This document is a solicitation (W912QR24R0073) for the Olmsted Lock and Dam Backup Operating System in Olmsted, Illinois. The U.S. Army Corps of Engineers, Louisville District is seeking to procure two portable hydraulic power units to operate the lock gates, culvert valves, and miter gate latches at the Olmsted Lock and Dam facility.
The solicitation requires the contractor to design and provide the hydraulic power units, generators, control booths, hoses, valves, and all ancillary equipment necessary to operate the lock. The units must be configured to meet space limitations and be free-standing and capable of being lifted or moved without damage. The contractor's work includes all planning, programming, administration, management, supervision, communications, and inspection to ensure compliance with the contract requirements. Offers are due by August 19, 2024 at 10:00 AM local time. The award will be based on the lowest evaluated price. This solicitation is set aside 100% for small businesses under NAICS code 333996 - Fluid Power Pump and Motor Manufacturing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912QR24R0073 24-Jul-2024
b. TELEPHONE NUMBER
502.315.7409
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 19 Aug 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912QR9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JOEL HUBERMAN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 502.315.7494 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
1,250
NAICS:
333996
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF39
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912QR24R0073
Section SF 1449 - CONTINUATION SHEET
SPECIAL INSTRUCTIONS
Provide two (2) portable hydraulic power units with a pump-motor group for Olmsted Lock & Dam. A single motor will drive one variable displacement piston pump and one fixed displacement gear pump. Design the packaged unit to operate the hydraulic cylinders in accordance with the criteria stated in paragraph "Design Parameters." Design the power unit to meet the space limitations shown and configure essentially as indicated. The structure of the unit both internally and externally will be adequate for the units to be free standing and capable of being lifted or moved without structural damage. Securely attach all components including piping, motors, pumps, and manifolds to the power unit in a manner to be free of damaging vibration during operation. Design and provide each unit with forklift tubes and lifting eyes to facilitate lifting or moving the unit, including the reservoir when full of oil. Both portable HPUs will be installed on a skid steer towable trailer as indicated on the mechanical drawings for ease of use during emergencies. Prices should include mobilization & de-mobilization, fuel, labor, material, and equipment.
The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.
This solicitation is set aside 100% Small Business.
NAICS 333996 – Fluid Power Pump and Motor Manufacturing
ELECTRONIC PROPOSAL SUBMISSION – see instructions for proposal submission.
PROJNET BIDDER INQUIRY - see instructions for proposal questions.
Site Visit An organized site visit has been scheduled for--
Thursday 13 August 2024 at 10:30am CT
Participants will meet at—
U.S. Army Corps of Engineers Olmsted Locks and Dams New Dam Road La Center, KY 42056
Contact for scheduling:
TPOC: Brian Holcomb USACE Project Engineer Office: (502) 315 - 6702 Email: brian.l.holcomb@usace.army.mil
One award will be made from this solicitation. The contract award will be based on Low Price. Method of payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor. Quotes will not be accepted for quantities less than the quantities specified in the price breakout schedule. Failure to submit a unit price for all items listed will be considered as a material deviation from the requirements and the Quote will be rejected.
Training tools are available on the SAM website to help you get familiar with SAM. Start by going to www.sam.gov and then click on the SAM HELP tab. Under User Help you will find the full User Guide as well as Quick Start Guides and Helpful Hints that will help you create and account, migrate your roles, perform updates, and search for the information you need. These guides can also be viewed on http://www.acquisition.gov.
PLEASE NOTE: SAM is completely free of charge for both registrants and users.
ELECTRONIC PROPOSAL SUBMISSION
Offerors shall submit one (1) electronic copy of their offer via the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module before the time and date specified in Block 13 of this SF 1442. No paper copies, CDROMS, facsimile, or DoD SAFE submissions will be accepted.
A User ID and Password are required to access PIEE. Offerors are required to self-register as a Vendor or Contractor with the user's CAGE code(s) and must have an active registration in the System for Award Management (SAM) prior to the PIEE registration process.
1. Instructions for registering in PIEE:
a. Navigate to htps://piee.eb.mil/
b. Select Register [top right]
c. Select Vendor
d. Create a User ID and Password and follow the prompts [next]
e. Create Security Questions [next]
f. Complete your User Profile Information [next]
g. Complete your Supervisor or Approving Official Information [next]
h. Complete Roles
i. Step 1. Select SOL-Solicitation
ii. Step 2. Select Proposal Manager
iii. Step 3. Click Add Roles
iv. Step 4. Fill in your Location Code (CAGE Code) [next]
i. Provide a justification for your registration [next]
j. Follow the remaining prompts to submit your registration
2. Instructions for Electronic Proposal Submission in PIEE Solicitation Module:
a. Log into PIEE and select the Solicitation Icon.
b. Enter search criteria to find the solicitation. (Search Criteria can be the complete solicitation number, Solicitation Open Date, Response Due Date, Product or Service Code, NAICS, Set Aside code, Place of Performance Zip Code, Contracting Office DODAAC, or Status)
c. The search results display. Select the Solicitation Number link to open the solicitation.
d. The solicitation displays. The information is view only.
e. Scroll down to see the Contract Information and Attachments. The Attachments can be viewed by selecting the File link. Scroll back up to the top of the screen and click the Offer tab.
f. Click the Offer tab to Add and review current offers on the Solicitation. Click the Add button to add an offer to the Solicitation.
g. Select the applicable CAGE Code for which submitting the offer for. The list is prefiltered based on the CAGEs in the Proposal Manager’s profile.
h. Upload the attachments that comprise the offer by selecting the Choose Files link.
i. After entering all necessary information enter a Signature Date and Click the Signature button.
j. The Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and One Time Password (OTP). Click the Sign and Submit button to continue.
k. After successfully adding the Offer a success message of the submission will be displayed and the offer displayed collapsed. Users may expand and view all their offers on a Solicitation.
File Size Limitations: Offerors are advised to follow the above instructions for uploading files. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
• W912QR24R0073_FIRMNAME_VOLUME_I
• W912QR24R0073_FIRMNAME_VOLUME_II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above. (***NOTE: The PIEE Solicitation Module will replace special characters and spaces in the attachment filename with underscores “_”***)
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 11 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.
Upload Completion & Deadline: Offerors are highly encouraged to become familiar with the PIEE Solicitation module well in advance of the proposal due date. Interested offerors shall submit proposals no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within PIEE Solicitation module. Do not assume that electronic submission will occur instantaneously. Large files will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the Solicitation.
The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
For training and help using the PIEE Solicitation module, reference the links below.
• New User Information and Help: https://piee.eb.mil/xhtml/unauth/help/helpvendors.xhtml
• Vendor Customer Support:
https://piee.eb.mil/xhtml/unauth/web/homepage/vendorCustomerSupport.xhtml
Olmsted Backup Operating System
CLIN Description QTY TOTAL Base 0001 Provide Backup Operating System 2 0002 Piping Modifications 1 0003 Testing of Backup Operating System On-Site 1 0004 Training of Field Personnel 1
Total Base Contract Options 0005 Option 1 – Provide Additional Backup Operating System 1 0006 Option 2 – Testing of Backup Operating System On-Site 1
Total Options
Total Base + Options
NOTES:
1. Award will be based on the lowest evaluated price, with price evaluated as the total price of base proposal plus all options.
2. Failure of the offeror to propose prices for all items in the Price Breakout Schedule may be cause for rejection of the proposal as unacceptable.
3. Any reference to “bid”, bidder, or “bidding schedule” shall be construed to mean “offeror” and “proposal”.
4. CLIN 0001 covers all base items covered by drawings and specifications not broken out into the other CLINs. A backup operating system unit consists of 1 complete hydraulic power unit (HPU), all temporary piping, hosing, and fittings to connect between the HPU and the pipe modifications performed in CLIN 0002, 1 Generator, all related electrical distribution equipment, 1 one control station inside the temporary structure. All of the equipment to be portable. Drawing G-002 shows all the potential locations to install the backup operating system. Payment shall constitute full compensation for all costs of providing all plant, labor, materials and equipment and performing all operations necessary to complete the work as shown on the drawings and as specified.
5. CLIN 0002 covers all items that are permanently installed on the lock. It includes all piping, valves, couplers, fittings and associated connecting hydraulic items as needed to connect to the backup operating system to the existing lock equipment. Item 0002 covers all locations shown on drawing G-002, which includes 8 culvert valve locations, and 8 miter gate locations. Payment shall constitute full compensation for all costs of providing all plant, labor, materials and equipment and performing all operations necessary to complete the work as shown on the drawings and as specified.
6. CLIN 0003 covers all items covered by SECTION 35 05 40.14 10 Paragraph 3.8 and includes all onsite demonstration and testing of the system. Payment shall constitute full compensation for all costs of providing all plant, labor, materials and equipment and performing all operations necessary to complete the work as shown on the drawings and as specified.
7. CLIN 0004 covers all training of field personnel and O&M Manuals for the system.
8. Optional CLINN 0005 covers an additional Backup Operating System as defined in CLIN 0001. It is awardable up to 2 times.
9. Optional CLIN 0006 covers an additional Testing of Backup Operating System as defined in CLIN 0003. It is awardable up to 2 times.
W912QR24R0073
PRICE BREAKOUT SCHEDULE
10. See Specification Section 01 20 00 for Price and Payment Procedures.
11. The Government shall have 90 days from NTP to exercise options 0005 and 0006.
128624 - OBOS 128624OBOS
Olmsted L&D
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 04/21, CHG 1: 06/23 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 10 08/23 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 11/23 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 05/23 OPERATION AND MAINTENANCE DATA
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 08/20, CHG 1: 02/21 PORTABLE METAL BUILDING SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 19.00 10 11/22 INSULATED WIRE AND CABLE
26 20 00 08/23 INTERIOR DISTRIBUTION SYSTEM
26 32 15.00 05/20 ENGINE-GENERATOR SET PORTABLE 15-2500
KW, WITH AUXILIARIES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 05 40.14 10 08/21 HYDRAULIC POWER SYSTEMS FOR CIVIL
WORKS STRUCTURES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
CERTIFIED FINAL
W912QR24R0073
SPECIFICATIONS
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 80 00.00 0
SPECIAL PROVISIONS
04/21, CHG 1: 06/23
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1
1.4 SUMMARY AND COORDINATION OF WORK
1.5 NOT USED
1.6 CONTRACT DRAWINGS AND SPECIFICATIONS
1.7 NOT USED
1.8 NOT USED
1.9 EQUIPMENT DATA, O&M, & REPAIR MANUALS WITH FIELD TRAINING
REQUIREMENTS
1.9.1 Real Property Equipment
1.9.2 O&M and Repair Manuals
1.9.3 Field Training
1.9.3.1 Training Course
1.10 AVAILABILITY OF UTILITIES
1.11 NOT USED
1.12 PERFORMANCE OF WORK BY THE CONTRACTOR
1.13 NOT USED
1.14 NOT USED
1.15 NOT USED
1.16 NOT USED
1.17 CHANNEL TRAFFIC
1.18 NOT USED
1.19 NOT USED
1.20 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
1.21 INTERFERENCE WITH TRAFFIC AND PUBLIC AND PRIVATE PROPERTY
1.22 NOT USED
1.23 NOT USED
1.24 NOT USED
1.25 COST PRINCIPLES AND PROCEDURES FOR MODIFICATION
1.26 ENGLISH-SPEAKING REPRESENTATIVE
1.27 SALES and USE TAX
1.28 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS REQUIREMENTS
1.28.1 Supplemental Security Requirements
1.28.1.1 For All Louisville District Contracts
1.28.1.2 For Contractors Requiring DOD Common Access Cards (CAC)
1.28.1.3 Foreign Nationals
1.28.2 General Security Requirements
1.28.3 Physical Security
1.28.4 Suspicious Activity Reporting Training
1.28.5 Pre-Screen Candidates Using E-Verify Program
1.29 INSURANCE--WORK ON A GOVERNMENT INSTALLATION
1.30 NOT USED
1.31 NOT USED
DOCUMENT 00 80 00.00 06 Page 1
CERTIFIED FINAL
1.32 NOT USED
1.33 CONSTRUCTION HAZARD COMMUNICATION
1.34 NOT USED
1.35 NOT USED
1.36 NOT USED
1.37 NOT USED
1.38 NOT USED
1.39 NOT USED
1.40 NOT USED
1.41 NOT USED
1.42 NOT USED
1.43 NOT USED
1.44 NOT USED
1.45 NOT USED
1.46 BASIS FOR SETTLEMENT OF PROPOSALS
1.47 DELIVERY LOCATION
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
-- End of Section Table of Contents --
DOCUMENT 00 80 00.00 06 Page 2
SECTION 00 80 00.00 06
SPECIAL PROVISIONS
04/21, CHG 1: 06/23
PART 1 GENERAL
Attachments to this specification are as follows:
Construction Project Sign Details Project Submittal Register
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1926.59 Hazard Communication
1.2 SUBMITTALS
Government approval/acceptance is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00.00 06
SUBMITTAL PROCEDURES:
SD-11 Closeout Submittals
Preliminary (Working) As-Built Drawings; G, ED
Final As-Built Drawings; G, ED
Maintenance and Parts Data;
Warranty Management Plan; G
1.3 SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1
The Safety and Health Requirements Manual EM 385-1-1 forms a part of these specifications. EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil/USACEPublications/Engineer-Manuals/.
Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
DOCUMENT 00 80 00.00 06 Page 3
1.4 SUMMARY AND COORDINATION OF WORK
Contractor shall provide a backup operating system for the operation of Olmsted Lock gates in accordance with the plans and specifications. This work includes providing a hydraulic power unit, generator, control booth, hoses, valves, and all ancillary equipment to operate the lock miter gates, culvert valves, and miter gate latch. Delivery of the equipment must be coordinated as specified. Equipment must be tested and project staff trained on the operations.
1.5 NOT USED
1.6 CONTRACT DRAWINGS AND SPECIFICATIONS
a. After Award or no later than Notice to Proceed (NTP), the Government will furnish the Contractor a compact disk containing all technical contract documents in electronic media only. This disk will include a complete set of drawing files and technical specification files which have all amendments included. The disk will contain drawing files in PDF format along with technical specifications in PDF format. These PDF files are the contract documents that represent the construction requirements of the contract, and are being provided for the Contractor's use in printing paper copies of contract documents.
b. In addition, native CAD files(this includes, but not limited to, all source files, models, custom fonts and linestyles, plot files, and images used to create the contract drawings) are provided in accordance with the "AS-BUILT DOCUMENTS" paragraph for the Contractor's use in maintaining and preparing as-built plans. If another CAD Program is used other than the Using Agency's System, all native CAD files that were generated with that software and all support files will also be included. Only native files are to be used for As-Built preparation and information.
c. Native files are to be used for As-Built preparation only. The PDF files are the contract documents that represent the construction requirements of the contract.
1.7 NOT USED
1.8 NOT USED
1.9 EQUIPMENT DATA, O&M, & REPAIR MANUALS WITH FIELD TRAINING REQUIREMENTS
1.9.1 Real Property Equipment
Maintenance and Parts Data The Contractor will be required to furnish a brochure, catalog cut, parts list, manufacturer's data sheet or other publication which will show detailed parts data on all other equipment subject to repair and maintenance procedures not otherwise required in Operations and Maintenance Manuals specified elsewhere in this contract. This information shall be provided electronically in PDF format with bookmarks for each piece of equipment with file name included in a separate column or linked worksheet in the equipment data excel spreadsheet as described in the paragraph above. Distribution of directives shall follow the same requirements as
DOCUMENT 00 80 00.00 06 Page 4 listed in paragraph above.
1.9.2 O&M and Repair Manuals
Withholding & Copies
The Contractor shall provide 6 complete copies of the Equipment Operating, Maintenance, and Repair Manuals unless the Technical Specification indicates otherwise. The manuals shall be prepared electronically in PDF format containing bookmarks for each table of contents item. Operations and Maintenance manuals shall be accepted/approved before field training or ninety (90) calendar days before substantial completion (whichever occurs earlier). An amount of $20,000 shall be withheld until submittal and acceptance/ approval of O&M manuals is complete.
1.9.3 Field Training
1.9.3.1 Training Course
Contractor shall conduct a training course for the operating staff for each particular component and system. Training shall only occur after the Manuals have been approved/ accepted by the Government and during normal working time, and shall start after the system or component is functionally completed. The field instructions shall cover all of the items contained in the Equipment Operating, Maintenance and Repair Manuals as identified per individual Technical Specifications. The training will include both classroom and "hands-on" training. The Contractor shall submit a lesson plan outlining the information to be discussed during training periods.
This lesson plan will be submitted and accepted/approved before the field training occurs. Training shall be documented by the Contractor and a list of attendees shall be furnished to the Government.
1.10 AVAILABILITY OF UTILITIES
Coordinate any need for utilities or sanitary facilities with the Government 5 days prior to being on site.
1.11 NOT USED
1.12 PERFORMANCE OF WORK BY THE CONTRACTOR
a. Veterans Employment Emphasis for U.S. Army Corps of Engineers Contracts
In addition to complying with the requirements outlined in Subpart 22.13, provision 52.222-38, clause 52.222-35, clause 52.222-37, DFARS Subpart
222.13 and United States Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
(1) U.S. Department of Labor Veterans' Employment and Training Service (VETS): https://www.dol.gov/vets/
DOCUMENT 00 80 00.00 06 Page 5
(2) Federal veteran employment information:
https://www.fedshirevets.gov/
(3) Veterans Opportunity to Work (VOW) Program:
https://benefits.va.gov/vow/
(4) U.S. Army Warrior Transition Command Employment Index:
http://wct.army.mil/modules/employers/index.html
(5) Hiring Our Heroes:
https://www.uschamberfoundation.org/hiring-our-heroes
1.13 NOT USED
1.14 NOT USED
1.15 NOT USED
1.16 NOT USED
1.17 CHANNEL TRAFFIC
There is commercial and pleasure traffic operating in the Ohio River adjacent to the delivery site. The Government will not undertake to keep the channel free from vessels or other obstructions. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage.
1.18 NOT USED
1.19 NOT USED
1.20 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER
This provision specifies the procedure for the determination of time extensions for unusually severe weather. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
Indicate the location of the National Weather Service office closest to the site. See: https://www.weather.gov/srh/nwsoffices The Contractor shall make his own investigations and determinations as to weather conditions at the site. Data may be obtained from various National Weather Service offices located generally at airports of principal cities, the nearest to this project being: Paducah, KY.
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
DOCUMENT 00 80 00.00 06 Page 6
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON FIVE (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
5 4 5 5 6 4 4 3 4 4 4 6
The Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification.
1.21 INTERFERENCE WITH TRAFFIC AND PUBLIC AND PRIVATE PROPERTY
a. The Contractor at all times shall dispose his plant and conduct the work in such manner as to cause as little interference as possible with private and public travel. Damage (other than that resulting from normal wear and tear) to roads, shall be repaired to as good a condition as they were prior to the beginning of work and to the satisfaction of the Contracting Officer.
1.22 NOT USED
1.23 NOT USED
1.24 NOT USED
1.25 COST PRINCIPLES AND PROCEDURES FOR MODIFICATION
Cost principles and procedures for any modifications processed under this contract will follow all applicable contract clauses, laws, regulations, policies, and guidance.
1.26 ENGLISH-SPEAKING REPRESENTATIVE
At all times when any performance of the work at any site is being conducted by any employee of the Contractor or his subcontractors, the Contractor shall have a representative present at each site who has the capability of receiving instructions in the English language, fluently speaking the English language and explaining the work operations to persons performing the work, in the language that those performing the work are capable of understanding. The Contracting Officer shall have the right to determine whether the proposed representative has sufficient technical bilingual capabilities, and the Contractor shall immediately replace any individual not acceptable to the Contracting Officer.
DOCUMENT 00 80 00.00 06 Page 7
1.27 SALES and USE TAX
Some states have tax exemptions for certain aspects of work when done for the federal government and the Contractor shall check with the state where the project is located for more information. If a sales tax exemption is applicable, the contractor is responsible for obtaining any required exemption certification.
1.28 CONTRACTOR SECURITY TRAINING/FACILITY ACCESS REQUIREMENTS
1.28.1 Supplemental Security Requirements
All Contractors and subcontractor employee(s) working on this contract who require access to any Louisville District Lake Projects and Lock and Dam Projects shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with "Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors" (HSPD 12).
The Louisville District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee's suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results of the background investigation provided by the Louisville District Security Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Louisville District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
1.28.1.1 For All Louisville District Contracts
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Louisville District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted access to Louisville District facilities.
The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) US Citizens Security Access Form each employee working on site must have a background investigation form submitted directly to the Louisville District Security Office.
The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver's license number if available. It is the Contractor's responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
Contractors shall have background checks completed for their employees annually in the case of Contracts with an initial period of performance (POP) greater than 1 year and those Contracts with Options or Modifications Which Extend the POP beyond 1 year. For instance, if the employee was cleared in May of 2022, they shall be cleared again in May of 2023. It is the Contractor's responsibility to ensure that each employee's security is up to date. Failure to comply may lead to possible removal from the
DOCUMENT 00 80 00.00 06 Page 8 project/jobsite.
The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Louisville District USACE Security Office for background purposes.
1.28.1.2 For Contractors Requiring DOD Common Access Cards (CAC)
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). Fingerprints are captured electronically at the closest Army Recruiting Station to the contractor's home of record or at the USACE, Louisville District Security Office.
Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Louisville District Security Office will conduct an initial criminal check based upon the information provided.
If there are no issues, the Louisville District Security Office will make recommendations to the PCO or their Designated Representative. The Louisville District Security Office cannot give approval due to unfavorable report(s). The Louisville District Security Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.
1.28.1.3 Foreign Nationals
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, "Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives" dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers' contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N- 550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time
DOCUMENT 00 80 00.00 06 Page 9 delays, the Contractor is encouraged to work closely with the Louisville District Security Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation, or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Louisville District Security Office by phone, letter, or email at the following numbers/addresses:
CELRL-SM
600 Martin Luther King Jr. Pl Louisville, KY 40202
Primary Email: DLL-CELRL-Security-SM@usace.army.mil
Alternate (if no response in 72 hours):
James R. Milner, phone (502) 315-6916; James.R.Milner@usace.army.mil Jason Almodovar, phone (502) 315-6754; Jason.Almodovar@usace.army.mil
1.28.2 General Security Requirements
The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts.
The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, DOCUMENT 00 80 00.00 06 Page 10 including any site-specific requirements identified in local policies or procedures.
1.28.3 Physical Security
All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures.
Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
1.28.4 Suspicious Activity Reporting Training
All contractor employees, to include subcontractor employees, shall be briefed on the local iWATCH program (training standards provided by the requiring activity ATO) by the contractor and all associated subcontractors. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The training shall be completed within seven (7) calendar days after commencing work on the site with the results reported to the COR NLT seven (7) calendar days after completion of training.
1.28.5 Pre-Screen Candidates Using E-Verify Program
Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements.
Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
1.29 INSURANCE--WORK ON A GOVERNMENT INSTALLATION
The following shall be provided:
a. Coverage complying with State laws governing insurance requirements, such as those requirements pertaining to Workman's Compensation and Occupational Disease Insurance. Employer's Liability Insurance shall be furnished in limits of not less than $100,000.00 except in states with exclusive or monopolistic funds.
DOCUMENT 00 80 00.00 06 Page 11
b. Comprehensive Automobile Liability Insurance for both bodily injury and property damage, shall be furnished in limits of not less than $200,000.00 per person, $500,000.00 per accident for bodily injury, and $20,000.00 per accident for property damage. When the Financial Responsibility or Compulsory Insurance Law of the State, requires higher limits, the policy shall provide for coverage of at least those higher limits.
c. Within seven calendar days after the award of contract, the Contractor shall submit to the Contracting Officer Evidence of Insurance for all insurance coverages. Dates of coverage shall be entered into RMS and maintained thru the contract duration. If and when new insurance is obtained because of expiration or renewal, new certificates shall be submitted to the Contracting Officer within seven days of obtainment and the new coverage information and dates entered into RMS.
1.30 NOT USED
1.31 NOT USED
1.32 NOT USED
1.33 CONSTRUCTION HAZARD COMMUNICATION
The Contractor is required to comply with the requirements of the OSHA Hazard Communication Standard in alignment with the Globally Harmonized System (GHS) (29 CFR 1926.59). This standard is designed to inform workers of safe and appropriate methods of working with hazardous substances in the workplace. The standard has five requirements, and every hazardous or potentially hazardous substance used or stored in the work area is subject to all five. They are:
(1) Hazard Classification. Any company which produces or imports a chemical or compound must conduct a hazard classification of the substance to determine its potential health or physical hazard. The hazard evaluation consists of an investigation of all the available scientific evidence about the substance. The Contractor is required to assure that all producers (manufacturer/distributors) have performed these classifications and transmit the required information with any hazardous materials being used or stored on the project site. From the hazard classification, a substance may be classified as a health hazard or a physical hazard. These classifications are then further broken down into hazard categories according to the severity of the effect:
Health Hazards Physical Hazards
Carcinogens Combustible liquids
Irritants Compressed gases
Sensitizers Explosives
Corrosives Flammables
Toxic substances Organic peroxides
Highly toxic substances Unstable substances
DOCUMENT 00 80 00.00 06 Page 12
Health Hazards Physical Hazards
Substances harmful to specific organs or parts of the body
Water-reactive substances
(2) Warning Labels. If a chemical is hazardous or potentially hazardous, the producer or importer must affix a label to every container of that chemical before it leaves his facility. The Contractor must assure these labels are attached and legible. The label must identify the hazard symbol/pictograms, signal words, hazard statements, product name or identifier (identify hazardous ingredients, where appropriate), precautionary statements and pictograms, supplier identification, and supplemental information. If the hazardous substance is transferred to another container, that container must then be labeled, tagged, or marked with the name of the chemical and the appropriate hazard warning. Warning labels shall be replaced immediately if they are defaced or removed.
(3) Safety Data Sheets. The producer or importer must also supply a safety data sheet (SDS) that follows the 16 heading format as defined by GHS. The Contractor must keep these available in the work area where the substance is used, so that the people using the substance can easily review important safety and health information, such as:
(i) Emergency procedures for leaks, spills, fire and first aid.
(ii) Precautions necessary for use, handling, and storage.
(iii) Useful facts about the substance's physical or chemical properties.
(iv) Regulatory information and any other pertinent information including information on preparation and revision of the SDS.
(4) Work Area Specific Training. Because of hazardous substance may react differently depending on how it is used or the environment of the work area, the Contractor must conduct work area specific training;
special training which takes the Contractor's operations, environment, and work policies into consideration. Work area training presents:
The hazardous substances which are present in the work place and the hazards they pose.
Ways to protect against those hazards, such as protective equipment, emergency procedures, and safe handling.
Where the SDS's are kept, and an explanation of the labeling system.
Where the Contractor's written Hazard Communication Program is located.
(5) The Written Hazard Communication Program. In accordance with OSHA and the EM 385-1-1 requirements, the Contractor must prepare a written Hazard Communication Program. This document will be included in the Contractor's Accident Prevention Plan. This document states the
DOCUMENT 00 80 00.00 06 Page 13 hazardous or toxic agent inventory, how the Contractor plans to ensure that hazardous materials are appropriately labeled, how and where SDS's will be maintained, and how employees will be provided with specific information and training.
1.34 NOT USED
1.35 NOT USED
1.36 NOT USED
1.37 NOT USED
1.38 NOT USED
1.39 NOT USED
1.40 NOT USED
1.41 NOT USED
1.42 NOT USED
1.43 NOT USED
1.44 NOT USED
1.45 NOT USED
1.46 BASIS FOR SETTLEMENT OF PROPOSALS
See FAR Section 31.105(d)(2)(i) for establishing the cost of construction equipment.
1.47 DELIVERY LOCATION
Deliver all equipment to the following location:
U.S. Army Corps of Engineers Louisville District Olmsted Locks and Dams New Dam Road La Center, KY 42056
Provide not less than 3 week notification to the Government prior to shipment. At the time of notification provide the estimated size of each delivered unit (length by widt by height) including any protective shipping enclosure, and provide the estimated weight of each delivered unit. Deliver equipment to the location at the Olmsted Lock facility as directed by the Government at the time of delivery.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .