W912QR25BA012 Solicitation and Price Breakout Schedule - Buckhorn Tailwater Bank Stabilization.zip
ZIP file 6 MB Posted
- Solicitation number
- W912QR25BA012
About this file
The file is a Solicitation and Price Breakout Schedule for the Buckhorn Tailwater Bank Stabilization project by the U.S. Army Corps of Engineers Louisville District. The Invitation for Bid (IFB) is for a Design/Bid/Build contract to repair approximately 500 feet of severely eroded streambank along Squabble Creek at the Buckhorn Campground in Kentucky, damaged during a 2022 flood event. The project scope includes regrading the streambank, installing rip rap stone protection, repairing campsites with grading and concrete/gravel pad placement, and performing asphalt milling and road subgrade repairs.
The contract is a Firm-Fixed-Price (FFP) procurement set aside for 100% Small Business participation, with a NAICS code of 237990 (Other Heavy and Civil Engineering Construction). The contract duration is 60 calendar days from the Construction Notice to Proceed (NTP), and special considerations include erosion control best management practices due to endangered darter species in Squabble Creek. The procurement will be conducted through a sealed bid selection process, with the U.S. Army Corps of Engineers Louisville District serving as the contracting agency.
Other files
| File | Type | Posted |
|---|---|---|
| W912QR25BA012 Amendment 0001- Buckhorn Tailwater Bank Stabilization.zip | ZIP file | |
| Site Visit Sign-In Sheet.pdf | ||
| W912QR25BA012_Specs-0000.pdf | ||
| W912QR25BA012_Plans-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .