W912R1-18-Q-2001_Questions_and_Answers_(response).pdf
PDF 57 KB Posted
- Attached to
- Resource Management Support Services
- Solicitation number
- W912R1-18-Q-2001
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52.222-42_--_Statement_of_Equivalent_Rates_for_Federal_Hires_9May18..docx | DOCX document | |
| RM_Combined_Cost_Proposal_Template_(revised).xls | XLS spreadsheet | |
| PWS_Resource_Advisor_&_Account_Tech_(Final_2018).doc | DOC document | |
| 52.222-42_--_Statement_of_Equivalent_Rates_for_Federal_Hires..docx | DOCX document | |
| Combined_Synopsis-Sol_RM_Reqts)_FY_18.pdf | ||
| Wage_Determination.docx | DOCX document | |
| RM_Combined_Cost_Proposal_Template.xls | XLS spreadsheet | |
| Combined_Synopsis-Sol_RM_Reqts)_FY_18.pdf | ||
| DD0254.pdf | ||
| Past-Performance-Questionaire.docx | DOCX document | |
| PWS_RESOURCE_ADVISOR&_Account_IIA_Final_2018.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESPONSES TO QUESTIONS FOR W912R1-18-Q-2001
1. To confirm - As submission the Government just requires 1) Detailed breakout of price 2) Past Performance Questionnaire 3) DD254?
Yes. Breakout of price should be captured in the attached cost proposal template. Ensure a brief, yet concise, narrative of how price was derived is included.
2. Does this effort require a facility clearance? DD254 does not state that a facility clearance is required
No.
3. The provided price breakdown excel file has hours listed for "Resource Advisor" and "Accountant II", however, no hours are listed for "Res Adv Spt", "Acct Tech Spt", and "CMRA" (Rows 26 - 29). Can you please verify that these are Full time roles with 1920 hours?
Cost proposal position roles are updated to reflect Resource Advisor Support and Accountant Tech Support (2 FTE’s). CMRA is a mandated Government requirement to assist in tracking contractor annual manpower hours. The contractor is required to submit these hours annually. As such, CMRA is not priced at an hourly rate; it is a Contractor business decision/judgment that is determined by the level of effort needed to complete the annual CMRA report (see CMRA description in solicitation).
There are two full time roles; Accountant Tech Support and Resource Advisor Support. Although the overall period of performance is anticipated to begin 16 May 18 – 15 May 19, the Accountant Tech Support role will have a slightly shorter base period of performance (9 Jun 18 – 15 May 19). Shortening the base period of performance will align the two roles with the same period of performance for the out years.
Illustration:
Labor Category Year Hours Resource Advisor Spt Base 1920 Accountant Tech Spt Base 1800 *Option Year’s 1, 2, and 3 will have 1920 hours for all labor categories (see revised cost proposal template).
4. What is the place of performance?
Joint Base Anacostia-Bolling (JBAB)
Resource Management Office
189 Poremba Court, SW
Bldg. 351 Washington DC 20373
5. Do the Prime Contractor require a Facility Clearance?
No.
6. Do all three resources require a clearance? If so, what levels for each resource?
There are only two (2) resources. They require a Secret level.
7. As a new small business, can personal experience be used in lieu of past performance to avoid a neutral rating?
Past performance must be in accordance with the attached questionnaire.
8. Is there an incumbent performing this work? What is the contact number? Who is the incumbent? What is the value of the contract?
Yes.
o Resource Advisor- Zoa Bouwhuis (202) 433-9030 Contract Number W912R1-17-F-0006
ADLI BUSINESS & PROFESSIONAL SOLUTIONS
$41,380.00 (Part Time) o Accountant Tech- Mike Robinson (703) 601-6829
Contract Number W912R1-17-P-0011
GENESIS PERFORMANCE GROUP INC.
$75,510.04 (Part Time)
9. Regarding Past Performance Questionnaires – To allow a reasonable amount of time for Government customer references to complete the questionnaires and return them to the District of Columbia National Guard, can you please extend the due date of the proposal response and questionnaires until Tuesday, May 15 2018?
The due date of the responses will stand; 10 May 18.
10. PWS Section 1.4.8 Refers to “Task Order”, is this an Indefinite Delivery Indefinite
Quantity (IDIQ) contract? If not, can the Government remove that wording?
Wording updated. “Task Order” removed and “Contract” inserted.
11. PWS Section 1.4.8.1, 1.4.8.2, and 1.4.8.3 – Do all the qualifications listed apply to the Resource Advisor and the Accountant Tech?
Yes.
12. PWS Section 1.4.13 Contractor Travel – If travel is required, how will associated costs be handled? Will the Government add a CLIN for ODCs/travel?
Per the PWS, no travel is expected for this requirement. However, if travel is required; the Government will add a NTE cost reimbursable
(CR) CLIN.
13. PWS Section 3.0 – In the event of authorized telework (PWS Section 1.14.16) does the Government provide a laptop or other needed equipment?
14. Can the Government confirm if this solicitation is subject to the Service Contract Act (SCA)?
15. If the contract is subject to the SCA, can the Government provide the corresponding Wage Determination?
Wage Determination added to package with responses to questions.
16. If a Wage Determination is provided, can the Government map the labor category for each required position?
17. Can the Government confirm what is the official position for the Accounting position? The Synopsis requires an Accountant Tech Support while the PWS and Cost Proposal Template refer to an Accountant IIA position.
The official position is the Accounting Tech Support. All documents have been updated to reflect “Accountant Tech Support.”
18. Can the Government confirm if this solicitation is a firm-fixed price contract?
Government will award a Firm Fixed Price Contract.
19. PWS Section 1.4.4.1 states the “contractors are not compensated for unexpected closures or delays.” Does this indicate that the contract is a Time & Material contract?
Government will award a Firm Fixed Price Contract.
20. PWS Section 1.4.4, is overtime allowed or expected on this contract? If so, can the Government add a CLIN?
Overtime is not allowed or expected on this contract.
21. PWS Sections 3.2, 3.3, and 3.4 are blank. Are we to assume that the Government will not provide any of these items?
These sections are Not Applicable to this requirement, the PWS has been updated with “N/A” in these sections.
22. PWS Section 5.2.1 and 5.2.2 are duplicate. Is the PWS missing a task?
No tasks missing, 5.2.2 in PWS updated to “N/A.”
23. Cost Proposal Template: Are the offerors to use the hours provided for each position or can we enter 1920 hours for each, which takes into account holidays and vacation hours?
The Cost Proposal template is updated to 1920 hours for the Resource Advisor position, for base year and option years, and the Accountant Tech position to 1800 hours for the base year and 1920 hours for the option years. Although the overall period of performance is anticipated to begin 16 May 18 – 15 May 19, the Accountant Tech Support role will have a slightly shorter base period of performance (9 Jun 18 – 15 May 19). Shortening the base period of performance will align the two roles with the same period of performance for the out years.
24. Cost Proposal Template: If the offerors are to use the Government-provided hours, can it explain why each position is required to work different hours? I.e.
Resource Advisor working 2080 hours for the year means no vacation or holiday hours. Accountant II A is only working 1906 hours which allows for nearly 4.5 weeks of time off.
Cost Proposal template updated to 1920 for Resource Advisor position for base year and option years and the Accountant Tech to 1800 for the base year and 1920 for the optional periods. Although the overall period of performance is anticipated to begin 16 May 18 – 15 May 19, the Accountant Tech Support role will have a slightly shorter base period of performance (9 Jun 18 – 15 May 19).
Shortening the base period of performance will align the two roles with the same period of performance for the out years.
25. Cost Proposal Template: Can the offeror correct the formulas to calculate correctly? Or will the Government provide an updated template? For example, LABOR (CLIN 1) Res Adv Spt (Cell D26) is adding all labor categories while LABOR (CLIN 2) Acct Tech Spt does not have a formula. Option Year amounts are not calculating when the Rate is entered. Additionally, the grand total on cell O32 is double-counting the subtotal of LABOR (CLIN 1) and again each labor category total.
Cost proposal formulas updated.