About this file

Amendment 0001

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001_-_Drawings.pdf PDF
Plans_-_1996-ELEV-REPLACEMENT.pdf PDF
Plans.pdf PDF
Specifications.pdf PDF
Plans_-_1966-ELEVATOR-MODS.pdf PDF
W912WJ18B0009.pdf PDF
Plans_-_ALIMAK_ELEV_AS-BUILTS.pdf PDF
Plans_-_Span_Lock.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this modification is to answ er RFIs raised at the site visit. The site-visit sign in sheet is included. The w age determination is updated. The DRC response time is updated. The bid opening date remains unchanged. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 30

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18B0009

X 9B. DATED (SEE ITEM 11)

23-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Sep-2018

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ18B0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

Requests for Information

1. There is a statement in the specifications stipulating that, when the trains are using the bridge, that everyone must get off the bridge. Is this true for all work? What if people are working in the elevator and not near the tracks?

[Answer] Per section 01 11 00 par 1.9 b. of the specifications, the section of the bridge that must be clear is the movable portion of the structure excluding the elevators.

2. Is safety netting required for the elevator shaft? What about underneath the bridge?

[Answer] Section 01 35 26 requires a Fall Protection Plan by a Competent Person for Fall Protection but does not specifically require safety netting. Fall Protection by other means can be approved.

3. Specs call for five doors and/or landings/ Is this three on one side and two on the other?

[Answer] Sheet M201 shows the location of 3 landings on the North and 2 landings on the South. Each landing will require new doors.

4. Will we need to install a new ladder for the inside of the shaft?

[Answer] No.

5. Will we need to provide new wiring to each control panel on each floor?

[Answer] ED101 and ED102 requires removal of all wiring and conduit on the load side to the control cabinet. New wiring will be required to the new control panels. See E101 and E102 for more information.

6. Can we reuse the mast? If so, will we need to sandblast and paint it?

[Answer]M201 has been revised to clarify that the mast shall not be reused.

7. Are there any additional drawings available for the structural details of the tower – As-Built, cross section, relative weight of rope and cable?

[Answer] All available relevant plans are included in the reference documents, specifically the 1996 Elevator Replacement and 1996 Elevator Mods.

8. If we are on the tracks, will we have to coordinate with the railroad?

[Answer] See Section 01 11 00 paragraphs 1.1.1, 1.82 for the requirements for coordination with the railroad.

9. As this is a federal job, will we still need proper licensing for Massachusetts?

[Answer] All work must be done by properly licensed personnel. Other permits may be required. It is the contractor's responsibility to determine this. See solicitation clause 52.236-7, Permits and Responsibilities.

10.This is a federal project.

A-Will a Massachusetts contractor’s license be required?

B- Cape Cod local permits yes. Will a Massachusetts state permit be required?

[Answer] All work must be done by properly licensed personnel. Other permits may be required. It is the contractor's responsibility to determine this. See solicitation clause 52.236-7, Permits and Responsibilities.

11. Please provide wage rates required for this project. Not specified.

[Answer] The wage determination is available in the solicitation and updated in Amendment 0001

12. Buy American. Will an elevator manufactured in Sweden comply?

[Answer] See FAR clauses 52.225-10 and 52.225-10 Alt 1 for the Buy American requirements.

13. Specifed is for the elevator manufactures to have a local office. Will a local generic elevator service companies office comply?

[Answer] Yes.

14. Train schedule; Two trains (24 hour) per day was discussed at the site meeting. Please confirm frequency.

[Answer] Section 01 11 00 Summary of work Par 1.9 f. details the train schedule as known at the present time.

15. I’ve been trying to reach someone about licenses and permits for the town of cape cod but not getting any response. Would you happen to know the best contact to get this information?

[Answer] See Permits and responsibilities clause. See questions 9. And 10.

16. Specified is a transparent hoist doors. Will UL listed steel doors/frames with a glass will be acceptable?

Answer: UL listed galvanized steel doors/frames with a glass meeting the requirements of Specification 14 21 13 specifically paragraphs 2.9.1 and 2.9.3 will be acceptable.

17. If the alternate in 11. is accepted for the existing elevator tower mast & rack assembly to remain.

A-Will this require to be cleaned & painted?

B-Sandblasted & painted?

C-Paint specification?

D-The existing elevator tower mast & rack assemble is to be reused. Will this equipment be certified by the government?

[Answer] The mast shall not be reused. See #6

SITE-VISIT SIGN-IN SHEET

Replace Elevator Vertical Lift Railroad Bridge

Cape Cod Canal, MA

Name Company Phone (Optional) PJ Laviola Delaware Elevator 443-366-4071 Charles M. Delaware Elevator 443-497-2034 Bill Reid Cianbro 207-553-2718

Michael Divito R. Zoppo Corporation 781-344-8822

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

Definitive Responsibility Criteria (DRC)

After bid opening but prior to award, the apparent low bidder will be required to furnish documentation as follows: The prime contractor or subcontractor responsible for the elevator must show at least one prior project within the last five years involving installation of exterior elevators to a height at least 200 feet above the ground.

Firms may use subcontractor (to be used on this project) experience to demonstrate experience with the Definitive Responsibility Criterion, but the role and work performed by each team member (prime and subcontractors) on projects demonstrating that team member's experience with the Definitive Responsibility Criterion shall be the same as the role for that team member under this procurement. The apparent low bidder is required to submit documentation demonstrating that it meets the requirements of this Definitive Responsibility Criterion to the Contracting Officer by noon EST the day following the bid opening. All documentation shall include references, including contract numbers and completion dates, customer/owner point of contact including name and telephone number, for the example project.

If the documentation provided demonstrates that the bidder meets the above DRC, the apparent low bidder will receive award of the contract if otherwise eligible and responsible.

Documentation related to the definitive responsibility criterion will be considered a matter of responsibility, not responsiveness.

If the apparent low bidder fails to timely provide the documentation or if the documentation provided does not demonstrate that it meets the DRC, the apparent low bid will be rejected and the Government will move to the next low bidder, who will have until noon EST of the business day following the Contracting Officer’s request to provide the documentation that it meets the DRC. If the next low bidder fails to timely provide the documentation or if the documentation fails to demonstrate that it meets the DRC, the Government will move to the next low bidder.

This process will be followed until the low bidder who meets the DRC requirements can document that it meets the DRC or the Government cancels the solicitation.

WAGE DETERMINATION

General Decision Number: MA180001 09/07/2018 MA1

Superseded General Decision Number: MA20170001

State: Massachusetts

Construction Type: Building

Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in Massachusetts.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/09/2018

3 02/16/2018 4 02/23/2018 5 03/09/2018 6 03/23/2018 7 03/30/2018 8 04/06/2018 9 05/25/2018 10 06/22/2018 11 07/06/2018 12 08/10/2018 13 08/17/2018 14 09/07/2018

ASBE0006-001 09/01/2017

Rates Fringes

Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems

(ZONE A)...................$ 46.09 27.50

(ZONE B)...................$ 41.48 27.50

ZONES:

ZONE A

BARNSTABLE COUNTY (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet, Yarmouth) BRISTOL COUNTY (Easton), MIDDLESEX COUNTY, and NORFOLK COUNTY (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxborough, Holbrook, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, Weymouth)

ZONE B

BARNSTABLE COUNTY (Barnstable, Bourne, Falmouth, Mashpee, Sandwich), BRISTOL COUNTY (All cities except Easton),and NORFOLK COUNTY (Bellingham, Franklin, Plainville)

ASBE0006-002 06/01/2018

BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)....$ 35.00 20.85

ASBE0006-010 09/01/2017

BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham)

Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)....$ 41.48 27.50

BOIL0029-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 42.42 24.92

BRMA0001-008 03/01/2018

FOXBORO CHAPTER

BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES

Bricklayer, Cement Mason, Plasterer........................$ 49.96 32.19

BRMA0001-009 03/01/2018

LOWELL CHAPTER

MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)

Bricklayer and plasterer.........$ 49.96 32.19

BRMA0001-010 03/01/2018

LOWELL CHAPTER

MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis)

BRICKLAYER.......................$ 49.96 32.19

BRMA0003-001 08/01/2018

Rates Fringes

Marble & Tile Finisher...........$ 40.40 29.94 Marble, Tile & Terrazzo

Workers..........................$ 52.95 31.83

TERRAZZO FINISHER................$ 51.85 31.67

BRMA0003-003 08/01/2018

BOSTON CHAPTER

MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK

BRICKLAYER.......................$ 52.91 31.88

BRMA0003-006 05/01/2018

LYNN CHAPTER

ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury);

and MIDDLESEX (Reading, North Reading, Wakefield)

Bricklayer, cement mason and plasterer........................$ 52.91 31.88

BRMA0003-007 08/01/2018

WALTHAM CHAPTER

MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)

Bricklayer and plasterer.........$ 52.91 31.88

BRMA0003-008 08/01/2018

NEWTON CHAPTER

MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley) plasterer........................$ 52.91 31.88

BRMA0003-009 08/01/2018

NEW BEDFORD

BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and

NANTUCKET COUNTIES

plasterer........................$ 52.91 31.88

BRMA0003-010 08/01/2018

QUINCY CHAPTER

NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) plasterer........................$ 52.91 31.88

CARP0026-001 09/01/2017

BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)

CARPENTER........................$ 39.28 27.90

CARP0033-001 09/01/2017

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK

CARPENTER........................$ 46.43 28.35

CARP0056-011 08/01/2015

SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of

DUKES AND NANTUCKET COUNTIES

PILEDRIVERMAN....................$ 42.04 29.73

CARP0056-012 08/01/2015

The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal

CARP0056-013 08/01/2015

Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)

CARP0424-003 09/01/2017

NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy)

CARP0624-005 09/01/2017

DUKES; NANTUCKET

Rates Fringes

CARPENTER........................$ 46.43 28.35

CARP0624-007 09/01/2017

BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES

CARP1121-001 10/01/2017

Rates Fringes

MILLWRIGHT.......................$ 39.52 30.85

CARP2168-001 03/01/2018

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK

FLOOR LAYER: Carpet.............$ 44.50 28.82

CARP2168-004 03/01/2018

BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County

FLOOR LAYER: Carpet.............$ 42.39 28.82

CARP2168-005 03/01/2018

BARNSTABALE; DUKES; AND NANTUCKET

Rates Fringes

FLOOR LAYER: Carpet.............$ 42.39 28.82

ELEC0096-001 06/01/2018

MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)

ELECTRICIAN......................$ 42.32 11%+21.66

Teledata System Installer........$ 29.04 24.27

ELEC0099-001 06/01/2017

BRISTOL (Attleboro, North Attleboro, Seekonk)

Rates Fringes

ELECTRICIAN......................$ 38.08 57.24%

Teledata System Installer........$ 28.56 13.1%+13.76

ELEC0103-001 03/01/2018

ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK

Teledata System Installer........$ 37.61 29.49

ELEC0103-002 03/01/2018

ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)

ELECTRICIAN......................$ 50.15 31.60

ELEC0103-004 03/01/2018

ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)

ELEC0103-005 03/01/2018

ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK

ELEC0104-001 09/03/2017

Rates Fringes

Line Construction:

Cableman....................$ 38.45 18.42+A Equipment Operator..........$ 38.45 22.50+A Groundman...................$ 24.88 10.24+A Lineman.....................$ 45.23 25.71+A

A. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.

* ELEC0223-005 09/01/2018

BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)

ELECTRICIAN......................$ 41.03 29.55%+11.40

* ELEC0223-006 09/01/2018

BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)

Teledata System Installer........$ 34.76 29.55%+11.15

ELEV0004-001 01/01/2018

Rates Fringes

ELEVATOR MECHANIC................$ 57.62 32.645+a+b

FOOTNOTE FOR ELEVATOR MECHANICS:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0004-001 06/01/2018

Power equipment operators:

Group 1.....................$ 47.08 27.50+a Group 2.....................$ 46.61 27.50+a Group 3.....................$ 31.90 27.50+a Group 4.....................$ 38.83 27.50+a Group 5.....................$ 23.14 27.50+a Group 6.....................$ 27.40 27.50+a

FOOTNOTE FOR POWER EQUIPMENT OPERATORS:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial Day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day

HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):

Over 150 ft. +2.13 Over 185 ft. +3.75 Over 210 ft. +5.27 Over 250 ft. +7.98 Over 295 ft. +11.05 Over 350 ft. +12.85

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

Group 1: Crane; shovel; truck crane; cherry picker;

dragline; trench hoe; backhoe; three drum machine; derrick;

pile driver; elevator tower; hoist; gradall; shovel dozer;

front end loader; fork lift; suger; boring machine; rotaryu drill; post hole hammer; post hole digger; pumpcrete machine; asphalt plant (on site); concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer; timber jack Group 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; concrete pump; bulldozer; tractor; york rake;

mulching machine; portable steam boiler; portable steam generator; roller; spreader; tamper (self propelled or tractor drawn); asphalt paver; mechanic - maintenance;

paving screed machine; stationary steam boiler; paving concrete finishing machine; cal truck; ballast regulator;

switch tamper; rail anchor machine; tire truck Group 3: Pumps (1-3 grouped); compressor; welding machine (1-3 grouped); generator; concrete vibrator; heater (power driven 1- 5); well point system (operating);

syphon-pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; Jackson type tamper; single diaphragm pump; lighting plant Group 4: Assistant engineer (fireman) Group 5: Oiler (other than truck cranes and gradalls)

Group 6: Oiler (on truck cranes and gradalls) stant engineer (on truck crane and gradall)

IRON0007-006 09/16/2017

AREA 1: BRISTOL (Easton); ESSEX (Beverly, Gloucester, Lynn,Lynnfield, Manchester, Marblehead, Nahant, Rockport, Salem, Saugus, Swampscott); MIDDLESEX (Arlington, Bedford, Belmont, Burlington, Cambridge, Carlisle, Concord, Dunstable, Everett, Framingham, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Except Medway);

SUFFOLK

AREA 2: ESSEX (Amesbury, Andover, Boxford, Danvers, Essex, Georgetown, Hamilton, Haverhill, Ipswich, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, Topsfield, Wenham, West Newbury); MIDDLESEX (Action, Billericia, Chelmsford, Dracut, Groton, Groveland, Littleton, Lowell, Middleton, North Reading, Pepperell, Tewksbury, Tyngsboro, Westford, Wilmington)

Ironworkers:

AREA 1......................$ 44.71 30.56

AREA 2......................$ 40.30 30.56

IRON0007-010 09/16/2017

MIDDLESEX (Ashby, Ashland, Ayer, Boxboro, Holliston, Hopkinton, Hudson, Marlboro, Shirley, Stow, Townsend); NORFOLK (Medway)

IRONWORKER.......................$ 44.41 30.56

IRON0037-005 09/16/2017

BARNSTABLE; BRISTOL (Acushnet, Attleboro, Berkley, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, Mansfield, New Bedford, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton, Westport); DUKES; NANTUCKET;

NORFOLK (Billingham, Franklin, Plainville, Wrentham)

IRONWORKER.......................$ 34.89 26.87

LABO0014-001 06/01/2018

Rates Fringes

Plasterer tender

BARNSTABLE, BRISTOL,

DUKES, ESSEX, NANTUCKET,

MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline Dedham and Milton) COUNTIES.$ 33.25 22.92 SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer Island, Nut Island);

MIDDLESEX COUNTY

(Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop and Woburn only);

NORFOLK COUNTY (Brookline, Dedham, and Milton only)....$ 38.00 24.10

LABO0022-009 06/01/2018

SUFFOLK COUNTY (Boston, Chelsea, Revere, Winthrop, Deer & Nut Islands); MIDDLESEX COUNTY (Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakefield, Winchester, Winthrop, and Woburn only); NORFOLK COUNTY (Brookline, Dedham, and Milton only)

Laborers:

Group 1.....................$ 38.00 24.10 Group 2.....................$ 38.25 24.10 Group 3.....................$ 38.75 24.10 Group 4.....................$ 39.00 24.10 Group 5.....................$ 38.75 24.10 Group 6.....................$ 39.00 24.10 Group 7.....................$ 21.50 24.10

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; Carpenter Tenders

GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator;

pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector

GROUP 3: Air track, block paver; rammer; curb setter, hydraulic and similar self-powered drills

GROUP 4: Blaster; powderman

GROUP 5: Pre-cast floor and roof plank erector

GROUP 6: Asbestos removal laborers/haz-mat laborers

GROUP 7: Flaggers

LABO0022-010 06/01/2018

Counties of BARNSTABLE; BRISTOL; DUKES; ESSEX; NANTUCKET;

MIDDLESEX (with the exception of Arlington, Belmont, Burlington, Cambridge, Everett, Malden, Medford, Melrose, Reading, Somerville, Stoneham, Wakfield, Winchester, Winthrop and Woburn); NORFOLK (with the exception of Brookline, Dedham and Milton)

Laborers:

Group 1.....................$ 33.25 22.92 Group 2.....................$ 33.50 22.92 Group 3.....................$ 34.00 22.92 Group 4.....................$ 34.25 22.92 Group 5.....................$ 34.00 22.92 Group 6.....................$ 34.25 22.92

LABORERS CLASSIFICATIONS

GROUP 1: Laborers; Carpenter Tenders

GROUP 2: Jackhammer operator; pavement breaker; asphalt raker carbide core drilling machine; chain saw operator;

pipelayer; barco type jumping tampers; laser beam; concrete pump; mason tender; motorized mortar mixer; ride-on motorized buggy; fence and beam rail erector

GROUP 3: Air track, block paver; hammer; curb setter, hydraulic and similar self-powered drills

GROUP 4: Blaster; powderman

GROUP 5: Pre-cast floor and roof plank erector

GROUP 6: Asbestos removal laborers/haz-mat laborers

LABO1421-004 06/01/2018

BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET NORFOLK

AND SUFFOLK COUNTIES

Laborers: (Wrecking) Group 1.....................$ 38.15 24.10 Group 2.....................$ 38.90 24.10 Group 3.....................$ 39.15 24.10 Group 4.....................$ 34.15 24.10 Group 5.....................$ 37.25 24.10 Group 6.....................$ 38.15 24.10

Group 1: Adzeman, Wrecking Laborer.

Group 2: Burners, Jackhammers.

Group 3: Small Backhoes, Loaders on tracks, Bobcat Type

Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete Cutting Saws.

Group 4: Yardman (Salvage Yard Only).

Group 5: Yardman, Burners, Sawyers.

Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.

PAIN0011-007 06/01/2018

BARNSTABLE, BRISTOL, DUKES, AND NANTUCKET COUNTIES

Rates Fringes

GLAZIER..........................$ 37.18 21.05+A

FOOTNOTE:

A. PAID HOLIDAY: LABOR DAY (provided employee has worked any part of the week prior to Labor Day and any part of the week after Labor Day)

* PAIN0035-004 07/01/2018

BARNSTABLE; BRISTOL; ESSEX; NANTUCKET; DUKES; COUNTIES;

REMAINDER OF NORFOLK; MIDDLESEX AND SUFFOLK COUNTIES

PAINTER

NEW CONSTRUCTION:

Brush, Taper...............$ 39.51 29.55 Spray, Sandblast...........$ 40.91 29.55

REPAINT:

Brush, Taper...............$ 37.57 29.55 Spray, Sandblast...........$ 38.97 29.55

* PAIN0035-013 07/01/2018

MIDDLESEX (Cambridge, Everett, Malden, Medford, Somerville) SUFFOLK COUNTY (Boston, Chelsea) NORFOLK COUNTY (Brookline)

PAINTER

NEW CONSTRUCTION:

Brush, Taper...............$ 45.30 29.55 Spray, Sandblast...........$ 46.70 29.55

REPAINT:

Brush, Taper...............$ 43.36 29.55 Spray, Sandblast...........$ 44.76 29.55

* PAIN0035-020 07/01/2018

ESSEX; MIDDLESEX; NORFOLK; SUFFOLK

Rates Fringes

GLAZIER..........................$ 39.51 29.55

PLAS0534-001 01/01/2018

ESSEX; MIDDLESEX; NORFOLK AND SUFFOLK COUNTY

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 40.00 36.06

PLAS0534-004 01/01/2018

MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES

Rates Fringes

PLASTERER........................$ 40.00 36.06

PLUM0004-001 03/01/2018

MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend)

Plumbers and Pipefitters.........$ 43.96 25.61

PLUM0012-005 03/01/2018

ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Manchester, Marblehead, Merrimac, Methuem, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfield, Wenham, West

Newbury)

PLUMBER..........................$ 50.61 28.93

PLUM0012-007 03/01/2018

ESSEX (Lynn, Lynnfield, Nahant, Saugus, and Swampscott);

MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);

SUFFOLK; WORCESTER (Hopedale and Southboro)

PLUMBER..........................$ 54.69 28.93

* PLUM0051-004 09/01/2018

BARNSTABLE; BRISTOL; DUKES; NANTUCKET; AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES

Plumbers and Pipefitters.........$ 42.04 29.91

PLUM0537-005 09/01/2016

ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);

SUFFOLK; WORCHESTER (Hopedale and Southboro)

PIPEFITTER.......................$ 50.19 29.76

* ROOF0033-001 08/01/2018

Rates Fringes

Roofers:

All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid........$ 42.36 27.90

SFMA0550-001 03/01/2018

BRISTOL (Portion within 35 mile radius from Boston City Hall;

ESSEX; MIDDLESEX (Except Ashby, Townsend, and portions of Pepperell and Shirley beyond 35 mile radius from Boston City Hall); NORFOLK; PLYMOUTH (Portion within 35 mile radius of Boston City Hall); SUFFOLK

SPRINKLER FITTER.................$ 57.78 28.08+a

a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.

SFMA0550-002 03/01/2018

BRISTOL (Seekonk, Swansea, and Somerset)

Rates Fringes

SPRINKLER FITTER.................$ 52.00 28.08+a

a. PAID HOLIDAYS: Memorial Day, July 4th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 20 working days prior to any such paid holiday.

SFMA0669-001 04/01/2017

BARNSTABLE; BRISTOL (Beyond 35 mile radius of Boston City Hall); DUKES; MIDDLESEX (Ashby, Townsend, portions of Pepperell and Shirley beyond 35 mile radius of Boston City Hall);

NANTUCKET; PLYMOUTH (Beyond 35 mile radius of Boston City Hall)

SPRINKLER FITTER.................$ 40.26 15.84

SHEE0017-003 10/01/2015

BRISTOL (Attleboro, Berkley, Easton, Mansfield, North Attleboro, Norton, Raynham, Taunton); ESSEX; MIDDLESEX;

NORFOLK; PLYMOUTH (except except Marion, Mattapoisett, Rochester, Wareham); SUFFOLK

Sheet metal worker...............$ 35.60 30.05

SHEE0017-007 10/01/2015

BARNSTABLE; BRISTOL (Acushnet, Assonet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, New Bedford, Rehoboth, Seeekonk, Somerset, Swansea, Westport); DUKES; AND NANTUCKET

Sheet metal worker...............$ 35.60 30.05

TEAM0379-001 12/01/2017

Rates Fringes

Truck drivers:

Group 1.....................$ 32.48 24.27+A+B Group 2.....................$ 32.65 24.27+A+B Group 3.....................$ 32.72 24.27+A+B Group 4.....................$ 32.84 24.27+A+B Group 5.....................$ 32.94 24.27+A+B Group 6.....................$ 33.23 24.27+A+B Group 7.....................$ 33.52 24.27+A+B

POWER TRUCKS $.25 DIFFERENTIAL BY AXLE

TUNNEL WORK (UNDERGROUND ONLY) $.40 DIFFERENTIAL BY AXLE

HAZARDOUS MATERIALS (IN HOT ZONE ONLY) $2.00 PREMIUM

TRUCK DRIVERS CLASSIFICATIONS

Group 1: Station wagons; panel trucks; and pickup trucks

Group 2: Two axle equipment; & forklift operator

Group 3: Three axle equipment and tireman

Group 4: Four and Five Axle equipment

Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;

mechanics, paving restoration equipment

Group 6: Specialized earth moving equipment over 35 tons

Group 7: Trailers for earth moving equipment (double hookup)

FOOTNOTES:

A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day

B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION