This document is a Special Instructions file for a small business set-aside solicitation for flooring renovation at the United States Corps of Engineers Green River Lake Visitor Center and Project Office. The project requires complete removal of existing floor coverings and installation of new flooring, with work to commence within 14 calendar days of the Notice to Proceed and conclude 120 calendar days thereafter. The solicitation (W912QR25QA039) is specifically designated for small businesses under NAICS code 238330 with a $19M size standard, located at 544 Lake Road in Campbellsville, Kentucky.
Key procurement details include electronic quote submission due on 18 June 2024 at 10:00 AM Eastern Time to adyson.medley@usace.army.mil, with a highly recommended site visit prior to bidding. Contractors must be registered in the System for Award Management (SAM.gov) and will be paid via Electronic Funds Transfer. The contract covers all necessary personnel, equipment, supplies, and materials, with pricing to include mobilization, de-mobilization, fuel, labor, material, and equipment costs. One award will be made from this solicitation, and the managing agency is the Department of the Army Corps of Engineers Engineering District Louisville.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912QR25QA0390001 SF 30.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Solicitation Amendment W912QR25QA0390001 SF 30.pdf | ||
| Solicitation - W912QR25QA039.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Color_Specifications.pdf | ||
| Reps and Certs.pdf | ||
| PROJNET INSTRUCTIONS.pdf | ||
| SOW.pdf | ||
| PRICE BREAKOUT SCHEDULE.pdf | ||
| Green River Lake Project Office Flooring - East Side South of Lobby - Theatre.pdf | ||
| Exhibits.pdf | ||
| KY20250042 dtd 02 May 2025 Taylor County KY.txt | TXT text file |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL INSTRUCTIONS
The contractor shall furnish all personnel, equipment, supplies and materials necessary to remove existing floor coverings and install new flooring throughout the Visitor Center & Project Office. Prices should include mobilization & de-mobilization, fuel, labor, material and equipment The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will begin within 14 calendar days of the Notice to Proceed (NTP) and will conclude 120 calendar days after the NTP.
Location:
United States Corps of Engineers Green River Lake 544 Lake Road Campbellsville, KY 42718-9805 This procurement is 100% set-aside for Small Business, NAICS 238330 (Size Determination $19M).
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
One award will be made from this Solicitation.
Note: A site visit is HIGHLY RECOMMENDED for the contractor to review the complexities of the work site, understand phasing requirements, verify existing conditions, and exact measurements. A site visit will be held on XXXX, 1000 EST. If the initial site visit is missed, the Contractor may request, up until bid closure, with no guarantee, to TPOC Josee Scott (502)-286-0590.
Quotes are due on 18 June 2024 at 10:00 AM Eastern Time.
Electronic submittals will be accepted. You may submit your quote to adyson.medley@usace.army.mil. Fax submittals will not be accepted.
For contractual questions, please contact Adyson Medley at (502) 315-6211 or by e-mail at adyson.medley@usace.army.mil.
**ALERT: All contractors must be registered in the System for Award Management (www.SAM.gov) prior to contractors’ submission. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS).
The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Note: Page numbering in this document may not be accurate.
File details come from the government source that posted it. Updated .