Green River Lake Project Office Flooring - East Side South of Lobby - Theatre.pdf
PDF 6 MB Posted
- Attached to
- W912QR25QA039 - Green River Lake Flooring
- Solicitation number
- W912QR25QA039
About this file
The provided document contains a series of images documenting various rooms and areas within the Green River Lake Project Office, including the theatre, conference room, locker room, kitchen, and other spaces. The images appear to be part of a site survey or documentation for a flooring replacement project, specifically for the U.S. Army Corps of Engineers Louisville District.
The photographs showcase different flooring conditions, electrical outlets, base trim, wall textures, and furniture layouts across multiple rooms. Key areas documented include the theatre's southeast lobby with seats to be removed and replaced, a conference room that can be used for furniture storage during project phasing, a locker room with a drain, and various other interior spaces. These images likely serve as reference documentation for contractors bidding on the flooring replacement solicitation (W912QR25QA039), helping them understand the site's current conditions and scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment W912QR25QA0390001 SF 30.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Solicitation Amendment W912QR25QA0390001 SF 30.pdf | ||
| Solicitation - W912QR25QA039.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Color_Specifications.pdf | ||
| Reps and Certs.pdf | ||
| PROJNET INSTRUCTIONS.pdf | ||
| SOW.pdf | ||
| PRICE BREAKOUT SCHEDULE.pdf | ||
| SPECIAL INSTRUCTIONS.docx | DOCX document | |
| Exhibits.pdf | ||
| KY20250042 dtd 02 May 2025 Taylor County KY.txt | TXT text file |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Theatre – Entrance - South east lobby – Seats to be removed and put back by contractor
Base trim in theatre
Projector Room / Closet in Theatre to remain unchanged – Transition to be replacedBase mold in Theatre
Carpet on stage to remain unchanged
All loose materials to be moved by site personnel, furniture to be moved by contractor hallway in kitchen
Locker room drain
Conference room – furniture will need to be moved by contractor, can be used as storage for other furniture during phasing
Locker room