A07_RFI_20180828.pdf

PDF 193 KB Posted

Attached to
Repair Base Electrical Service Federal contract opportunity
Solicitation number
W912SV18B5004
Issued by
Department of the Army Massachusetts Army National Guard

About this file

RFI Log 20180828

View the file

Other files for this federal contract opportunity

Other files attached to Repair Base Electrical Service, newest first.
File Type Posted
B01_Abstract_Repair_Base_Electrical_Service.pdf PDF
A01_RFI_Log_20180830.pdf PDF
A07_W912SV18B5004_0003.pdf PDF
A07_EAL_W912SV18B5004_20180906.pdf PDF
A07_W912SV18B5004_0002.pdf PDF
A07_W912SV18B5004_0001.pdf PDF
A07_W912SV18B5004_Pre-Bid_Conference_Sign-In.pdf PDF
A07_Solicitation_W912SV18B5004.pdf PDF
AXQD182743_SOW_AND_SPECS.PDF PDF
H01_Drawings_29JUN18.pdf PDF
A07_EAL_W912SV18B5004.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912SV18B5004 RFI Log

28 August 2018

1. Specification Section 01 11 00 paragraph 1.2.1.1 f. indicates that a switchgear vault with a false bottom is to be installed. Specification Section 03 42 13.00 10 paragraph 2.1 indicates that the precast concrete manufacturer shall have engaged in the production of precast concrete work “similar to that indicated on the drawings”. Neither Specification Section 03 42 13.00 10 Plant-Precast Concrete Products for Below Grade Construction or the Drawings provide detailed information with regard to the dimensions of these products. Please provide additional details for the precast equipment pad/vault.

ANSWER -- 8’x8’x10’ concrete vault with a concrete floor. Floor will have either a sump or “knockout” for drainage of water. Vault shall be set on a base of crushed stone.

2. Specification Section 01 11 00 paragraph 1.2.1.1 h. indicates that there are lockable manhole covers to be installed. Please provide size and ratings for these covers.

ANSWER -- Rating for this cover will be what the cover is rated for, not an issue due to the location on the vault.

New vault location is in a wooded area so no vehicle traffic is of a concern. Also would size the over to a min of 36” for easy access in and out.

3. Specification Section 26 05 13.00 40 paragraph 2.1.1 reads “Provide medium voltage power cables including multiple – and single conductor cables rated as follows, phase-to-phase, for grounded and ungrounded neutral systems: 25,000 volts, ungrounded neutral, on 13,200/13,800-volt, three phase, 60-hertz distribution systems.” Please clarify the ratings

NO ANSWER

4. Specification section 26 05 13.00 40 Medium-Voltage Cables paragraph 2.3.2.3 Termination states “Provide potheads with grounding terminals and cast iron bells that are rated as follows: Indoor – 15kV rating to withstand 45kV ac for 10 seconds, minimum Outdoor – 25kV rating, to withstand 60kV ac for 10 seconds, minimum”. Are potheads the only acceptable terminations? Can heat shrink or molded terminations be used? Are the specified indoor ratings correct?

NO ANSWER

5. Specification section 26 05 13.00 40 Medium-Voltage Cables paragraph 3.1.7 Single-Conductor Potheads states “Ensure that potheads are suitable for the type of cable, insulation, voltage rating …”. As there are multiple splices that connect the new cables to existing cables, please provide this information for the existing cables to ensure the proper selection of the potheads.

NO ANSWER

6. Specification Section 26 05 13.00 40 Medium-Voltage Cables Part 2 Products: 2.2.1 Multiple- Conductor Shielded Cables, 2.2.2 Multiple-Conductor, Non Shielded Cables, 2.2.3 Single-Conductor Shielded Cables, and 2.2.4 Single-Conductor Non Shielded Cables list six, four, four and three different types of cables respectively. Out of the seventeen types of cables listed which is to be installed? In additional, the paragraph 2.2.3.4 indicated that the EPR cable is rated 15kV. Is this correct?

NO ANSWER

7. Please confirm if Federal, state, or local taxes should be carried in proposals?

ANSWER -- This project is tax-exempt from Federal, state, and local taxes.

8. Please confirm if any state, local, and/or Federal permits will be required on this project?

ANSWER -- No permits required.

9. Please confirm if there are any known hazardous materials?

ANSWER -- No known hazardous materials.