About this file

This document is a detailed specification volume (Volume 3 of 3) for the construction of a Collocated Vehicle Maintenance Shop (VMS) and Area Maintenance Support Activity (AMSA) located in Richmond, VA. The solicitation, issued by the US Army Corps of Engineers Louisville District, covers technical specifications for mechanical systems, including sections for HVAC, thermal insulation, refrigerant piping, air distribution, instrumentation and control, and cybersecurity requirements.

The specification covers comprehensive technical requirements for mechanical and control systems, with specific focus on installation standards, equipment specifications, performance testing, and cybersecurity protocols. Key technical areas include detailed specifications for air handling units, ductwork, fans, dampers, piping, refrigeration systems, control networks, and electronic safety systems. The document provides extensive technical guidance for contractors, including installation methods, testing procedures, quality assurance requirements, and compliance standards for mechanical and control infrastructure, with a certification date of 17 February 2025 and a contract number of W912QR21D0023.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Collocated Vehicle Maintenance Shop (VMS) and Area Maintenance Support Activity (AMSA), Richmond, VA

P2: 507524

Design-Bid-Build

Specifications Vol. 3 of 3(Div 23-41) Certified Final Design

17 April 2025

W912QR25RA024

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR25RA024_Specs_Vol3-0000

Collocated Vehicle Maintenance Shop (VMS) and Area Maintenance Support Activity

(AMSA)

Specifications (Vol 3 of 3) Certified Final Submittal

Richmond, VA DSCR Contract Number: W912QR21D0023 | Task Order Number: W912QR23F0429 | P2 Number: 507524

17 Feb. 2025

300 West Vine Street, Suite 1500, Lexington, KY 40507 | 859.252.9980

Louisville District

02/17/2025

P2#: 507524 AMSA

Richmond, VA

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 02/24 SUMMARY OF WORK

01 14 00 11/22, CHG 2: 05/24 WORK RESTRICTIONS

01 32 01.00 06 10/23 PROJECT SCHEDULE

01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES

01 33 29.00 06 11/17 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR

MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 05/24 SPECIAL INSPECTIONS

01 46 00.00 06 04/20 TOTAL BUILDING COMMISSIONING

01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND

CONTROLS

01 57 19.00 06 04/20 TEMPORARY ENVIRONMENTAL CONTROLS AND

PERMITS

01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 23 05/23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 05/23 FACILITY DATA REQUIREMENTS

01 91 19 05/2023 BUILDING ENCLOSURE COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 08/22 DEMOLITION AND DECONSTRUCTION

DIVISION 03 - CONCRETE

03 11 19.00 06 09/17 INSULATING CONCRETE FORM (ICF) SYSTEM

03 30 00 02/19, CHG 8: 05/24 CAST-IN-PLACE CONCRETE

03 42 13.00 10 05/16 PLANT-PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE CONSTRUCTION

DIVISION 04 - MASONRY

04 20 00 11/15, CHG 2: 05/19 UNIT MASONRY

DIVISION 05 - METALS

05 05 20 05/22 POST-INSTALLED CONCRETE AND MASONRY

ANCHORS

05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL

05 21 00 05/15, CHG 1: 08/18 STEEL JOIST FRAMING

05 30 00 05/15, CHG 2: 08/18 STEEL DECKS

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

05 52 00 08/23 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

PROJECT TABLE OF CONTENTS Page 1

CERTIFIED FINAL SUBMITTAL

06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY

06 41 16.00 10 08/10, CHG 1: 11/18 PLASTIC-LAMINATE-CLAD ARCHITECTURAL

CABINETS

06 61 16 08/20 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 08/23 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 08/23 ROOF AND DECK INSULATION

07 27 10 08/23 BUILDING AIR BARRIER SYSTEM

07 27 19.01 08/23 SELF-ADHERING AIR BARRIERS

07 27 26 08/23 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 52 00.00 48 10/10 SBS-MODIFIED BITUMINOUS MEMBRANE

ROOFING SYSTEM

07 62 00.00 48 10/10 FLASHING AND SHEET METAL

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00.00 48 10/10 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 11 16 05/17, CHG 2: 11/18 ALUMINUM DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 31 00 05/17, CHG 1: 08/18 ACCESS DOORS AND PANELS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 51 14.00 48 03/06 ALUMINUM AND ENVIRONMENTAL CONTROL

ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00.00 48 09/06 GLAZING

08 91 00 08/20 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 02/10, CHG 2: 08/18 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 08/16, CHG 4: 02/20 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 67 23 08/24 RESINOUS FLOORING

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 11 00 08/20 VISUAL DISPLAY UNITS

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 21 13 08/20 TOILET COMPARTMENTS

10 22 13.00 48 01/11 WIRE MESH PARTITIONS

10 26 00 08/20 WALL AND DOOR PROTECTION

10 28 00.00 48 04/06 TOILET AND BATH ACCESSORIES

10 44 13.00 48 04/06 FIRE EXTINGUISHERS AND CABINETS

10 51 13 08/24 LOCKERS

10 56 13.00 48 10/05 METAL STORAGE SHELVING

DIVISION 12 - FURNISHINGS

12 24 13 08/20 ROLLER WINDOW SHADES

12 48 13 08/23 ENTRANCE FLOOR MATS

PROJECT TABLE OF CONTENTS Page 2

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS

DIVISION 21 - FIRE SUPPRESSION

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 05/24 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 93.00 06 08/16 TESTING, ADJUSTING, AND BALANCING

(TAB) OF HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 08 00 05/23 COMMISSIONING OF MECHANICAL AND

PLUMBING SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 23 00 08/21 REFRIGERANT PIPING

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 35 16.17 10 05/20 MECHANICAL ENGINE AND WELDING FUME

EXHAUST SYSTEMS

23 35 19.00 20 02/10, CHG 2: 08/18 INDUSTRIAL VENTILATION AND EXHAUST

23 81 29 02/20 VARIABLE REFRIGERANT FLOW HVAC SYSTEMS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.01 05/21, CHG 1: 08/23 CYBERSECURITY FOR FACILITY-RELATED

CONTROL SYSTEMS (HVAC ONLY)

25 05 11.02 05/21, CHG 1: 08/23 CYBERSECURITY FOR FIRE ALARM AND MASS

NOTIFICATION SYSTEMS

DIVISION 26 - ELECTRICAL

26 05 73 08/23 POWER SYSTEM STUDIES

26 08 00 11/22 APPARATUS INSPECTION AND TESTING

26 12 19 05/19, CHG 2: 11/23 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 31 00 11/21 FACILITY-SCALE SOLAR PHOTOVOLTAIC (PV)

SYSTEMS

26 41 00 08/23 LIGHTNING PROTECTION SYSTEM

26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING

26 56 00 08/21 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

PROJECT TABLE OF CONTENTS Page 3

27 05 13.43 05/20 TELEVISION DISTRIBUTION SYSTEM

27 05 28.36 48 04/20 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 10 00.00 48 10/20 BUILDING TELECOMMUNICATIONS CABLING

SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 13 00.00 48 01/11 PHYSICAL ACCESS CONTROL SYSTEM

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 00 00.00 06 07/18 EARTHWORK

31 05 19.13 02/21 GEOTEXTILES FOR EARTHWORK

31 11 00 11/18 CLEARING AND GRUBBING

31 31 16.13 08/22, CHG 1: 11/23 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19.61 11/19 SEALING OF JOINTS IN RIGID PAVEMENT

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 11 23 05/22 AGGREGATE BASE COURSE AND/OR GRADED

CRUSHED AGGREGATE BASE COURSE

32 11 23.23 08/22 BASE COURSE DRAINAGE LAYERS

32 12 13 05/24 BITUMINOUS TACK AND PRIME COATS

32 12 16.16 11/20 ROAD-MIX ASPHALT PAVING

32 13 13.06 06 06/18 PORTLAND CEMENT CONCRETE PAVEMENT FOR

ROADS AND SITE FACILITIES

32 15 00 05/17 AGGREGATE SURFACING

32 16 19 05/18 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 08/16, CHG 5: 11/18 PAVEMENT MARKINGS

32 31 13.53 11/21 HIGH-SECURITY FENCES (CHAIN LINK AND

ORNAMENTAL) AND GATES

32 92 19 08/17, CHG 1: 08/21 SEEDING

DIVISION 33 - UTILITIES

33 11 00 02/18, CHG 2: 11/23 WATER UTILITY DISTRIBUTION PIPING

33 30 00 05/18 SANITARY SEWERAGE

33 40 00 11/21 STORMWATER UTILITIES

33 46 13 05/20 FOUNDATION DRAINAGE

33 47 13 11/14, CHG 2: 11/15 POND AND RESERVOIR LINERS

33 51 15 08/19 NATURAL-GAS / LIQUEFIED PETROLEUM GAS

DISTRIBUTION PIPELINES

33 71 02 08/21 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00.00 48 04/20 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 13.14 11/19, CHG 1: 02/21 BRIDGE CRANES, OVERHEAD ELECTRIC, TOP

RUNNING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SECTION 23 03 00.00 20

BASIC MECHANICAL MATERIALS AND METHODS

08/10, CHG 3: 08/18

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus

1.2 RELATED REQUIREMENTS

This section applies to all sections of Divisions: 21, FIRE SUPPRESSION;

22, PLUMBING; and 23, HEATING, VENTILATING, AND AIR CONDITIONING of this project specification, unless specified otherwise in the individual section.

1.3 QUALITY ASSURANCE

1.3.1 Material and Equipment Qualifications

Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.

1.3.2 Alternative Qualifications

Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.

1.3.3 Service Support

The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.

1.3.4 Manufacturer's Nameplate

For each item of equipment, provide a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a

SECTION 23 03 00.00 20 Page 1 conspicuous place; the nameplate of the distributing agent will not be acceptable.

1.3.5 Modification of References

In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.

1.3.5.1 Definitions

For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions must be considered mandatory, the word "should" is interpreted as "must." Reference to the "code official" must be interpreted to mean the "Contracting Officer." For Navy owned property, references to the "owner" must be interpreted to mean the "Contracting Officer." For leased facilities, references to the "owner" must be interpreted to mean the "lessor." References to the "permit holder" must be interpreted to mean the "Contractor."

1.3.5.2 Administrative Interpretations

For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the Contracting Officer as authorized by his administrative cognizance and the FAR.

1.4 DELIVERY, STORAGE, AND HANDLING

Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.

1.5 ELECTRICAL REQUIREMENTS

Furnish motors, controllers, disconnects and contactors with their respective pieces of equipment. Motors, controllers, disconnects and contactors must conform to and have electrical connections provided under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Furnish internal wiring for components of packaged equipment as an integral part of the equipment.

Extended voltage range motors will not be permitted. Controllers and contactors shall have a maximum of 120 volt control circuits, and must have auxiliary contacts for use with the controls furnished. When motors and equipment furnished are larger than sizes indicated, the cost of additional electrical service and related work must be included under the section that specified that motor or equipment. Power wiring and conduit for field installed equipment must be provided under and conform to the requirements of Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.

1.6 INSTRUCTION TO GOVERNMENT PERSONNEL

When specified in other sections, furnish the services of competent

SECTION 23 03 00.00 20 Page 2 instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system.

Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work.

Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section.

When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.

When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.

1.7 ACCESSIBILITY

Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 PAINTING OF NEW EQUIPMENT

New equipment painting must be factory applied or shop applied, and must be as specified herein, and provided under each individual section.

3.1.1 Factory Painting Systems

Manufacturer's standard factory painting systems may be provided subject to certification that the factory painting system applied will withstand 125 hours in a salt-spray fog test, except that equipment located outdoors must withstand 500 hours in a salt-spray fog test. Salt-spray fog test must be in accordance with ASTM B117, and for that test the acceptance criteria must be as follows: immediately after completion of the test, the paint must show no signs of blistering, wrinkling, or cracking, and no loss of adhesion; and the specimen must show no signs of rust creepage beyond 0.125 inch on either side of the scratch mark.

The film thickness of the factory painting system applied on the equipment must not be less than the film thickness used on the test specimen. If manufacturer's standard factory painting system is being proposed for use on surfaces subject to temperatures above 120 degrees F , the factory painting system must be designed for the temperature service.

3.1.2 Shop Painting Systems for Metal Surfaces

Clean, pretreat, prime and paint metal surfaces; except aluminum surfaces need not be painted. Apply coatings to clean dry surfaces. Clean the

SECTION 23 03 00.00 20 Page 3 surfaces to remove dust, dirt, rust, oil and grease by wire brushing and solvent degreasing prior to application of paint, except metal surfaces subject to temperatures in excess of 120 degrees F must be cleaned to bare metal.

Where more than one coat of paint is specified, apply the second coat after the preceding coat is thoroughly dry. Lightly sand damaged painting and retouch before applying the succeeding coat. Color of finish coat must be aluminum or light gray.

a. Temperatures Less Than 120 Degrees F : Immediately after cleaning, the metal surfaces subject to temperatures less than 120 degrees F must receive one coat of pretreatment primer applied to a minimum dry film thickness of 0.3 mil , one coat of primer applied to a minimum dry film thickness of 1 mil ; and two coats of enamel applied to a minimum dry film thickness of 1 mil per coat.

b. Temperatures Between 120 and 400 Degrees F : Metal surfaces subject to temperatures between 120 and 400 degrees F must receive two coats of 400 degrees F heat-resisting enamel applied to a total minimum thickness of 2 mils .

c. Temperatures Greater Than 400 Degrees F : Metal surfaces subject to temperatures greater than 400 degrees F must receive two coats of 600 degrees F heat-resisting paint applied to a total minimum dry film thickness of 2 mils .

-- End of Section --

SECTION 23 03 00.00 20 Page 4

SECTION 23 05 93.00 06

TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

08/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE HVAC APP IP HDBK (2015) HVAC Applications Handbook, I-P Edition

ASSOCIATED AIR BALANCE COUNCIL (AABC)

AABC MN-1 (2002; 6th ed) National Standards for Total System Balance

AABC MN-4 (1996) Test and Balance Procedures

ACOUSTICAL SOCIETY OF AMERICA (ASA)

ASA S1.11 PART 1 (2014) American National Standard Electroacoustics – Octave-Band and Fractional-Octave-Band Filters – Part 1:

Specifications

ASA S1.4 (1983; Amendment 1985; R 2006) Specification for Sound Level Meters (ASA 47)

NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB)

NEBB MASV (2006) Procedural Standards for Measurements of Sound and Vibration; 2nd Edition

NEBB PROCEDURAL STANDARDS (2005) Procedural Standards for Testing, Adjusting and Balancing (TAB) of Environmental Systems

SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION

(SMACNA)

SMACNA 1780 (2002) HVAC Systems - Testing, Adjusting and Balancing, 3rd Edition

SMACNA 1858 (2004) HVAC Sound And Vibration Manual - First Edition

SMACNA 1972 CD (2012) HVAC Air Duct Leakage Test Manual -

SECTION 23 05 93.00 06 Page 1

2nd Edition

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with LRL Section 01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

TAB Schematic Drawings and Report Forms ; G

Submit TAB Schematic Drawings and Report Forms no later than 21 calendar days prior to the start of TAB field work. Submit an electronic copy.

SD-03 Product Data

TAB Related HVAC Submittals

Submit an electronic copy of a list of the TAB Related HVAC Submittals, no later than 7 calendar days after the approval of the TAB Specialist.

Duct Air Leakage Test Procedures ; G, DO

Submit Duct Air Leakage Test Procedures no later than 21 calendar days prior to the start of duct air leakage tests. Submit one electronic copy.

TAB Procedures ; G, DO

Submit TAB Procedures concurrent with the TAB Schematic Drawings and Report Forms. Submit an electronic copy.

Calibrations ; G

Submit Calibration concurrent with the TAB Schematic Drawings and Report Forms. Submit an electronic copy.

Duct Air Leakage Tests

Submit proposed date and time to begin the Duct Air Leakage Tests, no later than 7 calendar days prior to the start of the Systems Readiness Check.

Systems Readiness Check

Submit proposed date and time to begin the Systems Readiness Check, no later than 7 calendar days prior to the start of the Systems Readiness Check.

TAB Field Work ; G

Submit proposed date and time to begin TAB field work concurrent with the Systems Readiness Check Report.

SECTION 23 05 93.00 06 Page 2

TAB Verification ; G

Submit proposed date and time to begin the TAB Verification, concurrent with the Draft TAB Report.

SD-06 Test Reports

Design Review Report ; G, DO

Submit the Design Review Report no later than 14 calendar days after approval of the TAB Firm and the TAB Specialist. Submit an electronic copy.

Draft Duct Air Leakage Test Report ; G, DO

Submit the one hardcopy and an electronic copy of the Draft Duct Air Leakage Test Report no later than 7 calendar days after completion of duct air leakage testing.

Final Duct Air Leakage Test Report ; G, DO

Submit an electronic copy of the Final Duct Air Leakage Test Report no later than 7 calendar days after completion of duct air leakage acceptance test.

Systems Readiness Check Report ; G

Submit the Systems Readiness Check Report at least 14 calendar days prior to the start of TAB Field Work. Submit an electronic copy.

Draft TAB Report ; G, DO

Submit completed Draft TAB Report electronically no later that 7 calendar days after completion of all TAB field work. Submit an electronic copy.

Final TAB Report ; G, DO

Submit an electronic copy of the Final TAB Reports no later that 7 calendar days after successful completion of TAB Verification.

Submit an electronic copy.

SD-07 Certificates

TAB Firm ; G, DO

Submit certification of the proposed TAB Firm's qualifications by either AABC, NEBB, or TABB to perform the duties specified herein and in other related Sections, no later than 21 calendar days after the Notice to Proceed. The documentation shall include the date that the Certification was initially granted and the date that the current Certification expires. Submit one electronic copy.

TAB Specialist ; G, DO

Submit certification of the proposed TAB Specialist's qualifications by either AABC, NEBB, or TABB to perform the duties

SECTION 23 05 93.00 06 Page 3 specified herein and in other related Sections, no later than 21 calendar days after the Notice to Proceed. The documentation shall include the date that the Certification was initially granted and the date that the current Certification expires.

Submit an electronic copy.

1.3 SIMILAR TERMS

In some instances, terminology differs between the Contract and the TAB Standard primarily because the intent of this Section is to use the industry standards specified, along with additional requirements listed herein to produce optimal results. The following table of similar terms is provided for clarification only. Contract requirements take precedent over the corresponding AABC, NEBB, or TABB requirements where differences exist.

SIMILAR TERMS

Contract Term AABC Term NEBB Term TABB Term

TAB Standard National Standards for Procedural Standards SMACNA's Testing and Balancing for Testing, Adjusting, Procedures Heating, Ventilating, and Balancing of and Air Conditioning Environmental Systems.

Systems

TAB Specialist TAB Engineer TAB Supervisor TAB Supervisor

Systems Construction Phase Field Readiness Field Readiness Inspection Check & Preliminary Readiness Check Field Procedures. Check & Prelim.

Field Procedures

1.3.1 Work Description

Perform Duct Air Leakage Testing (DALT) and Testing, Adjusting, and Balancing (TAB) of the new heating, ventilation, and cooling (HVAC) air distribution systems.

Conduct Duct Air Leakage Testing in compliance with the requirements specified in SMACNA 1972 CD, except as supplemented and modified by this section.

1.4 TAB STANDARD

Perform TAB in accordance with the requirements of the TAB procedural standard recommended by the TAB trade association that approved the TAB Firm's qualifications, i.e. AABC MN-1, NEBB PROCEDURAL STANDARDS, or SMACNA 1780 as supplemented and modified by this specification section.

Comply with all recommendations and suggested practices contained in the TAB procedural standards. Use the provisions of the TAB Standard, including checklists, report forms, etc., as nearly as practical, to satisfy the Contract requirements. The TAB Standard shall be used for all aspects of TAB, including qualifications for the TAB Firm and Specialist and calibration of TAB instruments. Where the instrument manufacturer calibration recommendations are more stringent than those listed in the

SECTION 23 05 93.00 06 Page 4

TAB Standard, adhere to the manufacturer's recommendations.

All quality assurance provisions of the TAB Standard such as performance guarantees are part of this contract. For systems or system components not covered in the TAB Standard, TAB procedures must be developed by the TAB Specialist. Where new procedures, requirements, etc., applicable to the Contract requirements have been published or adopted by the body responsible for the TAB Standard used (AABC, NEBB, or TABB), the requirements and recommendations contained in these procedures and requirements are mandatory.

1.5 QUALIFICATIONS

1.5.1 TAB Firm

The TAB Firm must be either a member of AABC or certified by the NEBB or the TABB and certified in all categories and functions where measurements or performance are specified on the plans and specifications, including building systems commissioning and the measuring of sound and vibration in environmental systems.

The certification must be maintained for the entire duration of duties specified herein. If, for any reason, the firm loses subject certification during this period, immediately notify the Contracting Officer and submit another TAB Firm for approval. Any firm that has been the subject of disciplinary action by either the AABC, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this section and in other related sections to be performed by the TAB Firm is invalid if the TAB Firm loses its certification prior to Contract completion and must be performed by an approved successor.

These TAB services are to assist the prime Contractor in performing the quality oversight for which it is responsible. The TAB Firm must be a subcontractor of the prime Contractor and shall be financially and corporately independent of the mechanical subcontractor, and shall report to and be paid by the prime Contractor.

1.5.2 TAB Specialist

The TAB Specialist must be either a member of AABC, an experienced technician of the Firm certified by the NEBB, or a Supervisor certified by the TABB. The certification must be maintained for the entire duration of duties specified herein. If, for any reason, the Specialist loses subject certification during this period, immediately notify the Contracting Officer and submit another TAB Specialist for approval. Any individual that has been the subject of disciplinary action by either the AABC, the NEBB, or the TABB within the five years preceding Contract Award is not eligible to perform any duties related to the HVAC systems, including TAB. All work specified in this section and in other related sections performed by the TAB Specialist is invalid if the TAB Specialist loses its certification prior to Contract completion and must be performed by the approved successor.

1.6 TAB SPECIALIST RESPONSIBILITIES

All TAB work specified herein and in related sections must be performed under the direct guidance of the TAB Specialist. The TAB specialist is required to be onsite on a daily basis to direct TAB efforts. The TAB

SECTION 23 05 93.00 06 Page 5

Specialist shall participate in the commissioning process specified in LRL Section 01 46 00.00 06 TOTAL BUILDING COMMISSIONING .

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION

3.1 DESIGN REVIEW

The TAB Specialist must review the Contract Plans and Specifications and identify, in a Design Review Report, any deficiencies that would prevent the effective and accurate TAB of the system. In the Design Review Report , the TAB Specialist shall individually list each deficiency and the corresponding proposed corrective action necessary for proper system operation. State that no deficiencies are evident if that is the case.

3.2 TAB RELATED HVAC SUBMITTALS

The TAB Specialist must prepare a list of the submittals from the Contract Submittal Register that relate to the successful accomplishment of all HVAC TAB. Accompany the submittals identified on this list shall be accompanied by a letter certifying that submitted equipment will allow proper testing, adjusting, and balancing of the HVAC systems. The letter must be signed and dated by the TAB Specialist when submitted to the Government. The TAB Specialist must also ensure that the location and details of ports, terminals, connections, etc., necessary to perform TAB are identified on the submittals.

3.3 TAB SCHEMATIC DRAWINGS AND REPORT FORMS

Provide TAB Schematic Drawings showing each system component, including balancing devices, for each system. Include the following on TAB Schematic Drawings:

a. Location of all air terminal devices including supply, return, exhaust, and transfer devices.

b. A unique number or mark for each piece of equipment or terminal cross-referenced to the report forms and procedures.

c. Locations of air balancing dampers.

d. Air quantities at each air terminal.

e. Air quantities and temperatures in air handling unit schedules.

f. Intended location of all traverse, static pressure readings, and other testing points with a keying scheme cross-referenced to the TAB report forms and procedures.

Provide TAB Report Forms intended for use in preparing the TAB Report.

Include the following information in the TAB Report Forms:

a. Design data obtained from contract drawings, specifications, and approved submittals.

b. Notations detailing additional data to be obtained from the contract site by the TAB Specialist.

SECTION 23 05 93.00 06 Page 6

c. Designate the actual data to be measured.

d. Identifiers for each measured item and piece of equipment or terminal cross-referenced from TAB Schematic Drawings.

e. Provide a list of the types of instruments, and the measuring range of each, which are anticipated to be used. By means of a keying scheme, specify on each TAB report form submitted, which instruments will be used for measuring each item. If selection of which instrument to use will be made in the field, specify from which instruments the choice will be made. Place the instrument key number in the blank space where the measured data would be entered.

3.4 TAB Procedures

Provide step by step procedures for each measurement required during TAB.

Provide a separate section for each system. Include measures to ensure that each system performs as specified in all operating modes, interactions with other components (such as exhaust fans, fume hoods, relief vents, etc.) and systems, and with all seasonal operating differences, diversity, simulated loads, and pressure relationships required.

3.5 Calibrations

Provide a list of each instrument to be used during TAB, stating calibration requirements required or recommended by both the TAB Standard and the instrument manufacturer and the actual calibration history of the instrument, submitted with the TAB Procedures. The calibration history shall include dates calibrated, the qualifications of the calibration laboratory, and the calibration procedures used.

3.6 Duct Air Leakage Tests

3.6.1 Duct Air Leakage Test Procedures

The TAB Specialist must prepare and provide step by step procedures for duct air leakage testing. Procedures must comply with SMACNA 1972 CD.

Perform duct air leakage tests for ductwork over 3-inch water gauge static pressure. Despite specification of SMACNA 1972 CD to the contrary, duct air leakage tests must be performed for ductwork with a construction class of 3-inch water gauge static pressure and below if indicated on the drawings. Use the duct class, seal class, leakage class, and the leak test pressure data indicated on the drawings or as specified. Include a list of each instrument to be used during duct air leakage testing, stating the calibration requirements required or recommended by both the TAB standard and the instrument manufacturer and the actual calibration history of the instrument. The calibration history shall include dates calibrated, the qualifications of the calibration laboratory, and the calibration procedures used.

3.6.2 Ductwork to be Leakage Tested

The Contracting Officer's Representative will randomly select section of each completed duct system for testing by the TAB Firm. Coordinate scheduling of selection of duct sections for duct air leakage tests with the Contracting Officer's Representative. The sections selected will not exceed 20 percent of the total measured linear footage of the duct systems indicated as subject to duct air leakage testing. Sections of duct

SECTION 23 05 93.00 06 Page 7 systems subject to duct air leakage testing will include 20 percent of main ducts, branch main ducts, branch ducts, and plenums for supply, return, exhaust, and plenum ductwork. It is acceptable for the entire system to be duct air leakage tested instead of disassembling that system in order to test only the 20 percent portion.

3.6.3 Duct Air Leakage Testing

The TAB Specialist must perform duct air leakage test on each system as selected by the Contracting Officer's Representative only after Duct Air Leakage Test Procedures have been submitted and approved. Complete duct air leakage test work within 48 hours after the particular ductwork was selected for testing by the Contracting Officer's Representative. Comply with approved Duct Air Leakage Test Procedures and SMACNA 1972 CD.

Provide all instruments, consumables, and personnel required to accomplish the Duct Air Leakage field work. Calibrate and maintain instruments in accordance with manufacturer's written procedures. It is the contractor's responsibility to provide and install test ports as necessary for the duct air leakage tests. If the required conditions cannot be met during testing due to design or installation deficiencies, immediately notify the Contracting Officer's representative and provide written notice describing the deficiency and recommended corrections. The Contractor is responsible for correction of installation deficiencies.

3.6.4 Draft Duct Air Leakage Test Report

Following completion of the duct air leakage test work, prepare a Draft Duct Air Leakage Test Report using report forms shown in SMACNA 1972 CD.

The TAB Specialist must furnish the data required by the report forms.

Include a marked duct shop drawing identifying each section of duct tested with assigned node numbers for each section. Include node numbers in the completed report forms to identify each duct section. The TAB Specialist must certify the report. Include all calculations prepared in determining the duct surface of area of each duct test section. Include calibration curve for each of the test orifices used for testing. List instruments actually used to measure the data including the instruments unique identification number, calibration date, and calibration expiration date.

3.6.5 Duct Air Leakage Acceptance Test

In the presence of the Contracting Officer's Representative, verify, through retesting, 50 percent of the test data reported in the Draft Duct Air Leakage Test Report. If any data in the Draft Duct air Leakage Test Report is out-of-tolerance, perform acceptance testing on one additional duct section in the presence of the Contracting Officer's Representative.

If any of the duct sections checked for a given system are determined to have a leakage rate measured that exceeds the leakage rate allowed by SMACNA 1972 CD for an indicated duct construction class and sealant class, terminate data checking for that section. The associated draft report data will be disapproved. Make the necessary corrections and prepare a revised Draft Duct Air Leakage Test Report. Reschedule acceptance testing of the revised report data with the Contracting Officer's Representative.

At the sole discretion of the Government and with written concurrence from the Contracting Officer, the Contracting Officer's Representative may witness 100 percent of the Duct Air Leakage Tests in order to eliminate the requirement for Duct Air Leakage Acceptance Testing. In such a case, the Draft Duct Air Leakage Test Report serves as the Final Duct Air Leakage Test Report.

SECTION 23 05 93.00 06 Page 8

3.6.6 Final Duct Air Leakage Test Report

After successful completion of all duct air leakage acceptance testing, submit the Final Duct Air Leakage Test Report. Include all information from the Draft Duct Air Leakage Test Report updated to include final test data.

3.7 Systems Readiness Check

The TAB Specialist must inspect each system to ensure that it is complete, including installation and operation of controls, and that all aspects of the facility that have any bearing on the HVAC systems, including installation of ceilings, walls, windows, doors, and partitions, are complete in accordance with the applicable TAB standard and to the extent that TAB results will not be affected by any detail or touch-up work remaining. The TAB Specialist must also verify completion of all items necessary to perform TAB such as ductwork and piping ports, terminals, connections, etc. Provide a Systems Readiness Check Report , signed by the TAB Specialist, that certifies that all work necessary to perform TAB field work has been completed and includes checklists used to verify completion.

3.8 TESTING, ADJUSTING, AND BALANCING

3.8.1 Preliminary Procedures

Begin testing, adjusting, and balancing field work only after TAB Schematic Drawings and Report Forms, TAB Procedures, the Final Duct Air Leakage Test Report,the Building Air Barrier Air Leakage Test and Diagnostic Test Reports, and the Systems Readiness Check Report have been submitted and approved. It is the responsibility of the contractor to provide and install test ports as necessary for the TAB field work.

3.8.2 TAB Field Work

Test, adjust, and balance the HVAC systems until measured air and water flow rates are within plus or minus 10 percent of the design flow rates as specified or indicated on the contract documents. Test, adjust, and balance outdoor air supply flow to plus 10% and minus 0% percent and exhaust flow to plus 0% and minus 10% of design flow rates specified or indicated on the contract documents. Adjust balancing valves, dampers, and sheaves and change out fan sheaves and fan impellers as necessary to obtain the specified or indicated air and water flow rates. Comply with the requirements of the TAB Standard except as supplemented and modified by this section. Where possible, use "industry standard" adjusting and balancing techniques which would result in the greatest energy savings, such as adjusting the speed of a fan instead of throttling the flow.

Provide all instruments and consumables required to accomplish the TAB work. Calibrate and maintain instruments in accordance with manufacturer's written procedures. If the design flow rates cannot be attained due to design or installation deficiencies, immediately notify the Contracting Officer's representative and provide written notice describing the deficiency and recommended corrections. The Contractor is responsible for correction of installation deficiencies.

3.8.2.1 Units with Coils

Perform and report heating and cooling performance capacity tests for DX, SECTION 23 05 93.00 06 Page 9 for the purpose of verifying that the coils meet the indicated design capacity. Determine entering and leaving wet and dry bulb temperatures by single point measurement for units with capacities up to and including 7.5 tons or 90,000 Btu. Determine entering and leaving wet and dry bulb temperatures by the average of multiple readings, in accordance with AABC MN-4, procedure "Coil Capacity Testing" for units over 7.5 tons or 90,000 Btu. Submit part-load data from the coil manufacturer converting test conditions to design conditions to verify coils meet intended design capacity in accordance with AABC MN-4, Procedure Coil Capacity Testing, Actual Capacity vs. Design Capacity. Record the outdoor and indoor ambient dry and wet bulb temperature ranges within which the report data was recorded; record temperatures and the beginning and end of data taking.

3.8.2.2 Refrigeration Equipment

Measure and report data as indicated in NEBB Form TAB 15-83, NEBB PROCEDURAL STANDARDS, including refrigeration operational data for equipment using refrigerant such as compressors, condensers, condensing units, evaporators, and chillers. Record outdoor ambient dry and wet bulb temperature ranges within which the report data was recorded.

3.8.2.3 Sound Measurement Work

3.8.2.3.1 Areas To Be Sound Measured

In the following spaces, measure and record the sound power level for each octave band listed in ASHRAE HVAC APP IP HDBK Noise Criteria:

a. All HVAC mechanical rooms, including machinery spaces and other spaces containing HVAC power drivers and power driven equipment.

b. All spaces sharing a common barrier with each mechanical room, including rooms overhead, rooms on the other side of side walls, and rooms beneath the mechanical room floor.

3.8.2.3.2 Procedure

Conduct sound measurement work in conformance with AABC MN-1 and AABC MN-4;

NEBB MASV; or SMACNA 1858 except as modified by this section. Measure sound levels in each room, when unoccupied except for the TAB team, with all HVAC systems that would cause sound readings in the room operating at maximum expected speed and capacity (noisiest condition). Record the equipment operating conditions in the report. Record the sound level in each octave band. Attempt to mitigate the sound level and bring the level to within the specified ASHRAE HVAC APP IP HDBK noise criteria goals, if such mitigation is within the TAB team's control. State in the report the ASHRAE HVAC APP IP HDBK noise criteria goals. If sound level cannot be brought into compliance, provide written notice of the deficiency to the Contractor for resolution or correction.

3.8.2.3.3 Timing

Measure sound levels at times prescribed by AABC or NEBB or TABB.

3.8.2.3.4 Meters

Measure sound levels with a sound meter complying with ASA S1.4 , Type 1 or 2, and an octave band filter set complying with ASA S1.11 PART 1 . Use measurement methods for overall sound levels and for octave band sound

SECTION 23 05 93.00 06 Page 10 levels as prescribed by NEBB.

3.8.2.3.5 Calibration

Calibrate sound levels as prescribed by AABC or NEBB or TABB, except that calibrators emitting a sound pressure level tone of 94 dB at 1000 hertz (Hz) are also acceptable.

3.8.2.3.6 Background Noise Correction

Determine background noise component of room sound (noise) levels for each (of eight) octave bands as prescribed by AABC or NEBB or TABB.

3.9 TAB Report

3.9.1 Draft TAB Report

Provide a Draft TAB Report demonstrating successful completion of the TAB field work using the approved TAB Report Forms. Include a separate section for each system. Include a copy of the approved TAB Schematic Drawings and TAB Related Submittals such as pump curves and fan curves.

Mark, on the performance curves and tables, the operating points measured during successful TAB field work and the theoretical operating points listed in the approved submittals. Note any deficiencies outside of normal adjustments and balancing during TAB field work including a description of the corrective action performed to bring the measurement into the specified tolerance. If the TAB Specialist determines during TAB field work that any contract requirements cannot be met, include a written description of the deficiency and the corresponding proposed corrective action necessary for proper system operation.

3.9.2 Final TAB Report

Provide a Final TAB Report following TAB Verification. The Final TAB Report includes all information from the Draft TAB Report, updated to show results from any rework performed following successful TAB Verification.

Include data recorded and any changes or differences from the Draft TAB Report discovered during TAB Verification. All items in the TAB Report shall be signed by the TAB Specialist and shall bear the seal of the Professional Society or National Association used as the TAB Standard.

3.10 TAB Verification

Begin TAB Verification only after submission and approval of the Draft TAB Report. The TAB Specialist must recheck ten percent of the measurements listed in the Draft Tab Report. The measurements selected for verification and the individuals that witness the verification will be selected by the Contracting Officer's Representative (COR). The measurements will be recorded in the same manner as required for the TAB Report. If over 20 percent of the measurements selected by the COR for verification fall outside of plus to minus 10 percent of the Draft TAB Report data, the COR will select an additional ten percent for verification. If over 20 percent of the total tested (including both test groups) fall outside plus to minus 10 percent of the Draft TAB Report data, the TAB Report shall be considered invalid and all contract TAB field work shall be repeated beginning with the Systems Readiness Check.

Correct all items outside of the required tolerance.

The Contractor shall be responsible for all necessary insulation repair

SECTION 23 05 93.00 06 Page 11 following completion of TAB Verification.

3.11 Marking of Setting

Following approval of TAB Verification Report, the setting of all HVAC adjustment devices including valves, splitters, and dampers shall be permanently marked by the TAB Specialist so that adjustment can be restored if disturbed at any time. Marking shall be visible following completion or repair of insulation.

3.12 Identification of Test Ports

The TAB Specialist shall permanently and legibly identify the location points of duct test ports. If the ductwork has exterior insulation, the identification shall be made on the exterior side of the insulation. All penetrations through ductwork and ductwork insulation shall be sealed to prevent air leakage or to maintain integrity of vapor barrier.

-- End of Section --

SECTION 23 05 93.00 06 Page 12

SECTION 23 07 00

THERMAL INSULATION FOR MECHANICAL SYSTEMS

02/13, CHG 7: 05/20

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. At the discretion of the Government, the manufacturer of any material supplied will be required to furnish test reports pertaining to any of the tests necessary to assure compliance with the standard or standards referenced in this specification.

ASTM INTERNATIONAL (ASTM)

ASTM A167 (2011) Standard Specification for Stainless and Heat-Resisting Chromium-Nickel Steel Plate, Sheet, and Strip

ASTM A240/A240M (2023) Standard Specification for Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications

ASTM A580/A580M (2023) Standard Specification for Stainless Steel Wire

ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate

ASTM C195 (2007; R 2013) Standard Specification for Mineral Fiber Thermal Insulating Cement

ASTM C450 (2008) Standard Practice for Fabrication of Thermal Insulating Fitting Covers for NPS Piping, and Vessel Lagging

ASTM C533 (2017; R 2023) Standard Specification for Calcium Silicate Block and Pipe Thermal Insulation

ASTM C534/C534M (2023) Standard Specification for Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and Tubular Form

ASTM C547 (2022a) Standard Specification for Mineral Fiber Pipe Insulation

ASTM C552 (2022) Standard Specification for Cellular Glass Thermal Insulation

ASTM C591 (2022) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate

SECTION 23 07 00 Page 1

Thermal Insulation

ASTM C610 (2017; R 2023) Standard Specification for Molded Expanded Perlite Block and Pipe Thermal Insulation

ASTM C647 (2008; R 2013) Properties and Tests of Mastics and Coating Finishes for Thermal Insulation

ASTM C755 (2019b) Standard Practice for Selection of Water Vapor Retarders for Thermal Insulation

ASTM C795 (2008; R 2023) Standard Specification for Thermal Insulation for Use in Contact with Austenitic Stainless Steel

ASTM C916 (2020) Standard Specification for Adhesives for Duct Thermal Insulation

ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants

ASTM C921 (2010; R 2015) Standard Practice for Determining the Properties of Jacketing Materials for Thermal Insulation

ASTM C1126 (2018) Standard Specification for Faced or Unfaced Rigid Cellular Phenolic Thermal Insulation

ASTM C1136 (2023) Standard Specification for Flexible, Low Permeance Vapor Retarders for Thermal Insulation

ASTM C1710 (2011) Standard Guide for Installation of Flexible Closed Cell Preformed Insulation in Tube and Sheet Form

ASTM D882 (2012) Tensile Properties of Thin Plastic Sheeting

ASTM D2863 (2019) Standard Test Method for Measuring the Minimum Oxygen Concentration to Support Candle-Like Combustion of Plastics (Oxygen Index)

ASTM D5590 (2017; R 2021) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement by Accelerated Four-Week Agar Plate Assay

ASTM E84 (2023) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2022a; E 2023) Standard Test Methods for Gravimetric Determination of Water Vapor

SECTION 23 07 00 Page 2

Transmission Rate of Materials

ASTM E2231 (2021) Standard Practice for Specimen Preparation and Mounting of Pipe and Duct Insulation Materials to Assess Surface Burning Characteristics

CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)

CDPH SECTION 01350 (2017; Version 1.2) Standard…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .