Specifications-Amendment.pdf
PDF 210 KB Posted
- Solicitation number
- W912WJ-17-B-0003
About this file
Amendment to the Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Bid_Snapsheet.pdf | ||
| Bid-Schedule.pdf | ||
| W912WJ-17-B-0003-0004.pdf | ||
| Drawings-Revised.pdf | ||
| W912WJ-17-B-0003-0003.pdf | ||
| W912WJ-17-B-0003-0002.pdf | ||
| W912WJ-17-B-0003-0001.pdf | ||
| W912WJ-17-B-0003.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Concrete and Misc. Repairs, Fox Point Hurricane Barr., Prov., RI Amendment 0004
DOCUMENT 00 00 02 Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
AMENDMENT 0004 OF SOLICITATION
1.1 CHANGES TO SOLICITATION OFFER AND AWARD
1.2 CHANGE TO DRAWINGS
1.2.1 Revised and Reissued Drawing, Sheet S-401
1.3 ADDITION OF PHOTOGRAPH OF TRANSFORMER AREA
-- End of Section Table of Contents --
DOCUMENT 00 00 02 Page 2
AMENDMENT 0004 OF SOLICITATION
1.1 CHANGES TO SOLICITATION OFFER AND AWARD
The Bidding Schedule is deleted and a new Bidding Schedule, copy attached, is inserted in its place. Use the revised Bidding Schedule for submitting bids.
1.2 CHANGE TO DRAWINGS
1.2.1 Revised Plan Sheet S-401
Sheet S-401 is deleted and a new Sheet S-401 is inserted in its place.
See the separate file. Changes are marked on the revised Drawing.
1.3 ADDITION OF PHOTOGRAPH
A photograph showing the condition of the floor of the transformer areas has been added as a separate attachment.
END OF AMENDMENT 0004
DOCUMENT 00 41 00 Page 2
BIDDING SCHEDULE
Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
Base Bid Items
0001 Concrete Repairs to Pumping
Station; 2-inch
Concrete Repairs to to
6-inch Depth
Sloped
144 SF $ $
Barriers; 6-inch or Greater Depth 564 SF $ $
0003 Concrete Repairs to Service Bridge Pier at Gridline 19;
2-inch to 6-inch Depth 48 SF $ $
0004 Concrete Spall Repair at Trash Rack 1 Job Job $
0005 Concrete Crack Repair with Injection Epoxy at Pumping Station 420 LF $ $
0006 Apply Concrete Sealer to Pumping
Station Transformer Area Floors 896 SF $ $
0007 Install Compression Joint at Service Bridge Joints Center River Barrier
Seals Above
Job
Job
0008 Manufacture and Install Scuppers for Pumping Station Transformer Area Walls 4 EA $ $
0009 Concrete Crack Repair with Injection Epoxy at Center
Barrier 1200 LF $_______ $________
TOTAL ESTIMATED AMOUNT $
Optional Bid Item
0010 Remove Concrete Efflorescence from Bay Side of Center River Barrier and Walls Around the Pumping Station Transformer Areas 1 Job Job $
TOTAL ESTIMATED AMOUNT; BASE AND OPTIONAL BID ITEMS $
DOCUMENT 00 41 00 Page 3
Note 1: "SF" = Square Foot, "LF" = Linear Foot, "EA" = Each.
Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the Total Estimated Amount for Line Items 0001 through 0010, including the Base Bid Items and the Optional Item. The minimum work awarded will be the Base Bid work.
Note 3: Line Item Number 0010 above is an Optional Line Item that may, at the option of the Government, be exercised at any time within 30 calendar days after receipt by the Contractor of the Notice to Proceed.
If Optional Item 0009 is awarded, no additional calendar days will be added to the contract duration.
Note 4: All work shall be completed within the time period specified in Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart
COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR
52.211-10.
Note 5: In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
D A
T E
S U
B M
IT
T E
D B
Y : P L
O T D
A T
E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
C O
N T
R A
C T N
O
D R
A W
IN
G C
O D
E
IDENTIFICATION
SHEET
District
New England of Engineers
US Army Corps
S
IZ
E
F
IL
E N
A M
E
P L
O T S
C A
L E
SHEET OF
C O
N C
O R
D
M A
S S
A C
H U
S E
T T S
N E
W E
N G
L A
N D D
IS
T R
IC
T
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
F P -1
/2
/2
R H
O D
E I S
L A
N D
P R
O V
ID
E N
C E
C O
N C
R E
T E A
N D M
IS
C
E L L
A N
E O
U S R
E P
A
IR
S
F O
X P
O
IN
T H
U R
R
IC
A N
E B
A R
R
IE
R
W
W J -1
-B -0
O C
T O
B E
R
SCALE: 1" = 10'- 0"
1" = 10'
10 0 10 20
GRAPHIC SCALE:
S-501
A
NOTES:
S-501
ASIMILAR
18 19 20 21
TOP OF BARRIER EL. 25.0
RIVER GATES
S-401
A
JOINT, TYPICAL
CONTRACTION
S-401
A
SCALE: 1" = 10'- 0"
SECTION
F P -1
S -4
.d g n
> OF SERVICE BRIDGE
BAYSIDE
S-401
A N
D S
E C
T
IO
N
D S
H
A N
S I
D
C E
N T
E R B
A R
R
IE
R E
L E
V A
T
IO
N :1
L A
W R
E N
C E C
A R
A B
A J
A L
EFFLORESCENCE
AREA OF
EFFLORESCENCE
AREA OF
S-501
A S-501
A S-501
A
JOINT
EXPANSION
TOP OF SERVICE BRIDGE EL. 35.0
TOP OF BARRIER EL. 25.0
EL. 19.0
CONSTRUCTION JOINT AT EL. 11.0
CONSTRUCTION JOINT AT EL. 4.0
MEAN SEA LEVEL EL. 0.0
CONSTRUCTION JOINT AT EL. 11.0
RIVERSIDE
MEAN SEA LEVEL EL. 0.0MEAN SEA LEVEL EL. 0.0
12'-0"
CENTER RIVER BARRIER = 180'- 0"
CENTER BARRIER SOUTH ELEVATION
J H
K
SERVICE BRIDGE PIER
CONSTRUCTION JOINT AT EL. 4.0
OPPOSITE SIDE SIMILAR.
NOT TO EXCEED 6" IN DEPTH.
LIMIT OF DEMOLITION
AREA OF CONCRETE DETERIORATION.
J A
S O
N P
A O
L
IN
O S
R
E V
IS
E D I
N A
C C
O R
D A
N C
E A
M D
T
/0
/2
ON CENTER BARRIER SOUTH ELEVATION (BAYSIDE)
EPOXY INJECTION REPAIR CRACKS BETWEEN EL. 4.0 AND EL. 11.0
"CONCRETE REHABILITATION FOR CIVIL WORKS".
REPAIR AS DESCRIBED IN SPECIFICATION SECTION 03 01 32
AN INJECTION EPOXY IN AREAS IDENTIFIED ON THE ELEVATIONS.
4. REPAIR CRACKS HAVING A WIDTH GREATER THAN 1/16" USING
ON SHEET S-501.
GRIDLINE 19. REPAIR AREAS AS SHOWN IN DETAILS
AREAS IDENTIFIED ON THE SERVICE BRIDGE PIER AT
SPALLED OR HOLLOW SOUNDING CONCRETE IN THE
3. REMOVE DETERIORATED CONCRETE CONSISTING OF
LEVEL ELEVATION.
2 DO NOT REMOVE EFFLORESCENCE BELOW MEAN SEA
ELEVATION.
BARRIER WALL SURFACE AREA IDENTIFIED ON THE
1. REMOVE EFFLORESCENCE FROM THE CENTER RIVER
File details come from the government source that posted it. Updated .