W912QR-42063027-0001.pdf
PDF 705 KB Posted
- Attached to
- Carr Creek Facilities Restoration
- Solicitation number
- W912QR-42063027
About this file
This document is a MATOC (Multiple Award Task Order Contract) Amendment Letter from the U.S. Army Corps of Engineers, Louisville District, related to Contract Numbers W912QR21D0049 through W912QR21D0055 for military construction (MILCON) and operations and maintenance (O&M) funded construction requirements in the Southeast Region.
The amendment extends the Proposal Due date from September 4, 2024 to September 11, 2024. The project, titled "Carr Creek Facilities Restoration," requires design analysis and construction documents to meet HVAC and plumbing requirements, including a replacement lift station, new force main for the campground, and a septic system for the White Pine Comfort Station. The HVAC system analysis must include heating and ventilating loads and equipment sizing. This project is part of the Southeast MATOC pool, and the contracting officer is Andrew Fleming.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Sign in Sheet.jpg | JPG image | |
| Carr Creek Facilities Restoration Site Visit Slides.pptx | PPTX presentation | |
| W912QR-42063027_ Specs_Vol4-0000.pdf | ||
| W912QR-42063027_ Specs_Vol2-0000.pdf | ||
| W912QR-42063027_ Specs_Vol3-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE, KENTUCKY 40201-0059
REPLY TO
ATTENTION OF
CELRL-CT 29 August 2024
Billy W. Jarrett Construction Company, Inc.
Butt Construction Company, Inc.
Howard W. Pence, Inc.
PEM-Harkins JV LLP Southeastern Industrial Barlovento JV-2, LLC Zodiac-Poettker HBZ Joint Venture, LLC ESA South, Inc.
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Contracts, Numbers W912QR21D0049 through W912QR21D0055, to support the military construction (MILCON) and operations and maintenance (O&M) funded construction requirements for the U.S. Army Reserves, U.S. Air Force Reserves, U.S. Air Force and U.S. Army programs in the Southeast Region.
As a result of Amendment 0001, the Request for Proposal for the proposed task order is hereby amended as follows:
****AMENDMENT 0001****
The Proposal Due date has been extended from 04 September 2024 at 2:00pm ET to 11 September 2024 at 2:00 pm ET.
****AMENDMENT 0001****
If you have contractual questions, please contact Thomas Nauert at the email address Thomas.s.nauert@usace.army.mil. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposal, as received, without discussion.
Sincerely, Andrew Fleming Contracting Officer
(Signature) (Date)
(Printed Name)
(Firm Name)
FLEMING.AN
DREW.J.1368
435127
Digitally signed by
FLEMING.ANDREW.J.1
368435127 Date: 2024.08.29 15:45:49 -04'00'
W912QR-42063027-0001
W912QR-42063027-0001
MATOC Letter