This document is a project schedule for the LSA Contract Transition Logistics Tracker for July 2026, detailing a comprehensive facility transition and infrastructure modernization effort. The schedule spans from July 13, 2026 (Preparation Work) through July 30, 2026 (Critical End Date), with an overlap period beginning July 20, 2026 when the new contract becomes active.
The project encompasses fourteen major tasks with planned status, including infrastructure installation and relocation activities: installing and grounding connex containers (7 days, July 13-19), positioning waste containers and deploying light carts (1 day each, July 20), installing perimeter security fencing (1 day, July 20), transferring weapons and ammunition from cages to connex containers (1 day, July 21), and erecting a new Dining Facility (DFAC) structure (3 days, July 21-25). Additional tasks involve removing equipment from existing assembly tents (2 days, July 21-22), disassembling and inventorying weapon cage structural components (2 days, July 22-23), demobilizing existing tent structures (1 day, July 24), erecting new assembly structures (4 days, July 25-28), installing personnel trailer units (2 days, July 25-26), completing power and communications activation (1 day, July 27), relocating DFAC operations and personnel (3 days, July 27-30), and conducting final validation and operational acceptance (1 day, July 30). All tasks are scheduled to be completed by the critical end date of July 30, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B1 Questions and Answers.docx | DOCX document | |
| B1 Communication Layout.png | PNG image | |
| B1 Amendment_W912R1-26-Q-A020.pdf | ||
| B1 Updated PWS_LSA Lincoln FY26-FY27.docx | DOCX document | |
| B1 Site Layout.pdf | ||
| B1 Site Footprint.pdf | ||
| B1 Combined Synopsis Solicitation_LSA Lincoln FY 26-FY27.pdf | ||
| B1 Attachment 1 - PWS.docx | DOCX document | |
| B1 Attachment 3 - Pricing Exhibit.xlsx | XLSX spreadsheet | |
| B1 Attachment 2 - Wage Determination No. 2015-4281.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTROLLED UNCLASSIFIED INFORMATION
CONTROLLED UNCLASSIFIED INFORMATION
Project Schedule
13 Jul 2026 Preparation Work 20 Jul 2026 Overlap / New Contract Active 30 Jul 2026 Critical End Date
Task Bar
LSA CONTRACT TRANSITION LOGISTICS TRACKER – JULY 2026
Status Start Date End Date Duration
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ul
-J ulTask
Planned 13 Jul 2026 19 Jul 2026 7 Planned 20 Jul 2026 20 Jul 2026 1 Planned 20 Jul 2026 20 Jul 2026 1 Planned 20 Jul 2026 20 Jul 2026 1 Planned 21 Jul 2026 25 Jul 2026 3 Planned 21 Jul 2026 21 Jul 2026 1
Planned 21 Jul 2026 22 Jul 2026 2
Planned 22 Jul 2026 23 Jul 2026 2
Planned 24 Jul 2026 24 Jul 2026 1 Planned 25 Jul 2026 28 Jul 2026 4 Planned 25 Jul 2026 26 Jul 2026 2 Planned 27 Jul 2026 27 Jul 2026 1 Planned 27 Jul 2026 30 Jul 2026 3 Planned 30 Jul 2026 30 Jul 2026 1
Install and ground connex containers
Install perimeter security fencing around connex storage area
Transfer weapons, and ammunition from cages to connex containers Erect new DFAC structure
Position and stage waste containers Deploy light carts
Complete power tie-in and comm activation Relocate DFAC operations and peronnel into new facilities Final validation and operational acceptance
Remove all non-weapon and non-ammunition equipment from exisiting assembly tent.
Disassemble, iventory, and palletize weapon cage structural compnents.
Demobilize existing assembly and marque tent structure.
Erect new assemby structure Install new personnel trailer units