W912QR-50297505_NRP08-0002.pdf

PDF 865 KB Posted

Attached to
Construction Services for the FY25 National Roofing Program (NRP) Project #8 - TX213, Bryan, TX
Solicitation number
W912QR-50297505
Issued by

About this file

This document is an Amendment (0002) to a Request for Proposal (RFP) for a Design-Build roof replacement project at Bryan, Texas for the U.S. Army Reserves National Roofing Program. The project involves replacing roof systems for two buildings: USARC (44,343 sq ft) and AMSA (8,094 sq ft), with existing modified bitumen roofs to be replaced with new PVC membrane roofing with ribs. The scope includes design and construction services, with specific requirements such as installing roof access ladders, replacing exterior sealant (approximately 1,300 linear feet at USARC and 700 linear feet at AMSA), and removing and reinstalling solar panels powering hot water heaters.

Key contract details include a proposal due date of 1 July 2025 at 2:00 PM Eastern Time, submission via email to seth.j.dukes@usace.army.mil, and a design milestone schedule spanning approximately 160 days from Notice to Proceed. The project requires a Registered Roof Consultant (RRC) with at least ten years of roof repair experience and current IIBEC licensing. The contractor must comply with UFC 3-110-03 Roofing standards, remove 2-8 inches of existing insulation, and be prepared to repair up to 10% of decking and 50% of wood nailers as needed.

View the file

Other files

File Type Posted
W912QR-50297505_NRP08-0001.pdf PDF
W912QR-50297505_NRP08-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

LOUISVILLE DISTRICT, CORPS OF ENGINEERS

P.O. BOX 59

LOUISVILLE,KENTUCKY 40201-0059

REPLY T O

ATTENTION OF

Contracting Division 27 June 2025

AR6-Cram Company, Inc.

Brazos Roofing International of South Dakota Carmen Roofing Services, LLC Defense Roofing Solutions, LLC Reasor Roofing, LLC South Central Roofing, Inc.

Southwest Construction & Property Management, Inc.

Sustainable Building Solutions, LLC Tabcon, Inc.

Tri-Coast-Pac Tech JV LLLP

Dear MATOC Contractors:

Reference is made to your Indefinite Delivery Contracts, Numbers W912QR24D0054 - W912QR24D0063, Indefinite Delivery Indefinite Quantity (IDIQ), Design-Build Multiple Award Task Order Contract (MATOC) for Building Envelope, Roof Repair and Replacement Construction in Support of the U.S. Army Reserves National Roofing Program (NRP), Army, and Air Force Reserve Sections.

Amendment 0002 for solicitation number W912QR-50297505 for the National Roofing Program (NRP) Bryan, Texas, TX213, Project #8, is hereby issued and incorporates the following changes.

SUMMARY OF CHANGES

This Amendment shall be acknowledged with submitted Request for Proposal.

The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

01 11 50.00 06 Task Order Scope of Work

Proposal due date revised to 1 July 2025 at 2:00 PM Eastern Time.

All other terms and conditions remain unchanged.

Proposals are due no later than 2:00 PM ET on , 1 July 2025. Submit your proposal by email to seth.j.dukes@usace.army.mil. Proposals not received by the stated date/time will not be considered. Please acknowledge receipt of this RFP by signing below in the space provided and returning to Seth Dukes via email at seth.j.dukes@usace.army.mil.

W912QR-50297505_NRP08-0002

If you have contractual questions, please contact seth.j.dukes@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the fferor shall immediately notify the Contract Specialist in writing with supporting rationale. All Offerors reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.

Sincerely, Contracting Officer

ACKNOWLEDGEMENT OF AMENDMENT:

(Signature) (Date)

(Printed Name)

(Firm Name)

DYLEWSKI.BONNY

.CHAN.1184928201

Digitally signed by

DYLEWSKI.BONNY.CHAN.1184

928201 Date: 2025.06.27 11:29:56 -04'00'

FY25 NRR Project 08 TX213, Bryan, TX P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

SECTION

01 11 50.00 06

Task Order SCOPE OF WORK Amendment 000

1. PROJECT INFORMATION

1.1. GENERAL

Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at TX213 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test, and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.

1.2. SCOPE OF WORK

Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the following roof systems located at TX213:

Building RFID (SF) Section(s) Existing Roof System

USARC (44,343) 1 MODIFIED BITUMEN

AMSA (3,869) 1 MODIFIED BITUMEN

AMSA (4,225) 2 MODIFIED BITUMEN

Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable, and sustainable space.

Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

All demolition required to construct the project is included as part of the work of this Contract.

1.3. SITE LOCATION

This project is located at Bryan, TX.

1.4. EXISTING SITE UTILITIES

1.4.1. The contractor shall verify the location of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.

1.5. BID OPTIONS

1.6. NOT USED

1.7. ATTACHMENTS

Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.

a. ATTACHMENT A: Site Location

b. ATTACHMENT B: Building Layout Plans

c. ATTACHMENT C: Site Inspection Report, 14-Mar-25

1.8. NOT USED

1.9. NOT USED

1.10. NOT USED

1.11. NOT USED

1.12. NOT USED

1.13. NOT USED

1.14. PERSONNEL REQUIREMENTS AND QUALIFICATIONS

1.15. Registered Roof Consultant (RRC) (Designer of Record) shall have a degree in Architecture or Engineering and have at least ten (10) years of experience in roof repairs. The RRC must be currently licensed by the International Institute of Building Envelope Enclosures

(IIBEC).

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

1.16. NOT USED

1.17. NOT USED

1.18. NOT USED

1.19. NOT USED

2. DESIGN REQUIREMENTS

2.1. GENERAL

The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.

2.2. DESIGN

2.2.1. The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/ Build Contractor to verify the accuracy of the documents provided.

2.2.2 CAD/BIM Requirement

The contractor will not be required to produce advanced modeling and design drawings will be limited to CAD files.

2.2.3 Design Submittal Requirements

The contractor will not be required to produce charette or interim design submittals. The contractor will submit a final design, a corrected final design, and a certified final design. The independent Registered Roof Observer (RRO) identified under Section 01 11 00.00 06 Paragraph 3.3..2.3 shall review the final design as part of the contractor design QC review team. The RRO shall attend the final design plan-in-hand review meeting.

2.1.4 Design Professionals

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

General Scope of work for most task orders will be for roof replacement and exterior water proofing with associated work. Roof replacement design will be certified by a RRC and have a professional engineer or architectural stamp. Structural analysis will only be required if there is a change in the dead load for the structural system or if called out in the task order scope of work. Electrical and mechanical design will be limited to relocating existing systems.

2.2.2. Design Milestone Schedule

Notice to Proceed (NTP) Day 0 Design Quality Control Plan (DQCP) NTP + 14 Days Design Kick-off (on site) NTP + 40 Days Charette Report (FIO no review) NTP + 60 Days Final Submittal NTP + 120 Days Final Plan in Hand Meeting (on-site) NTP + 138 Days Corrected Final Submittal NTP + 152 Days Certified Final Submittal NTP + 160 Days

2.3. REQUEST FOR PROPOSAL (RFP) INTENT

The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.

2.4. Design Milestone Meetings

2.4.1. Charette / Kickoff Meeting

2.4.1.1. Shall be in person and on-site.

2.4.2. Final Design / Plan-in-hand Review Meeting

2.4.2.1. Shall be in person and on-site.

2.5. NOT USED

2.6. NOT USED

2.7. NOT USED

2.8. NOT USED

2.9. NOT USED

2.10. NOT USED

2.11. NOT USED

2.12. GOVERNMENT FURNISHED MATERIALS

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

2.12.1. GFM Handover

The GFM has been provided as part of the Solicitation package.

2.12.2. GFM File Formats

GFM are provided only in PDF format.

2.13. (See Paragraph 2.1 Section 01 11 00.00 06 )DESIGN SUBMITTAL

DISTRIBUTION MATRIX

Submittal Reviewers & Mailing Addresses

U.S. Army Corps of Engineers Ryan Fagan, PE

RYAN.A.FAGAN@USACE.ARMY.MIL

LRL-ED-MA Room 414 600 Doctor Martin Luther King Junior Place Louisville, KY 40202

U.S. Army Corps of Engineers Timothy M. McClellan, P.E., RRC Timothy.m.mcclellan@usace.army.mil LRL-ED-MA Room 414 600 Doctor Martin Luther King Junior Place Louisville, KY 40202

U.S. Army Corps of Engineers Michael Brooks Michael.s.brooks@usace.army.mil

LRL-CDR

600 Doctor Martin Luther King Junior Place Louisville, KY 40202

U.S. Army Corps of Engineers Jeffrey E. Bayers, P.E., P.M.P.

Jeffrey.e.bayers@usace.army.mil

LRL-PM-R

600 Doctor Martin Luther King Junior Place Louisville, KY 40202

Steve Coffey, PE USARC G 3/5/7 Engineers - Desk 4N-4001-62 4700 Knox Street, Bldg 8-8108 Ft. Bragg, NC 28310 Phone: 910-570-8961 Email: steven.w.coffey3.civ@army.mil

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

Justin Reeder, PE, RRC, RRO, CDT USARC-ARIMD Engineering Branch / SAIN Engineering USAR National Roofing Program REM Phone: 843.813.2423 Email: justin.reeder@saineng.com

Jimmy Allgeier Construction Administration Section US Army Corps of Engineers 600 Dr. Martin Luther King, Jr Pl Louisville, Ky 40202 Phone:502-315-7428 Email: jamesjimmy.r.allgeier@usace.army.mil

3. GENERAL CONSTRUCTION REQUIREMENTS

3.1. SUMMARY

3.1.1. The requirements include:

a. Construction considerations and use of the premises.

b. Protection of personnel and Government property.

c. Construction facilities and job site standards.

d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.

3.2. GENERAL INFORMATION

3.2.1. NOT USED

3.2.2. NOT USED

3.2.3. Coordinate all construction activities with:

a. Contracting Officer’s Representative

b. Base Fire Department

c. Base Security/Police

d. Base Civil Engineer

e. Building Occupants

3.2.4. NOT USED

3.2.5. NOT USED

3.2.6. NOT USED

3.2.7. NOT USED

3.2.8. NOT USED

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

3.2.9. Project and Safety Signs. See 01 50 00, Paragraph 2.1.3.

3.3. DOCUMENTATION

3.3.1. NOT USED

3.3.2. NOT USED

3.4. NOT USED

3.5. Work Schedule under Section 01 11 00.00 06 Paragraph 3.9.1.2 is changed to “Work S WORK SCHEDULE: The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m. Monday through Friday except Federal Holidays.

3.5.1. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.

3.5.2. The Government may or may not grant such permission at its discretion.

3.6. Contractor Personal Vehicle Parking under Section 01 11 00.00 06 Paragraph 3.9.1.7 is changed to Contractor Personal Vehicle Parking:

The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the Government on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site. Parking in these areas is available on a first-come first served basis.

4. NOT USED

5. NOT USED

Amendment 0002***************************************************************

6. EXTERIOR EQUIPMENT

6.1. Properly secure rooftop equipment on AMSA, limited to one exhaust fan.

6.2. Solar panels powering hot water heaters located on top of USARC and AMSA to be removed and reinstalled after roof construction. Water heaters to remain functional during duration of construction. There are six solar panels on the USARC and three on the OMS

***************************************************************Amendment 0002

7. ARCHITECTURAL / BUILDING ENVELOPE

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

7.1. Approximately 1300 LF of exterior sealant to be replaced at USARC. Approximately 700 LF of exterior sealant to be replaced at AMSA.

7.2. NOT USED

8. NOT USED

9. NOT USED

10. NOT USED

11. NOT USED

12. NOT USED

13. NOT USED

14. Roof System

Roof system installed shall comply with UFC 3-110-03 Roofing, with Change 5, or the latest version available. Where they do not existing contractor shall install roof access ladders from the ground to roof and between roof sections to allow access to all sections.

Contractors shall install new splash blocks at all downspout terminations.

Contractor bids shall include removal of 2-8 inches of insulation.

Existing roof systems may be multi-layered with differing roof system types below the surface membrane. Contractor is responsible for identifying all equipment mounted directly below the deck and to utilize a connection method that either avoids the deck or relocates equipment in a way that complies with current building codes.

Building RFID (SF) Section(s) New Roof System USARC (44,343) 1 PVC Membrane w/ Ribs AMSA (3,869) 1 PVC Membrane w/ Ribs AMSA (4,225) 2 PVC Membrane w/ Ribs

14.1. NOT USED

14.2 ROOF DECK REPAIR

Inspect the roof deck carefully. If there are roof deck areas which require repair or replacement, notify the Contracting Officer. Do not proceed with repair or replacement until directed by the Contracting Officer. Assume replacement up to 10% damaged decking and 50% wood nailers.

P2 565479 25-Jun-25

SECTION 01 11 50.00 06

Version CERTIFIED

FINAL Amendment 000

--End of Section --

File details come from the government source that posted it. Updated .