A07_W912SV-18-Q-6005_Q&A-1_B162_Heat_Pump.pdf

PDF 94 KB Posted

Attached to
Heat Pump
Solicitation number
W912SV-18-Q-6005
Issued by

View the file

Other files

File Type Posted
A07_Provisions_&_Clauses.pdf PDF
A07_DFARS_252.209-7991.pdf PDF
A03_JA_B162_Heat_Pump_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION

Solicitation Number: W912SV-18-Q-6005

PROJECT TITLE: B162 Heat Pump

RFI

NO.

DATE OF

SUBMISSION

DATE TO

REQUESTOR/TECH

POC

DATE

RESPONSE

RETURNE

D TO KO

RESPONSE TO CLARIFICATION REQUEST DATE

RETURNED

TO KTR

31 Jan 2018 31 Jan 2018 1 Feb 2018 See Answer Below 1 Feb 2018

Whoever did the initial installed should have shop drawing for the VRV schematics (showing wiring, piping, etc for the system). Do you have this? The installer basically wants know if the condensers are tied into fan coils and other electrical components etc. for the 10 ton condensing unit and drawings would help to also know the amount of refrigerant needed.

A drawings are attached for that portion of the mechanical drawings and a schedule which will show the size of the indoor units. ACU 6 is currently being removed.

31 Jan 2018 31 Jan 2018 1 Feb 2018 See Answer Below 1 Feb 2018

Do we need to crane the machine up to a roof or can they use an elevator or is this being installed on ground level?

Please see photos attached

If this is a Re & Re (replacement) there should be no new electrical feed, will they use the same mounting feature (footprint)? Assuming same electrical and mounting structure.

The Electrical is in place but the contractor will need to verify if the wiring is up to date per the NFPA 77 The National Electrical Code and the Code of Massachusetts Regulation and manufactures installation instructions. The Unit that is spec’d out calls for 460 volt/60hz/3 Phase.

They also want to know why is this is being replace has something failed in the current unit & if so why is that component not being replaced they should have been a 10yr warranty.

One of the Compressors failed and burnt the Control Boards and also contaminated the system. According to the Manufacturers Date, it is 10 years old.

1 Feb 2018 1 Feb 2018 1 Feb 2018 See Answer Below 1 Feb 2018

Do you happen to have a picture of the location of where the old system is?

Photos are attached.

File details come from the government source that posted it.