This is a Solicitation Amendment (Standard Form 30) for a Design-Bid-Build Construction project for an Army Reserve Center (ARC) and Vehicle Maintenance Shop (VMS) at Dobbins Air Reserve Base in Georgia. The amendment (No. 0006) extends the proposal due date from 11:00 AM to 4:00 PM ET on 18 August 2025 and modifies several key sections of the solicitation, primarily changing references from "Operations and Maintenance Army Reserve (OMAR) Funded" to "Military Construction - Army Reserve (MCAR) Funded" for equipment items.

The solicitation includes a comprehensive Price Breakout Schedule with base proposal and optional bid items, covering construction of the ARC, VMS, site work, electrical infrastructure, and various optional elements like an unheated storage building, loading ramp, wash racks, and electric vehicle charging. Optional equipment items are categorized into MCAR-funded items (permanently attached) and "Bona Fide Need" OMAR-funded items (not permanently attached), with specific equipment lists for each category. The government will evaluate offers using a Trade-Off process, adding the total price of all options to the base requirement for award determination.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of theoffer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

J 1 7

0006 15 AUG 2025 P2 502297

W912QR

W072 ENDIST LOUISVILLE

KO CONTRACTING DIVISION, 600 DR MARTIN LUTHER KING JR PL

LOUISVILLE, KY 40202-2230

UNITED STATES

BONNY DYLEWSKI, EMAIL: BONNY.C.DYLEWSKI@USACE.ARMY.MIL

SCD: PAS:

W912QR25RA009

05 MAR 2025

SEE SECTION G - CONTRACT ADMINISTRATION DATA

SEE SUMMARY OF CHANGES

W912QR25RA009-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification):

SOLICITATION AMENDMENT 0006

Solicitation No. W912QR25RA009 for the Design-Bid-Build Construction of an Army Reserve Center (ARC) at Dobbins Air Reserve Base (ARB), GA is hereby amended as follows:

A. The proposal due date has been extended from 11:00 a.m. Eastern Time (ET) to 4:00 p.m. ET on 18 August 2025.

B. Section 00 10 00 - Solicitation, Price Breakout Schedule is amended as follows

(1) BID OPTION ITEMS, Item No. 0010 has been revised from:

"Option '6' - Operations and Maintenance Army Reserve (OMAR) Funded Equipment Items (ARC

/VMS)"

to:

"Option '6' - Military Construction - Army Reserve (MCAR) Funded Equipment Items (ARC/VMS)."

(2) BID OPTION ITEMS, Item No. 0011 has been revised from:

"Option '7'- Operations and Maintenance Army Reserve (OMAR) Funded Equipment Items (UHS)" to:

"Option '7'- Military Construction - Army Reserve (MCAR) Funded Equipment Items (UHS)."

(3) Description of Bid Option Proposal Items line (j) has been revised from:

"(j) Item No. 0010 "Optional Bid Item '6' - Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items (Items funded at or shortly after the time of construction award)" includes all work required to furnish and install "OMAR Funded" equipment items which are considered to not be permanently attached to the construction. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI). These OMAR funded items are for the ARC and VMS only.

CFCI OMAR Funded Equipment Items for this project consists of:

1. Metal Lockers (both ARC and VMS)

2. Wire Mesh Caging for Unit Storage and Arms Vault.

3. Wire Mesh Caging for Tool and Parts Room.

4. Metal Lockers in restroom."

to:

"(j) Item No. 0010 "Optional Bid Item '6' - Military Construction - Army Reserve (MCAR) Funded Equipment Items (Items funded at or shortly after the time of construction award)" includes all work required to furnish and install "MCAR Funded" equipment items which are considered to be permanently attached to the construction. MCAR funded equipment is to be Contractor provided and Contractor installed (CFCI). These MCAR funded items are for the ARC and VMS only.

CFCI MCAR Funded Equipment Items for this project consists of:

1. Built-In Metal Lockers (both ARC and VMS)

2. Built-In Wire Mesh Caging for Unit Storage and Arms Vault.

3. Built-In Wire Mesh Caging for Tool and Parts Room.

4. Built-In Metal Lockers in restroom."

(4) Description of Bid Option Proposal Items line (k) has been revised from:

"(k) Item No. 0011 "Optional Bid Item '7' - Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items (Items funded at or shortly after the time of construction award)" includes all work required to furnish and install "OMAR Funded" equipment items which are considered to not be permanently attached to the construction. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI). This OMAR funded item is for the Unheated Storage Building Only.

CFCI OMAR Funded Equipment Item(s) for this project consist(s) of:

1. Wire Mesh Caging for the Storage Area."

to:

"(k) Item No. 0011 "Optional Bid Item '7' - Military Construction - Army Reserve (MCAR) Funded Equipment Items (Items funded at or shortly after the time of construction award)" includes all work required to furnish and install "MCAR Funded" equipment items which are considered to be permanently attached to the construction. MCAR funded equipment is to be Contractor provided and Contractor installed (CFCI). This MCAR funded item is for the Unheated Storage Building Only.

CFCI MCAR Funded Equipment Item(s) for this project consist(s) of:

1. Built-In Wire Mesh Caging for the Storage Area."

C. All other terms and conditions remain unchanged.

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Time 11:00 AM 04:00 PM

85736 – Army Reserve Center/VMS Dobbins ARB, GA

PRICE BREAKOUT SCHEDULE

PROJECT: Army Reserve Center/VMS LOCATION: Dobbins ARB, GA

PROPOSER’S NAME:

BASE PROPOSAL

Item No. Description Unit Amount

0001 Army Reserve Center (ARC) JOB $

0002 Vehicle Maintenance Shop (VMS) JOB $

0003 Site Work/Supporting Facilities JOB $

0004 Site Electrical JOB $ 191,191.48

Subtotal – BASE PROPOSAL $

BID OPTION ITEMS

0005 Option ‘1’– Unheated Storage Building (UHS) JOB $

0006 Option ‘2’ – Bi-Level Loading Ramp JOB $

0007 Option ‘3’ – Wash Rack JOB $

0008 Option ‘4’ – Electric Vehicle Charging JOB $

0009 Option ‘5’ – Water Line Relocation JOB $

0010 Option ‘6’ – Military Construction – Army Reserve (MCAR) Funded Equipment Items (ARC/VMS) JOB $

0011 Option ‘7’ – Military Construction – Army Reserve (MCAR) Funded Equipment Items (UHS) JOB $

0012 Option ‘8’ – “Bona Fide Need” Operations and Maintenance – Army Reserve Funded Equipment Items (ARC/VMS) JOB $

0013 Option ‘9’ – “Bona Fide Need” Operations And Maintenance – Army Reserve Funded Equipment Items (UHS) JOB $

Subtotal – BID OPTION ITEMS $

TOTAL BASE PROPOSAL + BID OPTION ITEMS $

Description of Base Proposal Items

(a) Item No. 0001 “Army Reserve Center Building” includes all Base Proposal construction work required within a line five feet outside of the building.

(b) Item No. 0002 “Vehicle Maintenance Shop” includes all Base Proposal construction work required within a line five feet outside of the building.

(c) Item No. 0003 “Site Work / Supporting Facilities” includes all Base Proposal construction work required beyond a line five feet outside the buildings and within construction limits.

(d) Item No. 0004 “Site Electrical” includes electrical tie-in connectivity reimbursement via Construction CCA (Connecting Charge Agreement) to Georgia Power for all work, materials, labor, and inspection fees complete as indicated in the Design Documents for connection of primary power up to and including the transformer and transformer pad.

Description of Bid Option Proposal Items

(e) Item No. 0005 “Optional Bid Item ‘1’ – Unheated Storage Building includes all work required for the construction of the Unheated Storage Building located near the Vehicle Maintenance Shop within the Military Equipment Parking area. (refer to Civil drawings for extent), as indicated in the Design Documents.

*This option may be exercised within 90 calendar days from Notice to Proceed (NTP).*

(f) Item No. 0006 “Optional Bid Item ‘2’ – Bi-Level Loading Ramp includes all work required for the construction of the Bi-Level Loading Ramp as indicated in the Design Documents.

*This option may be exercised within 90 calendar days from Notice to Proceed (NTP).*

(g) Item No. 0007 “Optional Bid Item ‘3’ – Wash Racks includes all work required for the construction of the one (1) exterior covered wash racks, including all utility infrastructure and systems (refer to Civil, Plumbing, Architectural, & Electrical drawings for extent), as indicated in the Design Documents.

*This option may be exercised within 90 calendar days from Notice to Proceed (NTP).*

(h) Item No. 0008 “Optional Bid Item ‘4’ – Electric Vehicle Charging includes all work required for the construction of the electric vehicle (EV) charging infrastructure, including all utility infrastructure and systems (refer to Civil and Electrical drawings for extent), as indicated in the Design Documents.

*This option may be exercised within 90 calendar days from Notice to Proceed (NTP).*

(i) Item No. 0009 “Optional Bid Item ‘5’ – Water Line Relocation includes all work required for the demolition and construction the water line located south of the project site (refer to Civil drawings for extent), as indicated in the Design Documents.

*This option may be exercised within 365 calendar days from Notice to Proceed (NTP).*

(j) Item No. 0010 “Optional Bid Item ‘6’ – Military Construction – Army Reserve (MCAR) Funded Equipment Items (Items funded at or shortly after the time of construction award)” includes all work required to furnish and install “MCAR Funded” equipment items which are considered to be permanently attached to the construction. MCAR funded equipment is to be Contractor provided and Contractor installed (CFCI). These MCAR funded items are for the ARC and VMS only.

CFCI MCAR Funded Equipment Items for this project consists of:

1. Built-In Metal Lockers (both ARC and VMS)

2. Built-In Wire Mesh Caging for Unit Storage and Arms Vault.

3. Built-In Wire Mesh Caging for Tool and Parts Room.

4. Built-In Metal Lockers in restroom.

*This option may be exercised within 90 calendar days from Notice to Proceed (NTP).*

(k) Item No. 0011 “Optional Bid Item ‘7’ – Military Construction – Army Reserve (MCAR) Funded Equipment Items (Items funded at or shortly after the time of construction award)” includes all work required to furnish and install “MCAR Funded” equipment items which are considered to be permanently attached to the construction. MCAR funded equipment is to be Contractor provided and Contractor installed (CFCI). This MCAR funded item is for the Unheated Storage Building Only.

CFCI MCAR Funded Equipment Item(s) for this project consist(s) of:

1. Built-In Wire Mesh Caging for the Storage Area.

*This option may be exercised within 90 calendar days from Notice to Proceed (NTP).*

(l) Item No. 0012 “Optional Bid Item ‘8’ – “Bona Fide Need” Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items” includes all work required to furnish and install “OMAR Funded Equipment Items” which are considered to not be permanently attached to construction. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI). These OMAR funded items are for the ARC and VMS only.

CFCI “Bona Fide Need” OMAR Funded Equipment Items for this project consists of:

1. Arms Vault Dehumidifier.

2. Freestanding Metal Shelving.

3. Refrigerators in Break Room and Lactation Room.

4. Microwaves in Break Room and Lactation Room.

5. Window Treatments (mini blinds and roller shades).

6. Fire Extinguishers (extinguisher cabinets are to be in the building-specific respective Base Proposal).

*This option may be exercised within 840 calendar days from Notice to Proceed

(NTP).*

(m) Item No. 0013 “Optional Bid Item ‘9’ – “Bona Fide Need” – Unheated Storage Building” includes all work required to furnish and install the Bona Fide Need OMAR Funded items which are not permanently attached to the structures. Bona Fide Need OMAR Funded Items are to be contractor furnished, contractor-installed. OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI). This OMAR funded item is for the Unheated Storage Building Only.

CFCI “Bona Fide Need” OMAR Funded Equipment Item(s) for this project consist(s) of:

1. Fire Extinguishers (extinguisher cabinets are to be in the building-specific respective Base Proposal).

*This option may be exercised within 840 calendar days from Notice to Proceed

(NTP).*

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE 1: To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE 2: Offerors must insert a price on all numbered items including options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE 3: The Offeror’s Base Bid and all Options will be evaluated for Best Value to the Government. The basis for award is the Trade-Off process. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

NOTE 4: Offeror’s shall rely upon the contract documents for project requirements associated with each CLIN. Descriptions and titles given for overall project coordination and convenience.

-- END OF PRICE BREAKOUT SCHEDULE --