W912WJ-17-B-0003-0002.pdf

PDF 22 KB Posted

Attached to
Concrete Repairs, Fox Point Hurricane Barrier, Providence RI
Solicitation number
W912WJ-17-B-0003
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Bid_Snapsheet.pdf PDF
Bid-Schedule.pdf PDF
Specifications-Amendment.pdf PDF
W912WJ-17-B-0003-0004.pdf PDF
Drawings-Revised.pdf PDF
W912WJ-17-B-0003-0003.pdf PDF
W912WJ-17-B-0003-0001.pdf PDF
W912WJ-17-B-0003.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is to update the bid schedule. The bid opening date is not extended.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Dec-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-17-B-0003

X 9B. DATED (SEE ITEM 11)

15-Nov-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Dec-2016

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912WJ-17-B-0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

BIDDING SCHEDULE

Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

Base Bid Items

0001 Concrete Repairs to Pumping Station; 2-inch to 6-inch Depth 144 SF $______ $________

0002 Concrete Repairs to Sloped Barriers; 6-inch or Greater Depth 564 SF $______ $________

0003 Concrete Repairs to Service Bridge Pier at Gridline 19;

2-inch to 6-inch Depth 48 SF $______ $________

0004 Concrete Spall Repair at Trash Rack 1 Job Job $________

0005 Concrete Crack Repair with Injection Epoxy at Pumping Station 420 LF $______ $________

0006 Apply Concrete Sealer to Pumping Station Transformer Area Floors 896 SF $______ $________

0007 Install Compression Joint Seals at Service Bridge Joints Above Center River Barrier 1 Job Job $________

0008 Manufacture and Install Scuppers for Pumping Station Transformer Area Walls 4 EA $______ $________

0009 Concrete Crack Repair with Injection Epoxy at Center Barrier 100 LF $______ $________

TOTAL ESTIMATED AMOUNT $_____________

Optional Bid Item

W912WJ-17-B-0003

0010 Remove Concrete Efflorescence from Bay Side of Center River Barrier and Walls Around the Pumping Station Transformer Areas 1 Job Job $________

TOTAL ESTIMATED AMOUNT; BASE AND OPTIONAL BID ITEMS $_____________

Note 1: "SF" = Square Foot, "LF" = Linear Foot, "EA" = Each.

Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0010, including the Base Bid Items and the Optional Item. The minimum work awarded will be the Base Bid work.

Note 3: Line Item Number 0010 above is an Optional Line Item that may, at the option of the Government, be exercised at any time within 30 calendar days after receipt by the Contractor of the Notice to Proceed. If Optional Item 0009 is awarded, no additional calendar days will be added to the contract duration.

Note 4: All work shall be completed within the time period specified in Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10.

Note 5: In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

-- End of Document --

(End of Summary of Changes)

File details come from the government source that posted it. Updated .