This document is an Amendment 0003 to a Task Order Scope of Work for the FY25 National Roofing Program (NRP) Project #5, located at 6467 Mike Wood Boulevard, Conneaut Lake, PA 16316. The project involves design-build roof replacement services for multiple buildings, including an AMSA facility and a warehouse, totaling approximately 56,331 square feet of roof area. The scope requires replacing existing roof systems with new roof systems: Section 1 of AMSA will receive a 3-ply MOD BIT roof, while Sections 2-4 of AMSA and the Warehouse will receive PVC overlay with flute filler and coverboard.
Key technical requirements include removing 2-8 inches of existing insulation, installing roof access ladders, replacing approximately 680 linear feet of joint sealant, replacing 2,560 roof fasteners, providing and installing a snow rail system, replacing heat trace in gutters, and installing new splash blocks at downspout terminations. The contractor must comply with UFC 3-110-03 Roofing standards, verify existing utilities, and be prepared to potentially replace up to 10% of damaged decking and 50% of wood nailers. Work is to be performed between 7:00 a.m. and 4:30 p.m. Monday through Friday, excluding federal holidays and drill weekends, with a Registered Roof Consultant (RRC) responsible for design oversight.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR-50297495_NRP05-0002.pdf | ||
| W912QR-50297495_NRP05-0001.pdf | ||
| Site Visit Sign-in Sheet.pdf | ||
| W912QR-50297495_NRP05-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912QR-50297495_NRP05-0003
FY25 NRR Project 05
PA118, 6467 Mike Wood Boulevard, Conneaut Lake, PA 16316
P2 565479
8-Apr-25
SECTION 01 11 50.00 06
Version CERTIFIED FINAL
Amendment 0003
SECTION
01 11 50.00 06
Task Order SCOPE OF WORK
1. PROJECT INFORMATION
1.1. GENERAL
Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at
PA118 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test, and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.
1.2. SCOPE OF WORK
Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base
MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the following roof systems located at PA118:
Building RFID (SF) Section(s) Existing Roof System
AMSA (9,492) 1 EPDM
AMSA (10,471) 2 SSMR
AMSA (3,902) 3 SSMR
AMSA (1,146) 4 SSMR
WAREHOUSE (31,320) 1 SSMR
Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified
Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the
Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable, and sustainable space.
Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.
All demolition required to construct the project is included as part of the work of this Contract.
1.3. SITE LOCATION
This project is located at 6467 Mike Wood Boulevard, Conneaut Lake, PA
16316.
1.4. EXISTING SITE UTILITIES
1.4.1. The contractor shall verify the location of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.
1.5. BID OPTIONS
1.6. NOT USED
1.7. ATTACHMENTS
Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.
a. ATTACHMENT A: Site Location
b. ATTACHMENT B: Building Layout Plans
c. ATTACHMENT C: Site Inspection Report, 14-Mar-25
1.8. NOT USED
1.9. NOT USED
1.10. NOT USED
1.11. NOT USED
1.12. NOT USED
1.13. NOT USED
1.14. PERSONNEL REQUIREMENTS AND QUALIFICATIONS
1.15. Registered Roof Consultant (RRC) (Designer of Record) shall have a degree in Architecture or Engineering and have at least ten (10) years of experience in roof repairs. The RRC must be currently licensed by the International Institute of Building Envelope Enclosures
(IIBEC).
1.16. NOT USED
1.17. NOT USED
1.18. NOT USED
1.19. NOT USED
2. DESIGN REQUIREMENTS
2.1. GENERAL
The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01
33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.
2.2. DESIGN
2.2.1. The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/
Build Contractor to verify the accuracy of the documents provided.
2.2.2 CAD/BIM Requirement
The contractor will not be required to produce advanced modeling and design drawings will be limited to CAD files.
2.2.3 Design Submittal Requirements
The contractor will not be required to produce charette or interim design submittals. The contractor will submit a final design, a corrected final design, and a certified final design. The independent
Registered Roof Observer (RRO) identified under Section 01 11 00.00 06
Paragraph 3.3..2.3 shall review the final design as part of the contractor design QC review team. The RRO shall attend the final design plan-in-hand review meeting.
2.1.4 Design Professionals
General Scope of work for most task orders will be for roof replacement and exterior water proofing with associated work. Roof replacement design will be certified by a RRC and have a professional engineer or architectural stamp. Structural analysis will only be required if there is a change in the dead load for the structural system or if called out in the task order scope of work. Electrical and mechanical design will be limited to relocating existing systems.
2.2.2. Design Milestone Schedule
Notice to Proceed (NTP) Day 0
Design Quality Control Plan (DQCP) NTP + 14 Days
Design Kick-off (on site) NTP + 40 Days
Charette Report (FIO no review) NTP + 60 Days
Final Submittal NTP + 120 Days
Final Plan in Hand Meeting (on-site) NTP + 138 Days
Corrected Final Submittal NTP + 152 Days
Certified Final Submittal NTP + 160 Days
2.3. REQUEST FOR PROPOSAL (RFP) INTENT
The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.
2.4. Design Milestone Meetings
2.4.1. Charette / Kickoff Meeting
2.4.1.1. Shall be in person and on-site.
2.4.2. Final Design / Plan-in-hand Review Meeting
2.4.2.1. Shall be in person and on-site.
2.5. NOT USED
2.6. NOT USED
2.7. NOT USED
2.8. NOT USED
2.9. NOT USED
2.10. NOT USED
2.11. NOT USED
2.12. GOVERNMENT FURNISHED MATERIALS
2.12.1. GFM Handover
The GFM has been provided as part of the Solicitation package.
2.12.2. GFM File Formats
GFM are provided only in PDF format.
2.13. (See Paragraph 2.1 Section 01 11 00.00 06 )DESIGN SUBMITTAL
DISTRIBUTION MATRIX
Submittal Reviewers & Mailing Addresses
U.S. Army Corps of Engineers
Ryan Fagan, PE
RYAN.A.FAGAN@USACE.ARMY.MIL
LRL-ED-MA Room 414
600 Doctor Martin Luther King Junior Place
Louisville, KY 40202
Timothy M. McClellan, P.E., RRC
Timothy.m.mcclellan@usace.army.mil
LRL-ED-MA Room 414
John P. Hearn
Supervisory Construction Control Rep, COR
OSHA SGE/CDSO
US Army Corps of Engineers – Wright Patterson Area/ Resident Office
2475 K Street Bldg 52
WPAFB OH 45433
937-656-6463 (Desk)
937-510-8228 (Work Cell)
Michael Brooks
Michael.s.brooks@usace.army.mil
LRL-CDR
Jeffrey E. Bayers, P.E., P.M.P.
Jeffrey.e.bayers@usace.army.mil
LRL-PM-R
Steve Coffey, PE mailto:Timothy.m.mcclellan@usace.army.mil mailto:Michael.s.brooks@usace.army.mil mailto:Jeffrey.e.bayers@usace.army.mil
USARC G 3/5/7 Engineers - Desk 4N-4001-62
Bldg 8-8108
Ft. Bragg, NC 28310
Phone: 910-570-8961
Email: steven.w.coffey3.civ@army.mil
Justin Reeder, PE, RRC, RRO, CDT
USARC-ARIMD Engineering Branch / SAIN Engineering
USAR National Roofing Program REM
Phone: 843.813.2423
Email: justin.reeder@saineng.com
Bill Markey
DPW Operations Engineering Tech
99th Readiness Division
5231 South Scott Plaza
Joint Base McGuire-Dix-Lakehurst, NJ 08640
Phone:609-997-5271
Email: William.f.markey4.civ@army.mil
3. GENERAL CONSTRUCTION REQUIREMENTS
3.1. SUMMARY
3.1.1. The requirements include:
a. Construction considerations and use of the premises.
b. Protection of personnel and Government property.
c. Construction facilities and job site standards.
d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.
3.2. GENERAL INFORMATION
3.2.1. NOT USED
3.2.2. NOT USED
3.2.3. Coordinate all construction activities with:
a. Contracting Officer’s Representative
b. Local Fire Department
c. Local Security/Police
d. Local Civil Engineer
e. Building Occupants
3.2.4. NOT USED
3.2.5. NOT USED
3.2.6. NOT USED
mailto:steven.w.coffey3.civ@army.mil mailto:justin.reeder@saineng.com
3.2.7. NOT USED
3.2.8. NOT USED
3.2.9. Project and Safety Signs. See 01 50 00, Paragraph 2.1.3.
3.3. DOCUMENTATION
3.3.1. NOT USED
3.3.2. NOT USED
3.4. NOT USED
3.5. Work Schedule under Section 01 11 00.00 06 Paragraph 3.9.1.2 is changed to “Work S WORK SCHEDULE: The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m. Monday through Friday except Federal Holidays.
3.5.1. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.
3.5.2. The Government may or may not grant such permission at its discretion.
3.5.3. No work shall be performed on drill weekends. Contractor is responsible for contacting the POC at the reserve center for a drill weekend schedule.
3.6. The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the RFOS/AFOS and
Facility Coordinator on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site. Parking in these areas is available on a first-come first served basis.
4. NOT USED
5. NOT USED
6. EXTERIOR EQUIPMENT
6.1. Four (4) curbs need to be replaced on section 1 of the AMSA.
6.2. Five (5) curbs need to be replaced on section 2 of the AMSA.
6.3. Two (2) curbs need to be replaced on section 3 of the AMSA.
6.4. One (1) curb needs to be replaced on section 4 of the AMSA.
6.5. Four (4) curbs need to be replaced on the warehouse.
Amendment 0003***************************************************************
7. ARCHITECTURAL / BUILDING ENVELOPE
7.1. Approximately 680 LF of joint sealant needs to be replaced at section 1 of the AMSA.
7.2. Approximately 2560 roof fasteners need to be replaced on the warehouse.
7.3. Contractor shall provide design and shop drawings for snow rail system for all AMSA and Warehouse. Contractor to provide and install new snow rail designed.
7.4. Heat trace in gutters to be replaced at the warehouse and AMSA for all gutter/downspout systems.
***************************************************************Amendment 0003
8. NOT USED
9. NOT USED
10. NOT USED
11. NOT USED
12. NOT USED
13. NOT USED
Amendment 0003***************************************************************
14. Roof System
Roof system installed shall comply with UFC 3-110-03 Roofing, with
Change 5, or the latest version available. Where they do not existing contractor shall install roof access ladders from the ground to roof and between roof sections to allow access to all sections.
Contractors shall install new splash blocks at all downspout terminations.
AMSA Roof Section 1: Contractor bids shall include removal of 2-8 inches of insulation. Existing roof systems may be multi-layered with differing roof system types below the surface membrane. Contractor is responsible for identifying all equipment mounted directly below the deck and to utilize a connection method that either avoids the deck or relocates equipment in a way that complies with current building codes.
New roof system to be installed on AMSA sections 2-4 and Warehouse are
PVC overlay with flute filler and coverboard.
Remove existing roof systems with the following new roof systems:
Building RFID (SF) Section(s) NEW Roof System
AMSA (9,492) 1 3-ply MOD BIT
AMSA (10,471) 2 PVC OVERLAY
AMSA (3,902) 3 PVC OVERLAY
AMSA (1,146) 4 PVC OVERLAY
WAREHOUSE (31,320) 1 PVC OVERLAY
14.2 ROOF DECK REPAIR
AMSA Roof Section 1: Inspect the roof deck carefully. If there are roof deck areas which require repair or replacement, notify the Contracting
Officer. Do not proceed with repair or replacement until directed by the
Contracting Officer. Assume replacement up to 10% damaged decking and 50% wood nailers.
***************************************************************Amendment 0003
--End of Section --
| MATOC Letter |
| 01 11 50.00 06 |
File details come from the government source that posted it. Updated .