W912QR25BA012_Plans-0000.pdf
PDF 33 MB Posted
- Solicitation number
- W912QR25BA012
About this file
This document is a comprehensive set of engineering design plans for the Buckhorn Tailwater Streambank Erosion Repair Project located in Buckhorn, Kentucky, prepared by the U.S. Army Corps of Engineers Louisville District. The project involves stabilizing approximately 500 linear feet of streambank along Squabble Creek that experienced severe erosion during a 2022 flood event, which is threatening adjacent camper pads. The planned repairs include regrading the streambank, installing riprap stone protection, regrading and reconstructing multiple campsites with gravel and concrete camping pads, and performing asphalt road repairs.
The project specifications detail precise technical requirements, including erosion prevention measures, specific grading and slope specifications, and environmental considerations for protecting endangered darter species in the creek. The contract is structured as a Design/Bid/Build procurement with a 60-calendar day construction timeline, set aside exclusively for small businesses. The estimated contract value falls under NAICS code 237990 for Heavy and Civil Engineering Construction, with the Louisville District Corps of Engineers serving as the contracting agency. Design plans include detailed site surveys, aerial imagery, demolition plans, civil site plans, grading plans, and comprehensive technical drawings specifying construction methodologies and material specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
LOUISVILLE DISTRICT
BUCKHORN TAILWATER STREAMBANK EROSION
BUCKHORN, KY
P2 511801, FY2025
NOV, 2024
S.
M
C
FA
R
LA
N D
D .L
O G
AN
D .L
O G
AN
D .L
O G
AN
C
O
VE
R S
H
EE
T
GI001
O :\E
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
O
VE
R S
H
EE
T.
D
W G
:0
3:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, AN
SI
D
BU
C
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
C
ER
TI
FI
ED
F
IN
AL
US Army Corps of Engineers ®
PROJECT
LOCATION
LAYDOWN
AREA
07 March 2025
W912QR25BA012
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O G
AN
SH
EE
T
IN
D
EX
GI002
O :\E
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
O
VE
R S
H
EE
T.
D
W G
:0
3:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, AN
SI
D
BU
C
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
ER
TI
FI
ED
F
IN
AL
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
KENTUCKY
INDIANA
W VIRGINIA
TENNESSE
OHIO
VIRGINIA
ILLINOIS
N CAROLINA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O G
AN
AR
EA
, V
IC
IN
IT
Y, A N
D L
O C
AT
IO
N M
AP
GI003
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\A
R
EA
, V
IC
IN
IT
Y, A
N D
L O
C
AT
IO
N
M
AP
S.
D
W G
:0
3:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
PLAN
NORTH
PLAN
NORTH
PLAN
NORTH
PROJECT SITE LOCATION
PROJECT
LOCATION
LAYDOWN
AREA
PERRY COUNTY
A12 SCALE: NTS
LOCATION MAPA1 SCALE: NTS
AREA MAP
H12 SCALE: NTS
VICINITY MAP
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
PROJECT LOCATION
USACE PROJECT OFFICE
CO
NTRACTO
R
HAUL RO
UTE
KY HW
Y 28
SCHOOL HOUSE BRANCH RD
KY HWY 2022 BU
C
KH
O
R N
L N
GROSS LN
KY
H
W Y
CAMPGROUND ROAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
T.
F
R O
ST
D . L
O G
AN
D . L
O
N
TR
AC
TO
R H
AU
L
R O
U
TE
GI004
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\1
8_ G
-1
_H
AU
L R
O U
TE
.D
W G
:0
4:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
A1 SCALE: 1"=100'
CONTRACTOR HAUL ROUTE
PLAN
NORTH
100' 200'0
1. FOR CONTRACTOR WORK LIMITS REFER TO SHEET VA101
2. THE FOOTPRINT OF GROUND DISTURBANCE ACTIVITIES MUST BE MINIMIZED
AND LIMITED TO THE PROJECT AREA
3. FUGITIVE DUST CONTROL BEST MANAGEMENT PRACTICES (E.G. PERIODIC
WATERING, SWEEPING), MUST IMPLEMENTED DURING SITE PREPARATION
AND CONSTRUCTION.
GENERAL SHEET NOTES
LEGEND
HAUL ROUTE
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
ELEC ELEC
ELEC
E
ELEC
ELEC
ELEC E
E
E
E
E
E
E
E
E
E
E
E
E E
W W
W
W
W
W
W
W
W
W
W
W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSAN
SAN
EE
EE
E
E
E
W
W
W
W
CAMPGROUND ROAD
SQUABBLE CREEK
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
(GRASS)
(GRASS)
(ASPHALT)
(WOODS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SCALE: 1"=30'
PHOTOGRAPHY LOCATION PLAN
PLAN
NORTH
S.
TH
IB
AU
D
EA
U
D .L
O G
AN
D .L
O
PH
TO
G
R
AP
H Y
LO
C
AT
IO
N P
LA
N
GI005
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:0
4:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
A1
GENERAL SHEET NOTES
LEGEND
GI006
H2GI006
H8
GI006
H14
GI006
A2
GI006
A8
GI006
A14
GI007
H2
GI007
H8
GI007
H14
GI007
A2 GI007
A8
GI007
A14
G-00X
DET #
1. SEE SHEETS GI006 - GI007 FOR SITE PHOTOS.
2. SEE VF101 AND VF401 FOR FIELD SURVEY DATA.
3. SEE VA101 FOR AERIAL SURVEY PLAN.
4. DATES OF PHOTOGRAPHS ARE 2-5-2024 AND
5-17-2024
5. AERIAL PHOTOGRAPH IMPORTED FROM BING MAPS
4-20-2024
PHOTO LOCATION
ARROW DENOTES
DIRECTION
CONTRACTOR WORK
LIMITS
CAMPSITE NUMBER26
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
SITE PHOTO (004)
SCALE: NTSA2 SITE PHOTO (005)
SCALE: NTSA8 SITE PHOTO (006)
SCALE: NTSA14
SITE PHOTO (001)
SCALE: NTSH2 SITE PHOTO (002)
SCALE: NTSH8 SITE PHOTO (003)
SCALE: NTSH14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
(1
F 2)
SI
TE
P H
O
TO
G R
AP
H
Y
GI006
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\S
IT
E
PH
O
TO
G
R
AP
H Y.
D W
G
:0 4:
A
M
/6 /2
AE
C
_N C
S_ 4_
M O
N O
.S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, AN
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
CAMPSITE 22 CAMPSITE 22
CAMPSITE 22 CAMPSITE 24
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
SITE PHOTO (010)
SCALE: NTSA2 SITE PHOTO (011)
SCALE: NTSA8 SITE PHOTO (012)
SCALE: NTSA14
SITE PHOTO (007)
SCALE: NTSH2 SITE PHOTO (008)
SCALE: NTSH8 SITE PHOTO (008)
SCALE: NTSH14
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
(2
F 2)
S
IT
E
PH
O
TO
G R
AP
H
GI007
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\S
IT
E
PH
O
TO
G
R
AP
H Y.
D W
G
:0 4:
A
M
/6 /2
AE
C
_N C
S_ 4_
M O
N O
.S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, AN
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
CAMPSITE 25 CAMPSITE 26 CAMPSITE 25
CAMPSITE 24 CAMPSITE 22 CAMPSITE 25
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
725724
723724
725726
720719
736740
719720
730 732
734730725
725724
ELEC ELEC
ELEC
ELEC
E
ELEC
ELEC
ELECBO
RE 2
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
RE 3
ELEV. 729.20
B-1 B-1 O
FFSET
B-2
B-3
B-4
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
EE
W W
W
W
W
W W
W
W
W
W
W
W
W
W
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E E
E
E E
E
E E
E E
W W
W W
W
W
CAMPGROUND ROAD
SQUABBLE CREEK
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
PROPOSED
CONCRETE PAD
PROPOSED
CONCRETE PAD
SSF
SSF
SSF
SSF
SSF
SSF
SSF
SSF
PROPOSED
GRAVEL PAD
(GRASS)
(GRASS)
(ASPHALT)
(WOODS)
TURNAROUND AREA
(SEE DETAIL A1 ON SHEET GC501)
FLOW
FLOW
FL
O
W
FL
O
W
731730
2.00:1
2.00:1
732730
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SCALE: 1"=20'
EROSION PREVENTION AND SEDIMENT CONTROL PLAN
PLAN
NORTH
I.W
EI
LB
AK
ER
D .L
O G
AN
D .L
O
SI
O
N P
R
EV
EN
TI
O N
A N
D S
ED
IM
EN
T
C O
N
TR
O L
PL
GC101
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:0
4:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
20' 40'0
SHEET KEYNOTES
LEGEND
CE
CE CE
1. EXISTING CONTOUR LINES SHOWN ARE SHADED.
PROPOSED CONTOURS AND LABELS ARE SHOWN SOLID
AND UNSHADED.
2. EPSC MEASURES SHOWN ENCOMPASS BASE BID AND
OPTIONS CONSTRUCTION. CONTRACTOR IS
RESPONSIBLE TO ADJUST CONTROLS AS NECESSARY AS
WORK PROGRESSES OR SITE CONDITIONS CHANGES.
3. INSTALL PERIMETER CONTROL FOR ALL TEMPORARY
STOCKPILES. COORDINATE LOCATIONS WITH THE COR.
4. PRIOR TO ANY CONCRETE DELIVERY, INSTALL
CONCRETE WASHOUT STATION WITH IDENTIFYING
SIGNAGE. COORDINATE LOCATION WITH COR.
5. TOPSOIL, SEED, AND INSTALL EROSION CONTROL
BLANKET ON ALL AREAS NOT TO RECEIVE ROCK
SURFACING OR PAVING IN ACCORDANCE WITH
SPECIFICATION SECTION 32 92 19 SEEDING.
6. IMPLEMENT BMPS IN ACCORDANCE WITH SPECIFICATION
SECTION 01 57 00.00 06, KPDES PROGRAM, AND KY BMP
MANUAL.
7. TOTAL LAND DISTURBANCE = 0.83 ACRES.
SITE SOILS = SANDY LEAN CLAYS (CL) ARE PREDOMINANT
THROUGHOUT THE SITE. SANDY SILTY CLAY (CL-ML),
CLAYEY SAND (SC), AND SILTY, CLAYEY SAND (SC-SM)
PERCENT SLOPES = 0 TO 6 PERCENT. 2:1 FOR
STREAMBANK.
8. CONTRACTOR MUST PROVIDE ACTUAL SEQUENCE OF
CONSTRUCTION IN THE CONSTRUCTION SITE PLAN
PRE-CONSTRUCTION SUBMITTAL.
9. LAND DISTURBANCE OCCURS ONLY IN THE
CONSTRUCTION AREA SHOWN ON THIS SHEET.
SSF
1. INSTALL CONCRETE WASHOUT ON LEVEL GRAVEL PAD.
(DETAIL H11; SHEET CG501)
2. RESTORE DISTURBED AREAS TO PRE-CONSTRUCTION OR
BETTER GRASSED SURFACING. UFGS SECTION 32 92 19
SEEDING
3. INSTALL PERIMETER FILTER TUBE OR FIBER ROLL. SILT
FENCE MAY BE USED AS AN ALTERNATIVE. REMOVE
PERIMETER CONTROLS AFTER FINAL SITE STABILIZATION.
(DETAIL A11; SHEET GC501)
4. INSTALL FLOATING TURBIDITY BARRIER. (DETAIL G1; SHEET
GC501)
5. BANK SLOPE TO RECEIVE PERMANENT RIPRAP
PROTECTION. SEE SHEETS CS101, CG101, AND CS501.
CW
CW
FLOW
PROPOSED CONTRACTOR WORK LIMITS
PROPOSED FLOATING TURBIDITY BARRIER
(DETAIL G1, SHEET GC502)
SHEET KEYNOTES FIBER ROLL, FILTER
TUBE, OR SILT FENCE PER KEY NOTE
PROPOSED CONCRETE WASHOUT (DETAIL
H11, SHEET GC501)
PROPOSED TEMPORARY CONSTRUCTION
ENTRANCE (DETAIL A1 SHEET GC501)
FLOW ARROW
EXISTING CONTOURS
PROPOSED CONTOURS
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
SECTION NTS
PLAN NTS
8" MIN. FILTER SOCK
AREA TO BE PROTECTEDWORK AREA
WORK AREA
AREA TO BE PROTECTED
8" MIN. FILTER SOCK
WATER FLOW
PAVEMENT OR
IMPERVIOUS SURFACE CONCRETE BLOCKS OR SAND BAGS
SIZED AS NEEDED (10' O.C.)
CONCRETE BLOCKS OR SAND BAGS
SIZED AS NEEDED (10' O.C.)
PAVEMENT APPLICATION
WORK AREA
PYRAMID STAKING DETAIL
18" MIN.
ALTERNATE STAKING
OPTION
CLOSED END
STAKE
SECTION VIEW
WORK AREA
TOP VIEW
NON-PAVEMENT APPLICATION
NOTES:
1. ALL MATERIAL TO MEET SPECIFICATIONS.
2. FILTER MEDIA TO MEET APPLICATION REQUIREMENTS.
3. FILTER MEDIA TO BE DISPERSED ON SITE.
FLOW
TOP VIEW
SECTION VIEW
FILTER TUBE
SCALE: NTSA11
FILTER SILT SOCK
(8", 9", OR 12" TYPICAL)
FILTER SILT SOCK
(8", 9" OR 12" TYPICAL)
NOTES:
1. PRODUCT TO BE INSTALLED IN ACCORDANCE WITH MFTR INSTRUCTIONS.
2. WATTLE, FILTER TUBE, FIBER ROLL, AND SEDIMENT SOCK PRODUCTS MUST
BE SELECTED IN ACCORDANCE WITH MFTR RECCOMENDATIONS.
3. PRODUCT MUST BE STABLE THROUGHOUT CONSTRUCTION AND NOT
ALLOW INFILL MATERIALS TO ESCAPE CONTAINMENT AND ENTER DITCHES,
STRUCTURES OR WATERWAYS.
4. REMOVE TEMPORARY TUBE PRODUCT AFTER WORK AREA IS STABILIZED.
ROAD
CONSTRUCTION ENTRANCE/EXIT (CE)
SCALE: NTSA1
2"x2"x36" HARDWOOD STAKE @ 10' O.C.
START 5' FROM ANGLED STAKES
(2) 2"x2"x48+" HARDWOOD STAKES
WRAPPED WITH 16 GUAGE
AREA TO BE
PROTECTED
2" SQ. WOODEN STAKES
AT 10' ON CENTER
OVERLAPPING SECTIONS
FORM CONNECTION
2" SQ. WOODEN STAKES
AT 10' ON CENTER
WIRE @ 10' O.C.
CONNECTION/ATTACHMENT DETAIL
DIVERSION RIDGE
IF GRADES ARE >/= 2%
6" LAYER
KYTC NO.3
ELEVATION
W
AT
ER
F
LO
W
BRIDGE
WORK
DANGER BUOY
(BRIDGE WORK
EXAMPLE)
NOTES:
1. SILT CURTAINS FLOATING TURBIDITY BARRIER SHOULD BE ORIENTED
PARALLEL TO THE DIRECTION OF FLOW.
2. FOR SITES NOT SUBJECT TO HEAVY WAVE ACTION, THE CURTAIN
HEIGHT SHALL PROVIDE SUFFICIENT SLACK TO ALLOW THE TOP OF
THE CURTAIN TO RISE TO THE MAXIMUM EXPECTED HIGH-WATER
LEVEL (INCLUDING WAVES) WHILE THE BOTTOM MAINTAINS
CONTINUOUS CONTACT WITH THE BOTTOM OF THE WATER BODY. THE
BOTTOM EDGE OF THE CURTAIN SHALL HAVE A WEIGHT SYSTEM
CAPABLE OF HOLDING THE BOTTOM OF THE CURTAIN DOWN AND
CONFORMING TO THE BOTTOM OF THE WATER BODY, SO AS TO
PROHIBIT ESCAPE OF TURBID WATER UNDER THE CURTAIN.
3. THE SILT CURTAIN SHALL BE LOCATED BEYOND THE LATERAL LIMITS
OF THE CONSTRUCTION SITE AND FIRMLY ANCHORED INTO PLACE
(THE ALIGNMENT SHOULD BE SET AS CLOSE TO THE WORK AREA AS
POSSIBLE BUT NO SO CLOSE AS TO BE DISRUPTED BY
CONSTRUCTION EQUIPMENT).
4. DANGER BUOYS SHALL BE USED AS DIRECTED BY THE COAST GUARD
OR DNR PERMIT WHEN WORKING IN NAVIGABLE WATERS.
5. THE ENDS OF THE SILT CURTAIN SHALL BE SECURELY ANCHORED
AND KEYED IN ORDER TO ENCLOSE AREA.
6. A GENERAL RULE OF THUMB FOR ATTACHING ANCHORS IS TO DO SO
AT 100' INTERVALS (DEPENDING ON CURRENT AND TIDAL CONDITIONS,
IT MAY BE NECESSARY TO ANCHOR THE BARRIER ON BOTH SIDES-AS
SHOWN).
7. SELECT, INSTALL, AND MAINTAIN SILT CURTAIN/ TURBIDITY BARRIER
IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION.
FLOATING TURBIDITY BARRIER (TB)
SCALE: NTSG1
PLAN
ANCHOR SYSTEM AND LAYOUT DETAILS
STRAW BALE ANCHOR SECTIONS
PLAN VIEW
SIGN DETAIL
LINER ANCHOR
2'
6" 3'
6"
M
IN
" M
IN
10' - 0" MIN.
1. MAINTAINING TEMPORARY CONCRETE WASHOUT FACILITIES SHALL INCLUDE
REMOVING AND DISPOSING OF HARDENED CONCRETE AND/OR SLURRY AND
RETURNING THE FACILITIES TO A FUNCTIONAL CONDITION.
2. FACILITY SHALL BE CLEANED OR RECONSTRUCTED IN A NEW AREA ONCE
WASHOUT BECOMES TWO-THIRDS FULL.
3. EACH STRAW BALE IS TO BE STAKED IN PLACE USING (2) 2"x2"x4' WOODEN
STAKES.
4. STRAW BALE TYPE SHOWN. EARTHEN OR BARRIER TYPE MAY BE INSTALLED
AS APPROVED BY THE COR.
5. ACTUAL LAYOUT TO BE DETERMINED IN THE FIELD.
6. WASHOUT SHALL BE LOCATED 50' MIN. FROM ANY STORM DRAIN, CREEK BANK,
OR PERIMETER CONTROL.
NOTES:
2' M
AX
3' M
IN
H11 NTS
TEMPORARY CONCRETE WASHOUT FACILITY
STRAW BALE
6" WIRE STAPLE OR SANDBAG
30-MIL POLYETHYLENE
NATIVE SOIL ENTRENCH 3"
NOMINAL 2'X2' SIGN FOR
EXTERIOR USE
T-POST OR WOODEN
STAKE
STRAW BALE
STRAW BALE
ANCHOR
SECTION
6" WIRE STAPLE OR SANDBAG
(ANCHOR EVERY 2')30-MIL POLYETHYLENE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
(S H
EE
T
O
F 2)
ER
O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
GC501
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\E
R O
SI
O
N C
O N
TR
O
L D
ET
AI
LS
.D
W G
:0
5:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, AN
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
ELEC
ELEC
E
ELEC
ELEC
ELECBO
RE 2
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
RE 3
ELEV. 729.20
B-1 B-1 O
FFSET
B-2
B-3
B-4
E
E
E
W
W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E
CAMPGROUND ROAD
SQUABBLE CREEK
MIDDLE FORK KENTUCKY RIVER
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
N: 2016743.4630 E: 2303116.9044
N: 2016660.7540 E: 2303088.1365
N: 2016682.1843 E: 2303074.0666
N: 2016691.9156 E: 2303012.4621
N: 2016807.5044 E: 2303017.5335
N: 2016951.9211 E: 2303059.2721
N: 2016864.5760 E: 2303111.3095
N: 2016895.3819 E: 2303041.5729
N: 2016362.1499 E: 2303013.6000
N: 2016317.1616 E: 2303011.7647
N: 2016367.1573 E: 2302779.8066
N: 2016574.5627 E: 2302582.6605
N: 2016367.6742 E: 2302914.2216
N: 2016448.9013 E: 2303032.6921
N: 2016923.7733 E: 2303004.8040
N: 2016675.2552 E: 2303022.7057
N: 2016654.5151 E: 2303051.9160
N: 2016488.3818 E: 2303105.3091
N: 2016993.2701 E: 2303130.0689
N: 2016945.0715 E: 2303106.2292
N: 2016970.2744 E: 2303153.4287
N: 2016940.5721 E: 2303070.2080
N: 2016933.1304 E: 2303061.4120
N: 2016918.3477 E: 2303097.7390
N: 2016395.0380 E: 2302748.4609
N: 2016764.3233 E: 2302464.8104
N: 2016787.7733 E: 2302406.4912
N: 2016714.8125 E: 2302452.0120
N: 2016708.2745 E: 2302428.9942
N: 2016549.4458 E: 2302548.2148
N: 2016324.9091 E: 2302751.4185
N: 2016189.7255 E: 2302821.6359
N: 2016330.0093 E: 2303125.3559 N: 2016433.6130
E: 2303179.9939
N: 2016944.6325 E: 2303345.5042
N: 2016997.3530 E: 2303276.9668
N: 2017029.3212 E: 2303295.8118
N: 2016396.4222 E: 2302998.8681
N: 2016319.4298 E: 2302804.4960
N: 2015778.9701 E: 2302855.7012
N: 2015775.4953 E: 2302890.6564
N: 2016741.0964 E: 2303139.0722
N: 2016838.5364 E: 2303146.0408
0+
1+
2+00
3+00 4+00 5+00 6+00
7+00 8+008+05.27
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SCALE: 1"=60'
AERIAL WITH SITE PLAN
PLAN
NORTH
S, M
C
FA
R
LA
N D
D .L
O G
AN
D .L
O
A
ER
IA
L
IM
AG
ER
VA-101
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:0
5:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
N O
V, KH
O
R N
L
AK
E
TA
IL
W
AT
ER
SQ
U
AB
BL
E C
R
EE
K
BU
C
KH
O R
N , K
TI
FI
ED
F
IN
AL
1. HORIZONTAL DATUM IS KENTUCKY STATE PLANE SOUTH
ZONE 1602 (NAD83). U.S. SURVEY FEET.
2. VERTICAL DATUM IS CORPS OF ENGINEERS.
3. SITE SURVEY COMPLETED IN JANUARY 2024.
4. DATE OF AERIAL PHOTO. 2024
5. SEE VF101 FOR ADDITIONAL SURVEY INFORMATION AND VF401
FOR CONTROL POINT INFORMATION.
LEGEND
PROPOSED CONTRACTOR WORK LIMITS
CONTROL POINT LOCATION
60' 120'0
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
722723
735 740
740739
725724
730731
(CONC)
(CONC)
(CONC)
(CONC)
(STONE)
(STONE)
(ASPH)
(ASPH)
(ASPH)
(STONE)
(STONE)
(GRASS)
(GRASS)
(ASPH)
(ASPH)
(ASPH)
(ASPH)
(ASPH)
(ASPH)
ELEC
ELEC
ELEC
ELEC
E
ELEC
ELEC
ELEC
10109
OFFICE
15" M
APLE
36"
36"
W O
O
D SQ
UARE
10" TRIPLE O
THER
12" Q
UAD O
THER
6" O
THER
10" O
THER
12" O
THER
12" {5} O
THER 10" {2} O
THER
8" O
THER
8" O
THER
12" {2} O
THER
ELEVATED POWER POLE
12" O
THER
12" O
THER
18" O
THER
BO
RE 2
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
RE 3
ELEV. 729.20
N. 2,016,631.15 E. 2,303,111.38
ELEV. 741.85
#5 REBAR USACE CAP
USACE - STATUS SET
N. 2,016,955.79 E. 2,303,101.85
ELEV. 732.86
#5 REBAR USACE CAP
USACE - STATUS SET
B-1 B-1 O
FFSET
B-2
B-3
B-4 E E
E
E
E
E
E
E
E
E
E
E
E
E
W W
W
W
W
W W
W
W
W
W
W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E E
E E
E
E
W
W
W
W
CAMPGROUND ROAD
SQUABBLE CREEK
ELEC
ELEC
ELEC
ELEC
E
ELEC
ELEC
ELEC
10109
OFFICE
15" M
APLE
36"
36"
W O
O
D SQ
UARE
10" TRIPLE O
THER
12" Q
UAD O
THER
6" O
THER
10" O
THER
12" O
THER
12" {5} O
THER 10" {2} O
THER
8" O
THER
8" O
THER
12" {2} O
THER
ELEVATED POWER POLE
12" O
THER
12" O
THER
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
E. 2,303,111.38
ELEV. 741.85
#5 REBAR USACE CAP
USACE - STATUS SET
N. 2,016,955.79 E. 2,303,101.85
ELEV. 732.86
#5 REBAR USACE CAP
USACE - STATUS SET
B-1 B-1 O
FFSET
B-2
B-3
B-4 E E
E
E
E
E
E
E
E
E
E
E
E
E
W W
W
W
W
W W
W
W
W
W
W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E E
E E
E
E
W
W
W
W
ELEC
ELEC
ELEC
ELEC
E
ELEC
ELEC
ELEC
10109
OFFICE
15" M
APLE
36"
36"
W O
O
D SQ
UARE
10" TRIPLE O
THER
12" Q
UAD O
THER
6" O
THER
10" O
THER
12" O
THER
12" {5} O
THER 10" {2} O
THER
8" O
THER
8" O
THER
12" {2} O
THER
ELEVATED POWER POLE
12" O
THER
12" O
THER
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
E. 2,303,111.38
ELEV. 741.85
#5 REBAR USACE CAP
USACE - STATUS SET
N. 2,016,955.79 E. 2,303,101.85
ELEV. 732.86
#5 REBAR USACE CAP
USACE - STATUS SET
B-1 B-1 O
FFSET
B-2
B-3
B-4 E E
E
E
E
E
E
E
E
E
E
E
E
E
W W
W
W
W
W W
W
W
W
W
W W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E E
E E
E
E
W
W
W
W
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
F
IE
LD
S
U R
VE
VF101
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\1
8_
VF
1_
SI
TE
F
IE
LD
S
U R
VE
Y.
D W
G
:0 5:
A
M
/6 /2
AE
C
_N C
S_ 4_
M O
N O
.S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
A1 SCALE: 1"=20'
SITE FIELD SURVEY
20' 40'0
1. HORIZONTAL DATUM IS KENTUCKY STATE PLANE SOUTH
ZONE 1602 (NAD83). U.S. SURVEY FEET.
2. VERTICAL DATUM IS CORPS OF ENGINEERS.
3. SITE SURVEY COMPLETED IN JANUARY 2024.
4. AN APPROXIMATE UTILITY LAYOUT IS BEING PROVIDED. THE
CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL
EXISTING UTILITIES. THE CONTRACTING OFFICER SHOULD
BE NOTIFIED OF ANY CONFLICTS OR DISCREPANCIES PRIOR
TO INSTALLATION. THE CONTRACTOR MUST REPLACE OR
REPAIR ANY UTILITIES THAT ARE DAMAGED DURING
CONSTRUCTION.
5. CONTRACTOR MUST VERIFY CONTROL PRIOR TO ANY
EXCAVATION.
6. CONSTRUCTION MUST BE LAID OUT USING CONTROL
PROVIDED TO COINCIDE WITH ORIGINAL SURVEY AND
DESIGN.
7. REFER TO SHEET VA101 FOR CONTRACTOR WORK LIMITS.
GENERAL SHEET NOTES
LEGEND
CONTROL POINT LOCATION
CONTRACTOR WORK LIMITS
W EXISTING WATER LINE (NOT SURVEYED)
SAN
EXISTING SANITARY LINE
(NOT SURVEYED)
E
EXISTING UNDERGROUND ELECTRIC
LINE (NOT SURVEYED)
COMM EXISTING COMMUNICATIONS LINE
EXISTING CONTOURS865PLAN
NORTH
1. CAMPGROUND PAVEMENT
SHEET KEYNOTES
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV. V
NORTHING
EASTING
(M)
LOCATION:
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV. V
COMB. FACTOR
NORTHING
EASTING
(M)
LOCATION:
DESCRIPTION:
DESCRIPTION:
GEOGRAPHIC COORDINATES (NAD83)
SET set
(US FT)
(FT)(FT)
2,016,631.15 2,016,955.79
741.85
2,303,111.38 2,303,101.85
GEOGRAPHIC COORDINATES (NAD83)
(US FT)
(US FT)
(US FT)
JAN 2024 JAN 2024
KENTUCKY SOUTH SPC ZONE 1602 (NAD83) KENTUCKY SOUTH SPC ZONE 1602 (NAD83)
JAN 2024 JAN 2024
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV. V
SCALE FACTOR
NORTHING
EASTING
(M)
LOCATION:
COE
PROJECT:
DATE:
SKETCH OF STATION
STATION
LONGITUDE
ELEVATION
LATITUDE N
W
CONV. V
COMB. FACTOR
NORTHING
EASTING
(M)
LOCATION:
COE
DESCRIPTION:
DESCRIPTION:
GEOGRAPHIC COORDINATES (NAD83)
SET set
(US FT)
N
(FT)(FT)
N
732.86
GEOGRAPHIC COORDINATES (NAD83)
(US FT)
(US FT)
(US FT)
BUCKHORN LAKE FY 24 - TAILWATER BANK EROSION
BUCKHORN LAKE FY 24 - TAILWATER BANK EROSION
37°20'44.05020"
83°28'12.28456"
37°20'40.83900"
83°28'12.26360"
NOT TO
SCALE
NOT TO
SCALE
0.99994542 0.99994542 01°22'57.68" 01°22'57.67"
40.5'
19.2'
MONUMENT 100 IS LOCATED IN THE GRASS ON THE EAST SIDE OF CAMPGROUND
ROAD JUST NORTH OF THE CAMPGROUND OFFICE; 40.5 FEET EASTERLY OF 18
INCH DECIDUOUS TREE, 40.2 FEET SOUTHEASTERLY OF SOUTHEASTERLY COTNER
OF CAMPSITE LANDSCAPE TIMBER, 34.0 FEET WESTERLY OF UTILITY POLE AND
30.3 FEET NORTHWESTERLY OF NORTHEAST CORNER OF OFFICE BUILDING.
THE STATION IS A 5/8 INCH IRON PIN SET WITH YELLOW
USACE CAP THAT IS DRIVEN FLUSH WITH THE GROUND.
MONUMENT 101 IS LOCATED IN THE GRASS NEAR THE
PAVEMENT BETWEEN CAMP SITES; 26.5 FEET SOUTHERLY OF
THE SOUTHWEST CORNER OF LANDSCAPE TIMBER AROUND
CAMP SITE, 22.7 FEET EASTER OF SOUTHEASTERLY INTERIOR
CORNER OF LANDSCAPE TIMBERS AROUND CAMP SITE, 19.2
FEET NORTHWESTERLY OF EASTERLY EDGE OF PAVEMENT AND
5.9 FEET NORTHERLY OF NORTH EDGE OF PAVEMENT.
THE STATION IS A 5/8 INCH IRON PIN SET WITH YELLOW
USACE CAP THAT IS DRIVEN FLUSH WITH THE GROUND.
BUCKHORN LAKE
TAILWATER BANK EROSION FY24
BUCKHORN, KY
BUCKHORN LAKE TAILWATER
BANK EROSION FY24
BUCKHORN, KY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
N
TR
O L
PO
IN
T D
ES
C
R
IP
TI
O
N
VF401
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\1
8_
VF
1_
P O
IN
T
D
ES
C R
IP
TI
O N
S.
D
W G
:0
5:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, AN
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
A1 SCALE: NTS'
CONTROL POINT DESCRIPTIONS
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
CAMPGROUND ROAD
SQUABBLE CREEK
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
PROPOSED
CONCRETE PAD
PROPOSED
CONCRETE PAD
732 732730
725 725 724722721
STREAM BANK
0+00
1+00
2+00
3+003+82.07
B-1
B-3
B-2
B-4
B-1
B-1
OFFSET
ELEC ELEC
ELEC
ELEC
E
ELEC
ELEC
ELEC
SCALE: 1"=20'
BORING LOCATION PLAN
PLAN
NORTH
E.
S
PR
IN
G
ST
O N
G . J
O N
ES
D . D
O N
N
EL
LY
IN
G
L O
C
AT
IO
N
P
LA
B-101
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\5
1_ B-
1.
D W
G
:0 4:
A
M
2/ 3/
AE
C
_B &W
.S
TB
H 2E
D
TG
D J
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
1. FOR BORING LOGS REFER TO SHEET B-103.
B-XX
BORING LOCATION
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
SHEET ID
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
D
EC
, 2
AN
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
MAJOR DIVISIONS LEGENDS
UNIFIED SOIL CLASSIFICATION
(INCLUDING IDENTIFICATION AND DESCRIPTION)
FIELD IDENTIFICATION PROCEDURES
(EXCLUDING PARTICLES LARGER THAN 3 INCHES
AND BASING FRACTIONS ON ESTIMATED WEIGHTS)
C O
AR
SE
-G R
AI
N
ED
S
O
IL
S M
O R
E
TH
AN
H
AL
F
O F
M
AT
ER
IA
L
IS
L
AR
G
ER
T H
AN
N
O . 2
S
IE
VE
S
IZ
E.
TYPICAL NAMES LABORATORY CLASSIFICATION CRITERIA
WELL-GRADED GRAVELS, GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES.
WIDE RANGE IN GRAIN SIZES AND SUBSTANTIAL
AMOUNTS OF ALL INTERMEDIATE PARTICLE SIZES.
PREDOMINANTLY ONE SIZE OR A RANGE OF SIZES
WITH SOME INTERMEDIATE SIZES MISSING.
NONPLASTIC FINES OR FINES WITH LOW PLASTICITY
(FOR IDENTIFICATION PROCEDURES SEE ML BELOW).
PLASTIC FINES
(FOR IDENTIFICATION PROCEDURES SEE CL BELOW).
WIDE RANGE IN GRAIN SIZE AND SUBSTANTIAL AMOUNTS
OF ALL INTERMEDIATE PARTICLE SIZES.
PREDOMINANTLY ONE SIZE OR A RANGE OF SIZES
WITH SOME INTERMEDIATE SIZES MISSING.
NONPLASTIC FINES OR FINES WITH LOW PLASTICITY
(FOR IDENTIFICATION PROCEDURES SEE ML BELOW).SILTY SANDS, SAND-SILT MIXTURES.
POORLY-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES.
WELL-GRADED SANDS, GRAVELLY
SANDS, LITTLE OR NO FINES.
CLAYEY GRAVELS, GRAVEL-SAND-CLAY MIXTURES.
POORLY-GRADED GRAVELS, GRAVEL-SAND MIXTURES,
LITTLE OR NO FINES.
SM
SP
SW
GC
GM
GP
GW
PLASTIC FINES
(FOR IDENTIFICATION PROCEDURES SEE CL BELOW).
SI
LT
S
AN
D
CL
AY
S
LI
Q
U
ID
L
IM
IT
LE
SS
T H
AN
SI
LT
S
AN
D
CL
AY
S
LI
Q
U
ID
L
IM
IT
EQ
U
AL
T
O O
R
G R
EA
TE
R T
H
AN
M O
RE
T
HA
N
HA
LF
O F
M
AT
ER
IA
L
IS
S M
AL
LE
R
TH
AN
N
O . 2
S
IE
VE
S
IZ
E.
FI
N E-
G R
AI
N
ED
S
O
IL
S
HIGHLY ORGANIC SOILS PT PEAT AND OTHER HIGHLY ORGANIC SOILS.
ORGANIC CLAYS OF MEDIUM TO HIGH
PLASTICITY, ORGANIC SILTS.OH
CH INORGANIC CLAYS OF HIGH PLASTICITY,
FAT CLAYS.
INORGANIC SILTS, MICACEOUS OR
DIATOMACEOUS FINE SANDY OR SILTY
SOILS, ELASTIC SILTS.MH
OL ORGANIC SILTS AND ORGANIC SILTY CLAYS
OF LOW PLASTICITY.
INORGANIC CLAYS OF LOW TO MEDIUM
PLASTICITY, GRAVELLY CLAYS, SANDY
CLAYS, SILTY CLAYS, LEAN CLAYS.
CL
ML
INORGANIC SILTS AND VERY FINE SANDS,
ROCK FLOUR, SILTY OR CLAYEY FINE SANDS
OR CLAYEY SILTS WITH SLIGHT PLASTICITY.
IDENTIFICATION PROCEDURES
ON FRACTION SMALLER THAN NO. 40 SIEVE SIZE.
DRY STRENGTH
(CRUSHING
CHARACTERISTICS)
DILATANCY
(REACTION
TO SHAKING)
TOUGHNESS
(CONSISTENCY
NEAR PL)
NONEQUICK TO SLOW NONE TO SLIGHT
MEDIUM TO HIGH MEDIUM
SLIGHTSLOW
SLIGHT TO
MEDIUM
SLIGHT TO
MEDIUM
SLOW TO NONE
SLIGHT TO
MEDIUM
HIGH
HIGH TO
VERY HIGH
NONE
SLIGHT TO
MEDIUM
NONE TO
VERY SLOW
MEDIUM TO HIGH
READILY IDENTIFIED BY COLOR, ODOR,
SPONGY FEEL AND FREQUENTLY BY FIBROUS
TEXTURE.
(F O
R V
IS
U
AL
C
LA
SS
IF
IC
AT
IO
N , T
H E
1/
IN
. S
IZ
E
M
AY
B E
U
SE
D A
S
EQ
U
IV
AL
EN
T
TO
T H
E N
O . 4
S
IE
VE
S
IZ
E)
SA
ND
S
M O
RE
T
HA
N
HA
LF
O F
CO
AR
SE
F
RA
CT
IO
N
IS
S
M
AL
LE
R
TH
AN
N O
.4 S
IE
VE
S
IZ
E.
GR
AV
EL
S
M O
RE
T
HA
N
HA
LF
O F
CO
AR
SE
F
RA
CT
IO
N
IS
L
AR
G
ER
T
HA
N
NO
.4
S
IE
VE
S
IZ
E.
31 4 6
C
LE
AN
G
R
AV
EL
S
(L
ES
S
TH
AN
5%
F
IN
ES
G R
AV
EL
S W
IT
H
FI
N
ES
(M
O R
E
TH
AN
F
IN
ES
C
LE
AN
S
AN
D
S (L
ES
S
TH
AN
5% F
IN
ES
SA
N
D S
W
IT
H
FI
N
ES
(M O
R E
TH
AN
F
IN
ES
GENERAL NOTES
TERMS FOR THICKNESS OF ROCK BEDDINGTERMS FOR HARDNESS OF BEDROCK
WEATHERING CORRELATION OF PENETRATION RESISTANCE (ASTM D 1586) WITH
RELATIVE DENSITY AND CONSISTENCY
SOIL DESCRIPTIVE TERMS SIZE
ABBREVIATIONS
NOT MEETING ALL GRADATION REQUIREMENTS FOR GW
ATTERBERG LIMITS BELOW
"A" LINE WITH PI LESS THAN 4
ATTERBERG LIMITS ON OR ABOVE
"A" LINE WITH PI GREATER THAN 7
ABOVE "A" LINE WITH
PI BETWEEN 4 AND 7
ARE BORDERLINE CASES
REQUIRING USE OF DUAL
SYMBOLS.
NOT MEETING ALL GRADATION REQUIREMENTS FOR SW
ATTERBERG LIMITS ON OR ABOVE
"A" LINE WITH PI GREATER THAN 7
ATTERBERG LIMITS BELOW
"A" LINE WITH PI LESS THAN 4LE
SS
T
H
AN
M O
R E
TH
AN
2%
5% to
2%
G W
, G P, S W
, S P
G M
, G C
, S M
, S C
BO
R
D
ER
LI
N
E C
AS
ES
R
EQ
U
IR
IN
G
D U
AL
S
YM
BO
LS
FOR LABORATORY CLASSIFICATION OF FINE-GRAINED SOILS
LIQUID LIMIT
PLASTICITY CHART
PL
AS
TI
C
IT
Y
IN
D
EX
COMPARING SOILS AT EQUAL LIQUID LIMIT,
TOUGHNESS AND DRY STRENGTH INCREASE
WITH INCREASING PLASTICITY INDEX
"U " L
INE
"A" L
INE
ML OR OL
CL OR OL
CL-ML
90 10080706050403020100
U
SE
G R
AI
N
-S
IZ
E C
U R
VE
IN
ID
EN
TI
FY
IN
G
T H
E
FR
AC
TI
O N
S
AS
G
IV
EN
U
N D
ER
F
IE
LD
ID
EN
TI
FI
C
AT
IO
N
D
ET
ER
M
IN
E
PE
R
C
EN
TA
G
ES
O
F G
R
AV
EL
A
N D
S
AN
D F
R O
M G
R
AI
N -S
IZ
E
C U
R
VE
D
EP
EN
D
IN
G O
N P
ER
C
EN
TA
G E
O F
FI
N
ES
(F
R
AC
TI
O
N S
M
AL
LE
R
T H
AN
N
O . 2
S
IE
VE
S
IZ
E) C
O
AR
SE
-G
R
AI
N
ED
S O
IL
S
AR
E
C
LA
SS
IF
IE
D
A S
FO
LL
O W
S:
(D )
C = 30 BETWEEN 1 AND 3
C
D X D 10 60
D
C = 60 GREATER THAN 6
U
D
(D )
C = 30 BETWEEN 1 AND 3
C
D X D 10 60
D
C = 60 GREATER THAN 4
U
D
BOULDER >12 INCHES
COBBLE 3 INCHES TO 12 INCHES
COARSE GRAVEL 3/4 INCH TO 3 INCHES
FINE GRAVEL 1/4 INCH TO 3/4 INCH
COARSE SAND 2 MM TO 1/4 INCH
MEDIUM SAND 0.425 MM TO 2 MM
FINE SAND 0.075 MM TO 0.425 MM
TRACE LESS THAN 5%
FEW 5 TO 10%
LITTLE 15 TO 25%
SOME 30 TO 45%
MOSTLY 50 TO 100%
PENETRATION RESISTANCE,N60 CONSISTENCY
(BLOWS PER FOOT)
0-2 VERY SOFT
2-4 SOFT
SILTS 4-8 MED STIFF
AND 8-15 STIFF
CLAYS 15-30 VERY STIFF
OVER 30 HARD
PENETRATION RESISTANCE,N60 RELATIVE DENSITY
(BLOWS PER FOOT)
0-4 VERY LOOSE
4-10 LOOSE
SANDS 10-30 MED DENSE
AND 30-50 DENSE
GRAVELS OVER 50 VERY DENSE
UNWEATHERED - NO VISIBLE SIGN OF ROCK MATERIAL WEATHERING (I.E., NO CHEMICAL OR MECHANICAL ALTERATION).
PERHAPS SLIGHT DISCOLORATION ON MAJOR DISCONTINUITY SURFACES.
SLIGHTLY WEATHERED - SLIGHT DISCOLORATION OR ALTERATION ON SURFACES AND DISCONTINUITIES. STRENGTH PRESERVED.
MODERATELY WEATHERED - 10 T0 50 PERCENT OF THE ROCK MATERIAL IS DECOMPOSED OR DISINTEGRATED. FRESH OR
DISCOLORED ROCK IS PRESENT EITHER AS A CONTINUOUS FRAMEWORK OR AS CORE STONES.
TEXTURE PRESERVED BUT STRENGTH LESS THAN UNWEATHERED ROCK.
HIGHLY WEATHERED - MORE THAN HALF OF THE ROCK MATERIAL IS DECOMPOSED OR DISINTEGRATED. FRESH OR DISCOLORED ROCK IS PRESENT EITHER AS A DISCONTINUOUS FRAMEWORK OR AS CORE STONES.
TEXTURE INDISTINCT BUT FABRIC PRESERVED. STRENGTH GREATLY REDUCED.
DECOMPOSED - ALL ROCK MATERIAL IS DECOMPOSED AND/OR DISINTEGRATED TO SOIL. MASS STRUCTURE/TEXTURE
IS STILL LARGELY INTACT.
PARTING <0.02 FOOT
BAND 0.02 TO 0.2 FOOT
THIN BED 0.2 TO 0.5 FOOT
MEDIUM BED 0.5 TO 1.0 FOOT
THICK BED 1.0 TO 3.0 FEET
MASSIVE >3.0 FEET
VERY SOFT - CAN BE INDENTED EASILY WITH THUMB.
SOFT - CAN BE SCRATCHED WITH FINGERNAIL.
ONLY EDGES CAN BE BROKEN WITH FINGERS.
MODERATELY CAN BE SCRATCHED EASILY WITH KNIFE.
HARD - CANNOT BE SCRATCHED WITH FINGERNAIL.
HARD - DIFFICULT TO SCRATCH WITH KNIFE.
HARD HAMMER BLOW TO BREAK SPECIMEN.
VERY HARD - CANNOT BE SCRATCHED WITH KNIFE.
SEVERAL HARD HAMMER BLOWS TO BREAK SPECIMEN.
1. REFUSAL IS DEFINED AS THE POINT BEYOND WHICH FURTHER PENETRATION WAS
IMPRACTICAL WITH THE EXPLORATION METHOD USED. SEE THE INDIVIDUAL DRILLING
LOGS FOR THE EXPLORATION METHOD USED.
2. WATER ELEVATIONS INDICATED ON THE DRILLING LOGS MAY HAVE BEEN INFLUENCED
BY DRILLING OPERATIONS AND SHOULD NOT BE CONSTRUED AS INDICATING THE
TRUE GROUNDWATER LEVEL.
3. GROUNDWATER LEVELS WILL VARY IN ACCORDANCE WITH RAINFALL AND STREAM
STAGES, THEREFORE, ACTUAL LEVEL OF GROUNDWATER ON ANY DATE OTHER THAN
THAT SHOWN ON THE LOGS MUST BE DETERMINED BY SEPARATE OBSERVATIONS.
THE OMISSION OF GROUNDWATER ELEVATIONS SHALL NOT NECESSARILY BE
CONSTRUED AS INDICATING THE ABSENCE OF GROUNDWATER AT A PARTICULAR
DRILL LOCATION.
4. WHEREVER THE METHOD OF EXPLORATION PRECLUDED THE POSSIBILITY OF
RECOVERING SAMPLES ABOVE ROCK, SUITABLE FOR EXAMINATION OR TESTS, THE
MATERIAL IS DENOTED AS OVERBURDEN.
5. CLASSIFICATIONS AND PHYSICAL CHARACTERISTICS OF SOIL AND ROCK AS SHOWN
ON THE DRILLING LOGS WERE DETERMINED IN THE FIELD AND LATER SUPPLEMENTED
BY ANALYSIS IN THE LABORATORY, AS APPROPRIATE.
6. FIELD BOOKS, FIELD LOGS, LABORATORY LOGS (PRESENTING THE RESULTS OF
LABORATORY TESTS FOR SHEAR, CONSOLIDATION, PERMEABILITY, ETC. WHEN
PERFORMED) AND EDITED LOGS MAY BE VIEWED IN THE OFFICE OF THE DISTRICT
ENGINEER. U.S. ARMY ENGINEER DISTRICT, LOUISVILLE, CORPS OF ENGINEERS,
FEDERAL OFFICE BUILDING, LOUISVILLE, KY.
7. FAILURE OF THE CONTRACTOR TO AVAIL THEMSELVES OF THE INFORMATION
REPRESENTED BY THE DRILLING LOGS, INCLUDING LABORATORY TEST
RESULTS, SHALL NOT BE GROUNDS FOR A CLAIM THAT THE GOVERNMENT
WITHHELD INFORMATION ON SUBSURFACE CONDITIONS.
8. THE TERM "LOST WATER" IF SHOWN ON THE LOGS INDICATES A QUANTITY OF
DRILLING WATER LOST IN THE DRILL HOLE.
9. DRIVE SAMPLES WERE TAKEN WITH A 1 3/8" I.D. -2" O.D. X 2'-8" SPLIT SPOON.
10. CORE HOLES WERE COMPLETED BY AN NX OR NQ WIRE LINE SIZE CORE BARREL
WITH DIAMOND BIT, UNLESS OTHERWISE INDICATED.
11. MOISTURE CONTENT (MC) AS SHOWN ON GRAPHIC LOG REPRESENTS THE MOISTURE
CONTENT OF MATERIAL ON DATE TESTED.
12. SURFACE ELEVATION SHOWN ON THE DRILLING LOGS IS THE ELEVATION AT THE
TIME OF DRILLING. THE ELEVATION MAY HAVE CHANGED SINCE THAT TIME.
13. MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT WERE OBTAINED USING
THE MODIFIED PROCTOR METHOD IN ACCORDANCE WITH ASTM D1557, UNLESS NOTED
OTHERWISE.
14. GENERAL NOTE 6 MAY NOT BE APPLICABLE WHEN EXPLORATION AND TESTING
IS PERFORMED BY OTHERS.
CLAYEY SANDS, SAND-CLAY MIXTURES.
CFA CONTINUOUS FLIGHT AUGER
HSA HOLLOW STEM AUGER
LL LIQUID LIMIT
MC MOISTURE CONTENT
MDD MAXIMUM DRY DENSITY
N BLOW COUNT (PENETRATION RESISTANCE)
N60 BLOW COUNT CORRECTED FOR THE
SPECIFIED PERCENTAGE OF THE THEORETICAL
FREE-FALL HAMMER ENERGY (60%)
OMC OPTIMUM MOISTURE CONTENT
PI PLASTICITY INDEX
PL PLASTIC LIMIT
PP POCKET PENETROMETER
QU UNCONFINED COMPRESSIVE
STRENGTH PER ASTM D2166
RC ROCK CORE
REC RECOVERY
RQD ROCK QUALITY DESIGNATION
ABOVE "A" LINE WITH
PI BETWEEN 4 AND 7
ARE BORDERLINE CASES
REQUIRING USE OF DUAL
SYMBOLS.
SILTY GRAVELS, GRAVEL-SAND-SILT MIXTURES.
CH O
R O
H
NONE TO
VERY SLOW
MH OR OH
SC
GROUP
SYMBOLS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
E.
S
PR
IN
G
ST
O N
G . J
O N
ES
D . D
O N
N
EL
LY
SO
IL
A N
D R
O C
K C
LA
SS
IF
IC
AT
IO
N
B-102
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A3 SCALE: NTS
SOIL AND ROCK CLASSIFICATION
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
D
EC
, 2
AN
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
E.
S
PR
IN
G
ST
O N
G . J
O N
ES
D . D
O N
N
EL
LY
BO
R
IN
G
L O
G S
B-103
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
A1 SCALE: NTS
BORING LOGS
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
D
EC
, 2
KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
ELEC
ELEC
E
ELEC
ELEC
ELEC
10109
OFFICE
15" M
APLE
36"
36"
W O
O
D SQ
UARE
10" TRIPLE O
THER
12" Q
UAD O
THER
6" O
THER
10" O
THER
12" O
THER
12" {5} O
THER 10" {2} O
THER
8" O
THER
8" O
THER
12" {2} O
THER
ELEVATED POWER POLE
12" O
THER
12" O
THER
18" O
THER
TW
C1
N. 2,015,798.49
E. 2,302,981.51
ELEV. 750.82
IPUSACE - STATUS FO
UND
N. 2,016,631.15E. 2,303,111.38ELEV. 741.85
#5 REBAR USACE CAPUSACE - STATUS SET
N. 2,016,955.79E. 2,303,101.85 ELEV. 732.86
#5 REBAR USACE CAPUSACE - STATUS SET
EW
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN
SAN
SAN
SAN
CAMPGROUND ROAD
SQUABBLE CREEK
MIDDLE FORK KENTUCKY RIVER
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
D
SE
E
SH
EE
T
C D
(GRASS)
(GRASS)
(ASPHALT)
(WOODS)
3+72.45
0+00 1+00 2+00
3+00
L9 L10 L11
L12 L13 L14
L15
C7 C8
C9
C12C10
C110+
1+
2+00
3+00 4+00 5+00 6+00
7+00 8+008+05.27
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
VE
R
AL
L D
EM
O
LI
TI
O N
P
LA
CD101
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:0
5:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
PLAN
NORTH
A1 SCALE: 1"=80'
OVERALL DEMOLITION PLAN
80' 160'0
GENERAL SHEET NOTES
LEGEND
REMOVE EXISTING CONCRETE
REMOVE EXISTING STONE PAD
REMOVE EXISTING ASPHALT PAVEMENT
REMOVAL EXISTING TREE OR SHRUB
PROPOSED CONTRACTOR WORK LIMITS
1. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES
WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR)
AND LAKE PERSONNEL IN ORDER TO ENSURE
CONSTRUCTION ACTIVITIES DO NOT INTERFERE WITH
LAKE ACTIVITIES.
2. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO ANY CONSTRUCTION ACTIVITY.
3. EXISTING UTILITIES AND SITE STRUCTURES NOT
IDENTIFIED FOR DEMOLITION MUST BE PROTECTED
DURING DEMOLITION AND CONSTRUCTION.
4. REMOVE AND REINSTALL CAMPER PAD USE MATERIALS
SUCH AS PICNIC TABLES, TRASH HOOKS, AND GRILLS.
CD102 CD103
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
10109
OFFICE
ELEVATED POWER POLE
18" O
THER
N. 2,016,631.15E. 2,303,111.38ELEV. 741.85
#5 REBAR USACE CAPUSACE - STATUS SET
E
EE
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN
SAN
SAN
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
D
E
SH
EE
T
C D
(GRASS)
0+00 L9
L10 C7
0+
1+
2+00
3+00 4+00
5+00 L18
L19
L21
L22
L23 L24
C17 LINE B
LINE A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
EM
O
LI
TI
O
N P
LA
CD102
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:0
6:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
20' 40'0
PLAN
NORTH
A1 SCALE: 1"=20'
DEMOLITION PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
1. CONTRACTOR TO DEMOLISH EXISTING CAMP PADS AND
ADJACENT SUPPORTING STRUCTURES. DEMOLITION INCLUDES
THE CONCRETE ASPHALT, OR STONE PAD.
2. EXISTING CAMPGROUND ROAD TO REMAIN. CONTRACTOR TO
TAKE NOTE OF EXISTING CONDITION AND MAINTAIN DURING
DEMOLITION.
3. REMOVE EXISTING STUMPS
4. REMOVE UTILITY PEDESTAL
REMOVE EXISTING CONCRETE
REMOVE EXISTING STONE PAD
REMOVE EXISTING ASPHALT PAVEMENT
REMOVAL EXISTING TREE OR SHRUB
PROPOSED CONTRACTOR WORK LIMITS
1. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES
WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR)
AND LAKE PERSONNEL IN ORDER TO ENSURE
CONSTRUCTION ACTIVITIES DO NOT INTERFERE WITH
LAKE ACTIVITIES.
2. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO ANY CONSTRUCTION ACTIVITY.
3. EXISTING UTILITIES AND SITE STRUCTURES NOT
IDENTIFIED FOR DEMOLITION MUST BE PROTECTED
DURING DEMOLITION AND CONSTRUCTION.
4. REMOVE AND REINSTALL CAMPER PAD USE MATERIALS
SUCH AS PICNIC TABLES, TRASH HOOKS, AND GRILLS.
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
ELEC
ELEC
E
ELEC
ELEC
ELEC
10109
OFFICE
15" M
APLE
36"
36"
W O
O
D SQ
UARE
10" TRIPLE O
THER
12" Q
UAD O
THER
6" O
THER
10" O
THER
12" O
THER
12" {5} O
THER 10" {2} O
THER
8" O
THER
8" O
THER
12" {2} O
THER
ELEVATED POWER POLE
12" O
THER
12" O
THER
N. 2,016,631.15E. 2,303,111.38ELEV. 741.85
#5 REBAR USACE CAPUSACE - STATUS SET
N. 2,016,955.79E. 2,303,101.85 ELEV. 732.86
#5 REBAR USACE CAPUSACE - STATUS SET
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
EE
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E E
E
E E
E
E E
E E
W W
W W
W
W
CAMPGROUND ROAD
SQUABBLE CREEK
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
D
E
SH
EE
T
C D
(GRASS)
(GRASS)
(ASPHALT)
(WOODS)
TURNAROUND AREA
(SEE DETAIL A1 ON SHEET GC501)
3+72.45
0+00
1+00
2+00
3+00
L9
L10
L11
L12
L13
L14 L15
C7 C8
C9
C12
C10
C11
5+00
6+00
7+00
8+00 8+05.27
L19
L20734
731730
2.00:1
2.00:1
732730
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
S.
M
C
FA
R
LA
N D
D . L
O G
AN
D . L
O G
AN
D . L
O
EM
O
LI
TI
O
N P
LA
CD103
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:0
6:
A M
/6
/2
AE
C _N
C S_
4_ M
O N
O .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E
KY
, 4
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
IN
AL
20' 40'0
PLAN
NORTH
A1 SCALE: 1"=20'
DEMOLITION PLAN
GENERAL SHEET NOTES
SHEET KEYNOTES
LEGEND
1. CONTRACTOR TO DEMOLISH EXISTING CAMP PADS AND
ADJACENT SUPPORTING STRUCTURES. DEMOLITION INCLUDES
THE CONCRETE ASPHALT, OR STONE PAD.
2. EXISTING CAMPGROUND ROAD TO REMAIN. CONTRACTOR TO
TAKE NOTE OF EXISTING CONDITION AND MAINTAIN DURING
DEMOLITION.
3. REMOVE EXISTING STUMPS
4. REMOVE UTILITY PEDESTAL
REMOVE EXISTING CONCRETE
REMOVE EXISTING STONE PAD
REMOVE EXISTING ASPHALT PAVEMENT
REMOVAL EXISTING TREE OR SHRUB
PROPOSED CONTRACTOR WORK LIMITS
1. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES
WITH CONTRACTING OFFICER'S REPRESENTATIVE (COR)
AND LAKE PERSONNEL IN ORDER TO ENSURE
CONSTRUCTION ACTIVITIES DO NOT INTERFERE WITH
LAKE ACTIVITIES.
2. CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES
PRIOR TO ANY CONSTRUCTION ACTIVITY.
3. EXISTING UTILITIES AND SITE STRUCTURES NOT
IDENTIFIED FOR DEMOLITION MUST BE PROTECTED
DURING DEMOLITION AND CONSTRUCTION.
4. REMOVE AND REINSTALL CAMPER PAD USE MATERIALS
SUCH AS PICNIC TABLES, TRASH HOOKS, AND GRILLS.
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
ELEC
ELEC
E
ELEC
ELEC
ELECBO
RE 2
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
RE 3
ELEV. 729.20
B-1 B-1 O
FFSET
B-2
B-3
B-4
EW
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN
SAN
SAN
SAN
CAMPGROUND ROAD
SQUABBLE CREEK
MIDDLE FORK KENTUCKY RIVER
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
S1
SE
E
SH
EE
T
C S1
(GRASS)
(GRASS)
(ASPHALT)
(WOODS)
MATCHLINE - SEE SHEET CS103
- SEE SHEET CS105
MATCHLINE - SEE SHEET CS102
- SEE SHEET CS104
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
S1
SE
E
SH
EE
T
C S1
MATCHLINE - SEE SHEET CS106
- SEE SHEET CS102
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
S1
SE
E
SH
EE
T
C S1
MATCHLINE - SEE SHEET CS107
- SEE SHEET CS106
3+72.45
0+00 1+00 2+00
3+00
L9 L10 L11
L12 L13 L14
L15
C7 C8
C9
C12C10
C110+
1+
2+00
3+00 4+00 5+00 6+00
7+00 8+008+05.27
734733732731730 729728727726725724723722721720
730728726724722720
729727725723721
731730 737735733731
736738
7332.00:1
2.00:1
732730725
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SCALE: 1"=80'
OVERALL CIVIL SITE PLAN
PLAN
NORTH
S.
M
C
FA
R
LA
N D
D .L
O G
AN
D .L
O
VE
R
AL
L C
IV
IL
S
IT
E
PL
CS101
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:5
9:
A M
/1
4/
AE
C _B
&W .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
2. DIMENSIONS ARE TO THE EDGE OF PAVEMENT.
4. FOR GRADING AND DRAINAGE, SEE GRADING SHEETS CG101.
LEGEND
5. CONTRACTOR IS LIMITED TO THE CWL'S WITHIN THE
BEGINNING AND END OF THE PROJECT UNLESS
ADDITIONAL OPTIONS ARE CHOSEN FOR REPAIRS.
1. ALL DIMENSIONS ARE PROVIDED IN U.S. SURVEY FEET,
UNLESS INDICATED OTHERWISE.
3. CONTRACTOR TO COORDINATE CONSTRUCTION
ACTIVITIES WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AND LAKE PERSONNEL IN ORDER
TO ENSURE CONSTRUCTION ACTIVITIES DO NOT
INTERFERE WITH LAKE ACTIVITIES.
PROPOSED ASPHALT PAVEMENT BASE BID
(AS NOTED)
PROPOSED ASPHALT PAVEMENT OPTION 1
(AS NOTED)
PROPOSED ASPHALT PAVEMENT OPTION 2
(AS NOTED)
PROPOSED ASPHALT PAVEMENT OPTION 3
(AS NOTED)
PROPOSED CONCRETE PAVEMENT FOR CAMP
PADS (AS NOTED) (DETAIL G11 ; SHEET CS 502)
PROPOSED RIP RAP (AS NOTED)
PROPOSED GRAVEL CAMP PAD (AS NOTED)
(DETAIL A1 ; SHEET CS501)
CONTRACTOR WORK LIMITS
80' 160'0
CS102
CS103
CS108
CS106
CS107
CS104 CS105
6. REMOVE AND REINSTALL CAMPER PAD USE MATERIALS
SUCH AS PICNIC TABLES, TRASH HOOKS, AND GRILLS.
7. CONTRACTOR SHALL REINSTALL SPEED BUMPS AT THE
SAME LOCATIONS AND TYPE AS EXISTING.
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
EE
W W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SANSAN
SAN
SAN
SAN
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
S1
SE
E
SH
EE
T
C S1
(GRASS)
MATCHLINE - SEE SHEET CS102
- SEE SHEET CS104
MATCHLINE - SEE SHEET CS106
- SEE SHEET CS102
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
S1
SE
E
SH
EE
T
C S1
0+00 L9
L10 C7
0+
1+
2+00
3+00 4+00
5+00 L18
L21
L22
L23 L24
C17 LINE B
LINE A
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SCALE: 1"=20'
CIVIL SITE PLAN
PLAN
NORTH
S.
TH
IB
AU
D
EA
U
D .L
O G
AN
D .L
O
IV
IL
S
IT
E
PL
CS102
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:5
9:
A M
/1
4/
AE
C _B
&W .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
2. DIMENSIONS ARE TO THE EDGE OF PAVEMENT.
4. FOR GRADING AND DRAINAGE, SEE GRADING SHEETS CG101.
LEGEND
SHEET KEYNOTES
1. KEEP ALL WORK EQUIPMENT AND SUPPLIES OFF OF THE
EXISTING CONCRETE CAMP PAD.
2. TIE PROPOSED CAMPGROUND RD PAVING INTO EXISTING
ROAD AREA WITH EDGE KEY. SEE DETAIL A14 SHEET CS502.
3. RESTORE AREA TO EXISTING CONDITIONS.
4. PROVIDE TREE PROTECTION
5. ASPHALT PAVEMENT REPAIR OPTIONS TO BE PERFORMED
AFTER CONSTRUCTION OF THE SLOPE, CAMPER PADS, AND
ATTACHED DRIVEWAYS. THE BASELINE REPAIR IS 1.5"
ASPHALT MILLING AND OVERLAY FOR SURFACE DAMAGE.
THE GOVERNMENT'S ENGINEER WILL MAKE
DETERMINATION OF PAVEMENT CONDITION ALONG WITH
THE LOCATION OF THE REPAIRS AFTER A PROOF ROLL IS
PERFORMED.
ASPHALT REPAIR INCLUDES THE FOLLOWING:
OPTION 1: SUBGRADE REPAIRS. DEMOLITION OF EXISTING
PAVEMENT AND UNDERCUT TO A DEPTH OF 18", BACKFILL
TO GROUND SURFACE WITH KYTC #3 STONE, MEETING
DETAIL A1 ON CS502
OPTION 2: ASPHALT PAVEMENT SECTION BASE REPAIR.
PAVEMENT SECTION MEETING DETAIL A6 ON CS501.
6. ASPHALT FULL DEPTH PAVEMENT
7. INSTALL A NEW UTILITY PEDESTAL TO MATCH THE EXISTING
PEDESTAL. ALL UTILITY PEDESTAL FEATURES INCLUDING
THE PEDESTAL ITSELF, HYDRANT, AND WATER AND
ELECTRIC LINES, CAN BE REUSED AS LONG AS THEY ARE IN
WORKING ORDER AND HAVE NOT BEEN DAMAGED.
UTILITIES WILL BE TURNED OFF PRIOR TO CONSTRUCTION.
8. PROTECT AND REESTABLISH UTILITIES.
5. CONTRACTOR IS LIMITED TO THE CWL'S WITHIN THE
BEGINNING AND END OF THE PROJECT UNLESS
ADDITIONAL OPTIONS ARE CHOSEN FOR REPAIRS.
1. ALL DIMENSIONS ARE PROVIDED IN U.S. SURVEY FEET,
UNLESS INDICATED OTHERWISE.
3. CONTRACTOR TO COORDINATE CONSTRUCTION
ACTIVITIES WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE (COR) AND LAKE PERSONNEL IN ORDER
TO ENSURE CONSTRUCTION ACTIVITIES DO NOT
INTERFERE WITH LAKE ACTIVITIES.
PROPOSED ASPHALT PAVEMENT BASE BID
(AS NOTED)
PROPOSED ASPHALT PAVEMENT OPTION 1
(AS NOTED)
PROPOSED ASPHALT PAVEMENT OPTION 2
(AS NOTED)
PROPOSED ASPHALT PAVEMENT OPTION 3
(AS NOTED)
PROPOSED CONCRETE PAVEMENT FOR CAMP
PADS (AS NOTED) (DETAIL G11 ; SHEET CS 502)
PROPOSED RIP RAP (AS NOTED)
PROPOSED GRAVEL CAMP PAD (AS NOTED)
(DETAIL A1 ; SHEET CS501)
PROPOSED FULL DEPTH ASPHALT PAVEMENT
BASE BID(AS NOTED)
CONTRACTOR WORK LIMITS
6. CONTRACTOR SHALL REINSTALL SPEED BUMPS AT THE
SAME LOCATIONS AND TYPE AS EXISTING.
ALIGNMENTS: LINE A (STREAM BANK)
NUMBER
C7
C8
C9
C10
C11
C12
L9
L10
L11
L12
L13
L14
L15
LENGTH
10.74'
12.19'
4.31'
17.70'
21.45'
9.04'
8.08'
73.42'
57.54'
90.10'
17.53'
30.01'
20.35'
RADIUS
57.46'
57.46'
57.46'
57.46'
57.46'
57.46'
LINE/CHORD DIRECTION
N17° 41' 54.09"E
N06° 16' 03.51"E
N01° 57' 27.01"W
N04° 17' 38.33"W
N15° 13' 32.94"E
N08° 36' 43.15"W
N23° 03' 03.83"E
N12° 20' 44.34"E
N00° 11' 22.69"E
N04° 06' 16.71"W
N13° 07' 09.59"W
N04° 31' 52.92"E
N25° 55' 12.97"E
STA
0+08.08
0+92.24
1+61.97
2+82.94
3+30.65
2+56.37
0+00.00
0+18.81
1+04.43
1+66.28
2+65.41
3+00.64
3+52.10
ALIGNMENTS: LINE B (CAMPGROUND RD)
Number
C17
L18
L19
L20
L21
L22
L23
L24
Radius
59.75
Length
69.94
139.78
128.61
163.28
53.11
130.98
83.03
36.52
Line/Chord Direction
N63° 44' 07.93"E
N15° 16' 20.18"E
N5° 00' 09.64"E
N0° 15' 55.86"W
S80° 38' 53.35"E
S82° 43' 48.06"E
N23° 24' 32.54"E
N30° 12' 03.92"E
STA
1+84.09
3+73.58
5+13.37
6+41.98
0+00.00
0+53.11
2+90.55
2+54.03
ARIMS: 1200 Disposition: Permanent
W
2Q R
BA
2_
Pl an s-
ELEC
E
ELEC
ELEC
ELECBO
RE 2
ELEV. 727.30
BO
RE 1
ELEV. 722.88
BO
RE 3
ELEV. 729.20
B-1 B-1 O
FFSET
B-2
B-3
B-4
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
SAN
E
E E
E
E E
E
E E
E E
W W
W W
W
W
CAMPGROUND ROAD
SQUABBLE CREEK
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
EXISTING
CONCRETE PAD
10.71'
.0
0'
18.36'
18.00'
.9
0'
9.40'
22.56'
21.43'
24.50'
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
S1
SE
E
SH
EE
T
C S1
14.00'
.0
0'
40.00'
10.00'
.5
0'
(GRASS)
(GRASS)
(ASPHALT)
(WOODS)
LINE A
MATCHLINE - SEE SHEET CS103
- SEE SHEET CS105
TURNAROUND AREA
(SEE DETAIL A1 ON SHEET GC501)
3+72.45
1+00
2+00
3+00
14.50'
24.88'
8.00'
18.50'
16.50'
16.00'
28.74'
11.00'
8.00'
26.50'
22.75'
R2.00'
R2.00'
17.25'
9.90'
19.27'
L10
L11
L12
L13
L14 L15
C8
C9
C12
C10
C11
6+00
7+00
8+00 8+05.27
21.00'
R20.00'
R2.00'
R15.00'
R15.00'
16.50'
L19
L20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
SCALE: 1"=20'
CIVIL SITE PLAN
PLAN
NORTH
S.
M
C
FA
R
LA
N D
D .L
O G
AN
D .L
O
IL
S
IT
E
PL
CS103
D \P
U
BL
IC
\C
AD
\C
IV
IL
\5
- B U
C
KH
O R
N T
AI
LW
AT
ER
S
TR
EA
M
BA
N
K
ER
O
SI
O N
\P
LA
N S
ET
S\
_S
H
EE
TS
\C
R O
SS
S
EC
TI
O N
S.
D
W G
:5
9:
A M
/1
4/
AE
C _B
&W .S
TB
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
J
R P
L
LO
U
IS
VI
LL
E, K
EN
TU
C
KY
N O
V, KH
O
R N
T
AI
LW
AT
ER
S
TR
EA
M
BA
N K
ER
O
SI
O
N
BU
C
KH
O R
N , K
Y P2
1, F Y2
TI
FI
ED
F
2. DIMENSIONS ARE TO THE EDGE OF PAVEMENT.
4. FOR GRADING AND DRAINAGE, SEE GRADING SHEETS CG101.
LEGEND
SHEET KEYNOTES
1. KEEP ALL WORK EQUIPMENT AND SUPPLIES OFF OF THE
EXISTING CONCRETE CAMP PAD.
2. TIE PROPOSED CAMPGROUND RD PAVING INTO EXISTING
ROAD AREA WITH EDGE KEY. SEE DETAIL A14 SHEET CS502.
3. RESTORE AREA TO EXISTING CONDITIONS.
4. PROVIDE TREE PROTECTION
5. ASPHALT PAVEMENT REPAIR OPTIONS TO BE PERFORMED
AFTER CONSTRUCTION OF THE SLOPE, CAMPER PADS, AND
ATTACHED DRIVEWAYS. THE BASELINE REPAIR IS 1.5"
ASPHALT MILLING AND OVERLAY FOR SURFACE DAMAGE.
THE GOVERNMENT'S ENGINEER WILL MAKE
DETERMINATION OF PAVEMENT CONDITION ALONG WITH
THE LOCATION OF THE REPAIRS AFTER A PROOF ROLL IS
PERFORMED.
ASPHALT REPAIR INCLUDES THE FOLLOWING:
OPTION 1: SUBGRADE REPAIRS. DEMOLITION OF EXISTING
PAVEMENT AND UNDERCUT TO A DEPTH OF 18", BACKFILL
TO GROUND SURFACE WITH KYTC #3 STONE, MEETING
DETAIL A1 ON CS502
OPTION 2: ASPHALT PAVEMENT SECTION BASE REPAIR.
PAVEMENT SECTION MEETING DETAIL A6 ON CS501.
6. ASPHALT FULL DEPTH PAVEMENT
7. INSTALL A NEW UTILITY PEDESTAL TO MATCH THE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .