Revised Bid Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract.pdf | ||
| Bid_Snapsheet.pdf | ||
| Specifications-Amendment.pdf | ||
| W912WJ-17-B-0003-0004.pdf | ||
| Drawings-Revised.pdf | ||
| W912WJ-17-B-0003-0003.pdf | ||
| W912WJ-17-B-0003-0002.pdf | ||
| W912WJ-17-B-0003-0001.pdf | ||
| W912WJ-17-B-0003.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIDDING SCHEDULE
Refer to Section 01 22 00 MEASUREMENT AND PAYMENT.
Item Estimated Unit Estimated
No. Description Quantity Unit Price Amount
Base Bid Items
0001 Concrete Repairs to Pumping
Station; 2-inch to 6-inch Depth 144 SF $______ $________
0002 Concrete Repairs to Sloped
Barriers; 6-inch or Greater
Depth 564 SF $______ $________
0003 Concrete Repairs to Service
Bridge Pier at Gridline 19;
2-inch to 6-inch Depth 48 SF $______ $________
0004 Concrete Spall Repair at Trash
Rack 1 Job Job $________
0005 Concrete Crack Repair with
Injection Epoxy at Pumping
Station 420 LF $______ $________
0006 Apply Concrete Sealer to Pumping
Station Transformer Area Floors 896 SF $______ $________
0007 Install Compression Joint Seals at Service Bridge Joints Above
Center River Barrier 1 Job Job $________
0008 Manufacture and Install Scuppers for Pumping Station Transformer
Area Walls 4 EA $______ $________
0009 Concrete Crack Repair with
Injection Epoxy at Center
Barrier 200 LF $______ _________
TOTAL ESTIMATED AMOUNT $_____________
Optional Bid Item
0010 Remove Concrete Efflorescence from Bay Side of Center River
Barrier and Walls Around the
Pumping Station Transformer Areas 1 Job Job $________
TOTAL ESTIMATED AMOUNT; BASE AND OPTIONAL BID ITEMS $_____________
Note 1: "SF" = Square Foot, "LF" = Linear Foot, "EA" = Each.
../../../../../AppData/Local/Microsoft/Windows/Temporary%20Internet%20Files/Content.Outlook/Word/01%2022%2000.doc
Note 2: Bidders must bid all items. The work will be awarded as a whole to one bidder. Offers will be evaluated and the low bidder determined by the
Total Estimated Amount for Line Items 0001 through 0009, including the Base
Bid Items and the Optional Item. The minimum work awarded will be the Base
Bid work.
Note 3: Line Item Number 0010 above is an Optional Line Item that may, at the option of the Government, be exercised at any time within 30 calendar days after receipt by the Contractor of the Notice to Proceed. If Optional
Item 0010 is awarded, no additional calendar days will be added to the contract duration.
Note 4: All work shall be completed within the time period specified in
Section 00 80 00 SPECIAL CONTRACT REQUIREMENTS, Subpart COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) FAR 52.211-10.
Note 5: In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
-- End of Document --