PRICE BREAKOUT SCHEDULE.pdf
PDF 207 KB Posted
- Attached to
- W912QR25QA039 - Green River Lake Flooring
- Solicitation number
- W912QR25QA039
About this file
The document is a Price Breakout Schedule for the Green River Lake Flooring project (Solicitation W912QR25QA039), detailing five line items for flooring installation and renovation work. Base items include installation of carpet floor covering, vinyl plank flooring, and porcelain tile floor covering, each priced as a single job. Optional line items involve removal of existing wood paneling and installing drywall on eastern and western elevations.
The solicitation is 100% set aside for small businesses under NAICS code 238330 with a $19M size standard, issued by the Department of the Army Corps of Engineers Engineering District Louisville. Contractors are required to have an active SAM registration and are advised to visit the job site to assess quantities and dimensions. Option items must be exercised within 14 days of award, and quotes are due on 18 June 2025 at 10:00 AM Eastern Time. All work will be performed according to standard industry practices, with measurements noted as approximate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912QR25QA0390001 SF 30.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Solicitation Amendment W912QR25QA0390001 SF 30.pdf | ||
| Solicitation - W912QR25QA039.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Color_Specifications.pdf | ||
| Reps and Certs.pdf | ||
| PROJNET INSTRUCTIONS.pdf | ||
| SOW.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Green River Lake Project Office Flooring - East Side South of Lobby - Theatre.pdf | ||
| Exhibits.pdf | ||
| KY20250042 dtd 02 May 2025 Taylor County KY.txt | TXT text file |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE BREAKOUT SCHEDULE
LINE ITEM DESCRIPTION QTY UNIT OF
ISSUE
TOTAL
BASE ITEM 01 Installation of Carpet Floor Covering 1 Job $ BASE ITEM 02 Installation of Vinyl Plank Flooring 1 Job $ BASE ITEM 03 Installation of Porcelain Tile Floor
Covering 1 Job $
Base Total $ OPTION ITEM 04 Removal of Existing Wood Paneling, Installing Drywall (Eastern Elevation)
1 Job $
OPTION ITEM 05 Removal of Existing Wood Paneling, Installing Drywall (Western Elevation)
1 Job $
OPTION LINE ITEM TOTAL: $
BASE + OPTION TOTAL: $
Please Note: All distances and measurements given are approximate. Each bidding contractor is urged to visit the job site to assess quantities, critical dimensions, and work conditions. All work will be done according to standard industry practices.
Please Note: Option items shall be exercised within 14 days of award.
File details come from the government source that posted it. Updated .