W912QR25RA019_Specs_CertF_Vol2_0001.pdf
PDF 13 MB Posted
- Solicitation number
- W912QR25RA019
About this file
This is a design-build solicitation for the renovation of the US Army Reserve Center (USARC) Building 92001 located in Newtown Square, Pennsylvania. The project is being managed by the US Army Corps of Engineers Louisville District, with a solicitation number of W912QR25RA019. The certified final design is dated 15 August 2025, with the design-build phase covering two floors and including comprehensive architectural, interior, and site improvements.
The project involves a complete renovation of the existing building, including demolition of current interior spaces, reconfiguration of floor plans, new finishes, furniture, and site utilities. The scope encompasses both first and second floors, with multiple functional areas such as offices, administrative spaces, classrooms, restrooms, mechanical rooms, storage areas, and support facilities. Key elements include new floor finishes (luxury vinyl tile, carpet, porcelain tile), wall treatments, updated electrical and mechanical systems, and new furniture and equipment installations. The documents specify detailed requirements for partitions, finishes, furniture placement, and overall building functionality to meet US Army Reserve Center operational needs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For MRAR Newtown Square US Army Reserve Center (USARC) Building 92001 Newtown Square, PA
P2: 515204
Design-Build
Specifications - Vol 2 of 3 (Drawings)
Phase 1 16 May 2025
Certified Final Design 15 August 2025
W912QR25RA019
RRS-A: 200A Disposition: Maintain for 15 yrs after construction.
W912QR25RA019_Specs_CertF_Vol2-0001
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
VOLUME:
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/1
/2
:2
:2
P
M
G-001
C O
V E
R S
H E
E T
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
K C
A R
L S
O N
J
U L Y
11 JULY 2025
R&M NEWTOWN SQUARE (EDGEMONT), PA
US ARMY RESERVE CENTER (USARC)
CERTIFIED FINAL
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SHEET INDEX
NO SHEET NAME
GENERAL
G-001 COVER SHEET
CIVIL
CS101 SITE LAYOUT PLAN
CS102 SITE SETBACKS PLAN
CS501 MONUMENT & BUILDING IDENTIFICATION SIGN DETAILS
CU101 SITE UTILITIES PLAN
ARCHITECTURE
AD101 OVERALL DEMOLITION PLAN - FLOOR 01
AD102 OVERALL DEMOLITION PLAN - FLOOR 02
AD201 OVERALL DEMOLITION BUILDING ELEVATIONS
AD202 OVERALL DEMOLITION BUILLDING ELEVATIONS
AE101 PROPOSED OVERALL PLAN - FLOOR 01
AE102 PROPOSED OVERALL PLAN - FLOOR 02
AE201 OVERALL PROPOSED BUILDING ELEVATIONS
AE202 OVERALL PROPOSED BUILDING ELEVATIONS
A-601 PARTITION TYPES
INTERIORS
I-601 ROOM FINISH SCHEDULE / FINISH MATERIAL LEGEND
IF102 PROPOSED OVERALL FURNITURE PLAN - FLOOR 01
IF103 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA A
IF104 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA B
IF105 PROPOSED OVERALL FURNITURE PLAN - FLOOR 02
IF106 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 02 - AREA A
IF107 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 02 - AREA B
IN102 PROPOSED OVERALL FINISH PLAN - FLOOR 01
IN103 PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA A
IN104 PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA B
IN105 ROPOSED OVERALL FINISH PLAN - FLOOR 02
IN106 PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA A
IN107 PARTIAL SECOND FLOOR FINISH PLAN - AREA B
UD
UD
UD
UD
UD
UDUD
FFE:
245.75 FFE:
245.75
FFE:
259.15
FFE:
245.80
.0
26.0'
.0
30.6' 26.0' 29.2'
.0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
Te xa s R eg is te re d En gi ne er in g Fi rm F
-2
M ai n
St . F or t W or th
, T X
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
Y
J
U N
LY
AN
SI
D
R &M
N
EW
TO
W
N S
Q U
AR
E
(E D
G
EM
O N
T) , P
A U
S
AR
M Y
R
ES
ER
VE
C
EN
TE
R
(U
SA
R C
BU
IL
D
IN
G
C
ER
TI
FI
ED
F
IN
AL
D . T
ER
R
Y
P.
L
IN
G
LE
P.
L
IN
G
LE
S.
B
R O
TH
ER
S
7/ 9/
:3
4:
A M
C :\U se rs
\li ng le p\
D C
\A C
C D oc s\
Ja co bs \U
S
PA
_L D
C W
_U
SA
C E_
M R
AR
N ew to w n
Sq U
SA
R
C B ld g
1\ Pr oj ec t F ile s\
W
IP
\C I\D ra w in gs
\C -S
P0
1.
dw g Fi le P at h:
Pl ot
D at e:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
# SHEET KEYNOTES
DELCHESTER ROAD
SI
TE
L A
YO
U
T
PL
A N
CS101
B
A A
AA
A
A
A
1" = 40'
SITE LAYOUT PLANA1
40' 80'0
PLAN
NORTH
# EXISTING/DEMOLITION KEYNOTES
1 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
Te xa s R eg is te re d En gi ne er in g Fi rm F
-2
M ai n
St . F or t W or th
, T X
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
Y
J
U N
LY
AN
SI
D
R &M
N
EW
TO
W
N S
Q U
AR
E
(E D
G
EM
O N
T) , P
A U
S
AR
M Y
R
ES
ER
VE
C
EN
TE
R
(U
SA
R C
BU
IL
D
IN
G
C
ER
TI
FI
ED
F
IN
AL
D . T
ER
R
Y
P.
L
IN
G
LE
P.
L
IN
G
LE
S.
B
R O
TH
ER
S
7/ 9/
:3
4:
A M
C :\U se rs
\li ng le p\
D C
\A C
C D oc s\
Ja co bs \U
S
PA
_L D
C W
_U
SA
C E_
M R
AR
N ew to w n
Sq U
SA
R
C B ld g
1\ Pr oj ec t F ile s\
W
IP
\C I\D ra w in gs
\C -S
P0
1.
dw g Fi le P at h:
Pl ot
D at e:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
# SHEET KEYNOTES
DELCHESTER ROAD
SI
TE
S
ET
B A
C K
S
PL
A N
CS1021" = 40'
SITE SETBACKS PLANA1
40' 80'0
PLAN
NORTH
U.S. ARMY RESERVE CENTER
Edgemont, Pennsylvania
2101 S. Delchester Road
16'-2" 1'-11"1'-11"
1'-3"3" 3"
6' -1
1"
'-9
MASONRY TO MATCH
SURROUNDING
ENVIRONMENT
DARK
BRONZE
PAINT
NOTE:
1. TEXT FONT SHALL BE 6-INCH-HIGH HELVETICA NEUE 95
BLACK.
2. TEXT SHALL BE BRUSHED ALUMINUM PAINT.
3. SIGN LIGHTING REQUIRED ON BOTH SIDES.
ACCENT STRIP PAINT COLOR
SHALL BE GOLD PMS 123 AND
ARMY SECONDARY COLOR
BRUSHED
ALUMINUM
PAINT
PRECAST CONCRETE
(CAST STONE) CAP
20'-0"
NOTE:
1. TEXT FONTS:
1.1. U.S. ARMY RESERVE CENTER - HELVETICA NEUE 75 BOLD.
1.2. HEADQUARTERS - HELVETICA NEUE 65 MEDIUM.
1.3. BUILDING 315 - HELVETICA NEUE 65 MEDIUM.
2. SIGN BACKGROUND TO BE DARK BRONZE PAINTED FINISH.
3. SIGN LETTERING TO BE WHITE REFLECTIVE ENGINEERING-GRADE VINYL.
4. NO PROPOSED SIGN LIGHTING.
5. SIGN POST DEPTH AND RELEVANT FOUNDATION TO BE SIZED WITH
RESPECT TO WIND LOADS AND OTHER REQUIREMENTS.
U.S. Army Reserve
Edgemont Memorial Center
Building 1
4"
2' -0
3'
-0
5' -0
4" 33 4"
3" 4"
2" 33 4"
4" 4"
4"23
4" 4'-61 2"
5'-0"
DARK
BRONZE
PAINT
3/8" WIDE
3"
A
A FRONT ELEVATION SECTION A-A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
Te xa s R eg is te re d En gi ne er in g Fi rm F
-2
M ai n
St . F or t W or th
, T X
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
Y
J
U
LY
AN
SI
D
R &M
N
EW
C U
M
BE
R
LA
N D
, P A
U S
AR
M
Y R
ES
ER
VE
C
EN
TE
R (U
SA
R
C
BU
IL
D
IN
G
C
ER
TI
FI
ED
F
IN
AL
D . T
ER
R
Y
P.
L
IN
G
LE
P.
L
IN
G
LE
S.
B
R O
TH
ER
S
7/ 9/
:3
4:
A M
C :\U se rs
\li ng le p\
D C
\A C
C D oc s\
Ja co bs \U
S
PA
_L D
C W
_U
SA
C E_
M R
AR
N ew to w n
Sq U
SA
R
C B ld g
1\ Pr oj ec t F ile s\
W
IP
\C I\D ra w in gs
\C S5
.d w g
Fi le
P at h:
Pl ot D at e:
FRONT ELEVATION
M O
N U
M
EN
T
B U
IL
D
IN
G
ID
EN
TI
FI
C A
TI
O
N S
IG
N
D
ET
A
IL
S
CS501NOT TO SCALE
EXISTING BUILDING IDENTIFICATION SIGNA1 NOT TO SCALE
PROPOSED BUILDING IDENTIFICATION SIGNA9
NOT TO SCALE
EXISTING MONUMENT SIGNG1 NOT TO SCALE
PROPOSED MONUMENT SIGNG9
O E
O E
O E
O E
O E
OE
OE
OE
OE UE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
OE
DYH
D
Y H
DYH DYH
D
Y H
FW
FWFWFWFWFW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW
W
W
W
W
W
W
W
W
W
W
W
W
W W W W W W W W W W W
W
W
W
W
W W W
W W
W
W W
SS
SS SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
ST
ST
ST
ST
ST
STST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
ST
UD
UD
UD
UD
UD
UDUD
FW
UE
UE
UE
UE
UE
UE
UE
U E
U E
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
FW
FW
FW
FW
FW
FW
FW
FW
FW
FW FW
FW
FW
FW
FW FW
FWFWFWFWFW
UE
UE
U E
U E
U E
U E
U E
U E
U E
UE UE
UC
UC
U C
U C
U C
UC
UCUCUC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC UC UC
UC
UC
U C
U C
U C
U C
U C
UC
UC UC UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC
UC UC
UC
UC
DYH
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
UE
U E
U E
U E
UE UE U
E
UE
UE
UE
UE
UE
UE
UE
UE
UE UE UE
UE
UE
UE
UE
UE
UE
UEUEUE
UE
UE
UE
UE
UE
UE
UE
UE
UE
SS SS
SS SSSS
U E
UE
UE W
W W
SS
SS
SS
SS
SS SS
UE
UE UE UE UE UE
UE
UE
UE
UE
UE
UE
UE
UC
UC
UC
UC
UC
UC
U C
UC
UC
UC
UC
FFE:
245.75 FFE:
245.75
FFE:
259.15
FFE:
245.80
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
Te xa s R eg is te re d En gi ne er in g Fi rm F
-2
M ai n
St . F or t W or th
, T X
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
LO
U
IS
VI
LL
E, K
Y
J
U N
LY
AN
SI
D
R &M
N
EW
TO
W
N S
Q U
AR
E
(E D
G
EM
O N
T) , P
A U
S
AR
M Y
R
ES
ER
VE
C
EN
TE
R
(U
SA
R C
BU
IL
D
IN
G
C
ER
TI
FI
ED
F
IN
AL
D . T
ER
R
Y
P.
L
IN
G
LE
P.
L
IN
G
LE
S.
B
R O
TH
ER
S
7/ 9/
:3
4:
A M
C :\U se rs
\li ng le p\
D C
\A C
C D oc s\
Ja co bs \U
S
PA
_L D
C W
_U
SA
C E_
M R
AR
N ew to w n
Sq U
SA
R
C B ld g
1\ Pr oj ec t F ile s\
W
IP
\C I\D ra w in gs
\C -S
P0
1.
dw g Fi le P at h:
Pl ot
D at e:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
# SHEET KEYNOTES
A
DELCHESTER ROAD
SI
TE
U
TI
LI
TY
P
LA
N
CU1011" = 40'
SITE UTILITY PLANA1
40' 80'0
PLAN
NORTH
# EXISTING/DEMOLITION KEYNOTES
5 5
4 4
UP
A B C D E F G
3.4
2.2
1.3
E.8
1.5
2.5
A.5
2.8
C O
R R
ID
O
R
AD201
A1
AD202
A1
AD202
C1
AD201
C1
230'-0"
159'-4" 70'-8"
BIOMEDICAL
LAB
OFFICE
OFFICE
PARTS/EQUIP
STORAGE
MACHINE
SHOP
GRINDING
ROOM
FINISHING
ROOM
OPTICS
LAB
OFFICE
VAULT
MECHANICAL
FACILITY
MAINT.
STORAGE
ARMORER
SCULLERY
ELECTRICAL
RETENTION
KITCHEN
STORAGE
MESS
STEWARD
JAN
CORRIDOR
LOBBY
VESTIBULE
RETENTION
STORAGE
ELEV.
MACH.
ELEV.
STAIR
ELECTRICAL
ASSEMBLY
CHAIR
AND
TABLE
STORAGE
M
LOCKER
ROOM
W
LOCKER
ROOM
WAREHOUSING/DIST.
SUPPLY
ADMIN.
COMMON
RECEIVING
PACKAGING/
SHIPPING
LAN
OFFICE
CORRIDOR
JAN
WOMEN'S
TLT.
MEN'S
TLT.
STAIRS
1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"
/8
/8
/2
/8
/8
008 010
011 038
REMOVE EXISTING DOOR AND DOOR
FRAME SYSTEM, UNO
EXISTING PARTITION TO BE REMOVED
EXISTING PARTITION TO REMAIN
DEMOLITION PLAN LEGEND
PLAN
NORTH
TRUE N
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
DEMOLITION KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:1
P M
AD101
O V
E R
A L L D
E M
O L
IT
IO
N
P L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SCALE 3/32" = 1'-0"
A1
DEMOLITION OVERALL PLAN - FLOOR 01
A REFER TO SHEETS AE101 - AE106 FOR PROPOSED
FLOOR PLANS
B BACK-FILL AND PATCH CONCRETE FLOOR AFTER
REMOVING EXISITNG PLUMBING FIXTURES. BACK-FILL
TO ALIGN WITH EXISITNG FACE OF SLAB
C ALL EXISTING CEILINGS TO BE REMOVED
D REMOVE ALL FURNITURE UNLESS NOTED OTHERWISE.
E REMOVE ALL FLOOR FINISHES AND WALL BASE UNLESS
NOTED OTHERWISE.
F REPAIR FLOOR AS REQUIRED TO RECEIVE NEW
FINISHES WHERE WALLS ARE TO BE DEMOLISHED
003 REMOVE ALL KITCHEN EQUIPMENT AND COUNTERS; TYP.
005 REMOVE PLUMBING FIXTURES
006 REMOVE TOILET, TOILET PARTITIONS AND ASSOCIATED RESTROOM ACCESSORIES,
TYPICAL
007 REMOVE SHOWER AND ASSOCIATED SHOWER ACCESSORIES AND PLUMBING
FIXTURES, TYPICAL
008 REMOVE COUNTER, SINKS, AND ASSOCIATED ACCESSORIES, TYPICAL
009 REMOVE FLOOR AND WALL TILE IN THIS SPACE AND PREPARE FLOOR AND WALLS
TO REPLACE FINISHES
010 REMOVE CEILING FINISHES, LIGHTING, AND CEILING MOUNTED EQUIPMENT IN THIS
SPACE
011 REMOVE HANDRAILS AND GUARD RAILS
012 REMOVE STOREFRONT ENTRY SYSTEM
014 PORTION OF WALL TO BE DEMOLISHED
035 REMOVE GLASS BRICK INFILL
036 REMOVE MODULAR WALLS AND SUPPORTING STRUCTURE
038 PORTION OF WALL TO BE DEMOLISHED TO RECEIVE DOUBLE DOOR
039 EXTENTS OF MECHANICAL YARD TO REMAIN
040 MOVEABLE STORAGE UNITS TO BE REMOVED
041 REMOVE GLASS BLOCK WALL
042 REMOVE OVERHEAD COUNTER SHUTTER
043 REMOVE QUARRY TILE FLOORING AND PREP SLAB FOR NEW FLOOR FINISH
044 REMOVE STAINLESS STEEL COLUMN WRAP
DN
A B C D E F G
3.4
2.2
1.3
E.8
1.5
2.5
A.5
2.8
AD201
A1
AD202
A1
AD202
C1
AD201
C1
159'-4"
DISTANCE
LEARNING
ADMIN
COMMON
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
205 MAIL
ROOM
FAMILY
SERVICES
LOBBY
VESTIBULE
CLASSROOM
CLASSROOM
CLASSROOM
C O
R R
ID
O
R
BLOOD
LAB
STORAGE
BLOOD
LAB
NOC/IT
ELEV
ADMIN
COMMON
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
219 COMSEC
TRAINING
COMSEC
STORAGE
TRAINING
AIDS
STORAGE
REPRODUCTION
ELEC
CORRIDOR
BREAK
ROOM
IT ELEC
MEN'S
TLT
WOMEN'S
TLT
JAN
STAIR
STAIR
1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"
/8
/8
/2
/8
/8
009 010 009 010
006006
REMOVE EXISTING DOOR AND DOOR
FRAME SYSTEM, UNO
EXISTING PARTITION TO BE REMOVED
EXISTING PARTITION TO REMAIN
DEMOLITION PLAN LEGEND
PLAN
NORTH
TRUE N
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
DEMOLITION KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:1
P M
AD102
O V
E R
A L L D
E M
O L
IT
IO
N
P L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SCALE 3/32" = 1'-0"
A1
DEMOLITION OVERALL PLAN - FLOOR 02
A REFER TO SHEETS AE101 - AE106 FOR PROPOSED
FLOOR PLANS
B BACK-FILL AND PATCH CONCRETE FLOOR AFTER
REMOVING EXISITNG PLUMBING FIXTURES. BACK-FILL
TO ALIGN WITH EXISITNG FACE OF SLAB
C ALL EXISTING CEILINGS TO BE REMOVED
D REMOVE ALL FURNITURE UNLESS NOTED OTHERWISE.
E REMOVE ALL FLOOR FINISHES AND WALL BASE UNLESS
NOTED OTHERWISE.
F REPAIR FLOOR AS REQUIRED TO RECEIVE NEW
FINISHES WHERE WALLS ARE TO BE DEMOLISHED
002 REMOVE ALL EXTERIOR WINDOWS.
005 REMOVE PLUMBING FIXTURES
006 REMOVE TOILET, TOILET PARTITIONS AND ASSOCIATED RESTROOM
ACCESSORIES, TYPICAL
008 REMOVE COUNTER, SINKS, AND ASSOCIATED ACCESSORIES, TYPICAL
009 REMOVE FLOOR AND WALL TILE IN THIS SPACE AND PREPARE FLOOR AND WALLS
TO REPLACE FINISHES
010 REMOVE CEILING FINISHES, LIGHTING, AND CEILING MOUNTED EQUIPMENT IN
THIS SPACE
011 REMOVE HANDRAILS AND GUARD RAILS
012 REMOVE STOREFRONT ENTRY SYSTEM
045 DISPLAY CASES TO REMAIN
046 REMOVE MAILBOX UNITS
FIRST FLOOR
0" AFF
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
A
STAIR EAVE
36'-6" AFF
BCDEFG E.8 A.5
001TYP.
002TYP.
012 207TYP. 206 TYP.
FIRST FLOOR
0" AFF
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
STAIR EAVE
36'-6" AFF
3.432.221 1.3 1.5 2.5 2.8
002TYP.
TYP.
207TYP.
206TYP.
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
# DEMOLITION KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:1
P M
AD201
O V
E R
A L L D
E M
O L
IT
IO
N
B U
IL
D
IN
G
E L E
V A
T
IO
N S
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SCALE 3/32" = 1'-0"
A1
DEMOLITION SOUTH ELEVATION - OVERALL
SCALE 3/32" = 1'-0"
C1
DEMOLITION EAST ELEVATION - OVERALL
001 NO WORK TO ROOF
002 REMOVE ALL EXTERIOR WINDOWS.
012 REMOVE STOREFRONT ENTRY SYSTEM
206 CONCRETE TO REMAIN
207 EXTERIOR STEEL LINTELS TO REMAIN. REMOVE ALL SURFACE RUST AND REFINISH
WITH RUST INHIBITING PRIMER AND EXTERIOR PAINT TO MATCH BRICK FINISH
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
A
STAIR EAVE
36'-6" AFF
B C D E F GE.8A.5
TYP.
TYP.
207TYP.
206TYP.
FIRST FLOOR
0" AFF
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
STAIR EAVE
36'-6" AFF
3.4 3 2.2 2 11.31.52.52.8
001TYP.
002TYP.
207TYP.
014 035 037
206TYP.
047 047
SCALE 3/32" = 1'-0"
A1
DEMOLITION NORTH ELEVATION - OVERALL
SCALE 3/32" = 1'-0"
C1
DEMOLITION WEST ELEVATION - OVERALL
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
DEMOLITION KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:1
P M
AD202
O V
E R
A L L D
E M
O L
IT
IO
N
B U
IL
L D
IN
G
E L E
V A
T
IO
N S
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
001 NO WORK TO ROOF
002 REMOVE ALL EXTERIOR WINDOWS.
012 REMOVE STOREFRONT ENTRY SYSTEM
014 PORTION OF WALL TO BE DEMOLISHED
035 REMOVE GLASS BRICK INFILL
037 REMOVE DOOR
047 EXISTING METAL INFILL PANEL
206 CONCRETE TO REMAIN
207 EXTERIOR STEEL LINTELS TO REMAIN. REMOVE ALL SURFACE RUST AND REFINISH
WITH RUST INHIBITING PRIMER AND EXTERIOR PAINT TO MATCH BRICK FINISH
A B C D E F G
3.4
2.2
1.3
E.8
1.5
2.5
A.5
2.8
/8
/8
/2
/8
/8
159'-4" 70'-8"
A
A
133A
134A
A
B
128A
138A
A
A
A
A
A
A
A
110B
105A
110C
A
A
A
125A
123A
124A
126A
B
A
A
A
A
102A
B
B
B
VEST.
121A
VEST.
116A
MACHINE
SHOP
PARTS/EQUIP.
STORAGE
OFFICE
OFFICE
BIOMEDICAL
LAB
130STAIRS
GRINDING
ROOM
FINISHING
ROOM
OPTICS LAB
OFFICE
VAULT
MECHANICAL
CHAPLAIN
JAN.
ASSEMBLY
ELECTRICAL
ARMORER
RETENTION
STORAGE
TR
WOMEN'S
TLT.
WOMEN'S
LOCKER
ROOM
JAN.
MEN'S
LOCKER
ROOM
LAN OFFICE
ADMIN.
COMMON
PACKAGING/
SHIPPING
RECEIVING
CORRIDOR
C O
R R
ID
O
R
CORRIDOR
LOBBY
WAREHOUSING/DIST.
SUPPLY
VESTIBULE
ELEV
MACH
E L E
V
STAIR
MEN'S TLT.
140B
103B
MAIL ROOM
119A
CHAIR
STORAGE
ARCC
STOR
A
A
A
A
107A
109A
108B
115A
110A
1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"
128 130
230'-0"
TYP.
133133
130B
115115
A
A
B
B
110D
A6
F3
A6
F3 A3
A6
A6
A6
A3
A3
F3
A6 F3
F3
U8 U8
F3
F3
U8
U8
A3
A3
PLAN
NORTH
TRUE N
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
SHEET KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:1
P M
AE101
P R
O P
O S
E D
O V
E R
A L L P
L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SCALE 3/32" = 1'-0"
A1
PROPOSED OVERALL PLAN - FLOOR 01
A ALL NEW PARTITIONS TO ALIGN WITH EXISTING.
B ALL CEILINGS TO BE REPLACED IN KIND.
C REFER TO INTERIORS FOR FURNITURE LAYOUTS.
D REFER TO INTERIORS FOR FLOOR FINISHES
E ALL WALLS TO RECEIVE NEW PAINT; REFER INTERIORS
FOR FINISHES
109 REPLACE GUARDRAIL/HANDRAIL
115 PREFINISHED INSULATED ALUMINUM STOREFRONT ENTRY SYSTEM
116 INSULATED HOLLOW METAL EXTERIOR DOORS
118 PREFINISHED INSULATED ALUMINUM WINDOWS
127 INFILL OF DEMOLISHED DOOR
128 COUNTERTOPS, SINKS, AND ACCESSORIES
129 DITOILETS, TOILET PARTITIONS, AND ACCESSORIES
130 SHOWER AND ACCESSORIES
133 COMPACT STORAGE SYSTEM IN COMPLIANCE WITH USACE STANDARDS
A B C D E F G
3.4
2.2
1.3
E.8
1.5
2.5
A.5
2.8
215A
214A
A
A
A
A
A
A
A
A
A
202A
203A
253A
252A
A
A
A
A
219A
220A
238A
221A
222A 234A
A
A
A
A
A
A
A
A
A
A
235A
CDR
BREAK
BLOOD
LAB/STORAGE
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADMIN
COMMON
204 FTS OFFICE
VESTIBULE
CLASSROOM
CLASSROOM
CLASSROOM
CDR
OFFICE
OFFICE
OFFICE
CSM
BN CDR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
1SGT
CDR
MECHANICAL
COMSEC
TRAINING
237 COMSEC
STORAGE
DRIVING
SIMULATOR
TR
ADMIN
COMMON
LACTATION
STORAGE
CORRIDOR
LOBBY
C O
R R
ID
O
R
E L E
V
ELEC
241A
B
248A
WOMEN'S
TLT
MEN'S TLT
JAN
VEST
245A
VEST
244A
223A
245B
A
B
245A
243A236B
251A
159'-4"
/8
/8
/2
/8
/8
1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"
127 TYP.
128 128
A
B
B
A
STAIR
STAIR
A3
A3
A3 F3
A3
A3
A3
A3
A3 F3
A3 A3
F3 F3
A3
F3
A3
PLAN
NORTH
TRUE N
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
SHEET KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:1
P M
AE102
P R
O P
O S
E D
O V
E R
A L L P
L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SCALE 3/32" = 1'-0"
A1
PROPOSED OVERALL PLAN - FLOOR 02
A ALL NEW PARTITIONS TO ALIGN WITH EXISTING.
B ALL CEILINGS TO BE REPLACED IN KIND.
C REFER TO INTERIORS FOR FURNITURE LAYOUTS.
D REFER TO INTERIORS FOR FLOOR FINISHES
E ALL WALLS TO RECEIVE NEW PAINT; REFER INTERIORS
FOR FINISHES
115 PREFINISHED INSULATED ALUMINUM STOREFRONT ENTRY SYSTEM
127 INFILL OF DEMOLISHED DOOR
128 COUNTERTOPS, SINKS, AND ACCESSORIES
129 DITOILETS, TOILET PARTITIONS, AND ACCESSORIES
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
A
STAIR EAVE
36'-6" AFF
BCDEFG E.8 A.5
TYP
TYP
FIRST FLOOR
0" AFF
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
STAIR EAVE
36'-6" AFF
3.432.221 1.3 1.5 2.5 2.8
TYP
TYP
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
SHEET KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:2
P M
AE201
O V
E R
A L L P
R O
P O
S E
D B
U
IL
D
IN
G E
L E
V A
T
IO
N S
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
SCALE 3/32" = 1'-0"
A1
PROPOSED SOUTH ELEVATION - OVERALL
SCALE 3/32" = 1'-0"
C1
PROPOSED EAST ELEVATION - OVERALL
A REFER TO FINISH SCHEDULE FOR ADDITIONAL
INFORMATION.
B ALL NEW EXTERIOR DOORS TO BE INSULATED
001 NO WORK TO ROOF
201 NON-OPERABLE TYPE WINDOWS; TYP.
203 DOOR TO REMAIN
211 PREFINISHED ALUMINUM ENTRANCE STOREFRONT, TYPICAL
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
A
STAIR EAVE
36'-6" AFF
B C D E F GE.8A.5
TYP
TYP
FIRST FLOOR
0" AFF
SECOND FLOOR
13'-4" AFF
ROOF
26'-10 1/2" AFF
STAIR EAVE
36'-6" AFF
3.4 3 2.2 2 11.31.52.52.8
TYP
202202
TYP
210 210210
SCALE 3/32" = 1'-0"
C1
PROPOSED WEST ELEVATION - OVERALL
SCALE 3/32" = 1'-0"
A1
PROPOSED NORTH ELEVATION - OVERALL
3/32" = 1'-0"
0 8' 16' 32'4'
SCALE:
GENERAL SHEET NOTES
SHEET KEYNOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:2
P M
AE202
O V
E R
A L L P
R O
P O
S E
D B
U
IL
D
IN
G E
L E
V A
T
IO
N S
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
A REFER TO FINISH SCHEDULE FOR ADDITIONAL
INFORMATION.
B ALL NEW EXTERIOR DOORS TO BE INSULATED
001 NO WORK TO ROOF
201 NON-OPERABLE TYPE WINDOWS; TYP.
202 INSULATED DOOR AS SCHEDULED
210 PREFINISHED INSULATED ALUMINUM FIXED WINDOWS, TYPICAL.
211 PREFINISHED ALUMINUM ENTRANCE STOREFRONT, TYPICAL
R
T
IN
G S
IZ
IN
D
IC
A T
O R
T Y
P E
IND STUD SIZE TOTAL WIDTH
A
A
S
2 1/2"
3 5/8"
4"
6"
8"
NO RATING-NO INSULATION
1 HR FIRE RATED UL# U419
ACOUSTICAL - STC 42
SMOKE
3 3/4"
4 7/8"
5 1/4"
7 1/4"
9 1/4"
LINE OF STRUCTURE
ABOVE
CEILING AS SCHED
METAL STUD FRAMING
SOUND ATTENUATION
INSULATION - RATING 'A'
FLOOR
(1) LAYER OF GYP BD
ON EACH SIDE
WIDTH
DEFLECTION TRACK
SEALANT AS SPECIFIED
LINE OF STRUCTURE
ABOVE
CEILING AS SCHED
METAL STUD
FRAMING
SOUND ATTENUATION
INSULATION - RATING
'A'
FLOOR
(1) LAYER OF GYP BD
ON ONE SIDE
WIDTH
E
A
S
2 1/2"
3 5/8"
4"
6"
8"
NO RATING - NO INSULATION
ACOUSTICAL - STC 42
SMOKE
3 1/8"
4 1/4"
4 5/8"
6 5/8"
8 5/8"
R A
T
IN
G S
IC
A T
O R
T Y
P E
IND FURR SIZE TOTAL WIDTH
DEFLECTION TRACK
SEALANT AS SPECIFIED
5 5/8"
7 5/8"
NO RATING
1 HR FIRE RATED UL# U905
5 5/8"
7 5/8"
2 2 HR FIRE RATED UL# U905
12 11 5/8" 11 5/8"
CEILING AS SCHED
HORIZ REINF AT
16" OC VERT
DOWEL, REFER TO
STRUCT
FLOOR
WIDTH
U
BRACE EACH SIDE OF
PARTITION AS
REQUIRED
FOR VERT REINF
REFER TO STRUCT
CONCRETE MASONRY
UNIT
BOND BEAM
1" SPACE; FILL VOID
WITH CONT
INSULATION / FIRE
STOPPING
R A
T
IN
G S
IC
A T
O R
T Y
P E
IND CMU SIZE TOTAL WIDTH
14 13 5/8" 13 5/8"
LINE OF
STRUCTURE
ABOVE
STEEL STUD
FRAMING
SOUND
(R-13 MIN)
ATTENUATION
INSULATION
FLOOR
(1) LAYER OF 5/8"
GYP BD
EW-1
1 2 1/2"
NO RATING
5 1/8"
2" THICK CLOSED
CELL EXPANSIVE
FOAM INSULATION
/ AIR BARRIER
WIDTH
COMPLETE WALL
ASSEMBLY (R-19 MIN)
SEALANT
R A
T
IN
G S
IC
A T
O R
T Y
P E
IND FURR SIZE TOTAL WIDTH
A. NOT ALL PARTITIONS ILLUSTRATED ARE USED. RE: "GYP BD
PARTITIONS IN PROJECT" (SEE BELOW) FOR TYPES USED.
B. "LINE OF STRUCT" INDICATED FOR EACH PARTITION IS
DIAGRAMMATIC ONLY AND DOES NOT INDICATE EXACT
CONSTRUCTION CONDITIONS OR GEOMETRY. REFER TO
DETAILS ON THIS SHEET FOR TYPICAL CONNECTION DETAILS.
C. GYPSUM BOARD:
1. FIRE RESISTANT RATED PARTITIONS SHALL USE TYPE
"X" FIRE RATED GYPSUM BOARD.
2. PARTITIONS IN HIGH MOISTURE AREAS SHALL USE
MOISTURE RESISTANT GYPSUM BOARD WHICH INCLUDE
TOILET ROOM(S), LOCKER ROOM(S), JANITOR CLOSET(S),
MECHANICAL ROOM(S), AND WITHIN 4'-0" OF WATER
FOUNTAIN.
3. PARTITIONS BEHIND TOIILETS, FIXTURES AND WITHIN
SHOWER AREAS SHALL USE CEMENT BOARD WITH A
MOISTURE BARRIER.
4. DO NOT ATTACH GYPSUM BOARD TO THE TOP SLIP
TRACK.
5. ALL GYPSUM BOARD UTILIZED SHALL BE PAPERLESS.
6. ALL GYPSUM BOARD LOCATED IN CORRIDORS,
CONFERENCE ROOMS, TRAINING ROOMS, BREAK
ROOMS, STORAGE ROOMS, SUPPLY ROOMS, VENDING
ROOMS, AND RECYCLE ROOMS SHALL BE ABUSE
RESISTANT TO 8'-0" A.F.F. ALL GYPSUM BOARD LOCATED
IN SHOPS SHALL BE IMPACT RESISTANT TO 10'-0" A.F.F.
7. ALL CEILINGS LOCATED IN RESTROOMS SHALL USE
MOISTURE RESISTANT GYPSUM BOARD.
E. SEALANT:
1. FIRE RESISTANT RATED PARTITIONS SHALL USE FIRE
STOP SEALANT SYSTEM.
2. NON - RATED PARTITIONS AND SMOKE RATED
PARTITIONS SHALL USE ACOUSTICAL SEALANT.
3. FIRE RESISTANT RATED PARTITIONS SHALL NOT USE
ACOUSTICAL SEALANT.
F. INSULATION - HEAD CONDITION AT STRUCTURE ABOVE:
1. FIRE RATED RESISTANT PARTITIONS MUST USE FIRE
SAFING INSULATION.
2. NON - RATED PARTITIONS MUST USE SOUND
ATTENUATION BLANKET.
G. FIRE AND / OR SMOKE RESISTANT RATINGS ARE TO
SURROUND ALL OPENINGS IN RATED PARTITIONS.
H. FIRE AND / OR SMOKE RESISTANT PARTITIONS MUST EXTEND
TO INSIDE FACE OF EXTERIOR SHEATHING, DECKS, AND
INCLUDING EXTENSIONS THROUGH SOFFITS.
I. EACH PARTITION INDICATED TO BE FIRE AND/OR SMOKE
RESISTANT SHALL BE IDENTIFIED AS SUCH WITH A LABEL
ABOVE THE CEILING ON EACH SEGMENT OF WALL AT A MIN OF
8'-0" O.C.
J. STC RATING IS BASED ON THE USE OF A 3 5/8" METAL STUD
OR GREATER.
K. INSTALL HORIZONTAL STUD FRAMING BRACING AT 4'-0" ON
CENTER AT FURRING AND NON-RATED CHASE WALLS.
L. ALL STUDS ARE 16" ON CENTER UNLESS OTHERWISE.
M. ALL STUDS ARE MINIMUM 22 GAUGE.
N. REFER TO FLOOR PLANS FOR LOCATION OF PARTITION TYPE
TAGS.
O. CMU INFILL WALLS ARE TO BE A THICKNESS TO MATCH
EXISTING ADJACENT WALL.
PARITITON TYPE KEY
GENERAL NOTES
A3-2
SECOND DIGIT IS THE
'SIZE INDICATOR'
THIRD DIGIT IS THE
PARTITION 'RATING'
FIRST DIGIT IS THE
PARTITION 'TYPE'
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -A
-3 D
.r v t
/9
/2
:3
:2
P M
A-601
P A
R T
IT
IO
N T
Y P
E S
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
J P
E R
R Y
S L O
N G
O R
IA
M H
A R
E
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
LOBBY
MACHINE
SHOP
PARTS/EQUIP.
STORAGE
BIOMEDICAL
LAB
OFFICE
OFFICE
GRINDING
ROOM
FINISHING
ROOM
OPTICS LAB
OFFICE
VAULT
MECHANICAL
CORRIDOR
STAIR
PACKAGING/SHIPPING
RECEIVING
ADMIN.
COMMON
WAREHOUSING/DIST.
SUPPLY
WOMEN'S
LOCKER
ROOM
WOMENS
TLT.
WOMEN'S
SHOWER
X
VEST.
121A
JAN.
VEST.
116A
MEN'S TLT.
MEN'S
SHOWER
X
MEN'S
LOCKER
ROOM
ARMORER
RETENTION
STORAGE
ELEV MACH
142 ELEV
TR
MAIL ROOM
119A
VESTIBULE
ELECTRICAL
C O
R R
ID
O
R
2 STORAGE
JAN
MESS
STEWARD
CORRIDOR
KITCHEN
SCULLERY
LAN OFFICE
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E E.8 F G
A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT
FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE
FF&E DESIGN PACKAGE.
B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,
INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND
TELECOM.
D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE
DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL
FF&E PER MANUFACTURER'S INSTRUCTIONS.
E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,
MARKERBOARDS AND MONITORS.
F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN
ACCORDANCE WITH ASCE 7-16.
G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND
INSTALLED BY OTHERS, GFGI.
H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),
PROCURED AND INSTALLED BY OTHERS, GFGI.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IF102
P R
O P
O S
E D
O V
E R
A L L F
U R
N
IT
U R
E P
L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 3/32" = 1'-0"
A1
PROPOSED OVERALL FURNITURE PLAN - FLOOR 01
MACHINE
SHOP
PARTS/EQUIP.
STORAGE
BIOMEDICAL
LAB
OFFICE
OFFICE
GRINDING
ROOM
FINISHING
ROOM
OPTICS LAB
OFFICE
STAIR
PACKAGING/SHIPPING
RECEIVING
ADMIN.
COMMON
WAREHOUSING/DIST.
SUPPLY
WOMEN'S
LOCKER
ROOM
WOMENS
TLT.
WOMEN'S
SHOWER
X
VEST.
121A
JAN.
VEST.
116A
MEN'S TLT.
MEN'S
SHOWER
X
MEN'S
LOCKER
ROOM
STORAGE
TR
MAIL ROOM
119A
LAN OFFICE
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E
CH2
(2)
D1
CH1
ST1
WS1
(4)
CH1
(4)
ST1
CH2
D2
CH1
CH2
(2)
D1 CH1
ST1
CH2
(2)
ST1
CH1
D1
T5
A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT
FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE
FF&E DESIGN PACKAGE.
B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,
INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND
TELECOM.
D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE
DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL
FF&E PER MANUFACTURER'S INSTRUCTIONS.
E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,
MARKERBOARDS AND MONITORS.
F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN
ACCORDANCE WITH ASCE 7-16.
G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND
INSTALLED BY OTHERS, GFGI.
H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),
PROCURED AND INSTALLED BY OTHERS, GFGI.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IF103
P R
O P
O S
E D
P A
R T
IA
L F
U R
N
IT
U R
E P
L A
N
F L O
O R
A R
E A
A
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA A
FF&E
TYPE MARK DESCRIPTION
AC1 TRASH & RECYCLING
CH1 CHAIR, TASK
CH2 CHAIR, GUEST
CH3 CHAIR, STACKING
CH4 CHAIR, RECLINER
D1 DESK, U-SHAPED
D2 DESK, L-SHAPED, 72" X 72"
L1 LECTURN
ST1 STORAGE, LATERAL FILE
T2 TABLE, ROUND, 24"
T3 TRAINING TABLE
T4 TABLE, ROUND, 18"
T5 TABLE, ROUND, 30"
WS1 WORKSTATION, 72" X72"
LOBBY
VAULT
MECHANICAL
CORRIDOR
ARMORER
RETENTION
ELEV MACH
ELEV
VESTIBULE
STAIR
ELECTRICAL
CORRIDOR
STORAGE
JAN
MESS
STEWARD
CORRIDOR
KITCHEN
SCULLERY
3.4
2.8
2.5
2.2
1.5
1.3
E E.8 F G
ST1
(2)
D1
CH1
CH2
(4)
T5
A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT
FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE
FF&E DESIGN PACKAGE.
B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,
INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND
TELECOM.
D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE
DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL
FF&E PER MANUFACTURER'S INSTRUCTIONS.
E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,
MARKERBOARDS AND MONITORS.
F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN
ACCORDANCE WITH ASCE 7-16.
G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND
INSTALLED BY OTHERS, GFGI.
H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),
PROCURED AND INSTALLED BY OTHERS, GFGI.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IF104
P R
O P
O S
E D
P A
R T
IA
L F
U R
N
IT
U R
E P
L A
N
F L O
O R
A R
E A
B
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA B
FF&E
TYPE MARK DESCRIPTION
AC1 TRASH & RECYCLING
CH1 CHAIR, TASK
CH2 CHAIR, GUEST
CH3 CHAIR, STACKING
CH4 CHAIR, RECLINER
D1 DESK, U-SHAPED
D2 DESK, L-SHAPED, 72" X 72"
L1 LECTURN
ST1 STORAGE, LATERAL FILE
T2 TABLE, ROUND, 24"
T3 TRAINING TABLE
T4 TABLE, ROUND, 18"
T5 TABLE, ROUND, 30"
CORRIDOR
C O
R R
ID
O
R
ELEV
JAN
STAIR
STAIR
BLOOD
LAB/STORAGE
OFFICE
OFFICE
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADMIN
COMMON
FAMILY
SERVICES
ARCC
203 VESTIBULE
CLASSROOM
CLASSROOM
MECHANICAL
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BN CDR
OFFICE
OFFICE
OFFICE
OFFICE
CDR
COMSEC
TRAINING
COMSEC
STORAGE
DRIVING
SIMULATOR
TR
ELEC
VEST
245A
M E
N 'S
T L T
BREAK
WOMEN'S
TLT
LACTATION
STORAGE
ADMIN
COMMON
VEST
244A
CLASSROOM
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E E.8 F G
A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT
FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE
FF&E DESIGN PACKAGE.
B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,
INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND
TELECOM.
D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE
DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL
FF&E PER MANUFACTURER'S INSTRUCTIONS.
E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,
MARKERBOARDS AND MONITORS.
F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN
ACCORDANCE WITH ASCE 7-16.
G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND
INSTALLED BY OTHERS, GFGI.
H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),
PROCURED AND INSTALLED BY OTHERS, GFGI.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IF105
P R
O P
O S
E D
O V
E R
A L L F
U R
N
IT
U R
E P
L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 3/32" = 1'-0"
A1
PROPOSED OVERALL FURNITURE PLAN - FLOOR 02
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E
STAIR
BLOOD
LAB/STORAGE
OFFICE
OFFICE
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADMIN
COMMON
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BN CDR
OFFICE
OFFICE
OFFICE
OFFICE
CDR
COMSEC
TRAINING
237 COMSEC
STORAGE
DRIVING
SIMULATOR
TR
ELEC
ADMIN
COMMON
VEST
245A
M E
N 'S
T L T
BREAK
STORAGE
ADMIN
COMMON
CH2
(2)
D1
CH1
ST1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH2
D2
CH1
ST1
CH1
D1
CH2
(2)
T3 (5)
CH3
WS1
(16)
CH1
(16)
WS1
(18)
CH1
(18)
ST1
CH1
D1
CH2
(2)
ST1
CH2
CH1
D
ST1
CH2
CH1
D
ST1
CH2
D
ST1
CH2
D
CH1 CH1
ST1
CH2
D
CH1
ST1
CH2
D
CH1
ST1
CH2
D
CH1
C H
D2
CH2
ST1
CH3
(4)
T2
WS1
CH1
CH1
CH2 ST1
D2
CH1
CH2 ST1
D2
CH1
CH2 ST1
D2
CH1
CH2 ST1
D2
CH1
CH2 ST1
D2
D
CH1
CH2
ST1
D
CH1
CH2
ST1
D2
A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT
FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE
FF&E DESIGN PACKAGE.
B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,
INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND
TELECOM.
D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE
DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL
FF&E PER MANUFACTURER'S INSTRUCTIONS.
E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,
MARKERBOARDS AND MONITORS.
F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN
ACCORDANCE WITH ASCE 7-16.
G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND
INSTALLED BY OTHERS, GFGI.
H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),
PROCURED AND INSTALLED BY OTHERS, GFGI.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:0
A
M
IF106
P R
O P
O S
E D
P A
R T
IA
L F
U R
N
IT
U R
E P
L A
N
F L O
O R
A R
E A
A
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FURNITURE PLAN - FLOOR 02 - AREA A
FF&E
TYPE MARK DESCRIPTION
AC1 TRASH & RECYCLING
CH1 CHAIR, TASK
CH2 CHAIR, GUEST
CH3 CHAIR, STACKING
CH4 CHAIR, RECLINER
D1 DESK, U-SHAPED
D2 DESK, L-SHAPED, 72" X 72"
L1 LECTURN
ST1 STORAGE, LATERAL FILE
T2 TABLE, ROUND, 24"
T3 TRAINING TABLE
T4 TABLE, ROUND, 18"
T5 TABLE, ROUND, 30"
3.4
2.8
2.5
2.2
1.5
1.3
E E.8 F G
STAIR
FAMILY
SERVICES
ARCC
VESTIBULE
CLASSROOM
CLASSROOM
MECHANICAL
M E
N 'S
T L T
WOMEN'S
TLT
LACTATION
VEST
244A
CLASSROOM
6'-0"
CH4
T4
L1
CH1
T3 (10)
CH3
(19)
L1
CH1
T3 (10)
CH3
(19)
L1
CH1
T3 (10)
CH3
(19)
AC1
AP1
AP2 AP3
AP4
CH2
(5)
CH1
D2
T5
A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT
FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE
FF&E DESIGN PACKAGE.
B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE
PROPER FIT OF ALL ITEMS.
C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,
INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND
TELECOM.
D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE
DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL
FF&E PER MANUFACTURER'S INSTRUCTIONS.
E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,
MARKERBOARDS AND MONITORS.
F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN
ACCORDANCE WITH ASCE 7-16.
G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND
INSTALLED BY OTHERS, GFGI.
H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),
PROCURED AND INSTALLED BY OTHERS, GFGI.
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA A
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:0
A
M
IF107
P R
O P
O S
E D
P A
R T
IA
L F
U R
N
IT
U R
E P
L A
N
F L O
O R
A R
E A
B
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
FF&E
TYPE MARK DESCRIPTION
AC1 TRASH & RECYCLING
CH1 CHAIR, TASK
CH2 CHAIR, GUEST
CH3 CHAIR, STACKING
CH4 CHAIR, RECLINER
D1 DESK, U-SHAPED
D2 DESK, L-SHAPED, 72" X 72"
L1 LECTURN
ST1 STORAGE, LATERAL FILE
T2 TABLE, ROUND, 24"
T3 TRAINING TABLE
T4 TABLE, ROUND, 18"
T5 TABLE, ROUND, 30"
WS1 WORKSTATION, 72" X72"
EQUIP
Type Mark Description
AP1 MICROWAVE
AP2 COFFEE MAKER
AP3 REFRIGERATOR
AP4 UNDERCOUNTER REFRIGERATOR
LOBBY
MACHINE
SHOP
PARTS/EQUIP.
STORAGE
BIOMEDICAL
LAB
OFFICE
OFFICE
GRINDING
ROOM
FINISHING
ROOM
OPTICS LAB
OFFICE
VAULT
MECHANICAL
CORRIDOR
STAIR
PACKAGING/SHIPPING
RECEIVING
ADMIN.
COMMON
WAREHOUSING/DIST.
SUPPLY
WOMEN'S
LOCKER
ROOM
WOMENS
TLT.
WOMEN'S
SHOWER
X
VEST.
121A
JAN.
VEST.
116A
MEN'S TLT.
MEN'S
SHOWER
X
MEN'S
LOCKER
ROOM
ARMORER
RETENTION
STORAGE
ELEV MACH
ELEV
TR
MAIL ROOM
119A
VESTIBULE
STAIR
ELECTRICAL
CORRIDOR
STORAGE
JAN
MESS
STEWARD
CORRIDOR
KITCHEN
SCULLERY
LAN OFFICE
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E E.8 F G
CPT-1
EF-1
ETR-1
LVT-1
PFT-1
RF-1
SC-1
SDT-1
STOR
ARCC
A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM
FINISH SCHEDULE.
B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &
FINISHES.
C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE
INDICATED.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
LEGEND
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IN102
P R
O P
O S
E D
O V
E R
A L L F
IN
IS
H P
L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 3/32" = 1'-0"
A1
PROPOSED OVERALL FINISH PLAN - FLOOR 01
MACHINE
SHOP
PARTS/EQUIP.
STORAGE
BIOMEDICAL
LAB
OFFICE
OFFICE
GRINDING
ROOM
FINISHING
ROOM
OPTICS LAB
OFFICE
STAIR
PACKAGING/SHIPPING
RECEIVING
ADMIN.
COMMON
WAREHOUSING/DIST.
SUPPLY
WOMEN'S
LOCKER
ROOM
WOMENS
TLT.
WOMEN'S
SHOWER
X
VEST.
121A
JAN.
VEST.
116A
MEN'S TLT.
MEN'S
SHOWER
X
MEN'S
LOCKER
ROOM
STORAGE
TR
MAIL ROOM
119A
LAN OFFICE
CPT-1
EF-1
ETR-1
LVT-1
PFT-1
RF-1
SC-1
SDT-1
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E
A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM
FINISH SCHEDULE.
B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &
FINISHES.
C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE
INDICATED.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
LEGEND
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IN103
P R
O P
O S
E D
P A
R T
IA
L F
IN
IS
H P
L A
N
F L O
O R
A R
E A
A
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA A
LOBBY
VAULT
MECHANICAL
CORRIDOR
MEN'S
LOCKER
ROOM
ARMORER
RETENTION
ELEV MACH
ELEV
VESTIBULE
STAIR
ELECTRICAL
CORRIDOR
STORAGE
JAN
MESS
STEWARD
CORRIDOR
KITCHEN
SCULLERY
CPT-1
EF-1
ETR-1
LVT-1
PFT-1
RF-1
SC-1
SDT-1
3.4
2.8
2.5
2.2
1.5
1.3
E E.8 F G
STOR
ARCC
A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM
FINISH SCHEDULE.
B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &
FINISHES.
C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE
INDICATED.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
LEGEND
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IN104
P R
O P
O S
E D
P A
R T
IA
L F
IN
IS
H P
L A
N
F L O
O R
A R
E A
B
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA B
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E E.8 F G
STAIR
STAIR
BLOOD
LAB/STORAGE
OFFICE
OFFICE
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADMIN
COMMON
LOBBY
201FAMILY
SERVICES
ARCC
203 VESTIBULE
CLASSROOM
CLASSROOM
MECHANICAL
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BN CDR
OFFICE
OFFICE
OFFICE
OFFICE
CDR
COMSEC
TRAINING
COMSEC
STORAGE
DRIVING
SIMULATOR
TR
ELEC
VEST
245A
M E
N 'S
T L T
BREAK
WOMEN'S
TLT
LACTATION
STORAGE
ADMIN
COMMON
VEST
244A
CLASSROOM
CPT-1
EF-1
ETR-1
LVT-1
PFT-1
RF-1
SC-1
SDT-1
JAN
A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM
FINISH SCHEDULE.
B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &
FINISHES.
C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE
INDICATED.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
LEGEND
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IN105
R O
P O
S E
D O
V E
R A
L L F
IN
IS
H P
L A
N
F L O
O R
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 3/32" = 1'-0"
A1
PROPOSED OVERALL FINISH PLAN - FLOOR 02
3.4
2.8
2.5
2.2
1.5
1.3
A.5 B C D E
STAIR
BLOOD
LAB/STORAGE
OFFICE
OFFICE
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
ADMIN
COMMON
CDR
1SGT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BN CDR
OFFICE
OFFICE
OFFICE
OFFICE
CDR
COMSEC
TRAINING
COMSEC
STORAGE
DRIVING
SIMULATOR
TR
ELEC
ADMIN
COMMON
VEST
245A
M E
N 'S
T L T
BREAK
STORAGE
CPT-1
EF-1
ETR-1
LVT-1
PFT-1
RF-1
SC-1
SDT-1
A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM
FINISH SCHEDULE.
B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &
FINISHES.
C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE
INDICATED.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
LEGEND
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IN106
P R
O P
O S
E D
P A
R T
IA
L F
IN
IS
H P
L A
N
F L O
O R
A R
E A
A
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA A
3.4
2.8
2.5
2.2
1.5
1.3
E E.8 F G
STAIR
FAMILY
SERVICES
ARCC
203 VESTIBULE
CLASSROOM
CLASSROOM
MECHANICAL
CDR
M E
N 'S
T L T
WOMEN'S
TLT
LACTATION
VEST
244A
CLASSROOM
CPT-1
EF-1
ETR-1
LVT-1
PFT-1
RF-1
SC-1
SDT-1
A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM
FINISH SCHEDULE.
B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &
FINISHES.
C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE
DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE
INDICATED.
PLAN
NORTH
TRUE N
1" = 40'-0"
0 40' 80' 120'
SCALE:
GENERAL SHEET NOTES
LEGEND
GRAPHIC SCALE(S)
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:5
A
M
IN107
P A
R T
IA
L S
E C
O N
D F
L O
O R
F
IN
IS
H
P L A
N
A R
E A
B
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
SCALE 1/8" = 1'-0"
A1
PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA B
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
T e x a s R e g is te re d E n g in e e ri n g F ir m
F -2
M a in
S t.
F o rt
W o rt h T
X
A u to d e s k D o c s /U
S P
A L D
C W
U
S A
C E
M
R A
R N e w to w n S q U
S A
R C
B ld g
/L
D C
W -I
-3 D
.r v t
/1
/2
:1
:0
A
M
I-601
R O
O M
F
IN
IS
H
S C
H E
D U
L E
F
IN
IS
H M
A T
E R
IA
L
L E
G E
N D
R
M N
E W
T O
W N
S Q
U A
R E
E
D G
E M
O N
T
P A
U S
A R
M Y
R E
S E
R V
E C
E N
T E
R
U S
A R
C
M A
B O
V E
F D
O D
D S
J B
O G
E N
S C
H U
T Z
J
U L Y
C E
R T
IF
IE
D F
IN
A
L
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
L O
U
IS
V
IL
L E
K
Y
ROOM FINISH SCHEDULE
ROOM NAME
FLOOR
FINISH
BASE
FINISH
WALL FINISH
NORTH EAST SOUTH WEST
100 VESTIBULE EF-1 RB-1 PT-1 PT-1 PT-1 PT-1
101 LOBBY LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1
103 ELECTRICAL SC-1 RB-1 PT-1 PT-1 PT-1 PT-1
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .