This document is an Amendment (Number 0002) to a solicitation for the Design-Bid-Build Construction of an Army Reserve Center (ARC) at Dobbins Air Reserve Base in Georgia. The amendment modifies multiple specification sections, including sustainability reporting, metal stairs, metal railings, plumbing, water piping systems, and cybersecurity requirements for various control systems (mechanical, lighting, and metering).

Key changes include revisions to specification sections such as 01 33 29.00 06 Sustainability Reporting, 05 51 00 Metal Stairs, and 05 52 00 Metal Railings, with updates to technical requirements and design specifications. The amendment also extends the proposal submission due date to Tuesday, 06 May 2025 at 11:00 a.m. Eastern Daylight Time, changing the previous deadline of 02 May 2025 at 5:00 p.m. Several plan sheets have been revised, replaced, or added, and some specification sections have been modified or deleted. Offerors are required to acknowledge all amendments to the solicitation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 4

0002 25 APR 2025 P2 502297

W912QR

W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 600 DR MARTIN LUTHER KING JR PL

LOUISVILLE, KY 40202-2230

UNITED STATES

BONNY DYLEWSKI, EMAIL: BONNY.C.DYLEWSKI@USACE.ARMY.MIL

W912QR25RA009

05 MAR 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

SEE SCHEDULE

W912QR25RA009_Specs-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification):

SOLICITATION AMENDMENT NO. 0002

Solicitation No. W912QR25RA009 for the Design-Bid-Build Construction of an Army Reserve Center (ARC) at Dobbins Air Reserve Base (ARB), GA is hereby amended as follows:

A. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

01 33 29.00 06 SUSTAINABILITY REPORTING

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

22 00 00 PLUMBING, GENERAL PURPOSE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(MECHANICAL BACS)

25 05 11.03 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(LIGHTING)

25 05 11.04 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

(METERING)

B. The following SPECIFICATION SECTIONS have been added in their entirety:

None

C. The following SPECIFICATION SECTIONS have been deleted in their entirety:

27 41 00 AUDIO-VISUAL SYSTEMS

D. The following PLAN SHEETS have been revised and replaced in their entirety:

Drawings Volume 1 – Site

G-005 POV PARKING AND CONSTRUCTION TRAILER LOCATION

ES401 EV CHARGING BID ALTERNATIVE

Drawings Volume 2 – ARC

G-002 SHEET INDEX

A-601 DOOR SCHEDULE

A-602 DOOR SCHEDULE

IF601 FURNITURE LEGEND

Drawings Volume 3 – VMS

A-601 DOOR & FRAME TYPES, SCHEDULE AND DETAILS

IF101 FURNITURE PLAN

Drawings Volume 4 – UHS

A-201 EXTERIOR ELEVATIONS

IF101 FURNITURE PLAN

E. The following PLAN SHEETS have been added new:

A-591 MISCELLANEOUS DETAILS

F. The following PLAN SHEETS have been deleted in their entirety new:

G. The following DOCUMENTS have been added new:

H. The proposal submission due date and time has been extended to Tuesday, 06 May 2025 at 11:00 a.m. Eastern Daylight Time (EDT).

I. Offerors must acknowledge all amendments.

J. All other terms and conditions remain unchanged.

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Time 05:00 PM 11:00 AM Response Due Date 02 May 2025 06 May 2025

502297 Army Reserve Center / VMS Dobbins Air Reserve Base, GA

SECTION 01 33 29.00 06

SUSTAINABILITY REPORTING

02/ 21

AMENDMENT 0002

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING

ENGINEERS (ASHRAE)

ASHRAE 189.1 (2014; ERTA 1 2017) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings

U.S. DEPARTMENT OF AGRICULTURE (USDA)

FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA Biopreferred Program)

U.S. DEPARTMENT OF ENERGY (DOE)

Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

SNAP (2016) EPA's Significant New Alternatives Policy Program

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BDC Ref Guide (2013) USGBC LEED Reference Guide for Building Design and Construction, v4

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials

1.2 SUMMARY

This specification includes general requirements and procedures for this project to be constructed and documented per the federally mandated High Performance and Sustainable Building Guiding Principles (GP), LEED certification requirements and other requirements identified in this specification.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When

SECTION 01 33 29.00 06 Page 1

CERTIFIED FINAL / AMENDMENT 0002

used, a designation following that "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with LRL Section 01 33 00 Submittal Procedures:

SD-01 Preconstruction Submittals

Sustainability Action Plan ; G

LEED Implementation Plan ; G

LEED AP BD+C; G

Sustainability Progress Report ; G

SD-05 Design Data

LEED Correction Plan ; G

SD-11 Closeout Submittals

Final Sustainability eNotebook ; G

Amended Final Sustainability eNotebook ; G

Final High Performance and Sustainable Building Checklist ; G

LEED Plaque and Certificate ; G

1.4 LEED Accredited Professional ( LEED AP BD+C)

A LEED Accredited Professional with specialty in Building Design + Construction (LEED AP BD+C) on the Contractor's Quality Control Staff must assemble documentation and ensure that Guiding Principles Compliance documentation is prepared in accordance with this specification section and ensure that Third Party Certification requirements are achieved .

Identify the LEED AP BD+C on the Contractor's Quality Control Staff in accordance with specification LRL Section 01 45 04.10 06 CONTRACTOR QUALITY CONTROL. Provide a statement of qualifications of the LEED AP BD+C submitted to the Government with the QC Plan. Includes name and date of expiration of the current credential.

The LEED AP BD+C must review all requests for information, Contractor proposals, contract modifications, deviations from the design documents, or any other items that could potentially impact the compliance and Third Party Certification and rating of the project. Bring any actions that could negatively impact the Third Party Certification rating or ability to comply with Guiding Principles to the attention of the Contracting Officer.

1.5 Guiding Principles Compliance

Provide construction related sustainability documentation to verify compliance with Federal High Performance and Sustainable Building requirements. Refer to paragraph Guiding Principle Requirements for requirements and associated documentation to include in the Sustainability eNotebook.

SECTION 01 33 29.00 06 Page 2

1.5.1 Construction Phase

1.5.1.1 Sustainability Action Plan

Provide a Sustainability Action Plan to demonstrate planned methods to comply with the Guiding Principles requirements and comply with Third Party Certification requirements identified herein. Submit the LEED Implementation Plan as a part of the Sustainability Action Plan. Provide a cop y submitted to the Government to RMS with the QC Plan . The Government will consider an interim Sustainability Action Plan and LEED Implementation Plan for the first 60 calendar days of the Contractor's operation. Construction will be permitted to begin only after acceptance of the plans or acceptance of an interim plan applicable to the work to be started related to the Guiding Principles requirements identified in the interim plan. Include a detailed description of all activities that relate to accomplishing each project Guiding Principle requirement, including construction practices and procurement practices. Include any plans required by the Guiding Principle Requirements including the Indoor Air Quality Plan and Waste Management Plan. Include a schedule for completion and documentation of each requirement. Include the template to be used for Sustainability Progress Reports, a plan for indoctrinating employees to sustainable goals and responsibilities, a team structure identifying responsibility for documentation, and a process for reviewing sustainability related submittals and documentation.

1.5.1.2 Sustainability eNotebook

Provide and maintain a comprehensive Sustainability eNotebook to document compliance with the Guiding Principles requirements identified herein.

All materials requirements must be updated each month. The Sustainability eNotebook must contain all required data to support compliance with the Guiding Principles requirements. The Sustainability eNotebook must be in the form of an Adobe PDF file; bookmarked at each requirement, and sub-bookmarked at each document. Include the Final High performance and Sustainable Building Checklist. Include all "S" submittals through the specification sections of this contract.

Provide a cop y of the Final Sustainability eNotebook and Final High Performance and Sustainable Building Checklist to the Government to RMS 30 calendar days prior to the Contract Required Completion Date. Include a separate section in the Final Sustainability eNotebook with a copy of all Third Party Certification documentation, bookmarked at each separate requirement. Final progress payment retainage may be held by the Contracting Officer until the documentation is complete. Provide an Amended Final Sustainability eNotebook including any updates to documentation based on post-occupancy corrections or based on Third Party Certification requirements .

1.5.1.3 High Performance and Sustainable Building Checklist

Complete the Army Energy & Sustainability Record Card shown in Attachment A as required in paragraph Sustainability eNotebook. Obtain the electronic copy of the Army Energy & Sustainability Record Card from the Contracting Officer's Representative. Only the RECYCLED MATERIALS section of the Building Data Worksheet is required. If any deviations from contract result in a change in status to compliance with a listed requirement in the checklist, update the status of that item in the checklist. The LEED worksheet of the Army Energy & Sustainability Record Card is not required.

SECTION 01 33 29.00 06 Page 3

1.5.1.4 Progress Report

Submit a monthly Sustainability Progress Report , on the same day each month, that identifies the Guiding Principles requirements completed and documented to date. The Sustainability Progress Report must also include the Third Party Certification requirements and documentation completed to date. The Government will compare the Sustainability Progress Report and the available data in the current Sustainability eNotebook and Third Party Certification documentation to the schedule in the Sustainability Action Plan and LEED Implementation Plan . Failure to adhere to the schedule for completion of requirements, including the associated documentation, in the Sustainability Action Plan and LEED Implementation Plan will be cause for withholding the monthly progress payment until the information is updated and in accordance with the Sustainability Action Plan.

1.6 Guiding Principles Requirements

Incorporate each of the following Guiding Principles requirements into the project construction, and provide documentation that proves compliance with each listed requirement. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.

1.6.1 Commissioning

Comply with the requirements of LRL section 01 46 00.00 06 TOTAL BUILDING

COMMISSIONING.

1.6.2 Energy Efficient Products

Provide only energy-using products that are Energy Star rated, or have the Federal Energy Management Program (FEMP) recommended efficiency for products with established Energy Star or FEMP requirements. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:

https://energy.gov/eere/femp/federal-energy-management-program and https://www.energystar.gov/ . Provide the following documentation:

Proof that products are labeled energy efficient and comply with the cited requirements.

1.6.3 Indoor Water Use

Provide only water-consuming products that are EPA WaterSense labeled, or water fixtures available that meet the requirements of ASHRAE 189.1 Section 6.3.2, whichever is most water-efficient. Provide the following documentation:

For products available with EPA WaterSense labeling, proof that fixtures are labeled EPA WaterSense or Energy Star ; for all other fixtures, proof they comply with the cited efficiency requirements.

1.6.4 Reduce Volatile Organic Compound (VOC) (Low Emitting Materials)

Meet the requirements of Table 3-1 at the end of this specification.

Provide the following documentation:

SECTION 01 33 29.00 06 Page 4

Provide certifications or labels that demonstrate compliance with cited requirements.

1.6.5 Indoor Air Quality During Construction

Prior to construction, create indoor air quality plan. Implement IAQ plan during construction and flush building air before occupancy.

For new construction, indoor air quality plan must meet the requirements of ASHRAE 189.1 Section 10.3.1.4. (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60 percent.

Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and building air was flushed out in accordance with the cited standard.

1.6.6 Regional Materials

Comply with ASHRAE 189.1 paragraph 9.4.1.2 Regional Materials. Provide documentation demonstrating that 15% of the cost of building materials or products used were extracted, harvested, recovered or manufactured within 500 miles of the project site.

1.6.7 Recycled Content

Comply with 40 CFR 247 . Refer to https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products for assistance identifying products cited in 40 CFR 247 . Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:

a. Manufacturers’ documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.

b. Substitutions: Submit for Government approval, proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.

1.6.8 Bio-Based Products

Provide products and material composed of the highest percentage of biobased materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA Biopreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.

Comply with FSRIA 9002 USDA BioPreferred Program. Refer to https://www.biopreferred.gov/BioPreferred/ for the product categories and BioPreferred Catalog. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet

SECTION 01 33 29.00 06 Page 5 performance requirements. Provide the following documentation:

USDA Biopreferred label for each product; for bio-based products used on project but not listed with Biopreferred program, provide bio-based content and percentage.

1.6.9 Ozone Depleting Substances

Meet the requirements of ASHRAE 189.1 Section 9.3.3 Refrigerants for no CFC-based refrigerants in heating ventilation, air conditioning and refrigeration systems. Where feasible, use products from U.S. EPA Significant New Alternatives Policy (SNAP) ( https://www.epa.gov/snap ) or meet the criteria of SNAP. Provide the following documentation:

a. MSDS sheets for all refrigerants.

b. Provide label for each product meeting the cited standards.

1.6.10 Waste Material Management (Recycling – Construction)

Divert construction debris from landfill disposal where markets or on-site recycling exists, and provide documentation in accordance with UFGS Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.

1.6.11 Additional Sustainability Requirements

1.6.11.1 Validation and Certification Restrictions

Purchase of renewable energy certificates (RECs) is prohibited.

1.7 Third Party Certification

Comply with all requirements and provide all required documentation for the project to achieve certification in the Third Party Certification system identified herein. The Contractor must bear all costs and perform all administrative actions necessary to complete Third Party Certification.

1.7.1 LEED

This project has been designed for a rating of Silver in the Leadership in Energy and Environmental Design (LEED) version 4 certification system.

Certify the project at the designed LEED rating through the Green Building Certification Institute. The project has been registered with the Green Building Certification Institute. The Final Design Review of the Split Design & Construction Review path has been completed. Complete all remaining activities necessary for LEED certification.

Some LEED prerequisites and credits are similar to Guiding Principle Requirements. Comply with both the LEED and Guiding Principle Requirements. Refer to LEED BDC Ref Guide for additional information regarding LEED and LEED certification processes.

1.7.1.1 Registration

The project has been registered with the Green Building Certification Institute on LEED Online by others. Coordinate with the Government to obtain a Project Manager role for the project in LEED Online. The Government will retain the Project Administrator role.

SECTION 01 33 29.00 06 Page 6

1.7.1.2 LEED Project Checklist

Attachment B, LEED Project Checklist, identifies the LEED credits and prerequisites that are designed into or required for this project and identifies which are Construction Phase credits. Comply with the requirements of the Construction Phase credits and prerequisites identified in the LEED Project Checklist including providing all associated documentation required by the Green Building Certification Institute for LEED certification.

1.7.1.3 LEED Correction Plan

No variation or substitutions to the LEED credits and prerequisites identified for this contract are permitted without written consent from the Contracting Officer. Should there be a case where there is any current or projected problem meeting the full requirements of a LEED credit or prerequisite identified for this project, notify the Contracting Officer in writing immediately. Submit a LEED Correction Plan to the Government for acceptance detailing the method by which the LEED rating for the project will be preserved. Include the LEED credit or prerequisite impacted, the reason for non-compliance, the proposed correction or solution, an alternate credit, and a schedule for completion of the correction, solution, or alternate credit. If an alternate credit is proposed, submit, with the LEED Correction Plan, an explanation of associated documentation required by LEED certification requirements.

1.7.1.4 LEED Interpretations

Apply existing US Green Building Council or Green Building Certification Institute LEED Interpretations when pursuing credits using non-standard compliance paths or when there are special circumstances making compliance difficult. Applicable LEED Interpretations are those that apply to the LEED version under which the project has been registered. The Contractor may apply for a LEED Interpretation from the Green Building Certification Institute or US Green Building Council for any new proposed strategy, non-standard compliance path, or special circumstances. If a LEED Interpretation is to be used to substantiate compliance with attempted credits and prerequisites, a copy of the request and ruling, including the dates, must be included in the documentation on LEED Online for the associated credit or prerequisite. Compliance methods that are not addressed by existing or new LEED Interpretations may be submitted for LEED certification but are not permitted to be necessary to achieve the required LEED rating.

1.7.1.5 LEED Implementation Plan

Submit the LEED Implementation Plan as a part of the Sustainability Action Plan. Include a detailed description of all activities that relate to accomplishing project LEED requirements, including construction practices and procurement practices. Also include:

a. The name of the LEED Accredited Professional Building Design + Construction (LEED AP BD+C).

b. Copies of the LEED calculators or forms to be used for tracking and documenting LEED credits and prerequisites. Provide a list of proposed materials, estimated material costs, purchasing plans for materials and resources credits, and other calculation details to demonstrate that the requirements of the specified LEED credits and

SECTION 01 33 29.00 06 Page 7 prerequisites can be attained.

c. The schedule for completion of the requirements and documentation for each credit and prerequisite.

d. List all plans required by the attempted LEED credits and prerequisites and the proposed completion date of each plan. Add the plans to the LEED Implementation Plan and LEED Online as they are completed. Include the Indoor Air Quality Management Plan and the Construction and Demolition Waste Management Plan, coordinated with the Guiding Principle Requirements, in the LEED Implementation Plan.

e. List all applicable LEED Interpretations that will be used to substantiate compliance with credits and prerequisites. Include the complete text of each LEED Interpretation and the date of each.

1.7.1.6 LEED Documentation

Maintain LEED documentation using LEED Online. Complete the documentation in LEED Online in accordance with the schedule in the LEED Implementation Plan. Update the LEED calculators or forms used for tracking and documenting LEED Materials and Resources credits in LEED Online monthly with the information available at that time.

Within the Sustainability eNotebook, include a copy of all completed documentation in LEED Online including both Design Phase and Construction Phase documentation. Include correspondence occurring during construction with the Green Building Certification Institute. Include a copy of each LEED Correction Plan.

1.7.1.7 LEED Plaque and Certificate

Provide and install a LEED Plaque. The LEED Plaque must be 16" diameter by 3/4" brushed aluminum with clear coat and must be machined from solid aluminum sheet. Provide brushed aluminum mounting brackets and concealed mounting screws. Mount the LEED Plaque to wall at a location directed by the Contracting Officer's Representative. Provide the LEED Certificate, framed in 1 inch deep metal frames, with double matt, and wire hangars, concurrent with the LEED Plaque. The name of the project and installation on the plaque and certificate must be the final building name provide by the Contracting Officer's Representative.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

SECTION 01 33 29.00 06 Page 8

3.1 SUSTAINABILITY IMPLEMENTATION MEETING

The LEED AP BD+C , QC System Manager, and Contracting Officer's Representative must meet within 60 calendar days after notice to proceed to review project sustainability goals with respect to the Sustainability Action Plan and LEED Implementation Plan , identify potential difficulties related to meeting the Guiding Principle Requirements, and discuss mitigation strategies.

3.2 Sustainability Pre-Closeout Meeting

The LEED AP BD+C , QC System Manager, and Contracting Officer's Representative must meet 60 calendars days prior to Contract Required Completion Date to review completion status of sustainability requirements including level of completion of Third Party Certification, Guiding Principles Requirements documentation and the High Performance and Sustainable Building Checklist. Discuss any potential difficulties in completing Third Party Certification, outstanding requirements and documentation. Provide a copy of the Sustainability eNotebook with up-to-date documentation.

3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)

REQUIREMENTS

Refer to following table, based on ASHRAE 189.1 section 8.4.2 (Materials), for compliance criteria.

SECTION 01 33 29.00 06 Page 9

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Adhesives and Sealants

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring; panel;

primers) Sealants (acoustical;

firestop; HVAC Air duct; primers) Caulks

SCAQMD Rule 1168 (Use "other" category for HVAC duct sealant) (for firestop adhesive, UFC 3-600-01 overrides conflicting requirements)

Aerosol adhesives Section 3 of Green Seal Standard

GS-36

(except:

cleaners, solvent cements, and primers used with plastic piping and conduit in plumbing, fire suppression, and electrical systems; HVAC air duct sealants when the application space air temp is less than 40 F (4.5 C).

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Flat and nonflat topcoats, primers, undercoaters, and anti-corrosive coatings

Green Seal Standard GS-11

SECTION 01 33 29.00 06 Page 10

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Concrete/masonry sealers (waterproofing concrete/masonry sealers), concrete curing compounds, dry fog coatings, faux finishing coatings, fire resistive coatings, floor coatings, graphic arts (sign) coatings, industrial maintenance coatings, mastic texture coatings, metallic pigmented coatings, multicolor coatings, pretreatment wash primers, reactive penetrating sealers, recycled coatings, shellacs (clear and opaque), specialty primers, stains, wood coatings (clear wood finishes), wood preservatives, and zinc primers

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings or SCAQMD Rule 1113

SECTION 01 33 29.00 06 Page 11

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Paints and Coatings CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Basement specialty coatings, high-temperature coatings, low solids coatings, stone consolidants, swimming-pool coatings, tub- and tile-refining coatings, and waterproofing membranes

California Air Resources Board (CARB) Suggested Control Measure for Architectural Coatings

Floor Covering Materials

For carpet, all locations:

CDPH/EHLB/Standard Method V1.1 (California Section 01350) or label for Section 9 of CDPH/EHLB/Standard Method V1.1 (California Section 01350) none none

SECTION 01 33 29.00 06 Page 12

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Composite Wood, Wood Structural Panel, and Agrifiber Products particleboard medium density fiberboard (MDF) wheatboard strawboard panel substrates door cores no added urea-formaldehyde resins including laminating adhesives for composite wood and agrifiber assemblies

Third-party certification (approved by CARB) of California Air Resource Board's (CARB) regulation , Airborne Toxic Control Measure to Reduce Formaldehyde Emissions from Composite Wood Products none none

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) (except: Structural panel components such as plywood, particle board, wafer board, and oriented strand board identified as

"EXPOSURE 1,"

"EXTERIOR," or "HUD-APPROVED" are considered acceptable for interior use.)

SECTION 01 33 29.00 06 Page 13

TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements

MATERIAL CATEGORY EMISSIONS

REQUIREMENT

MATERIALS WITH

ADDED VOC

REQUIREMENT

MATERIAL CATEGORY

Office Furniture Systems and Seating installed prior to occupancy

ANSI/BIFMA X7.1

ANSI/BIFMA X7.1:

(95 percent of installed office furniture system workstations and seating units)

Section 7.6.2 of ANSI/BIFMA e3 (50 percent of office furniture system workstations and seating units) none none

Ceiling and Wall Systems ceiling and wall insulation acoustical ceiling panels tackable wall panels gypsum wall board and panels wall coverings

CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) none none

SECTION 01 33 29.00 06 Page 14

SECTION 01 33 29.00 06 Page 15

-- End of Section --

AMENDMENT 0002 *************************************************************

Attachment A

HIGH PERFORMANCE AND SUSTAINABLE BUILDING CHECKLIST

SECTION 01 33 29.00 06 Page 16

Air Force Sustainability Requirements Scoresheet HPSB COMPLIANCE (Updated Jan 2017) * required entry

General Information INCOMPLETE 85736, P2 #:502297 Project ID (e.g. ABCD12345) 00000000000000 Real Property Unique ID (RPUID) TBD Facility Number USACE Dobbins ARC/VMS Building Name Dobbins Air Reserve Base Installation

City State

CONUS

MAJCOM

USACE Construction Agent AFCEC DM/CM (Last Name, First Name) *

$45,000,000.00 PA

93,835 Building Size (SF) 2025 Program Year (FY####) Design Complete Project Phase 11/01/22 Design Started (MM/DD/YY)

BOD (MM/DD/YY) *

USGBC GP Guiding Principles Compliance Certification Method

100% HPSB Compliant 26% Energy Efficiency Achieved (% below ANSI/ASHRAE/IESNA

Standard 90.1-2013) 2017V1 Scoresheet version

SURVEY

INCOMPLETE

Date Project Registered Date Project Certified

4/22/2025 1

Color Coding: See Instructions Tab for more detail Yes or N/A No Recommended not Required

90.1-2013 HPSB I: Employ Integrated Design Principles (UFC 1-200-02 para 2-2) Total Points 2 Possible Points 2

Yes HPSB I.1 Integrated Design 1 Yes HPSB I.2 Commissioning 1

HPSB II: Optimize Energy Performance (UFC 1-200-02 para 2-3) Total Points 5 Possible Points 5

Yes HPSB II.1 Energy Efficiency 1

Yes Reduce energy use 30% below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, or if not - achieve maximum energy efficiency that is lifecycle cost effective

26.0% Insert percentage below ANSI/ASHRAE/IESNA Standard 90.1-2013 or IECC, in terms of energy use (e.g. 32)

22.87 Insert building energy intensity (kBtu/yr-sqft) calculated IAW 10 CFR

Yes Roof Attributes (Recommended) 1 Select roof types (Check below)

Energy Efficient Products 1 Yes

N/A HPSB II.2 On-site Renewable Energy 1

N/A Installed renewable energy elements or projects were not lifecycle cost effective Renewable energy types (check below)

Insert generation capacity (kW) * Insert percentage of total building *

N/A HPSB II.3 On-site Renewable Energy - Solar Hot Water Heater System 1

N/A Installed solar hot water heater system or found installation not lifecycle cost effective

0.0 Insert generation capacity (MMBtu/yr)

0.0% Insert percentage of demand

Yes HPSB II.4 Metering 1 Yes Electric Metering: Select N/A if no service Yes Natural Gas Metering: Select N/A if no service N/A Steam Metering: Select N/A if no service

HPSB III: Protect and Conserve Water (UFC 1-200-02 para 2-4) Total Points 6 Possible Points 6

Yes HPSB III.1 Indoor Water 1 Yes Indoor Water Metering 1 Yes HPSB III.2 Outdoor Water 1 Yes Outdoor Water Metering 1 N/A HPSB III.3 Alternative Water 1 Yes HPSB III.4 Stormwater Management (LID Documentation per UFC 3-210-10) 1

To Be Provided w/ 65% Design Change in Impervious Area (SF) $0.00 Pre-Award Cost Estimate ($)

Yes Project addressed EISA 438 1 EISA Technical Constraints

0.0%

Percent Increase in Stormwater Runoff for 95 Percentile Storm (%) -or- Percent Increase in Stormwater Runoff from continuous simulation model, published data, studies, or other established tools (Reference UFC 3-210-10 Figure 2-1 Implementation of EISA Section 438)

On-Site LID Features Locations 1 Integrated Management Practices Employed

Drop-Down Box No Entry Required Custom Entry

Solar PV

Solar CP

Solar Thermal Electric

Geothermal

GSHP Wind

Hydro Waste to Energy

Renewables were not lifecycle cost effective

Cool roof

Green roof

Solar electric

Solar thermal

Solar Passive

Retaining stormwater impact receving water flow

Site too small to infiltrate significant volume

State or local restrict water harvesting

Shallow bedrock, contaminated soil, high ground water table, underground utilities

Non-potable water demand to small Structural, plumbing, and other mods not

Soil infiltration capacity limited

State or local restrict use of green infrastructure Other

4/22/2025 2

$0.00 Final LID Construction Cost ($) 0 Post Construction Analysis (Name of DOR)

HPSB IV: Enhance Indoor Environmental Quality (UFC 1-200-02 para 2-5) Total Points 8 Possible Points 8

Yes HPSB IV.1 Thermal Comfort 1 Yes HPSB IV.2 Ventilation 1 N/A HPSB IV.3 Daylighting 1 Yes HPSB IV.4 1 Yes HPSB IV.5 Low Emitting Materials 1 Yes HPSB IV.6 Protect Indoor Air Quality during Construction 1 Yes HPSB IV.7 Environmental Tobacco Smoke Control 1 Yes HPSB IV.8 Occupant Health and Wellness 1

HPSB V: Reduce Environmental Impact of Materials (UFC 1-200-02 para 2-6) Total Points 5 Possible Points 5

Yes HPSB V.1 Recycled Content 1 Yes HPSB V.2 Biologically-based Products 1 Yes HPSB V.3 Ozone Depleting Substances 1 Yes HPSB V.4 Waste and Materials Management - Recycling 1 Yes HPSB V.5 Waste and Materials Management - Divert 60% from Disposal 1

Yes 60% or greater diverted 75.0% Insert percentage diverted from landfill

HPSB VI: Address Climate Change Risk (UFC 1-200-02 para 2-7) Total Points 1 Possible Points 1

Yes HPSB VI.1 Address Climate Change Risk 1 Possible Points 27

27 Federal Requirements - Yes or N/A 0 Federal Requirements - No

100% Percentage of Federal Requirements Met

Moisture Control

Bio-Retention

Infiltration Trench

Soil Amendments

Dry Wells Inlet Pollution Removal Device

Permeable Pavement/Pavers

Filter Strips Grassed Swells Rain Barrels/Cisterns

Tree Box Filters Vegetated Buffers Vegetated

Other

4/22/2025 3

SECTION 01 33 29.00 06 Page 20

THIS PAGE INTENTIONALLY LEFT BLANK

Attachment B

LEED PROJECT CHECKLIST

SECTION 01 33 29.00 06 Page 21

LEEDv4/4.1 Project Checklist Project Team and Acronyms Date: February 2025 100% + ReDesign

Project Name USACE Dobbins ARC/VMS Previous Upddates: September 2024 100% Design

Project Address Dobbins Air Reserve Base See Details tab for more versions.

Marietta, GA 30069 Issued by: ecoPreserve

Project Data

Peak Users 220 2.50%

Qty Bicycle Racks, Parking 5.5

Y ? N Responsible Party Credit Name Status *see details page Possible Points Y ? N Responsible Party Credit Name Status *see details page Possible Points

1 Credit MEP 1 O, MEP General Documents: Precertification Worksheet * n/a

2 16 Location and Transportation 16 6 4 3 13 20 Credit O, PTA LEED for Neighborhood Development Location 16 Y Prereq O, PA, PTA Storage and Collection of Recyclables Required

1 Credit O, PTA Sensitive Land Protection 1 Y Prereq GC Construction and Demolition Waste Management Planning Required

1 1 Credit O, PTA High Priority Site 2 1 2 2 Credit PA, PTA, GC Building Life-Cycle Impact Reduction 5

6 Credit PTA Surrounding Density and Diverse Uses 5 2 Credit O, PA, GC, PTA Building Product Disclosure and Optimization - Environmental Product Declarations 2

6 Credit PTA Access to Quality Transit 5 1 1 Credit O, PA, GC, PTA Building Product Disclosure and Optimization - Sourcing of Raw Materials 2

1 Credit O, PA Bicycle Facilities 1 1 1 Credit O, PA, GC, PTA Building Product Disclosure and Optimization - Material Ingredients 2

1 Credit O, PA Reduced Parking Footprint - 30 % Reduction 1 2 Credit O, PA, GC, PTA Construction and Demolition Waste Management 2

1 Credit O, GC Green Vehicles 1

- 7 3 6 Indoor Environmental Quality 16

8 2 Sustainable Sites 10 Y Prereq MEP Required

Y Prereq Civil, GC Required Y Prereq O, PTA Required

1 Credit O, Civil, PA 1 2 Credit MEP 2

2 Credit O, Civil, LA Site Development - Protect or Restore Habitat 5/2024 still exploring fescue and alternates to seeding/sod2 3 Credit O, PA, PTA, GC 3

1 Credit O, Civil, LA 1 1 Credit MEP, PA, GC Construction Indoor Air Quality Management Plan 1

3 Credit CIVIL 3 1 1 Credit MEP, PA, GC 2

2 Credit O, PA, GC, PTA 2 1 Credit O, PA, PTA, GC 1

1 Credit Electrical/Lighting Light Pollution Reduction 1 1 ` 1 Credit O, PA, PTA, GC 2

3 Credit PA, PTA 3

5 6 Water Efficiency 11 1 Credit PA, PTA 1

Y Prereq O, MEP, Civil Required 1 Credit MEP, PA, GC 1

Y Prereq O, MEP, PA Required

Y Prereq MEP Building-Level Water Metering Required 4 1 Innovation Verify each Innovation credit and Responsible Party 3 2 Credit Civil Outdoor Water Use Reduction 2 1 Credit Innovation EXEMPLARY PERFORMANCE - OUTDOOR WATER USE 1

3 3 Credit MEP 6 1 Credit GC Innovation EXEMPLARY PERFORMANCE - MATERIAL EPDS 40+ 1

2 Credit MEP 2 1 Credit Innovation 1

1 Credit MEP Water Metering - Meter will be installed for building. A second will exist for VMS + training center. 2 domestic water lines feeding 2 different buildings. Dobbins water supply.1 1 Credit O, PTA Innovation 1

Credit Innovation 1

17 16 Energy and Atmosphere 33 1 Credit PTA LEED Accredited Professional 1

Y Prereq O, CxA, GC, MEP Required

Y Prereq MEP Required 3 1 Regional Priority Monitor Regional Priorities for your assigned credits. 4 Y Prereq MEP Required 1 Credit MEP Regional Priority: WE Indoor Water Use Reduction (4pts/40%) 1

Y Prereq MEP Required 1 Credit CIVIL Regional Priority: WE Outdoor Water Use Reduction (2 pts/100%) 1

5 1 Credit O, CxA, GC, MEP Enhanced Commissioning 6 1 Credit CIVIL Regional Priority: SS Rainwater Management (3pts) 1

11 7 Credit MEP 18 1 Credit n/a Regional Priority: Specific Credit 1

1 Credit MEP 1 53 10 48 TOTALS Possible Points: 107 2 Credit MEP 2

3 Credit MEP 3 NOTES: See Details pages for credit status and responsibility details.

1 Credit MEP 1 Update point totals on Details tab.

2 Credit O 2 Responsible Party acronyms reflect design influencers through credit documentation.Green Power and Carbon Offsets - not standard ops

Heat Island Reduction - Roof will meet SRI. Design and specs to comply.

PVC white membrane, unheated storage is standing seam metal, grey, the

Indoor Water Use Reduction - NEEDS ATTENTION

Outdoor Water Use Reduction

Indoor Water Use Reduction

Building-Level Energy Metering

Fundamental Commissioning and Verification

Demand Response - Electrical - may be worth investigating as the high occupancy takes place on weekends, but demand is weekday based when the building is lightly occupied. Demand automation is not part of this design, and not included at 90% design. This is non-standard for the Reserve. Points will be moved to No.

Renewable Energy Production

Enhanced Refrigerant Management - 410A Refrigerants being phased out in January 2025. R22 previously phased out. Others included in phasing.

Optimize Energy Performance

Advanced Energy Metering

Fundamental Refrigerant Management

Certified: 40 to 49 points, Silver: 50 to 59 points, Gold: 60 to 79 points, Platinum: 80 to 110

Minimum Indoor Air Quality Performance

Interior Lighting

Daylight

Rainwater Management

Minimum Energy Performance

Cooling Tower Water Use

Acoustic Performance

Quality Views

Enhanced Indoor Air Quality Strategies - VERIFY WITH MECHANICAL REDESIGN!

Low-Emitting Materials

Indoor Air Quality Assessment

Thermal Comfort - revisit - operations surveys

Integrative Process

Construction Activity Pollution Prevention

Materials and Resources

Open Space

Site Assessment

Environmental Tobacco Smoke Control

Project Team: Certification Contributors

Project Owner O Lighting Designer LITE

Project Manager PM Acoustician ACST

Design Team DT Commissioning Agent CxA

Project Architect PA LEED Project Team Administrator PTA PTA

Interior Designer ID Sustainability Consultant SC

Project Engineer PE General Contractor GC

Plumbing Engineer PLMB Manufacturer MFR

Electrical Engineer ELEC Furniture Designer, Supplier FRN

Mechanical Engineer MECH

Structural Engineer STRC Other Acronyms

Civil Engineer CIVIL Design or Construction Phase d or c

Landscape Architect LA Commissioning Cx

************************************************************ AMENDMENT 0002

SECTION 05 51 00

METAL STAIRS

08/23

AMENDMENT 0002

PART 1 GENERAL

AMENDMENT 0002 *************************************************************

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 314 (1990; R 2013) Standard Specification for Steel Anchor Bolts

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 325 (2017) Steel Construction Manual

AISC 326 (2009) Detailing for Steel Construction

AISC 360 (2016) Specification for Structural Steel Buildings

AMERICAN IRON AND STEEL INSTITUTE (AISI)

AISC/AISI 121 (2007) Standard Definitions for Use in the Design of Steel Structures

AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)

ASCE 7-22 (2022; Supp 1 2023; Supp 2 2023) Minimum Design Loads and Associated Criteria for Buildings and Other Structures

AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)

ASME B18.2.1 (2012; Errata 2013) Square and Hex Bolts and Screws (Inch Series)

ASME B18.6.1 (2016) Wood Screws (Inch Series)

ASME B18.6.3 (2013; R 2017) Machine Screws, Tapping Screws, and Machine Drive Screws (Inch Series)

ASME B18.21.1 (2009; R 2016) Washers: Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series)

SECTION 05 51 00 Page 1

AMERICAN WELDING SOCIETY (AWS)

AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination

AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A27/A27M (2020) Standard Specification for Steel Castings, Carbon, for General Application

ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel

ASTM A47/A47M (1999; R 2022; E 2022) Standard Specification for Ferritic Malleable Iron Castings

ASTM A48/A48M (2003; R 2021) Standard Specification for Gray Iron Castings

ASTM A53/A53M (2022) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A108 (2013) Standard Specification for Steel Bar, Carbon and Alloy, Cold-Finished

ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/A153M (2023) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware

ASTM A283/A283M (2013) Standard Specification for Low and Intermediate Tensile Strength Carbon Steel Plates

ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength

ASTM A449 (2014; R 2020) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use

ASTM A500/A500M (202 3) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A512 (2006; R 2012) Standard Specification for Cold-Drawn Buttweld Carbon Steel Mechanical Tubing

SECTION 05 51 00 Page 2

ASTM A568/A568M (2019a) Standard Specification for Steel, Sheet, Carbon, Structural, and High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, General Requirements for

ASTM A575 (2020) Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades

ASTM A653/A653M (2023) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

ASTM A924/A924M (2022a) Standard Specification for General Requirements for Steel Sheet, Metallic-Coated by the Hot-Dip Process

ASTM A1008/A1008M (202 3) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable

ASTM A1011/A1011M (2023) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength

ASTM C514 (2004; R 2020) Standard Specification for Nails for the Application of Gypsum Board

ASTM C636/C636M (2013) Standard Practice for Installation of Metal Ceiling Suspension Systems for Acoustical Tile and Lay-In Panels

ASTM E488/E488M (2022) Standard Test Methods for Strength of Anchors in Concrete Elements

ASTM F3125/F3125M (2019) Standard Specification for High Strength Structural Bolts and Assemblies, Steel and Alloy Steel, Heat Treated, Inch Dimensions 120 ksi and 150 ksi Minimum Tensile Strength, and Metric Dimensions 830 MPa and 1040 MPa Minimum Tensile Strength

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 101 (2021; TIA 21-1) Life Safety Code

************************************************************ AMENDMENT 0002

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G"

SECTION 05 51 00 Page 3 classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Iron and Steel Hardware ; G

Steel Shapes, Plates, Bars, and Strips ; G

Metal Stair System ; G

Fabrication Drawings ; G

SD-03 Product Data

Concrete Inserts ; G

Masonry Anchorage Devices ; G

Protective Coating ; G

Steel Pan Stairs ; G

Steel Stairs ; G

SD-06 Test Reports

Mill Test Reports ; G

SD-07 Certificates

Welding Procedures ; G

Welder Qualification ; G

SD-08 Manufacturer's Instructions

Protective Coating ; G

Masonry Anchorage Devices ; G

1.3 QUALITY CONTROL

1.3.1 Qualifications for Welding Work

Submit welding procedures in accordance with AWS D1.1/D1.1M . Make test specimens in the presence of the Contracting Officer, and have the specimens tested by an approved testing laboratory at the Contractor's expense.

Certify welder qualification by tests in accordance with AWS D1.1/D1.1M , or under an equivalent approved qualification test. In addition, perform tests on test pieces in positions and with clearances equivalent to those actually encountered. If a test weld fails to meet requirements, ensure that two test welds are retested immediately and that each test weld is made and passes. Failure in the immediate retest requires that the welder be retested after further practice or training and a complete set of test welds be made.

SECTION 05 51 00 Page 4

1.4 QUALITY ASSURANCE

1.4.1 Fabrication Drawing Requirements

Submit fabrication drawings for approval prior to fabrication. Prepare in accordance with AISC 325 , AISC 326 , ASCE 7-22 , and State of Georgia Building Code. Fabrication drawings will not be reproductions of contract drawings. Sign and seal fabrication drawings by a registered professional engineer. Include complete information for the fabrication and erection of the structure's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts. Use AWS A2.4 standard welding symbols.