Green River Lake Project Office Flooring - East Side South of Lobby - Theatre.pdf

PDF 6 MB Posted

Attached to
W912QR25QA039 - Green River Lake Flooring
Solicitation number
W912QR25QA039
Issued by

About this file

The provided document contains a series of images documenting various rooms and areas within the Green River Lake Project Office, including the theatre, conference room, locker room, kitchen, and other spaces. The images appear to be part of a site survey or documentation for a flooring replacement project, specifically for the U.S. Army Corps of Engineers Louisville District.

The photographs showcase different flooring conditions, electrical outlets, base trim, wall textures, and furniture layouts across multiple rooms. Key areas documented include the theatre's southeast lobby with seats to be removed and replaced, a conference room that can be used for furniture storage during project phasing, a locker room with a drain, and various other interior spaces. These images likely serve as reference documentation for contractors bidding on the flooring replacement solicitation (W912QR25QA039), helping them understand the site's current conditions and scope of work.

View the file

Other files

File Type Posted
Solicitation Amendment W912QR25QA0390001 SF 30.pdf PDF
SPECIAL INSTRUCTIONS.docx DOCX document
SPECIAL INSTRUCTIONS.docx DOCX document
Solicitation Amendment W912QR25QA0390001 SF 30.pdf PDF
Solicitation - W912QR25QA039.pdf PDF
SPECIAL INSTRUCTIONS.docx DOCX document
Color_Specifications.pdf PDF
Reps and Certs.pdf PDF
PROJNET INSTRUCTIONS.pdf PDF
SOW.pdf PDF
PRICE BREAKOUT SCHEDULE.pdf PDF
SPECIAL INSTRUCTIONS.docx DOCX document
Exhibits.pdf PDF
KY20250042 dtd 02 May 2025 Taylor County KY.txt TXT text file
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Theatre – Entrance - South east lobby – Seats to be removed and put back by contractor

Base trim in theatre

Projector Room / Closet in Theatre to remain unchanged – Transition to be replacedBase mold in Theatre

Carpet on stage to remain unchanged

All loose materials to be moved by site personnel, furniture to be moved by contractor hallway in kitchen

Locker room drain

Conference room – furniture will need to be moved by contractor, can be used as storage for other furniture during phasing

Locker room