This is a design-build solicitation for the renovation of the US Army Reserve Center (USARC) Building 92001 located in Newtown Square, Pennsylvania. The project is being managed by the US Army Corps of Engineers Louisville District, with a solicitation number of W912QR25RA019. The certified final design is dated 15 August 2025, with the design-build phase covering two floors and including comprehensive architectural, interior, and site improvements.

The project involves a complete renovation of the existing building, including demolition of current interior spaces, reconfiguration of floor plans, new finishes, furniture, and site utilities. The scope encompasses both first and second floors, with multiple functional areas such as offices, administrative spaces, classrooms, restrooms, mechanical rooms, storage areas, and support facilities. Key elements include new floor finishes (luxury vinyl tile, carpet, porcelain tile), wall treatments, updated electrical and mechanical systems, and new furniture and equipment installations. The documents specify detailed requirements for partitions, finishes, furniture placement, and overall building functionality to meet US Army Reserve Center operational needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For MRAR Newtown Square US Army Reserve Center (USARC) Building 92001 Newtown Square, PA

P2: 515204

Design-Build

Specifications - Vol 2 of 3 (Drawings)

Phase 1 16 May 2025

Certified Final Design 15 August 2025

W912QR25RA019

RRS-A: 200A Disposition: Maintain for 15 yrs after construction.

W912QR25RA019_Specs_CertF_Vol2-0001

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/1

/2

:2

:2

P

M

G-001

C O

V E

R S

H E

E T

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

K C

A R

L S

O N

J

U L Y

11 JULY 2025

R&M NEWTOWN SQUARE (EDGEMONT), PA

US ARMY RESERVE CENTER (USARC)

CERTIFIED FINAL

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SHEET INDEX

NO SHEET NAME

GENERAL

G-001 COVER SHEET

CIVIL

CS101 SITE LAYOUT PLAN

CS102 SITE SETBACKS PLAN

CS501 MONUMENT & BUILDING IDENTIFICATION SIGN DETAILS

CU101 SITE UTILITIES PLAN

ARCHITECTURE

AD101 OVERALL DEMOLITION PLAN - FLOOR 01

AD102 OVERALL DEMOLITION PLAN - FLOOR 02

AD201 OVERALL DEMOLITION BUILDING ELEVATIONS

AD202 OVERALL DEMOLITION BUILLDING ELEVATIONS

AE101 PROPOSED OVERALL PLAN - FLOOR 01

AE102 PROPOSED OVERALL PLAN - FLOOR 02

AE201 OVERALL PROPOSED BUILDING ELEVATIONS

AE202 OVERALL PROPOSED BUILDING ELEVATIONS

A-601 PARTITION TYPES

INTERIORS

I-601 ROOM FINISH SCHEDULE / FINISH MATERIAL LEGEND

IF102 PROPOSED OVERALL FURNITURE PLAN - FLOOR 01

IF103 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA A

IF104 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA B

IF105 PROPOSED OVERALL FURNITURE PLAN - FLOOR 02

IF106 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 02 - AREA A

IF107 PROPOSED PARTIAL FURNITURE PLAN - FLOOR 02 - AREA B

IN102 PROPOSED OVERALL FINISH PLAN - FLOOR 01

IN103 PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA A

IN104 PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA B

IN105 ROPOSED OVERALL FINISH PLAN - FLOOR 02

IN106 PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA A

IN107 PARTIAL SECOND FLOOR FINISH PLAN - AREA B

UD

UD

UD

UD

UD

UDUD

FFE:

245.75 FFE:

245.75

FFE:

259.15

FFE:

245.80

.0

26.0'

.0

30.6' 26.0' 29.2'

.0

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

Te xa s R eg is te re d En gi ne er in g Fi rm F

-2

M ai n

St . F or t W or th

, T X

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

Y

J

U N

LY

AN

SI

D

R &M

N

EW

TO

W

N S

Q U

AR

E

(E D

G

EM

O N

T) , P

A U

S

AR

M Y

R

ES

ER

VE

C

EN

TE

R

(U

SA

R C

BU

IL

D

IN

G

C

ER

TI

FI

ED

F

IN

AL

D . T

ER

R

Y

P.

L

IN

G

LE

P.

L

IN

G

LE

S.

B

R O

TH

ER

S

7/ 9/

:3

4:

A M

C :\U se rs

\li ng le p\

D C

\A C

C D oc s\

Ja co bs \U

S

PA

_L D

C W

_U

SA

C E_

M R

AR

N ew to w n

Sq U

SA

R

C B ld g

1\ Pr oj ec t F ile s\

W

IP

\C I\D ra w in gs

\C -S

P0

1.

dw g Fi le P at h:

Pl ot

D at e:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

# SHEET KEYNOTES

DELCHESTER ROAD

SI

TE

L A

YO

U

T

PL

A N

CS101

B

A A

AA

A

A

A

1" = 40'

SITE LAYOUT PLANA1

40' 80'0

PLAN

NORTH

# EXISTING/DEMOLITION KEYNOTES

1 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

Te xa s R eg is te re d En gi ne er in g Fi rm F

-2

M ai n

St . F or t W or th

, T X

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

Y

J

U N

LY

AN

SI

D

R &M

N

EW

TO

W

N S

Q U

AR

E

(E D

G

EM

O N

T) , P

A U

S

AR

M Y

R

ES

ER

VE

C

EN

TE

R

(U

SA

R C

BU

IL

D

IN

G

C

ER

TI

FI

ED

F

IN

AL

D . T

ER

R

Y

P.

L

IN

G

LE

P.

L

IN

G

LE

S.

B

R O

TH

ER

S

7/ 9/

:3

4:

A M

C :\U se rs

\li ng le p\

D C

\A C

C D oc s\

Ja co bs \U

S

PA

_L D

C W

_U

SA

C E_

M R

AR

N ew to w n

Sq U

SA

R

C B ld g

1\ Pr oj ec t F ile s\

W

IP

\C I\D ra w in gs

\C -S

P0

1.

dw g Fi le P at h:

Pl ot

D at e:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

# SHEET KEYNOTES

DELCHESTER ROAD

SI

TE

S

ET

B A

C K

S

PL

A N

CS1021" = 40'

SITE SETBACKS PLANA1

40' 80'0

PLAN

NORTH

U.S. ARMY RESERVE CENTER

Edgemont, Pennsylvania

2101 S. Delchester Road

16'-2" 1'-11"1'-11"

1'-3"3" 3"

6' -1

1"

'-9

MASONRY TO MATCH

SURROUNDING

ENVIRONMENT

DARK

BRONZE

PAINT

NOTE:

1. TEXT FONT SHALL BE 6-INCH-HIGH HELVETICA NEUE 95

BLACK.

2. TEXT SHALL BE BRUSHED ALUMINUM PAINT.

3. SIGN LIGHTING REQUIRED ON BOTH SIDES.

ACCENT STRIP PAINT COLOR

SHALL BE GOLD PMS 123 AND

ARMY SECONDARY COLOR

BRUSHED

ALUMINUM

PAINT

PRECAST CONCRETE

(CAST STONE) CAP

20'-0"

NOTE:

1. TEXT FONTS:

1.1. U.S. ARMY RESERVE CENTER - HELVETICA NEUE 75 BOLD.

1.2. HEADQUARTERS - HELVETICA NEUE 65 MEDIUM.

1.3. BUILDING 315 - HELVETICA NEUE 65 MEDIUM.

2. SIGN BACKGROUND TO BE DARK BRONZE PAINTED FINISH.

3. SIGN LETTERING TO BE WHITE REFLECTIVE ENGINEERING-GRADE VINYL.

4. NO PROPOSED SIGN LIGHTING.

5. SIGN POST DEPTH AND RELEVANT FOUNDATION TO BE SIZED WITH

RESPECT TO WIND LOADS AND OTHER REQUIREMENTS.

U.S. Army Reserve

Edgemont Memorial Center

Building 1

4"

2' -0

3'

-0

5' -0

4" 33 4"

3" 4"

2" 33 4"

4" 4"

4"23

4" 4'-61 2"

5'-0"

DARK

BRONZE

PAINT

3/8" WIDE

3"

A

A FRONT ELEVATION SECTION A-A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

Te xa s R eg is te re d En gi ne er in g Fi rm F

-2

M ai n

St . F or t W or th

, T X

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

Y

J

U

LY

AN

SI

D

R &M

N

EW

C U

M

BE

R

LA

N D

, P A

U S

AR

M

Y R

ES

ER

VE

C

EN

TE

R (U

SA

R

C

BU

IL

D

IN

G

C

ER

TI

FI

ED

F

IN

AL

D . T

ER

R

Y

P.

L

IN

G

LE

P.

L

IN

G

LE

S.

B

R O

TH

ER

S

7/ 9/

:3

4:

A M

C :\U se rs

\li ng le p\

D C

\A C

C D oc s\

Ja co bs \U

S

PA

_L D

C W

_U

SA

C E_

M R

AR

N ew to w n

Sq U

SA

R

C B ld g

1\ Pr oj ec t F ile s\

W

IP

\C I\D ra w in gs

\C S5

.d w g

Fi le

P at h:

Pl ot D at e:

FRONT ELEVATION

M O

N U

M

EN

T

B U

IL

D

IN

G

ID

EN

TI

FI

C A

TI

O

N S

IG

N

D

ET

A

IL

S

CS501NOT TO SCALE

EXISTING BUILDING IDENTIFICATION SIGNA1 NOT TO SCALE

PROPOSED BUILDING IDENTIFICATION SIGNA9

NOT TO SCALE

EXISTING MONUMENT SIGNG1 NOT TO SCALE

PROPOSED MONUMENT SIGNG9

O E

O E

O E

O E

O E

OE

OE

OE

OE UE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

OE

DYH

D

Y H

DYH DYH

D

Y H

FW

FWFWFWFWFW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW

W

W

W

W

W

W

W

W

W

W

W

W

W W W W W W W W W W W

W

W

W

W

W W W

W W

W

W W

SS

SS SS SS SS SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

ST

ST

ST

ST

ST

STST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

ST

UD

UD

UD

UD

UD

UDUD

FW

UE

UE

UE

UE

UE

UE

UE

U E

U E

U E

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

FW

FW

FW

FW

FW

FW

FW

FW

FW

FW FW

FW

FW

FW

FW FW

FWFWFWFWFW

UE

UE

U E

U E

U E

U E

U E

U E

U E

UE UE

UC

UC

U C

U C

U C

UC

UCUCUC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC UC UC

UC

UC

U C

U C

U C

U C

U C

UC

UC UC UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC

UC UC

UC

UC

DYH

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

UE

U E

U E

U E

UE UE U

E

UE

UE

UE

UE

UE

UE

UE

UE

UE UE UE

UE

UE

UE

UE

UE

UE

UEUEUE

UE

UE

UE

UE

UE

UE

UE

UE

UE

SS SS

SS SSSS

U E

UE

UE W

W W

SS

SS

SS

SS

SS SS

UE

UE UE UE UE UE

UE

UE

UE

UE

UE

UE

UE

UC

UC

UC

UC

UC

UC

U C

UC

UC

UC

UC

FFE:

245.75 FFE:

245.75

FFE:

259.15

FFE:

245.80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

Te xa s R eg is te re d En gi ne er in g Fi rm F

-2

M ai n

St . F or t W or th

, T X

LO

U

IS

VI

LL

E

D

IS

TR

IC

T

LO

U

IS

VI

LL

E, K

Y

J

U N

LY

AN

SI

D

R &M

N

EW

TO

W

N S

Q U

AR

E

(E D

G

EM

O N

T) , P

A U

S

AR

M Y

R

ES

ER

VE

C

EN

TE

R

(U

SA

R C

BU

IL

D

IN

G

C

ER

TI

FI

ED

F

IN

AL

D . T

ER

R

Y

P.

L

IN

G

LE

P.

L

IN

G

LE

S.

B

R O

TH

ER

S

7/ 9/

:3

4:

A M

C :\U se rs

\li ng le p\

D C

\A C

C D oc s\

Ja co bs \U

S

PA

_L D

C W

_U

SA

C E_

M R

AR

N ew to w n

Sq U

SA

R

C B ld g

1\ Pr oj ec t F ile s\

W

IP

\C I\D ra w in gs

\C -S

P0

1.

dw g Fi le P at h:

Pl ot

D at e:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

# SHEET KEYNOTES

A

DELCHESTER ROAD

SI

TE

U

TI

LI

TY

P

LA

N

CU1011" = 40'

SITE UTILITY PLANA1

40' 80'0

PLAN

NORTH

# EXISTING/DEMOLITION KEYNOTES

5 5

4 4

UP

A B C D E F G

3.4

2.2

1.3

E.8

1.5

2.5

A.5

2.8

C O

R R

ID

O

R

AD201

A1

AD202

A1

AD202

C1

AD201

C1

230'-0"

159'-4" 70'-8"

BIOMEDICAL

LAB

OFFICE

OFFICE

PARTS/EQUIP

STORAGE

MACHINE

SHOP

GRINDING

ROOM

FINISHING

ROOM

OPTICS

LAB

OFFICE

VAULT

MECHANICAL

FACILITY

MAINT.

STORAGE

ARMORER

SCULLERY

ELECTRICAL

RETENTION

KITCHEN

STORAGE

MESS

STEWARD

JAN

CORRIDOR

LOBBY

VESTIBULE

RETENTION

STORAGE

ELEV.

MACH.

ELEV.

STAIR

ELECTRICAL

ASSEMBLY

CHAIR

AND

TABLE

STORAGE

M

LOCKER

ROOM

W

LOCKER

ROOM

WAREHOUSING/DIST.

SUPPLY

ADMIN.

COMMON

RECEIVING

PACKAGING/

SHIPPING

LAN

OFFICE

CORRIDOR

JAN

WOMEN'S

TLT.

MEN'S

TLT.

STAIRS

1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"

/8

/8

/2

/8

/8

008 010

011 038

REMOVE EXISTING DOOR AND DOOR

FRAME SYSTEM, UNO

EXISTING PARTITION TO BE REMOVED

EXISTING PARTITION TO REMAIN

DEMOLITION PLAN LEGEND

PLAN

NORTH

TRUE N

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:1

P M

AD101

O V

E R

A L L D

E M

O L

IT

IO

N

P L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SCALE 3/32" = 1'-0"

A1

DEMOLITION OVERALL PLAN - FLOOR 01

A REFER TO SHEETS AE101 - AE106 FOR PROPOSED

FLOOR PLANS

B BACK-FILL AND PATCH CONCRETE FLOOR AFTER

REMOVING EXISITNG PLUMBING FIXTURES. BACK-FILL

TO ALIGN WITH EXISITNG FACE OF SLAB

C ALL EXISTING CEILINGS TO BE REMOVED

D REMOVE ALL FURNITURE UNLESS NOTED OTHERWISE.

E REMOVE ALL FLOOR FINISHES AND WALL BASE UNLESS

NOTED OTHERWISE.

F REPAIR FLOOR AS REQUIRED TO RECEIVE NEW

FINISHES WHERE WALLS ARE TO BE DEMOLISHED

003 REMOVE ALL KITCHEN EQUIPMENT AND COUNTERS; TYP.

005 REMOVE PLUMBING FIXTURES

006 REMOVE TOILET, TOILET PARTITIONS AND ASSOCIATED RESTROOM ACCESSORIES,

TYPICAL

007 REMOVE SHOWER AND ASSOCIATED SHOWER ACCESSORIES AND PLUMBING

FIXTURES, TYPICAL

008 REMOVE COUNTER, SINKS, AND ASSOCIATED ACCESSORIES, TYPICAL

009 REMOVE FLOOR AND WALL TILE IN THIS SPACE AND PREPARE FLOOR AND WALLS

TO REPLACE FINISHES

010 REMOVE CEILING FINISHES, LIGHTING, AND CEILING MOUNTED EQUIPMENT IN THIS

SPACE

011 REMOVE HANDRAILS AND GUARD RAILS

012 REMOVE STOREFRONT ENTRY SYSTEM

014 PORTION OF WALL TO BE DEMOLISHED

035 REMOVE GLASS BRICK INFILL

036 REMOVE MODULAR WALLS AND SUPPORTING STRUCTURE

038 PORTION OF WALL TO BE DEMOLISHED TO RECEIVE DOUBLE DOOR

039 EXTENTS OF MECHANICAL YARD TO REMAIN

040 MOVEABLE STORAGE UNITS TO BE REMOVED

041 REMOVE GLASS BLOCK WALL

042 REMOVE OVERHEAD COUNTER SHUTTER

043 REMOVE QUARRY TILE FLOORING AND PREP SLAB FOR NEW FLOOR FINISH

044 REMOVE STAINLESS STEEL COLUMN WRAP

DN

A B C D E F G

3.4

2.2

1.3

E.8

1.5

2.5

A.5

2.8

AD201

A1

AD202

A1

AD202

C1

AD201

C1

159'-4"

DISTANCE

LEARNING

ADMIN

COMMON

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

205 MAIL

ROOM

FAMILY

SERVICES

LOBBY

VESTIBULE

CLASSROOM

CLASSROOM

CLASSROOM

C O

R R

ID

O

R

BLOOD

LAB

STORAGE

BLOOD

LAB

NOC/IT

ELEV

ADMIN

COMMON

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

219 COMSEC

TRAINING

COMSEC

STORAGE

TRAINING

AIDS

STORAGE

REPRODUCTION

ELEC

CORRIDOR

BREAK

ROOM

IT ELEC

MEN'S

TLT

WOMEN'S

TLT

JAN

STAIR

STAIR

1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"

/8

/8

/2

/8

/8

009 010 009 010

006006

REMOVE EXISTING DOOR AND DOOR

FRAME SYSTEM, UNO

EXISTING PARTITION TO BE REMOVED

EXISTING PARTITION TO REMAIN

DEMOLITION PLAN LEGEND

PLAN

NORTH

TRUE N

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:1

P M

AD102

O V

E R

A L L D

E M

O L

IT

IO

N

P L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SCALE 3/32" = 1'-0"

A1

DEMOLITION OVERALL PLAN - FLOOR 02

A REFER TO SHEETS AE101 - AE106 FOR PROPOSED

FLOOR PLANS

B BACK-FILL AND PATCH CONCRETE FLOOR AFTER

REMOVING EXISITNG PLUMBING FIXTURES. BACK-FILL

TO ALIGN WITH EXISITNG FACE OF SLAB

C ALL EXISTING CEILINGS TO BE REMOVED

D REMOVE ALL FURNITURE UNLESS NOTED OTHERWISE.

E REMOVE ALL FLOOR FINISHES AND WALL BASE UNLESS

NOTED OTHERWISE.

F REPAIR FLOOR AS REQUIRED TO RECEIVE NEW

FINISHES WHERE WALLS ARE TO BE DEMOLISHED

002 REMOVE ALL EXTERIOR WINDOWS.

005 REMOVE PLUMBING FIXTURES

006 REMOVE TOILET, TOILET PARTITIONS AND ASSOCIATED RESTROOM

ACCESSORIES, TYPICAL

008 REMOVE COUNTER, SINKS, AND ASSOCIATED ACCESSORIES, TYPICAL

009 REMOVE FLOOR AND WALL TILE IN THIS SPACE AND PREPARE FLOOR AND WALLS

TO REPLACE FINISHES

010 REMOVE CEILING FINISHES, LIGHTING, AND CEILING MOUNTED EQUIPMENT IN

THIS SPACE

011 REMOVE HANDRAILS AND GUARD RAILS

012 REMOVE STOREFRONT ENTRY SYSTEM

045 DISPLAY CASES TO REMAIN

046 REMOVE MAILBOX UNITS

FIRST FLOOR

0" AFF

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

A

STAIR EAVE

36'-6" AFF

BCDEFG E.8 A.5

001TYP.

002TYP.

012 207TYP. 206 TYP.

FIRST FLOOR

0" AFF

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

STAIR EAVE

36'-6" AFF

3.432.221 1.3 1.5 2.5 2.8

002TYP.

TYP.

207TYP.

206TYP.

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

# DEMOLITION KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:1

P M

AD201

O V

E R

A L L D

E M

O L

IT

IO

N

B U

IL

D

IN

G

E L E

V A

T

IO

N S

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SCALE 3/32" = 1'-0"

A1

DEMOLITION SOUTH ELEVATION - OVERALL

SCALE 3/32" = 1'-0"

C1

DEMOLITION EAST ELEVATION - OVERALL

001 NO WORK TO ROOF

002 REMOVE ALL EXTERIOR WINDOWS.

012 REMOVE STOREFRONT ENTRY SYSTEM

206 CONCRETE TO REMAIN

207 EXTERIOR STEEL LINTELS TO REMAIN. REMOVE ALL SURFACE RUST AND REFINISH

WITH RUST INHIBITING PRIMER AND EXTERIOR PAINT TO MATCH BRICK FINISH

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

A

STAIR EAVE

36'-6" AFF

B C D E F GE.8A.5

TYP.

TYP.

207TYP.

206TYP.

FIRST FLOOR

0" AFF

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

STAIR EAVE

36'-6" AFF

3.4 3 2.2 2 11.31.52.52.8

001TYP.

002TYP.

207TYP.

014 035 037

206TYP.

047 047

SCALE 3/32" = 1'-0"

A1

DEMOLITION NORTH ELEVATION - OVERALL

SCALE 3/32" = 1'-0"

C1

DEMOLITION WEST ELEVATION - OVERALL

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

DEMOLITION KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:1

P M

AD202

O V

E R

A L L D

E M

O L

IT

IO

N

B U

IL

L D

IN

G

E L E

V A

T

IO

N S

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

001 NO WORK TO ROOF

002 REMOVE ALL EXTERIOR WINDOWS.

012 REMOVE STOREFRONT ENTRY SYSTEM

014 PORTION OF WALL TO BE DEMOLISHED

035 REMOVE GLASS BRICK INFILL

037 REMOVE DOOR

047 EXISTING METAL INFILL PANEL

206 CONCRETE TO REMAIN

207 EXTERIOR STEEL LINTELS TO REMAIN. REMOVE ALL SURFACE RUST AND REFINISH

WITH RUST INHIBITING PRIMER AND EXTERIOR PAINT TO MATCH BRICK FINISH

A B C D E F G

3.4

2.2

1.3

E.8

1.5

2.5

A.5

2.8

/8

/8

/2

/8

/8

159'-4" 70'-8"

A

A

133A

134A

A

B

128A

138A

A

A

A

A

A

A

A

110B

105A

110C

A

A

A

125A

123A

124A

126A

B

A

A

A

A

102A

B

B

B

VEST.

121A

VEST.

116A

MACHINE

SHOP

PARTS/EQUIP.

STORAGE

OFFICE

OFFICE

BIOMEDICAL

LAB

130STAIRS

GRINDING

ROOM

FINISHING

ROOM

OPTICS LAB

OFFICE

VAULT

MECHANICAL

CHAPLAIN

JAN.

ASSEMBLY

ELECTRICAL

ARMORER

RETENTION

STORAGE

TR

WOMEN'S

TLT.

WOMEN'S

LOCKER

ROOM

JAN.

MEN'S

LOCKER

ROOM

LAN OFFICE

ADMIN.

COMMON

PACKAGING/

SHIPPING

RECEIVING

CORRIDOR

C O

R R

ID

O

R

CORRIDOR

LOBBY

WAREHOUSING/DIST.

SUPPLY

VESTIBULE

ELEV

MACH

E L E

V

STAIR

MEN'S TLT.

140B

103B

MAIL ROOM

119A

CHAIR

STORAGE

ARCC

STOR

A

A

A

A

107A

109A

108B

115A

110A

1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"

128 130

230'-0"

TYP.

133133

130B

115115

A

A

B

B

110D

A6

F3

A6

F3 A3

A6

A6

A6

A3

A3

F3

A6 F3

F3

U8 U8

F3

F3

U8

U8

A3

A3

PLAN

NORTH

TRUE N

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

SHEET KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:1

P M

AE101

P R

O P

O S

E D

O V

E R

A L L P

L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SCALE 3/32" = 1'-0"

A1

PROPOSED OVERALL PLAN - FLOOR 01

A ALL NEW PARTITIONS TO ALIGN WITH EXISTING.

B ALL CEILINGS TO BE REPLACED IN KIND.

C REFER TO INTERIORS FOR FURNITURE LAYOUTS.

D REFER TO INTERIORS FOR FLOOR FINISHES

E ALL WALLS TO RECEIVE NEW PAINT; REFER INTERIORS

FOR FINISHES

109 REPLACE GUARDRAIL/HANDRAIL

115 PREFINISHED INSULATED ALUMINUM STOREFRONT ENTRY SYSTEM

116 INSULATED HOLLOW METAL EXTERIOR DOORS

118 PREFINISHED INSULATED ALUMINUM WINDOWS

127 INFILL OF DEMOLISHED DOOR

128 COUNTERTOPS, SINKS, AND ACCESSORIES

129 DITOILETS, TOILET PARTITIONS, AND ACCESSORIES

130 SHOWER AND ACCESSORIES

133 COMPACT STORAGE SYSTEM IN COMPLIANCE WITH USACE STANDARDS

A B C D E F G

3.4

2.2

1.3

E.8

1.5

2.5

A.5

2.8

215A

214A

A

A

A

A

A

A

A

A

A

202A

203A

253A

252A

A

A

A

A

219A

220A

238A

221A

222A 234A

A

A

A

A

A

A

A

A

A

A

235A

CDR

BREAK

BLOOD

LAB/STORAGE

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ADMIN

COMMON

204 FTS OFFICE

VESTIBULE

CLASSROOM

CLASSROOM

CLASSROOM

CDR

OFFICE

OFFICE

OFFICE

CSM

BN CDR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

1SGT

CDR

MECHANICAL

COMSEC

TRAINING

237 COMSEC

STORAGE

DRIVING

SIMULATOR

TR

ADMIN

COMMON

LACTATION

STORAGE

CORRIDOR

LOBBY

C O

R R

ID

O

R

E L E

V

ELEC

241A

B

248A

WOMEN'S

TLT

MEN'S TLT

JAN

VEST

245A

VEST

244A

223A

245B

A

B

245A

243A236B

251A

159'-4"

/8

/8

/2

/8

/8

1'-0" 16'-2" 10'-10" 26'-0" 26'-0" 26'-0" 22'-8" 8'-8" 21'-2" 10"

127 TYP.

128 128

A

B

B

A

STAIR

STAIR

A3

A3

A3 F3

A3

A3

A3

A3

A3 F3

A3 A3

F3 F3

A3

F3

A3

PLAN

NORTH

TRUE N

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

SHEET KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:1

P M

AE102

P R

O P

O S

E D

O V

E R

A L L P

L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SCALE 3/32" = 1'-0"

A1

PROPOSED OVERALL PLAN - FLOOR 02

A ALL NEW PARTITIONS TO ALIGN WITH EXISTING.

B ALL CEILINGS TO BE REPLACED IN KIND.

C REFER TO INTERIORS FOR FURNITURE LAYOUTS.

D REFER TO INTERIORS FOR FLOOR FINISHES

E ALL WALLS TO RECEIVE NEW PAINT; REFER INTERIORS

FOR FINISHES

115 PREFINISHED INSULATED ALUMINUM STOREFRONT ENTRY SYSTEM

127 INFILL OF DEMOLISHED DOOR

128 COUNTERTOPS, SINKS, AND ACCESSORIES

129 DITOILETS, TOILET PARTITIONS, AND ACCESSORIES

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

A

STAIR EAVE

36'-6" AFF

BCDEFG E.8 A.5

TYP

TYP

FIRST FLOOR

0" AFF

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

STAIR EAVE

36'-6" AFF

3.432.221 1.3 1.5 2.5 2.8

TYP

TYP

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

SHEET KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:2

P M

AE201

O V

E R

A L L P

R O

P O

S E

D B

U

IL

D

IN

G E

L E

V A

T

IO

N S

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

SCALE 3/32" = 1'-0"

A1

PROPOSED SOUTH ELEVATION - OVERALL

SCALE 3/32" = 1'-0"

C1

PROPOSED EAST ELEVATION - OVERALL

A REFER TO FINISH SCHEDULE FOR ADDITIONAL

INFORMATION.

B ALL NEW EXTERIOR DOORS TO BE INSULATED

001 NO WORK TO ROOF

201 NON-OPERABLE TYPE WINDOWS; TYP.

203 DOOR TO REMAIN

211 PREFINISHED ALUMINUM ENTRANCE STOREFRONT, TYPICAL

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

A

STAIR EAVE

36'-6" AFF

B C D E F GE.8A.5

TYP

TYP

FIRST FLOOR

0" AFF

SECOND FLOOR

13'-4" AFF

ROOF

26'-10 1/2" AFF

STAIR EAVE

36'-6" AFF

3.4 3 2.2 2 11.31.52.52.8

TYP

202202

TYP

210 210210

SCALE 3/32" = 1'-0"

C1

PROPOSED WEST ELEVATION - OVERALL

SCALE 3/32" = 1'-0"

A1

PROPOSED NORTH ELEVATION - OVERALL

3/32" = 1'-0"

0 8' 16' 32'4'

SCALE:

GENERAL SHEET NOTES

SHEET KEYNOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:2

P M

AE202

O V

E R

A L L P

R O

P O

S E

D B

U

IL

D

IN

G E

L E

V A

T

IO

N S

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

A REFER TO FINISH SCHEDULE FOR ADDITIONAL

INFORMATION.

B ALL NEW EXTERIOR DOORS TO BE INSULATED

001 NO WORK TO ROOF

201 NON-OPERABLE TYPE WINDOWS; TYP.

202 INSULATED DOOR AS SCHEDULED

210 PREFINISHED INSULATED ALUMINUM FIXED WINDOWS, TYPICAL.

211 PREFINISHED ALUMINUM ENTRANCE STOREFRONT, TYPICAL

R

T

IN

G S

IZ

IN

D

IC

A T

O R

T Y

P E

IND STUD SIZE TOTAL WIDTH

A

A

S

2 1/2"

3 5/8"

4"

6"

8"

NO RATING-NO INSULATION

1 HR FIRE RATED UL# U419

ACOUSTICAL - STC 42

SMOKE

3 3/4"

4 7/8"

5 1/4"

7 1/4"

9 1/4"

LINE OF STRUCTURE

ABOVE

CEILING AS SCHED

METAL STUD FRAMING

SOUND ATTENUATION

INSULATION - RATING 'A'

FLOOR

(1) LAYER OF GYP BD

ON EACH SIDE

WIDTH

DEFLECTION TRACK

SEALANT AS SPECIFIED

LINE OF STRUCTURE

ABOVE

CEILING AS SCHED

METAL STUD

FRAMING

SOUND ATTENUATION

INSULATION - RATING

'A'

FLOOR

(1) LAYER OF GYP BD

ON ONE SIDE

WIDTH

E

A

S

2 1/2"

3 5/8"

4"

6"

8"

NO RATING - NO INSULATION

ACOUSTICAL - STC 42

SMOKE

3 1/8"

4 1/4"

4 5/8"

6 5/8"

8 5/8"

R A

T

IN

G S

IC

A T

O R

T Y

P E

IND FURR SIZE TOTAL WIDTH

DEFLECTION TRACK

SEALANT AS SPECIFIED

5 5/8"

7 5/8"

NO RATING

1 HR FIRE RATED UL# U905

5 5/8"

7 5/8"

2 2 HR FIRE RATED UL# U905

12 11 5/8" 11 5/8"

CEILING AS SCHED

HORIZ REINF AT

16" OC VERT

DOWEL, REFER TO

STRUCT

FLOOR

WIDTH

U

BRACE EACH SIDE OF

PARTITION AS

REQUIRED

FOR VERT REINF

REFER TO STRUCT

CONCRETE MASONRY

UNIT

BOND BEAM

1" SPACE; FILL VOID

WITH CONT

INSULATION / FIRE

STOPPING

R A

T

IN

G S

IC

A T

O R

T Y

P E

IND CMU SIZE TOTAL WIDTH

14 13 5/8" 13 5/8"

LINE OF

STRUCTURE

ABOVE

STEEL STUD

FRAMING

SOUND

(R-13 MIN)

ATTENUATION

INSULATION

FLOOR

(1) LAYER OF 5/8"

GYP BD

EW-1

1 2 1/2"

NO RATING

5 1/8"

2" THICK CLOSED

CELL EXPANSIVE

FOAM INSULATION

/ AIR BARRIER

WIDTH

COMPLETE WALL

ASSEMBLY (R-19 MIN)

SEALANT

R A

T

IN

G S

IC

A T

O R

T Y

P E

IND FURR SIZE TOTAL WIDTH

A. NOT ALL PARTITIONS ILLUSTRATED ARE USED. RE: "GYP BD

PARTITIONS IN PROJECT" (SEE BELOW) FOR TYPES USED.

B. "LINE OF STRUCT" INDICATED FOR EACH PARTITION IS

DIAGRAMMATIC ONLY AND DOES NOT INDICATE EXACT

CONSTRUCTION CONDITIONS OR GEOMETRY. REFER TO

DETAILS ON THIS SHEET FOR TYPICAL CONNECTION DETAILS.

C. GYPSUM BOARD:

1. FIRE RESISTANT RATED PARTITIONS SHALL USE TYPE

"X" FIRE RATED GYPSUM BOARD.

2. PARTITIONS IN HIGH MOISTURE AREAS SHALL USE

MOISTURE RESISTANT GYPSUM BOARD WHICH INCLUDE

TOILET ROOM(S), LOCKER ROOM(S), JANITOR CLOSET(S),

MECHANICAL ROOM(S), AND WITHIN 4'-0" OF WATER

FOUNTAIN.

3. PARTITIONS BEHIND TOIILETS, FIXTURES AND WITHIN

SHOWER AREAS SHALL USE CEMENT BOARD WITH A

MOISTURE BARRIER.

4. DO NOT ATTACH GYPSUM BOARD TO THE TOP SLIP

TRACK.

5. ALL GYPSUM BOARD UTILIZED SHALL BE PAPERLESS.

6. ALL GYPSUM BOARD LOCATED IN CORRIDORS,

CONFERENCE ROOMS, TRAINING ROOMS, BREAK

ROOMS, STORAGE ROOMS, SUPPLY ROOMS, VENDING

ROOMS, AND RECYCLE ROOMS SHALL BE ABUSE

RESISTANT TO 8'-0" A.F.F. ALL GYPSUM BOARD LOCATED

IN SHOPS SHALL BE IMPACT RESISTANT TO 10'-0" A.F.F.

7. ALL CEILINGS LOCATED IN RESTROOMS SHALL USE

MOISTURE RESISTANT GYPSUM BOARD.

E. SEALANT:

1. FIRE RESISTANT RATED PARTITIONS SHALL USE FIRE

STOP SEALANT SYSTEM.

2. NON - RATED PARTITIONS AND SMOKE RATED

PARTITIONS SHALL USE ACOUSTICAL SEALANT.

3. FIRE RESISTANT RATED PARTITIONS SHALL NOT USE

ACOUSTICAL SEALANT.

F. INSULATION - HEAD CONDITION AT STRUCTURE ABOVE:

1. FIRE RATED RESISTANT PARTITIONS MUST USE FIRE

SAFING INSULATION.

2. NON - RATED PARTITIONS MUST USE SOUND

ATTENUATION BLANKET.

G. FIRE AND / OR SMOKE RESISTANT RATINGS ARE TO

SURROUND ALL OPENINGS IN RATED PARTITIONS.

H. FIRE AND / OR SMOKE RESISTANT PARTITIONS MUST EXTEND

TO INSIDE FACE OF EXTERIOR SHEATHING, DECKS, AND

INCLUDING EXTENSIONS THROUGH SOFFITS.

I. EACH PARTITION INDICATED TO BE FIRE AND/OR SMOKE

RESISTANT SHALL BE IDENTIFIED AS SUCH WITH A LABEL

ABOVE THE CEILING ON EACH SEGMENT OF WALL AT A MIN OF

8'-0" O.C.

J. STC RATING IS BASED ON THE USE OF A 3 5/8" METAL STUD

OR GREATER.

K. INSTALL HORIZONTAL STUD FRAMING BRACING AT 4'-0" ON

CENTER AT FURRING AND NON-RATED CHASE WALLS.

L. ALL STUDS ARE 16" ON CENTER UNLESS OTHERWISE.

M. ALL STUDS ARE MINIMUM 22 GAUGE.

N. REFER TO FLOOR PLANS FOR LOCATION OF PARTITION TYPE

TAGS.

O. CMU INFILL WALLS ARE TO BE A THICKNESS TO MATCH

EXISTING ADJACENT WALL.

PARITITON TYPE KEY

GENERAL NOTES

A3-2

SECOND DIGIT IS THE

'SIZE INDICATOR'

THIRD DIGIT IS THE

PARTITION 'RATING'

FIRST DIGIT IS THE

PARTITION 'TYPE'

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -A

-3 D

.r v t

/9

/2

:3

:2

P M

A-601

P A

R T

IT

IO

N T

Y P

E S

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

J P

E R

R Y

S L O

N G

O R

IA

M H

A R

E

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

LOBBY

MACHINE

SHOP

PARTS/EQUIP.

STORAGE

BIOMEDICAL

LAB

OFFICE

OFFICE

GRINDING

ROOM

FINISHING

ROOM

OPTICS LAB

OFFICE

VAULT

MECHANICAL

CORRIDOR

STAIR

PACKAGING/SHIPPING

RECEIVING

ADMIN.

COMMON

WAREHOUSING/DIST.

SUPPLY

WOMEN'S

LOCKER

ROOM

WOMENS

TLT.

WOMEN'S

SHOWER

X

VEST.

121A

JAN.

VEST.

116A

MEN'S TLT.

MEN'S

SHOWER

X

MEN'S

LOCKER

ROOM

ARMORER

RETENTION

STORAGE

ELEV MACH

142 ELEV

TR

MAIL ROOM

119A

VESTIBULE

ELECTRICAL

C O

R R

ID

O

R

2 STORAGE

JAN

MESS

STEWARD

CORRIDOR

KITCHEN

SCULLERY

LAN OFFICE

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E E.8 F G

A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT

FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE

FF&E DESIGN PACKAGE.

B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,

INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND

TELECOM.

D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL

FF&E PER MANUFACTURER'S INSTRUCTIONS.

E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,

MARKERBOARDS AND MONITORS.

F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN

ACCORDANCE WITH ASCE 7-16.

G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND

INSTALLED BY OTHERS, GFGI.

H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),

PROCURED AND INSTALLED BY OTHERS, GFGI.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IF102

P R

O P

O S

E D

O V

E R

A L L F

U R

N

IT

U R

E P

L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 3/32" = 1'-0"

A1

PROPOSED OVERALL FURNITURE PLAN - FLOOR 01

MACHINE

SHOP

PARTS/EQUIP.

STORAGE

BIOMEDICAL

LAB

OFFICE

OFFICE

GRINDING

ROOM

FINISHING

ROOM

OPTICS LAB

OFFICE

STAIR

PACKAGING/SHIPPING

RECEIVING

ADMIN.

COMMON

WAREHOUSING/DIST.

SUPPLY

WOMEN'S

LOCKER

ROOM

WOMENS

TLT.

WOMEN'S

SHOWER

X

VEST.

121A

JAN.

VEST.

116A

MEN'S TLT.

MEN'S

SHOWER

X

MEN'S

LOCKER

ROOM

STORAGE

TR

MAIL ROOM

119A

LAN OFFICE

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E

CH2

(2)

D1

CH1

ST1

WS1

(4)

CH1

(4)

ST1

CH2

D2

CH1

CH2

(2)

D1 CH1

ST1

CH2

(2)

ST1

CH1

D1

T5

A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT

FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE

FF&E DESIGN PACKAGE.

B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,

INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND

TELECOM.

D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL

FF&E PER MANUFACTURER'S INSTRUCTIONS.

E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,

MARKERBOARDS AND MONITORS.

F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN

ACCORDANCE WITH ASCE 7-16.

G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND

INSTALLED BY OTHERS, GFGI.

H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),

PROCURED AND INSTALLED BY OTHERS, GFGI.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IF103

P R

O P

O S

E D

P A

R T

IA

L F

U R

N

IT

U R

E P

L A

N

F L O

O R

A R

E A

A

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA A

FF&E

TYPE MARK DESCRIPTION

AC1 TRASH & RECYCLING

CH1 CHAIR, TASK

CH2 CHAIR, GUEST

CH3 CHAIR, STACKING

CH4 CHAIR, RECLINER

D1 DESK, U-SHAPED

D2 DESK, L-SHAPED, 72" X 72"

L1 LECTURN

ST1 STORAGE, LATERAL FILE

T2 TABLE, ROUND, 24"

T3 TRAINING TABLE

T4 TABLE, ROUND, 18"

T5 TABLE, ROUND, 30"

WS1 WORKSTATION, 72" X72"

LOBBY

VAULT

MECHANICAL

CORRIDOR

ARMORER

RETENTION

ELEV MACH

ELEV

VESTIBULE

STAIR

ELECTRICAL

CORRIDOR

STORAGE

JAN

MESS

STEWARD

CORRIDOR

KITCHEN

SCULLERY

3.4

2.8

2.5

2.2

1.5

1.3

E E.8 F G

ST1

(2)

D1

CH1

CH2

(4)

T5

A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT

FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE

FF&E DESIGN PACKAGE.

B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,

INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND

TELECOM.

D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL

FF&E PER MANUFACTURER'S INSTRUCTIONS.

E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,

MARKERBOARDS AND MONITORS.

F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN

ACCORDANCE WITH ASCE 7-16.

G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND

INSTALLED BY OTHERS, GFGI.

H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),

PROCURED AND INSTALLED BY OTHERS, GFGI.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IF104

P R

O P

O S

E D

P A

R T

IA

L F

U R

N

IT

U R

E P

L A

N

F L O

O R

A R

E A

B

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FURNITURE PLAN - FLOOR 01 - AREA B

FF&E

TYPE MARK DESCRIPTION

AC1 TRASH & RECYCLING

CH1 CHAIR, TASK

CH2 CHAIR, GUEST

CH3 CHAIR, STACKING

CH4 CHAIR, RECLINER

D1 DESK, U-SHAPED

D2 DESK, L-SHAPED, 72" X 72"

L1 LECTURN

ST1 STORAGE, LATERAL FILE

T2 TABLE, ROUND, 24"

T3 TRAINING TABLE

T4 TABLE, ROUND, 18"

T5 TABLE, ROUND, 30"

CORRIDOR

C O

R R

ID

O

R

ELEV

JAN

STAIR

STAIR

BLOOD

LAB/STORAGE

OFFICE

OFFICE

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ADMIN

COMMON

FAMILY

SERVICES

ARCC

203 VESTIBULE

CLASSROOM

CLASSROOM

MECHANICAL

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BN CDR

OFFICE

OFFICE

OFFICE

OFFICE

CDR

COMSEC

TRAINING

COMSEC

STORAGE

DRIVING

SIMULATOR

TR

ELEC

VEST

245A

M E

N 'S

T L T

BREAK

WOMEN'S

TLT

LACTATION

STORAGE

ADMIN

COMMON

VEST

244A

CLASSROOM

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E E.8 F G

A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT

FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE

FF&E DESIGN PACKAGE.

B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,

INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND

TELECOM.

D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL

FF&E PER MANUFACTURER'S INSTRUCTIONS.

E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,

MARKERBOARDS AND MONITORS.

F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN

ACCORDANCE WITH ASCE 7-16.

G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND

INSTALLED BY OTHERS, GFGI.

H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),

PROCURED AND INSTALLED BY OTHERS, GFGI.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IF105

P R

O P

O S

E D

O V

E R

A L L F

U R

N

IT

U R

E P

L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 3/32" = 1'-0"

A1

PROPOSED OVERALL FURNITURE PLAN - FLOOR 02

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E

STAIR

BLOOD

LAB/STORAGE

OFFICE

OFFICE

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ADMIN

COMMON

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BN CDR

OFFICE

OFFICE

OFFICE

OFFICE

CDR

COMSEC

TRAINING

237 COMSEC

STORAGE

DRIVING

SIMULATOR

TR

ELEC

ADMIN

COMMON

VEST

245A

M E

N 'S

T L T

BREAK

STORAGE

ADMIN

COMMON

CH2

(2)

D1

CH1

ST1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH2

D2

CH1

ST1

CH1

D1

CH2

(2)

T3 (5)

CH3

WS1

(16)

CH1

(16)

WS1

(18)

CH1

(18)

ST1

CH1

D1

CH2

(2)

ST1

CH2

CH1

D

ST1

CH2

CH1

D

ST1

CH2

D

ST1

CH2

D

CH1 CH1

ST1

CH2

D

CH1

ST1

CH2

D

CH1

ST1

CH2

D

CH1

C H

D2

CH2

ST1

CH3

(4)

T2

WS1

CH1

CH1

CH2 ST1

D2

CH1

CH2 ST1

D2

CH1

CH2 ST1

D2

CH1

CH2 ST1

D2

CH1

CH2 ST1

D2

D

CH1

CH2

ST1

D

CH1

CH2

ST1

D2

A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT

FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE

FF&E DESIGN PACKAGE.

B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,

INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND

TELECOM.

D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL

FF&E PER MANUFACTURER'S INSTRUCTIONS.

E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,

MARKERBOARDS AND MONITORS.

F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN

ACCORDANCE WITH ASCE 7-16.

G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND

INSTALLED BY OTHERS, GFGI.

H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),

PROCURED AND INSTALLED BY OTHERS, GFGI.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:0

A

M

IF106

P R

O P

O S

E D

P A

R T

IA

L F

U R

N

IT

U R

E P

L A

N

F L O

O R

A R

E A

A

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FURNITURE PLAN - FLOOR 02 - AREA A

FF&E

TYPE MARK DESCRIPTION

AC1 TRASH & RECYCLING

CH1 CHAIR, TASK

CH2 CHAIR, GUEST

CH3 CHAIR, STACKING

CH4 CHAIR, RECLINER

D1 DESK, U-SHAPED

D2 DESK, L-SHAPED, 72" X 72"

L1 LECTURN

ST1 STORAGE, LATERAL FILE

T2 TABLE, ROUND, 24"

T3 TRAINING TABLE

T4 TABLE, ROUND, 18"

T5 TABLE, ROUND, 30"

3.4

2.8

2.5

2.2

1.5

1.3

E E.8 F G

STAIR

FAMILY

SERVICES

ARCC

VESTIBULE

CLASSROOM

CLASSROOM

MECHANICAL

M E

N 'S

T L T

WOMEN'S

TLT

LACTATION

VEST

244A

CLASSROOM

6'-0"

CH4

T4

L1

CH1

T3 (10)

CH3

(19)

L1

CH1

T3 (10)

CH3

(19)

L1

CH1

T3 (10)

CH3

(19)

AC1

AP1

AP2 AP3

AP4

CH2

(5)

CH1

D2

T5

A. FURNITURE, FIXTURES, AND EQUIPMENT (FF&E) ARE GOVERNMENT

FURNISHED, GOVERNMENT INSTALLED (GFGI). KTR TO PROVIDE

FF&E DESIGN PACKAGE.

B. FIELD VERIFY CONDITIONS PRIOR TO ORDERING FF&E TO ENSURE

PROPER FIT OF ALL ITEMS.

C. PROVIDE ALL INFRASTRUCTURE FOR FF&E AS REQUIRED,

INCLUDING BUT NOT LIMITED TO WALL BLOCKING, POWER AND

TELECOM.

D. PROVIDE ALL FF&E COMPONENTS REQUIRED TO FULFILL THE

DESIGN INTENT OUTLINED IN THE FF&E PACKAGE, AND INSTALL

FF&E PER MANUFACTURER'S INSTRUCTIONS.

E. INSTALL WALL BLOCKING AS REQUIRED AT DISPLAY BOARDS,

MARKERBOARDS AND MONITORS.

F. ALL FF&E 72" OR HIGHER MUST HAVE SEISMIC ANCHORING IN

ACCORDANCE WITH ASCE 7-16.

G. AUDIOVISUAL EQUIPMENT WILL BE DESIGNED, PROCURED AND

INSTALLED BY OTHERS, GFGI.

H. HIGH DENSITY SHELVING (NFPA COMPLIANT STORAGE SYSTEM),

PROCURED AND INSTALLED BY OTHERS, GFGI.

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA A

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:0

A

M

IF107

P R

O P

O S

E D

P A

R T

IA

L F

U R

N

IT

U R

E P

L A

N

F L O

O R

A R

E A

B

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

FF&E

TYPE MARK DESCRIPTION

AC1 TRASH & RECYCLING

CH1 CHAIR, TASK

CH2 CHAIR, GUEST

CH3 CHAIR, STACKING

CH4 CHAIR, RECLINER

D1 DESK, U-SHAPED

D2 DESK, L-SHAPED, 72" X 72"

L1 LECTURN

ST1 STORAGE, LATERAL FILE

T2 TABLE, ROUND, 24"

T3 TRAINING TABLE

T4 TABLE, ROUND, 18"

T5 TABLE, ROUND, 30"

WS1 WORKSTATION, 72" X72"

EQUIP

Type Mark Description

AP1 MICROWAVE

AP2 COFFEE MAKER

AP3 REFRIGERATOR

AP4 UNDERCOUNTER REFRIGERATOR

LOBBY

MACHINE

SHOP

PARTS/EQUIP.

STORAGE

BIOMEDICAL

LAB

OFFICE

OFFICE

GRINDING

ROOM

FINISHING

ROOM

OPTICS LAB

OFFICE

VAULT

MECHANICAL

CORRIDOR

STAIR

PACKAGING/SHIPPING

RECEIVING

ADMIN.

COMMON

WAREHOUSING/DIST.

SUPPLY

WOMEN'S

LOCKER

ROOM

WOMENS

TLT.

WOMEN'S

SHOWER

X

VEST.

121A

JAN.

VEST.

116A

MEN'S TLT.

MEN'S

SHOWER

X

MEN'S

LOCKER

ROOM

ARMORER

RETENTION

STORAGE

ELEV MACH

ELEV

TR

MAIL ROOM

119A

VESTIBULE

STAIR

ELECTRICAL

CORRIDOR

STORAGE

JAN

MESS

STEWARD

CORRIDOR

KITCHEN

SCULLERY

LAN OFFICE

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E E.8 F G

CPT-1

EF-1

ETR-1

LVT-1

PFT-1

RF-1

SC-1

SDT-1

STOR

ARCC

A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM

FINISH SCHEDULE.

B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &

FINISHES.

C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE

INDICATED.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

LEGEND

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IN102

P R

O P

O S

E D

O V

E R

A L L F

IN

IS

H P

L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 3/32" = 1'-0"

A1

PROPOSED OVERALL FINISH PLAN - FLOOR 01

MACHINE

SHOP

PARTS/EQUIP.

STORAGE

BIOMEDICAL

LAB

OFFICE

OFFICE

GRINDING

ROOM

FINISHING

ROOM

OPTICS LAB

OFFICE

STAIR

PACKAGING/SHIPPING

RECEIVING

ADMIN.

COMMON

WAREHOUSING/DIST.

SUPPLY

WOMEN'S

LOCKER

ROOM

WOMENS

TLT.

WOMEN'S

SHOWER

X

VEST.

121A

JAN.

VEST.

116A

MEN'S TLT.

MEN'S

SHOWER

X

MEN'S

LOCKER

ROOM

STORAGE

TR

MAIL ROOM

119A

LAN OFFICE

CPT-1

EF-1

ETR-1

LVT-1

PFT-1

RF-1

SC-1

SDT-1

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E

A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM

FINISH SCHEDULE.

B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &

FINISHES.

C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE

INDICATED.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

LEGEND

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IN103

P R

O P

O S

E D

P A

R T

IA

L F

IN

IS

H P

L A

N

F L O

O R

A R

E A

A

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA A

LOBBY

VAULT

MECHANICAL

CORRIDOR

MEN'S

LOCKER

ROOM

ARMORER

RETENTION

ELEV MACH

ELEV

VESTIBULE

STAIR

ELECTRICAL

CORRIDOR

STORAGE

JAN

MESS

STEWARD

CORRIDOR

KITCHEN

SCULLERY

CPT-1

EF-1

ETR-1

LVT-1

PFT-1

RF-1

SC-1

SDT-1

3.4

2.8

2.5

2.2

1.5

1.3

E E.8 F G

STOR

ARCC

A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM

FINISH SCHEDULE.

B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &

FINISHES.

C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE

INDICATED.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

LEGEND

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IN104

P R

O P

O S

E D

P A

R T

IA

L F

IN

IS

H P

L A

N

F L O

O R

A R

E A

B

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FINISH PLAN - FLOOR 01 - AREA B

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E E.8 F G

STAIR

STAIR

BLOOD

LAB/STORAGE

OFFICE

OFFICE

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ADMIN

COMMON

LOBBY

201FAMILY

SERVICES

ARCC

203 VESTIBULE

CLASSROOM

CLASSROOM

MECHANICAL

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BN CDR

OFFICE

OFFICE

OFFICE

OFFICE

CDR

COMSEC

TRAINING

COMSEC

STORAGE

DRIVING

SIMULATOR

TR

ELEC

VEST

245A

M E

N 'S

T L T

BREAK

WOMEN'S

TLT

LACTATION

STORAGE

ADMIN

COMMON

VEST

244A

CLASSROOM

CPT-1

EF-1

ETR-1

LVT-1

PFT-1

RF-1

SC-1

SDT-1

JAN

A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM

FINISH SCHEDULE.

B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &

FINISHES.

C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE

INDICATED.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

LEGEND

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IN105

R O

P O

S E

D O

V E

R A

L L F

IN

IS

H P

L A

N

F L O

O R

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 3/32" = 1'-0"

A1

PROPOSED OVERALL FINISH PLAN - FLOOR 02

3.4

2.8

2.5

2.2

1.5

1.3

A.5 B C D E

STAIR

BLOOD

LAB/STORAGE

OFFICE

OFFICE

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

ADMIN

COMMON

CDR

1SGT

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BN CDR

OFFICE

OFFICE

OFFICE

OFFICE

CDR

COMSEC

TRAINING

COMSEC

STORAGE

DRIVING

SIMULATOR

TR

ELEC

ADMIN

COMMON

VEST

245A

M E

N 'S

T L T

BREAK

STORAGE

CPT-1

EF-1

ETR-1

LVT-1

PFT-1

RF-1

SC-1

SDT-1

A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM

FINISH SCHEDULE.

B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &

FINISHES.

C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE

INDICATED.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

LEGEND

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IN106

P R

O P

O S

E D

P A

R T

IA

L F

IN

IS

H P

L A

N

F L O

O R

A R

E A

A

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA A

3.4

2.8

2.5

2.2

1.5

1.3

E E.8 F G

STAIR

FAMILY

SERVICES

ARCC

203 VESTIBULE

CLASSROOM

CLASSROOM

MECHANICAL

CDR

M E

N 'S

T L T

WOMEN'S

TLT

LACTATION

VEST

244A

CLASSROOM

CPT-1

EF-1

ETR-1

LVT-1

PFT-1

RF-1

SC-1

SDT-1

A. REFER TO SHEET I-601 FOR FINISH MATERIAL LEGEND AND ROOM

FINISH SCHEDULE.

B. FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS &

FINISHES.

C. ALL TRANSITIONS MUST OCCUR AT THE CENTERLINE OF THE

DOOR, DOORWAY OR CEILING LINE, UNLESS OTHERWISE

INDICATED.

PLAN

NORTH

TRUE N

1" = 40'-0"

0 40' 80' 120'

SCALE:

GENERAL SHEET NOTES

LEGEND

GRAPHIC SCALE(S)

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:5

A

M

IN107

P A

R T

IA

L S

E C

O N

D F

L O

O R

F

IN

IS

H

P L A

N

A R

E A

B

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

SCALE 1/8" = 1'-0"

A1

PROPOSED PARTIAL FINISH PLAN - FLOOR 02 - AREA B

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

T e x a s R e g is te re d E n g in e e ri n g F ir m

F -2

M a in

S t.

F o rt

W o rt h T

X

A u to d e s k D o c s /U

S P

A L D

C W

U

S A

C E

M

R A

R N e w to w n S q U

S A

R C

B ld g

/L

D C

W -I

-3 D

.r v t

/1

/2

:1

:0

A

M

I-601

R O

O M

F

IN

IS

H

S C

H E

D U

L E

F

IN

IS

H M

A T

E R

IA

L

L E

G E

N D

R

M N

E W

T O

W N

S Q

U A

R E

E

D G

E M

O N

T

P A

U S

A R

M Y

R E

S E

R V

E C

E N

T E

R

U S

A R

C

M A

B O

V E

F D

O D

D S

J B

O G

E N

S C

H U

T Z

J

U L Y

C E

R T

IF

IE

D F

IN

A

L

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

L O

U

IS

V

IL

L E

K

Y

ROOM FINISH SCHEDULE

ROOM NAME

FLOOR

FINISH

BASE

FINISH

WALL FINISH

NORTH EAST SOUTH WEST

100 VESTIBULE EF-1 RB-1 PT-1 PT-1 PT-1 PT-1

101 LOBBY LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1

103 ELECTRICAL SC-1 RB-1 PT-1 PT-1 PT-1 PT-1