Amendment W912UM-23-R-0002-0001.pdf
PDF 857 KB Posted
- Attached to
- Cost Estimating Services for ROKFC In-Kind Program Contracts Federal contract opportunity
- Solicitation number
- W912UM23R0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment D - Price Table for the Sample Task Order (Revised thru Amendment 0001).xlsx | XLSX spreadsheet | |
| Solicitation W912UM-23-R-0002.pdf | ||
| Attachment E - Drawings for Sample Task Order (5 of 5).pdf | ||
| Attachment E - Drawings for Sample Task Order (4 of 5).pdf | ||
| Attachment E - Drawings for Sample Task Order (2 of 5).pdf | ||
| Attachment C - PWS for the Sample Task Order.pdf | ||
| Attachment A - Price Table (Basic IDIQ).xlsx | XLSX spreadsheet | |
| Attachment E - Drawings for Sample Task Order (3 of 5).pdf | ||
| Attachment E - Drawings for Sample Task Order (1 of 5).pdf | ||
| Attachment D - Price Table for the Sample Task Order.xlsx | XLSX spreadsheet | |
| Attachment B - Key Personnel Resume Form.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Next Page.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 19
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Nov-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912UM23R0002
X 9B. DATED (SEE ITEM 11)
19-Oct-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Nov-2022
CODE
CONTRACTING DIVISION
U.S. ARMY CORPS OF ENGINEERS
FAR EAST DISTRICT
UNIT #15546
APO AP 96271
W912UM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912UM23R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
a. The purpose of this amendment is to make changes and to provide responses to vendors’ questions as shown below.
1. To change the last sentence of sub-paragraph 6.3.1. of Addendum to FAR 52.212-1 as follows: The definition of Fully Burdened Labor Rate is fully loaded hourly rate that includes all salary, overhead costs, general administrative expenses, and profit. In addition, the sub-paragraph 3.2.1 of the Performance Work Statement (PWS) has been changed to read as follows: The detailed breakdown of the MND formatted cost estimate shall be written in English or Korean language.
2. To make changes to Attachment D of the solicitation.
3. To extend the closing date and time of the solicitation to 12 December 2022 at 1:00 p.m.
4. To answer vendors’ questions as shown below:
i. Question 1: Do we require to submit the fee proposal for Attachment E (Osan East Campus Fitness
Center)? We would like to clarify it due to the Attachment E cited as a sample project in the solicitation.
Response: Offerors are required to submit completed Attachments A and D with their proposal as specified in the solicitation. Please refer to paragraph 6 titled “Proposal Submittal” within Addendum to FAR 52.212-1 of the solicitation. Attachment A is the Price Table that offeror shall submit its prices for the base contract.
Attachment D is the Price Table of the Sample Task Order that the Offeror shall submit as part of its technical proposal. For Attachment D, requirement is outlined in Attachment C with the PWS and Attachment E with the drawings.
ii. Question 2: Last week, I submitted a revalidation of SAM certification due to expired SAM registration. The re-validation process is expected to take long (at least a month). Please advise.
Response: In accordance with FAR 52.204-7, all Offerors shall be registered in SAM at the time of proposal submission and continue to be registered. Please see FAR clause 52.204-7 for more detailed information.
iii. Question 3: Can additional Labor Rates be proposed beyond those listed in RFP Attachment A – Price Table?
Response: No, the Offerors are required to propose fully burdened rates for the labor categories identified in Attachment A of the solicitation.
iv. Question 4: Please confirm whether travel and per diem are to be included in the fully burdened labor rates or if they are to be priced separately as suggested in RFP Attachment D – Price Table for Sample Task Order?
Response: The format of Attachment D is more of a breakdown, but the Attachment A centers on Fully Burdened Labor Rate for each labor category when considering labor section of the attachment.
Typically, there should be no per diem incurred into the costs of providing the services outlined in each project. Depending on each project, travel expenses may occur due to number of meetings held at the Government installation(s).
The definition of Fully Burdened Labor Rate mentioned in sub-paragraph 6.3.1 of Addendum to FAR 52.212-1 has been changed as shown in the following: The definition of Fully Burdened Labor Rate is fully loaded hourly rate that includes all salary, overhead costs, general administrative expenses, and profit.
v. Question 5: I read the solicitation and it says at page 9 (total 65 pages) there is specific tasks such as:
3.2.1. The detailed breakdowns of the MND format cost estimate shall be written in the Korean language only. I just want to clarify that if the cost estimate written by English or some items which need to written by Korean language.
Response: Sub-paragraph 3.2.1 of the PWS has been changed as follows: The detailed breakdown of the MND formatted cost estimate shall be written in English or Korean language.
b. All other terms and conditions remain the same.
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Nov-2022 01:00 PM to 12-Dec-2022 01:00 PM.
The following have been modified:
PERFORMANCE WORK STATEMENT (PWS)
FOR
COST ESTIMATING SERVICES
FOR REPUBLIC OF KOREA FUNDED CONSTRUCTION (ROKFC)
IN-KIND PROGRAM CONTRACTS
WITHIN THE U.S. FORCES KOREA (USFK) AREA OF OPERATIONS
Revision: 15 November 2022
1. GENERAL: This is a non-personal services contract to provide cost estimating services for Republic of Korea Funded Construction (ROKFC) In-Kind program contracts. The Government will not exercise any supervision or control over the contract service providers performing the services herein.
1.1 Description of Services: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the cost estimating services as defined in this PWS. The contractor shall possess the appropriate certifications, proprietary tools, and expertise to perform work to the standards required in this PWS and contract.
1.2 Background: The Government seeks additional capability and capacity to perform cost estimating work for ROK Ministry of National Defense (MND) format estimates for ROKFC In-Kind program construction contract designs. The MND format cost estimates are subject to overarching and unique submittal formats using the Korean Estimating Management System, Version 7 (EMS7) software or the latest version.
1.3. Scope of Work: The Contractor shall provide professional services to perform cost estimating services for the ROK In-Kind program construction contracts.
1.3.1. Services include three (3) submittals for each separate design project: Initial MND Estimate (90% design complete); Back-Check MND Estimate (95% design complete); and Contract MND Documents (100% contract document). MND format cost estimates with EMS files must incude complete backup documentation to submit for the ROK MND’s review.
1.4. Objectives: The objective of this contract is to provide current working estimates with Estimated Construction Cost (ECC) milestones.
1.5. Period of Performance: The period of performance shall be as follows:
Base Period: One (1) year from contract award date 1st Option Period: One (1) year from prior ordering period 2nd Option Period: One (1) year from prior ordering period 3rd Option Period: One (1) year from prior ordering period 4th Option Period: One (1) year from prior ordering period
1.6. General Information
1.6.1. Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which the Contractor assures itself that its work complies with the requirements of the contract.
1.6.2. Quality Assurance: The Government will evaluate the Contractor’s performance and adherence to its quality control program under this contract IAW the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3. Hours of Operation: The Contractor may set its own hours of operation; however, it must be available to work with the Government during the Government’s business hours (see paragraph “Work Days, Holidays, and Work Hours U.S. and Republic of Korea (ROK)” herein), except listed U.S. Federal and Korean national holidays; or when the Government’s offices are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.4. Type of Contract: Firm Fixed Price IDIQ MATOC with firm-fixed price task orders.
1.6.5. Data Rights: The Government has unlimited right to all documents/material produced under this contract.
All documents and materials produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government.
1.6.6. Organizational Conflict of Interest: The Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.7. Non-Disclosure Statement: All contractor personnel shall be required to sign a non-disclosure statement acknowledging that cost estimating materials from the company treated as proprietary information and are not to be disclosed to any persons who do not have a need to know about the contents of the materials. The Contractor shall disclose all information and data obtained during the performance of the contract only per the instructions of the Contracting Officer.
1.6.8. Contracting Officer Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR. The COR is not authorized to change any of the terms and conditions of the resulting contract and order(s).
2. Contractor Qualification.
2.1. The Contractor as a firm shall have experience at least 3 years in MND format cost estimating services (EMS) for US design projects. If the Contractor does not have such experience as a firm, it must provide evidence that its proposed work team (to include its key personnel described in paragraph 2.2 below) has such experience.
2.2. Contractor Key Personnel Qualification: The Contractor shall directly employ adequate numbers of staff with sufficient experience, skill, and qualifications to successfully manage the contractor’s effort under the base contract and each task order, and to accomplish the work that may be required under each task order. The Contractor is free to organize its work effort in a manner it believes will best deliver required services to the Government and provide staff that it believes fully supports that effort. At a minimum, the Contractor’s staff shall consist of the following labor categories: project manager, contract manager, quality control manager, and MND cost estimator.
2.2.1. Project Manager and Contract Manager: A project manager and contract manager shall have overall authority and responsibility for execution of the contract. The project manager and contract manager shall:
2.2.1.1. Possess a bachelor’s degree in an academic discipline.
2.2.1.2. Have experience in management of MND cost estimate services projects.
2.2.1.3. Have experience working on projects/contracts for United States military clients in Korea.
2.2.1.4. Possess good written and spoken English proficiency.
2.2.2. Quality Control Manager: A quality control manager shall have overall authority and responsibility for implementing the Contractor’s quality control program. The quality control manager shall:
2.2.2.1. Possess engineering degree in any academic interdisciplinary discipline such as civil, architectural & structural, mechanical including fire protection, or electrical including communication.
2.2.2.2. Have at least two (2) years of experience in managing quality control program of MND cost estimate services projects.
2.2.2.3. Have experience working on projects/contracts for United States military clients in Korea.
2.2.2.4. Possess good understating of drawing which shall be complete and ready for solicitation of a construction contract and specification in English.
2.2.3. MND Cost Estimator: A cost estimator shall have overall expertise, authority, and responsibility for implementing MND cost estimating. The cost estimator shall:
2.2.3.1. Possess an engineering degree in an academic interdisciplinary discipline such as civil, architecture & structural, mechanical including fire protection, and electrical including communication.
2.2.3.2. Have at least two (2) years of experience in developing MND cost estimating using EMS software.
2.2.3.3. Have at least two (2) years of experience working on projects/contracts for United States military clients in Korea.
2.2.3.4. Possess understating of drawing which shall be complete and ready for cost estimating solicitation of a construction contract and specification in English.
3. Specific Tasks
3.1. The Contractor shall produce an MND format cost estimate using the latest version or Korean EMS Version 7 software. EMS software: Company: Korea Software (고려전산): “EMS7” (current as of March 2017) (www.koreasoft.co.kr, +82-02- 529-6071).
3.2. The Contractor shall provide the Government a Current Working Estimate (CWE) for In-house design projects or updates to existing CWEs to current standards requiring 90%, 95% and 100% design phase submittals only.
3.2.1. The detailed breakdown of the MND formatted cost estimate shall be written in English or Korean language.
3.2.2. The MND format cost estimate shall include complete backup documentation such as quotes, quantity take-off, catalog cuts, etc. to be provided for the ROK MND's review.
3.2.3. The Government will furnish completed design documents such as specifications and drawings in PDF files. The MND format cost estimate shall match with the necessary value requirements from specifications and drawings. Quantities in the MND format cost estimate shall match up to material/quantity take-off from the design specifications and drawings.
3.2.4. The MND format cost estimate shall include offshore materials cost estimates, such as systems with components which are not locally available products in meeting the design specification requirements. Also, it shall include quantities, unit prices, and total cost for each in both United States Dollars and Korean Won.
3.2.5. All materials with components required to install a complete and useable system or assembly shall be included in the MND format cost estimate. Notes on the drawings or in the specifications, which state the intent of all miscellaneous materials with components, shall be included on the cost estimate whether shown in detail design drawings or not.
3.2.6. The process(es) and equipment indicated in the MND Format Cost Estimate shall meet the requirements for a complete construction project.
3.2.7. EMS files shall include complete backup documentation to submit for the ROK MND's review, and XML files which have been produced by EMS7 software shall be reviewed and accepted by the Korea Public Procurement Service using PCCS (Public Construction Cost-estimation System; http://pccs.g2b.go.kr).
3.3. Each summary sheet shall delineate the cost of materials, labor, equipment, miscellaneous expenses, overhead, profit, V.A.T., and inspector’s cost. The pricing method shall be as follows:
a. Price List of Commodity for Government (Korean) Purchases (PLCGP): All project requirements shall be based on pricing information contained thereto.
b. For pricing items not contained in the PLCGP, the following references shall be used, as a minimum:
c. The Comprehensive Market Price Information published by Daehan Construction.
d. The Information on Commodity Prices, published by Korea Price Research Center.
e. Consolidated Price Information, published by Korea Pricing Information.
f. The latest MND-Defense Procurement Agency (DPA) established pricing information on specific items, if available.
3.4. Instances where pricing information conflicts, the PLCGP shall take precedence. For each pricing item, a cost comparison of at least three (3) sources shall be provided in which no priced items shall exceed those items in the PLCGP. All offshore items shall be selected from at least three (3) alternate sources. Provide a complete offshore material lists with backup documents for the project.
3.5. From the 90% design CWE, a separate cost estimate shall be provided for disposing of industrial waste.
3.6. Provide one set of hard copy and CD/DVD of cost estimate, to the Far East District (FED), Cost Engineering Branch (CEPOF-ED-C) for review, including backup supporting information, editable EMS data files, excel files, and XML files.
3.7. The CWE shall include all temporary construction components, such as scaffolding, shoring, dewatering system, traffic control, equipment, and etc.
3.8. In order for a quantity take-off to be completely and accurately performed, all relevant engineering calculations shall be shown all the required components to complete the construction without any essential components unidentified.
3.9. All items/materials indicated in the drawings and specifications, which do not have an exact match with the MND EMS database of materials, shall be identified and listed as a new item. They will be discussed and one of the following actions will be taken.
a. The material(s) as identified in the drawings and specifications may be changed to align with the MND database material(s), or
b. The cost estimate shall include a backup information indicating how the cost was determined, e.g., local vendor quotes, historical data from past projects, commonly used and industry accepted price and labor books, etc.
c. The contractor shall assure that the MND format cost estimate is produced accurately and completely on the performing of Architect-Engineer’s (AE) quality control.
d. The contractor shall develop and submit a Cost Estimating Quality Control Check Sheet (see Exhibit A, Template QA Checklist).
3.10. The work shall also include attending On-Board Review (OBR) meetings at each 90%, 95%, and 100% design phase as determined on project-by-project basis.
3.11. The ECC on the PWS will be identified on a project-by-project basis (in each task order).
3.12. The contractor shall provide without additional cost a justification for any items in the cost estimate when the Government requests an explanation. This will include providing a more detailed cost breakdown and back up data if required during design phases or construction phases.
4. Deliverables
4.1. The contractor shall submit cost estimate documents in ROK MND format to the FED, CEPOF-ED-C, appointed COR for review and validation at each stage of design completion. The deliverables may consist of maximum of 4 printed set copies of the estimate, depending on project submittal requirements and determined at the task order level, a digital copy on CD/DVD of the full editable EMS data files, excel filles, XML files, and all backup documents to include quantity take-off calculations.
4.2. The typical milestones will be determined on a project by project based on the project size and complexity.
MILESTONE Duration After Receipt of Order
(ARO) days LOCATION Notice to proceed & design kickoff meeting 7 days 7 days ARO Will be identified in each task order Initial MND estimate (90% design complete & negotiable at TO level) 30 days 37 days ARO Will be identified in each task order 90% estimate review 21 days 58 days ARO Will be identified in each task order 90% OBR 7 days 65 days ARO Will be identified in each task order Back check (95% design complete & negotiable at TO level) 21 days 86 days ARO Will be identified in each task order 95% estimate review 21 days 107 days ARO Will be identified in each task order 95% OBR 7 days 114 days ARO Will be identified in each task order Contract documents (100%) completion 21 days 135 days ARO Will be identified in each task order Final coordination & task order close-out 14 days 149 days ARO Will be identified in each task order
5. Antiterrorism (AT) and Operations Security (OPSEC)
a. For Contracts Requiring Performance or Delivery in a Foreign Country. All non-local contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor’s compliance with combatant commander and subordinate task force command.
b. Contractor shall appoint an Operational Security Officer Representative upon award of contract.
Operational Security Officer shall be responsible for completing an OPSEC plan, outlining critical information.
c. Submit a completed Operational Security (OPSEC) plan and designate an OPSEC representative. OPSEC representative must have received training from an accredited Operational Security training course, within the last three (3) years.
d. Requirements under this Contract may require preparation of classified designs, access to classified data or necessitate the Contractor obtaining security clearances.
e. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
f. Access and general protection/security policy and procedures. All contractors and all associated sub-contractor’s employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
g. For contractors requiring Common Access Card (CAC). The contractor and all sub-contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non- DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.
h. AT Awareness training for contractor personnel traveling overseas. All US based contractor employees and associated sub-contractor employees traveling overseas will receive the government provided AOR specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure from CONUS based location and prior to commencing work on this project.
i. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something).
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
j. Access to Government information systems. All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25-2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems – to include associated DoD Security refresher training located:
https://jkodirect.jten.mil; and or here: https://cs.signal.army.mil. Training MUST be completed prior to accessing ANY DoD network. Network request forms will be provided by the government upon request. (See: DD2875).
k. OPSEC SOP/Plan requirements. The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator.
l. For Contracts that Require OPSEC Training. Per AR 530-1, all new contractor employees will complete
Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
m. Information assurance/information technology training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six months of employment.
n. Information assurance/information technology training certification. All contractor employees supporting
IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239-7001 and AR 25-2. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
o. For Contracts Requiring Performance or Delivery in a Foreign Country. All non-local contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.
p. Pre‐screen candidates using E‐Verify Program. All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01-M, DFARS 252.239-7001 and AR 25-2. The baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
q. Threat Awareness Reporting Program (TARP) training. All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381-12. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized web- based TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474
6. Applicable Publications: Regulations and Criteria applicable to this project includes but are not limited to the Following:
6.1. Unified Facilities Criteria (UFC) 3-740-05, Change2, Construction Cost Estimating dated 2 April 2020.
6.2. Engineer Regulation (ER) 1110-1-1300, Cost Engineering Policy and General Requirements.
6.3. Price List of Commodity for Government (Korean) Purchases (PLCGP).
6.4. Comprehensive Market Price Information published by Daehan Construction.
6.5. Information on Commodity Prices, published by the Korea Price Research Center.
6.6. Consolidated Price Information, published by Korea Pricing Information.
7. Performance Requirement Summary (PRS)
Performance Objective
Performance Standard
Acceptable Quality level Monitoring Method Remedy
Timeliness of estimates
Estimates are to be delivered by the due date of the task order
100% Milestone schedule Timeliness will be reflected in evaluations.
Accuracy of estimates
Estimates have to be accurate in quantities and cost
95% Estimates will be reviewed and validated
Any deficiencies are corrected before the due date
Backup documentation
Backup of all calculations used for quantity take offs and quotes for costs
95% Documentation will be reviewed and validated
Any missing documentation will have to be provided or updated as needed
Response to inquiries
Timely response to inquiries in the time specified in the task order
95% Time to respond and completeness of answer
Provide missing information.
Timeliness will be reflected in evaluations
Attending meetings and site visits
Attend all meetings and site visits required to produce an accurate estimate
90% Logging of attendance
Attendance and timeliness will be reflected in evaluations
Exhibit A TEMPLATE QUALITY ASSURANCE CHECKLIST
QA Checklist for MND Format Estimate
Project Name:
Number:
Type of Estimate:
Manager:
Date:
Office Symbol:
Reviewer Name:
Reviewer Signature:
INSTRUCTIONS: Check items pertaining to this estimate as "Yes" or "No" Check "N/A" for lines that do not pertain to the level of estimate being reviewed.
For items that are indicated "No", indicate why in "Comment".
Ye s
N o
N/ A
Ref
BASIC INFORMATION FOR
REVIEWER
COMMENT
1 The CWE has exceeded the PA. If yes, did you make the comment in? What is the main reason?
2 Were similar projects already executed reviewed and considered?
3 Is the estimate prepared based on the latest EMS data and quotes?
4 Does the material descriptions of the line items in MND Format Estimate match the descriptions on drawings or specifications?
5 Are all required off-shore materials for the construction identified compared with the off-shore material list prepared by the designer?
If not, did you make it in the comments?
6 Did you spot check on MAJOR line items in AE's estimate? If yes, how many items?
7 Has it provided proper supplier's quotes for local materials or off-shore materials in the estimate package?
8 Is the off-shore material or local material description in the material line item clearly and enough described up to assemble or operable level with clear notes?
9 Is DDC control system cost w/supplier's quote in the estimate addressed properly?
Has Estimate specified in the estimate enough?
10 Is the cost for Fire Protection System w/ supplier's quote in the MND reasonable?
11 Are all test fees required by the specs included in the MND estimates?
12 Are all fees for shop drawings preparation included in the MND estimates?
13 Is the use of lump sum by the estimator? If yes, did you make a comments to correct it?
14 Did costs for permits, licenses, fees, etc. considered in MND estimate?
15 Is temp access road and utility cost included in the estimate? Is it properly estimated compare with the design?
16 Have Haul Roads and/or Site Access been considered?
17 Have all Material and Task items been captured by the estimate?
18 Asbestos Abatement cost is included in the MND estimate?
19 Were environmental cost considered?
20 Are the Specifications/Drawings, etc. at appropriate level to complete estimate?
21 Is escalation calculated to midpoint of construction?
22 Used proper exchange rates for Offshore materials (weekly rate) and total summary (Daily Command rate)?
23 Was proper contingency (5% of ECC), Construction Managements Fee (3% of ECC) and FED S/A (3% of ECC+Contingency) used in
CWE?
24 ALL known "Lesson-Learned" for each discipline has been incorporated in this estimate?
Additional Comments / Notes / Concerns -
- End of Performance Work Statement -
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO OFFERORS – COMMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
1. General.
1.1. The Republic of Korea (ROK)-United States (U.S.) Status of Forces Agreement (SOFA), precludes the U.S. Government from granting Invited Contractor or Technical Representative Status to any offeror, awarded a contract under this requirement. All offerors submitting a proposal, including U.S. sources, must already have, or obtain the requisite business licenses directly from the ROK Government, and conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. Any contractor not already doing business in Korea, must submit adequate verification in its initial proposal that it has the requisite business licenses directly from the ROK Government to perform the contract and the capacity to conduct business in accordance with all applicable ROK laws, including but not limited to, rules and policies regarding labor, taxation, and immigration. If an initial proposal does not fully demonstrate this authorization and capacity, it may not be further considered for award. Whether an offeror demonstrates this authorization and capacity shall be determined by the Contracting Officer.
1.2. The Offeror shall submit its technical, past performance, and price proposals for the base IDIQ contract in accordance with the instructions set forth in this section.
1.3. The Government will evaluate technical, past performance, and price proposals in accordance with the factors and sub-factors set forth in the Basis of Award.
1.4. Offerors are cautioned to follow the detailed instructions fully and carefully, as the Government reserves the right to make award based on initial offers received, without discussion with Offerors.
1.5. No information concerning this solicitation or requests for clarification will be provided in response to Offeror initiated telephone calls. All such requests must be made in writing and submitted to the following email addresses: Ms. Han, Un-Kyong (Contract Specialist) at unkyong.han@usace.army.mil, and Ms. Jenny Suh (Contracting Officer) at jenny.y.suh@usace.army.mil. Written inquiries will be answered in writing through issuance of an amendment. The deadline for submission of written questions regarding this solicitation is two (2) weeks after the release of the solicitation.
1.6. System for Award Management (SAM): The offeror must be registered in the SAM database to be eligible to receive award of a contract under this solicitation. Instructions for registering with SAM are located at the SAM Web site: https://www.sam.gov/. Offerors located outside of the United States must obtain a NATO Commercial and Government Entity (NCAGE) code prior to registering at the SAM site. On 4 April 2022, the unique entity identified used across the U.S. Federal Government changed from the Data Universal Numbering System (DUNS) number to the Unique Entity ID, which is generated by SAM.gov.
FOR NON-U.S. COMPANIES
Non-U.S. companies are issued NATO Cage Codes (NCAGE) by contacting the designated Point of Contact (POC) at the National Codification Bureau (NCB) of the country where the company is located. For a list of addresses and POCs, go to for NCAGE:
http://www.d2b.go.kr.
Please note: Organizations with an address containing APO, FPO or AE do not need an NCAGE assigned by an Allied Nation or NATO-sponsored NCB. Instead, these companies must register in the Central Contractor Registration (CCR) to receive a U.S. Cage Code.
2. Proposal Format.
2.1. All proposals shall be submitted in PDF format, or as required in this section, Excel spreadsheets, bookmarked according to the Evaluation Factors described in paragraph 7 of this section. All electronic pages must be equivalent to “Letter,” 8 x 11.5 inches pages, if printed on paper, except for charts and schedules, which may be 11 x 17 inches pages when printed. Use Times New Roman or Arial font type sized not smaller than 11 pitch. Excel spreadsheets do not need to follow this format.
2.2. The offeror shall submit the Technical, Past Performance, and Price Proposals as “separate” single PDF Files. Offerors may use compression utility software such as WinZip or PKZip to reduce file size and facilitate transmission. Title the file(s) in the following format:
SOLICITATION NUMBER – COMPANY NAME – TECHNICAL PROPOSAL
SOLICITATION NUMBER – COMPANY NAME – PAST PERFORMANCE PROPOSAL
SOLICITATION NUMBER – COMPANY NAME – PRICE PROPOSAL
2.3. Description of File(s). Include in the description of the file, the solicitation number, title of the solicitation, and company name.
3. Closing Deadline for the Submissions.
Proposals must be received by the Contracting Office (see below), Far East District, U.S. Army Corps of Engineers not later than (NLT) the date and time specified in Block 8 of Standard Form (SF) 1449. The date and time is Korean Standard Time (KST).
4. Transmission of Proposals.
4.1. Offeror(s) shall submit complete proposal package electronically through Procurement Integrated Enterprise Environment (PIEE) – Solicitation Module or via email to Ms. Han, the Contract Specialist, and Ms. Suh, the Contracting Officer. It’s offeror’s responsibility to make sure its proposal is submitted through PIEE - Solicitation Module or via email within the response date and time of the solicitation.
4.1.1. For vendors, step-by-step instructions on how to use the PIEE - Solicitation Module, to include video demonstrations on the functionality of the module, are found at the following site:
https://wawf-gt.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml.
4.1.2. The following link provides information on how a vendor gets set up in PIEE.
https://piee.eb.mil/xhtml/unauth/web/homepage/vendorGettingStartedHelp.xhtml#step5 Follow below steps to register for PIEE – Solicitation.
a. Go to the following website: https://piee.eb.mil.
b. Click on register.
c. In the Roles screen, under Step 1, in the drop-down menu select SOL – Solicitation.
d. In Step 2, select both Proposal Manager and Proposal View Only Roles.
e. Location Code: Vendor’s CAGE Code.
f. Click Next.
g. The PIEE PFL CAM, whom is not a FED employee, will be responsible for activation.
4.2. Offeror(s) shall submit complete proposal in separate files with page limitations as shown below.
Volume Factor Page Limit I Factor A: Technical – Sample Task Order
Factor B: Technical – Key Personnel Qualifications
II Factor C – Past Performance No Page Limit
III Factor D - Price No Page Limit
IV Signed first page of the solicitation and any subsequent solicitation amendments; and completed FAR 52.212-3, Offeror Representations and Certifications
No Page Limit
4.3. Late Proposal. Notwithstanding any other provisions of this solicitation, proposals received by a contracting office outside the United States after the exact date and time specified herein for receipt of proposals are late and may not be considered for award.
4.4. Recipient Information. The recipients of the online submission are Ms. Han, Un-Kyong (unkyong.han@usace.army.mil), Contract Specialist, and Ms. Jenny Suh (jenny.y.suh@usace.army.mil), Contracting Officer.
4.5. When completing the information for transmittal, provide the following information in each of the relevant fields:
- Name of person submitting proposal – Use the name of individual signing proposal.
- Email address of person submitting proposal – Use the email address of the individual signed the proposal.
5. Proposal Content.
5.1. Each Offeror shall submit a complete offer package including: (a) signed first page of the solicitation and any subsequent solicitation amendments, (b) a completed Attachment A - Price Table of the solicitation and supporting information regarding the composition of the CLIN, (c) supporting documentation for the non-price factor(s) specified in FAR 52.212-1 and Basis of Award of this solicitation, and (d) completed FAR 52.212-3, Offeror Representations and Certifications – Commercial Products and Commercial Services.
5.2. Submit information for Government evaluation in the Technical, Past Performance, and Price Proposals in the same order in which they are required in this solicitation.
5.3. Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision FAR 52.212-1, Instructions to Offerors – Commercials Products and Commercial Services (Nov 2021).
5.4. The Offeror shall submit only an unclassified proposal. No classified material is requested or required in the Offeror’s proposal.
5.5. Offerors are cautioned to submit adequate information to enable the Government team to fully ascertain each Offeror’s capability to perform all of the requirements identified in the solicitation. All commitments made in the proposal shall become a part of the resultant contract.
6. Proposal Submittal: The Offeror’s Technical, Past Performance, and Price Proposals shall consist of the following:
6.1. Volume I. Factors A and B, Technical Proposal.
6.1.1. Factor A: Technical – Sample Task Order. The Offeror shall provide a completed Price Table (Attachment D) of the sample task order (Attachment C – PWS of Sample Task Order and Attachment E - Drawings) to show its understanding of the Solicitation’s requirements. The Offeror shall apply its proposed Fully Burdened Labor Rates and Reproduction Rates from the base period for the necessary key personnel and reproduction materials for this project.
6.1.2. Factor B: Technical - Key Personnel Qualifications. The Offeror shall provide key personnel resumes in the format shown in Attachment B of the solicitation and individual’s diploma for the educational qualification specified in sub-paragraph 2.2. of the PWS for each of the position titles listed below. Offeror is required to identify and ensure personnel possess the qualification as described in sub-paragraph 2.2 of the PWS.
- Project Manger
- Contract Manager
- Quality Control Manger
- MND Cost Estimator
6.2. Volume II – Factor C, Past Performance.
6.2.1. Offerors are required to identify only government contracts for the same or similar services. The Government may ascertain past performance information on the Offeror from sources other than the contracts/references provided. Offeror’s experience as a sub-contractor is also acceptable.
6.2.2. Recent Past Performance is within the last six (6) years as of the opening date of the solicitation. Relevant Past Performance is that for the “same or similar” services as the services described in the PWS.
6.2.3. The Offeror shall provide the following information for each past performance reference:
- Contract Number
- Total Dollar Value
- Procuring Agency
- Title of Contract
- Point of Contact (Name, Address, Email Address, and Telephone Number)
- Contracting Officer Information (Name, Address, Email Address, and Telephone
Number)
- Period of Performance
- Type of Contract
6.3. Volume III – Factor D, Price Proposal.
6.3.1. Electronic Copy. The Offeror shall provide a completed Attachment A – Price Table.
Hourly rates of key personnel listed in Attachment A of the solicitation shall be fully burdened labor rates. The definition of Fully Burdened Labor Rate is fully loaded hourly rate that includes all salary, overhead costs, general adminstrative expenses, and profit.
6.3.2. Compliance. Failure to comply with the RFP requirements for Price information may result in an adverse assessment of an offeror’s proposal and reduce or eliminate its chance of being selected for award. Offerors shall ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes. Also, the Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF 1449 and continuation sheet.
6.3.3. Offeror may be required, after it has submitted its price proposal, to provide to the Contracting Officer a breakdown of the Price Table (Attachment A) for the Government to more completely evaluate the price proposal.
6.3.4. All offerors interested in competing for this requirement are required to submit their price proposal in Korean Won (KW) only.
End of Section