Spec_01_50_00_A0002.pdf
PDF 1 MB Posted
- Solicitation number
- W912WJ-16-B-0011
About this file
Revised Spec
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| Bid_Snapsheet.pdf | ||
| W912WJ-16-B-0011_-_Amendment_0003.pdf | ||
| Plans_PLY-507_C-303_A0002.pdf | ||
| Amendment_W912WJ-16-B-0011-0002.pdf | ||
| Spec_35_31_19_A0002.pdf | ||
| Spec_01_22_00_A0002.pdf | ||
| SPECS_Revised_August.pdf | ||
| PLANS.pdf | ||
| Amendment_W912WJ-16-B-0011-0001.pdf | ||
| PLANS.pdf | ||
| SPECS.pdf | ||
| Solicitation_W912WJ-16-B-0011.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIRS TO STONE DIKE, PLYMOUTH LONG BEACH,
PLYMOUTH, MASSACHUSETTS
AMENDMENT 0002
AUGUST 2016
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 CONSTRUCTION SITE PLAN
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
2.2 TEMPORARY SAFETY AND CONSTRUCTION CONTROLS
2.2.1 Barricades
2.2.2 Fencing
2.2.2.1 Temporary Safety Fencing
2.2.2.2 Temporary Chain Link Fencing
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
3.2 PUBLIC AND VEHICLE CONTROLS
3.3 AVAILABILITY AND USE OF UTILITY SERVICES
3.3.1 Water and Electricity
3.3.2 Telecommunications (Voice/Data)
3.3.3 Fire Protection
3.3.4 Sanitation
3.4 CONTRACTOR'S TEMPORARY FACILITIES
3.4.1 Location of Temporary Facilities and Field Office/Trailer(s)
3.4.2 Use and Appearance of Field Office/Trailers
3.4.3 Staging and Storage Area
3.4.3.1 Storage of Hazardous Materials
3.4.4 Maintenance of Storage Area
3.4.5 Access to/from Storage Area(s)
3.4.6 Usage of Fuels and Lubricants
3.4.7 Temporary Electrical System
3.4.7.1 Temporary Wiring
3.4.7.2 Construction Equipment
3.4.7.3 Circuit Protection
3.4.8 Security Provisions
3.4.9 Weather Protection of Stored Equipment and Materials
3.4.9.1 Building and Site Storm Protection
3.4.10 Stormwater Pollution Prevention
3.4.11 Dust Control
3.5 PLANT COMMUNICATION
3.6 GOVERNMENT FIELD OFFICE
3.6.1 Resident Engineer's Office
3.6.2 Trailer-Type Mobile Office
3.7 CLEANING DURING CONSTRUCTION
SECTION 01 50 00 Page 1
AMENDMENT 0002
AUGUST 2016
3.7.1 Daily Cleaning
3.7.2 Dumpster
3.7.3 Burning
3.8 REMOVAL OF TEMPORARY FACILITIES, MATERIALS, AND EQUIPMENT
3.9 RESTORATION OF STORAGE AREA
-- End of Section Table of Contents --
SECTION 01 50 00 Page 2
AMENDMENT 0002
AUGUST 2016
SECTION 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 SUMMARY
Requirements of this Section apply to, and are a component of, each section of the specifications.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 241 (2013; Errata 2015) Standard for Safeguarding Construction, Alteration, and Demolition Operations
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code
NFPA 70E (2015; ERTA 1 2015) Standard for Electrical Safety in the Workplace
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Construction Site Plan ; G, RO
Temporary Electrical System ; G, RO
SD-03 Product Data
Barricades
Temporary Safety Fencing
SECTION 01 50 00 Page 3
AMENDMENT 0002
AUGUST 2016
Temporary Chain Link Fencing
1.4 CONSTRUCTION SITE PLAN
Prior to the start of work, submit a site plan showing the locations and dimensions of onsite fenced in temporary equipment and material storage area, access and haul routes, and ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Show locations of safety and construction fences, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.
PART 2 PRODUCTS
2.1 TEMPORARY SIGNAGE
2.1.1 Bulletin Board
Immediately upon beginning of work, provide a weatherproof glass-covered bulletin board not less than 36 by 48 inches in size for displaying the Equal Employment Opportunity poster, a copy of the wage decision contained in the contract, Wage Rate Information poster, and other information approved by the Contracting Officer. Locate the bulletin board at the project site in a conspicuous place easily accessible to all employees, as approved by the Contracting Officer.
2.2 TEMPORARY SAFETY AND CONSTRUCTION CONTROLS
2.2.1 Barricades
All barricades shall be provided with a flashing light (amber yellow, 5 candelas effective intensity, 55-75 flashes per minute). All barricades must be anchored or of sufficient mass to retain an established position where they are placed. Continuous burning lights shall have an effective intensity of 10 candelas. Place barricades at 10 foot maximum intervals and use dual markers and lights at corners and ends. Flashing lights shall be maintained to operate nightly during construction. Contractor shall check each flashing light for operation every night before leaving the project area.
2.2.2 Fencing
2.2.2.1 Temporary Safety Fencing
Temporary safety fencing shall be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 42 inches high, able to restrain a force of at least 250 pounds against it, supported and tightly secured to steel posts located on maximum 10 foot centers.
2.2.2.2 Temporary Chain Link Fencing
Galvanized chain link fence with metal posts. The fence shall have a height of at least 6 feet. Fence materials need not be new but shall be in good condition.
SECTION 01 50 00 Page 4
AMENDMENT 0002
AUGUST 2016
PART 3 EXECUTION
3.1 EMPLOYEE PARKING
Contractor employees will park privately owned vehicles (POVs) in the area designated for use as the Contractor's temporary staging and storage area as noted on the contract drawing Sheet G-102. Contractor employee parking shall not interfere with existing and established parking requirements of adjacent parking areas, restaurants, or the beach.
3.2 PUBLIC AND VEHICLE CONTROLS
a. Provide and erect temporary safety fencing and/or barricades at areas as needed to prohibit access by unauthorized personnel, the public, or vehicles.
b. Maintain controls during the life of the contract. Upon completion and acceptance of the work, remove all controls from the site. The controls shall become the property of the Contractor.
3.3 AVAILABILITY AND USE OF UTILITY SERVICES
3.3.1 Water and Electricity
a. The Contractor shall provide and pay for its own water and electricity that may be required in the prosecution of the work. There will be no Government provided water and electricity at the project site.
b. Engage the local electrical utility company to install temporary electrical service. Where utility company provides only part of the service, provide the remainder with matching, compatible materials and equipment. Comply with company requirements and recommendations.
c. All electrical work shall be in accordance with EM 385-1-1 and NFPA 70 and accomplished by a skilled licensed electrician. [(AMENDMENT 0002) The use of temporary box enclosed portable generators will be allowed onsite.]
3.3.2 Telecommunications (Voice/Data)
Make arrangements, provide, maintain, and pay for telecommunication (voice and data) services desired.
3.3.3 Fire Protection
Provide and maintain temporary fire protection equipment for the protection of personnel and property during construction. Remove debris and flammable materials daily to minimize potential hazards.
3.3.4 Sanitation
In accordance with Section 2 of EM 385-1-1 , provide, maintain, and make available to all workers provisions for sanitation. Maintain these provisions at all times without nuisance. Upon completion of the work, all sanitary provisions and facilities shall be removed from the premises by the Contractor, leaving the premises clean and free from nuisance.
In accordance with Section 2, subpart 02.C of EM 385-1-1 , provide, maintain, and make available to all workers an adequate supply of potable
SECTION 01 50 00 Page 5
AMENDMENT 0002
AUGUST 2016
water for both drinking and personal cleansing. During hot weather, provide cool drinking water.
In accordance with Section 2, subpart 02.E of EM 385-1-1 , provide, maintain, and make available to all workers adequate minimum field-type portable toilets. Portable toilets shall be properly secluded from public observation in such a manner as required or approved by the Contracting Officer. Include provisions for pest control and elimination of odors.
Any penalties and/or fines associated with improper discharge of wastewater shall be the responsibility of the Contractor. Government toilet facilities will not be available to Contractor's personnel.
3.4 CONTRACTOR'S TEMPORARY FACILITIES
3.4.1 Location of Temporary Facilities and Field Office/Trailer(s)
An area has been made available for use for the Contractor's temporary facilities and field office/trailer(s); refer to contract drawing sheet G-102 for location. The final location for temporary facilities within this area will be discussed during the Preconstruction Conference prior to commencing work.
3.4.2 Use and Appearance of Field Office/Trailers
a. Provide and maintain administrative field office facilities within the construction area at the designated site. Government office and warehouse facilities will not be available to the Contractor's personnel.
b. Field Office/Trailers utilized by the Contractor for administrative or material storage purposes must present a clean and neat exterior appearance and be in a state of good repair. Trailers that, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on Government property.
3.4.3 Staging and Storage Area
a. An area has been made available for use by the Contractor, for work, staging, and storage of equipment, materials and trailers during the life of this contract; refer to contract drawing sheet G-102 for location. The Contractor shall confine its storage areas to the limits as designated or approved by the Contracting Officer and shall be responsible for the security of the areas. Upon completion of the contract, and at no additional cost to the Government, remove all equipment and materials, except as otherwise specified, and restore the site to its original condition as approved by the Contracting Officer.
b. Do not stockpile materials outside the staging and storage area in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the storage area at the end of each work day.
c. Except for equipment and materials which are in support of ongoing work on any given day or unless such equipment or materials are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the project site boundaries, equipment and materials shall be stored and placed inside the temporary chain link fencing.
SECTION 01 50 00 Page 6
AMENDMENT 0002
AUGUST 2016
3.4.3.1 Storage of Hazardous Materials
Hazardous materials shall be stored using a secondary containment system at least 50 feet from any drainage inlets, waterbodies (rivers, streams, lakes), environmentally sensitive areas (wetlands, vernal pools).
3.4.4 Maintenance of Storage Area
Keep temporary fencing in a state of good repair and proper alignment.
Grass and vegetation along temporary fences, under trailers, and in areas not accessible to mowers will be edged or trimmed neatly.
3.4.5 Access to/from Storage Area(s)
a. Access to and from the storage area shall be along paved or established access ways. The traversing of non-established roadways, such as grassed or unpaved areas, with construction equipment or other vehicles shall not be allowed unless no other means of access exist.
Mud tracked onto paved or established roadways shall be removed immediately.
b. If the traversing of non-established access ways with construction equipment or other vehicles is necessary and approved by the Contracting Officer, access ways shall be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways; gravel gradation will be at the Contractor's discretion.
3.4.6 Usage of Fuels and Lubricants
Refer to Section 01 57 20 ENVIRONMENTAL PROTECTION, subpart "Chemical Materials Management and Waste Disposal," subparagraph "Fuel and Lubricants."
3.4.7 Temporary Electrical System
a. Provide a temporary electrical distribution system for temporary power and lighting, to include equipment and connections, in accordance with EM 385-1-1 , NFPA 70 , and NFPA 70E. The Contractor, or his delegated subcontractor, shall enforce all the safety requirements of electrical extensions for the work of all subcontractors. All work shall be accomplished by skilled electrical tradesmen in a workmanlike manner, as approved by the Contracting Officer.
b. Temporary lighting circuits shall be separate from electrical tool circuits. Receptacle circuits shall be dedicated to either temporary lighting or electric tools and shall be labeled "LIGHTS ONLY" or "TOOLS ONLY," as acceptable.
c. A sketch of the proposed temporary electrical system shall be submitted and accepted by the Contracting Officer before temporary power and lighting is installed. The sketch shall indicate the location, voltages, and means of protection of all circuits, including receptacles, disconnecting means, grounding, GFCIs, and lighting circuits.
SECTION 01 50 00 Page 7
AMENDMENT 0002
AUGUST 2016
3.4.7.1 Temporary Wiring
Provide temporary wiring in accordance with NFPA 241 and NFPA 70 , Article 305-6(b), Assured Equipment Grounding Conductor Program. Include frequent inspection of all equipment and apparatus.
3.4.7.2 Construction Equipment
In addition to the requirements of EM 385-1-1 , all temporary wiring conductors installed for operation of construction tools and equipment shall be either Type TW or THW contained in metal raceways, or may be multiconductor cord. Temporary wiring shall be secured above the ground or floor in a workmanlike manner and shall not present an obstacle to persons or equipment. Open wiring may only be used outside of buildings, and then only in strict accordance with the provisions of the National Electrical Code.
3.4.7.3 Circuit Protection
In addition to the requirements in EM 385-1-1 and NFPA 70 , all 15 and 20-ampere receptacle outlets used for obtaining power during construction shall have ground fault circuit interrupters (GFCI) for personnel protection. All generator-powered 15- and 20-ampere, 60 Hertz receptacle outlets shall have GFCI'S, and shall be properly grounded. A testing means shall be provided which will impose a measured fault of 5 milliamperes, plus or minus 1 milliamperes, and result in tripping the GFCI unit.
3.4.8 Security Provisions
Provide adequate outside security lighting at the Contractor's temporary facilities. The Contractor will be responsible for the security of its own equipment; in addition, the Contractor will notify the appropriate law enforcement agency requesting periodic security checks of the temporary project field office.
3.4.9 Weather Protection of Stored Equipment and Materials
Take necessary precautions to ensure that stored equipment and materials, and openings and other critical openings in the temporary storage area are monitored carefully. Take immediate actions required to seal off such openings when rain or other detrimental weather is imminent, and at the end of each workday. Ensure that the openings are completely sealed off to protect materials and equipment in the temporary facilities from damage.
3.4.9.1 Building and Site Storm Protection
When a warning of gale force winds is issued, take precautions to minimize danger to persons, and protect the work and nearby Government property.
Precautions must include, but are not limited to, closing openings;
removing loose materials, tools and equipment from exposed locations; and removing or securing scaffolding and other temporary work. Close openings in the work when storms of lesser intensity pose a threat to the work or any nearby Government property.
3.4.10 Stormwater Pollution Prevention
To prevent sediment-laden runoff from entering any resource areas such as lakes, ponds, rivers, or wetlands, provide erosion prevention and sediment
SECTION 01 50 00 Page 8
AMENDMENT 0002
AUGUST 2016
controls (such as entrenched staked straw bales and sediment (silt) fence) in areas where land disturbance has resulted from the installation temporary facilities and use of storage areas.
3.4.11 Dust Control
Dust control methods and procedures must be approved by the Contracting Officer. Treat dust abatement on access roads with applications of calcium chloride, water sprinklers, or similar methods or treatment.
3.5 PLANT COMMUNICATION
Whenever the Contractor has the individual elements of its plant so located that operation by normal voice between these elements is not satisfactory, the Contractor must install a satisfactory means of communication, such as telephone or other suitable devices and made available for use by Government personnel.
3.6 GOVERNMENT FIELD OFFICE
3.6.1 Resident Engineer's Office
Provide the Government Resident Engineer with an office, approximately 200 square feet in floor area (not including hallways, conference rooms, closets, and toilet facilities), located where directed and providing space heat, electric light and power, and toilet facilities consisting of one lavatory and one water closet complete with connections to water and sewer mains. Field-type portable sanitary facilities, approved by the Contracting Officer, may be substituted for the water closet. The office shall include, as a minimum, two overhead shelves, two double desks with pedestals, a 36 inch by 72 inch plan table, two single movable desks, and chairs for all desks. The conference area shall have a minimum 16 feet long conference table and 10 chairs. Provide one high speed data Internet connection (DSL or Broadband). Provide a mail slot in the door or a lockable mail box mounted on the surface of the door. The office shall be alarmed with door and motion sensors and wired to a central station. All windows shall have security grates. At completion of the project, the office will remain the property of the Contractor and be removed from the site. Utilities shall be connected and disconnected in accordance with local codes and to the satisfaction of the Contracting Officer.
3.6.2 Trailer-Type Mobile Office
The Contractor may, at its option, furnish and maintain a trailer-type mobile office acceptable to the Contracting Officer and providing as a minimum the facilities specified above. Securely anchor the trailer to the ground at all four corners to guard against movement during high winds.
3.7 CLEANING DURING CONSTRUCTION
3.7.1 Daily Cleaning
Execute to keep the temporary facilities, work site, and adjacent properties free from accumulation of solid waste materials, packaging material, rubbish, windblown trash and debris, and the like resulting from construction operations. Construction debris, waste materials, packaging material and the like shall be removed from the work site daily.
SECTION 01 50 00 Page 9
AMENDMENT 0002
AUGUST 2016
3.7.2 Dumpster
Provide dumpsters for the collection of trash, rubbish, and debris. Equip dumpsters with a secure cover. Keep cover closed at all times, except when being loaded with trash and debris. Locate dumpsters behind the construction fence or out of the public view. Empty dumpsters at least once a week or as needed to keep the site free of trash and debris.
3.7.3 Burning
Burning of brush, trash, rubbish, or debris will not be permitted at the site.
3.8 REMOVAL OF TEMPORARY FACILITIES, MATERIALS, AND EQUIPMENT
a. Prior to the completion of work, remove temporary field office trailers, bulletinboard, temporary utilities, signs, materials, and equipment from area used during construction.
b. After removal of field office trailer, materials, and equipment from within the fenced area, the temporary chain link fencing shall be dismantled and removed from the project site and become the property of the Contractor.
3.9 RESTORATION OF STORAGE AREA
At no additional cost to the Government clean and restore the area used for the temporary field office and storage to its condition that existed prior to the Notice to Proceed (NTP) or better.
-- End of Section --
SECTION 01 50 00 Page 10
| 01 50 00 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS |
| 01 50 00 - TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 CONSTRUCTION SITE PLAN |
| PART 2 PRODUCTS |
| 2.1 TEMPORARY SIGNAGE |
| 2.1.1 Bulletin Board |
| 2.2 TEMPORARY SAFETY AND CONSTRUCTION CONTROLS |
| 2.2.1 Barricades |
| 2.2.2 Fencing |
| 2.2.2.1 Temporary Safety Fencing |
| 2.2.2.2 Temporary Chain Link Fencing |
| PART 3 EXECUTION |
| 3.1 EMPLOYEE PARKING |
| 3.2 PUBLIC AND VEHICLE CONTROLS |
| 3.3 AVAILABILITY AND USE OF UTILITY SERVICES |
| 3.3.1 Water and Electricity |
| 3.3.2 Telecommunications VoiceData |
| 3.3.3 Fire Protection |
| 3.3.4 Sanitation |
| 3.4 CONTRACTOR'S TEMPORARY FACILITIES |
| 3.4.1 Location of Temporary Facilities and Field OfficeTrailers |
| 3.4.2 Use and Appearance of Field Office/Trailers |
| 3.4.3 Staging and Storage Area |
| 3.4.3.1 Storage of Hazardous Materials |
| 3.4.4 Maintenance of Storage Area |
| 3.4.5 Access tofrom Storage Areas |
| 3.4.6 Usage of Fuels and Lubricants |
| 3.4.7 Temporary Electrical System |
| 3.4.7.1 Temporary Wiring |
| 3.4.7.2 Construction Equipment |
| 3.4.7.3 Circuit Protection |
| 3.4.8 Security Provisions |
| 3.4.9 Weather Protection of Stored Equipment and Materials |
| 3.4.9.1 Building and Site Storm Protection |
| 3.4.10 Stormwater Pollution Prevention |
| 3.4.11 Dust Control |
| 3.5 PLANT COMMUNICATION |
| 3.6 GOVERNMENT FIELD OFFICE |
| 3.6.1 Resident Engineer's Office |
| 3.6.2 Trailer-Type Mobile Office |
| 3.7 CLEANING DURING CONSTRUCTION |
| 3.7.1 Daily Cleaning |
| 3.7.2 Dumpster |
| 3.7.3 Burning |
| 3.8 REMOVAL OF TEMPORARY FACILITIES, MATERIALS, AND EQUIPMENT |
| 3.9 RESTORATION OF STORAGE AREA |