD'S SHEET PILE
USING DREDGED MATERIAL, FILL SPACE
2.3
2.1
2.3
2.1
1.3
2.3
1.3
2.3
1.6
4.1
1.6
4.1
1.2
2.3
2.5
4.1
1.1
1.2
2.1
0.55
1.2
2.3
2.5
4.1
1.1
1.2
2.1
0.55
4.1
1.3
4.1
1.7
0.77
0.80
0.19
4.1
1.3
4.1
1.7
0.77
0.80
0.19
4.14.1
1.71.7
2.94.1 2.94.1
-1.1-1.1
-0.0-0.0
E L E
V A
T
IO
N S I
N F
E E
T
M L L
W
0+00 0+40 0+80 1+20 1+60 2+00 2+40 2+80 3+20 3+60 4+00 4+40 4+80 5+20 5+60 6+00 6+40 6+80 7+20 7+60 8+00 8+40 8+80 9+20 9+60 10+00
E L E
V A
T
IO
N S I
N F
E E
T
M L L
W
MHW (EL. 8.62' MLLW)
MLW (EL. 0.32' MLLW)
THAN TOP OF BULKHEAD
AREA OF SAND LOWER
THAN TOP OF…
This is the start of the file's text. The full file is on GovTribe.