128624-Olm Backup Drawings - Certified Final.pdf

PDF 27 MB Posted

Attached to
Olmsted Lock and Dam Backup Operation System - Olmsted, IL
Solicitation number
W912QR24R0073
Issued by

About this file

This document is a Solicitation for the Olmsted Lock and Dam Backup Operation System project in Olmsted, Illinois. The Department of the Army Corps of Engineers Engineering District Louisville is seeking to procure two (2) portable hydraulic power units with a pump-motor group to operate the hydraulic cylinders at the Olmsted Lock and Dam. The contractor will be responsible for providing the power units, which must meet specific design parameters and space limitations, as well as for all planning, programming, administration, management, supervision, communications, and inspection necessary to complete the work in accordance with the contract requirements and applicable laws and regulations. Pricing should include mobilization, demobilization, fuel, labor, material, and equipment. The power units will be installed on a skid steer towable trailer for ease of use during emergencies.

View the file

Other files

File Type Posted
W912QR24R0073 Amendment 0003.pdf PDF
W912QR24R0073 Pre-Bid Signin Sheet_Redacted.pdf PDF
W912QR24R0073 Amendment 0002.pdf PDF
W912QR24R0073.pdf PDF
W912QR24R0073 Amendment 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOTOR CONTROL DIAGRAM E-602

ONE LINE DIAGRAM AND PANEL SCHEDULES E-601

ELECTRICAL DETAILS ELECTRICAL DETAILS E-501

CONTROL SHACK DETAIL CONTROL SHACK DETAIL E-401

ELECTRICAL LEGEND AND NOTES E-001

ELECTRICAL

PORTABLE HYDRAULIC UNIT SCHEMATICM-601

HYDRAULIC POWER UNIT M-502

DETAILS M-501

LOCK LAND WALL PARTIAL PLAN STA. 31+53.00 TO STA. 32+84.00M-119

LOCK LAND WALL PARTIAL PLAN STA. 30+52.00 TO STA. 31+08.00M-118

LOCK LAND WALL PARTIAL PLAN STA. 21+00.00 TO STA. 21+56.00M-117

LOCK LAND WALL PARTIAL PLAN STA. 18+36.00 TO STA. 19+69.00M-116

LOCK MIDDLE WALL PARTIAL PLAN STA. 31+46.50 TO STA. 32+84.00M-115

LOCK MIDDLE WALL PARTIAL PLAN STA. 30+22.00 TO STA. 31+08.00M-114

LOCK MIDDLE WALL PARTIAL PLAN STA. 29+96.00 TO STA. 30+52.00M-113

LOCK MIDDLE WALL PARTIAL PLAN STA. 21+56.00 TO STA. 22+12.00M-112

LOCK MIDDLE WALL PARTIAL PLAN STA. 21+00.00 TO STA. 22+31.00M-111

LOCK MIDDLE WALL PARTIAL PLAN STA. 18+36.00 TO STA. 19+69.00M-110

LOCK RIVER WALL PARTIAL PLAN STA. 31+53.00 TO STA. 32+84.00M-109

LOCK RIVER WALL PARTIAL PLAN STA. 30+22.00 TO STA. 31+53.00M-108

LOCK RIVER WALL PARTIAL PLAN STA. 21+00.00 TO STA. 22+31.00M-107

RIVER WALL DOWNSTREAM MITER GATE PIPING MODIFICATIONM-106

RIVER WALL UPSTREAM MITER GATE PIPING MODIFICATIONM-105

LAND WALL DOWNSTREAM MITER GATE PIPING MODIFICATIONM-104

LAND WALL UPSTREAM MITER GATE PIPING MODIFICATIONM-103

MIDDLE WALL UPSTREAM MITER GATE PIPING MODIFICATIONM-102

LOCK MIDDLE WALL DOWNSTREAM MITER GATE PIPING MODIFICATIONM-101

MECHANICAL

PLAN OF LOCKG-002

COVER SHEETG-001

GENERAL

SHEET DESCRIPTIONSHEET NUMBER

24" DIA PIPE

ELEV 326.51

E 1033364.76

N 325510.45

END CELL

6" CONDUIT

6" CONDUIT

C

UP

-3

4" D

RAI

N

UP

-3

4" D

RAI

N

UP

-3

4" D

RAI

N

UP

-3

4" D

RAI

N

D f o o t i n g

INV ELEV 333.24

36" RCP

4" C

R

X

FM

BOX ABANDONED

P W R

F E E

D

C

P

W R

T E L E P

H O

N E

F I B E R

O P T I C S

1½"

TELE1½

" TELE

MH #2

MH #1

2" C

1" C

THIS CONDUIT LOCATION APPROXIMATE

THIS CONDUIT LOCATION APPROXIMATE

EL

HO

DN

HA

G

ENERATOR

0k

W

C

WV WV

R

XF

M

0/

27H 3P

A

0k

V

C

ELEV 273.1

E 1032692.76

N 324547.02

AD-4001

ELEV 274.2

E 1032751.26

N 324913.03

AD-4002

ELEV 312.6

E 1032764.79

N 325463.62

AD-4003

ELEV 319.8

E 1032775.36

N 325570.61

AD-4004

ELEV 336.4

E 1032790.51

N 325750.75

AD-4005

ELEV 344.9

E 1033156.08

N 326187.36

AD-4013

BOLLARDS

CLEANOUT

HAND HOLE

1" CONDUIT

(2

CONDUI

T d a m a x i s c e n t e r l i n e

E

N fleeting shore area power pull box #3

IL

K

Y

ST

ATE

L

IN

E (E

ST

3)

IL

K

Y

ST

ATE

L

IN

E (E

ST

3)

MONO 1

MONO2

MONO 3

MONO 4

MONO 5

MONO 7

MONO 6

MONO 8

MONO 9

MONO 10

MONO 11

MONO 12

MONO 13

MONO 14

MONO 15

MONO 16

MONO 17

MONO 18

MONO 19

MONO 20

MONO 21

MONO 22

MONO 23

MONO 26

MONO 24

MONO 25

M R

AWL-1

M7L-1

M6L-1

M23L-4

M4R-11

M4R-2

M4R-3

M4R-4

M4R-6

M4R-7

M4R-8

M4R-9

M4R-10

M23R-1

M23R-2

M24M-1

M6R-2

M5M-1

M5M-25

M5R-1

M6R-3

M6L-2

ALW-2

M L

M L

M L

M R

M23M-1 M22M-5

M5M-22

M24R-4

M R

M26R-22

M26R-12 M26R-11

M26R-10

M26R-9

M26R-8

M26R-7

M26R-6

M26R-5 M26R-4M

R

M R

M26R-2

M22M-2

M22M-3

M22M-4

M23M-5

M5M-14

M25M-1

M5R-14

M25R-1

M7M-2

M6M-4

M6M-3

M6M-8 M6M-6

AWL-6

M

M

M6M-7

AWL-5 M

R

M4M-13

M4M-14

M4M-15 M4M-16

M4M-17

M4M-18

M4M-19

M4M-21 M4M-22 M4M-23

M4M-12

M4M-11

M4M-10

M4M-9 M4M-8

M4M-7

M4M-6

M4M-4

M4M-3

M4M-2

M24M-4

M25R-4

M25-M4

M26M-23

M24M-8

M25M-19

M L

A W L

A W L

M L

M R

M R

M26M-32 M26M-33

M26M-34M26M-35

M26M-36

M26M-38 M26M-39 M26M-40

M26M-42

M26M-43

M

M

M26M-31

M26M-30

M26M-29

M

M

M

M

M26M-3

M

M

M26M-10

M26M-11

M26M-5

M26M-6

M26M-7

M26M-9

M26M-12

M26M-13

M6M-5

M23M-7

M23M-6

M1R-1

M1M-1

M

M

M L

M6M-2

M1L-8

M1L-7

M1L-6

M1L-5

M1L-4

M1L-3 M1L-2

M3L-1

M3L-2

M4L-10

M4L-1

M4L-2

M4L-3

M4L-4

M4L-5

M4L-6 M4L-7

M4L-8

M4L-9

5G

5H

M5L1

M5L2

M L

M5L4 M L

M5L6

M5L7

M5L8

M5L9

M5L10

M5L11

51C

51B

51A

M8L-1

8C

8B

M8L-4

M8L-2

M8L-6

M L 5M L

9C

9B

9A

10C

10B

10A

11C

11B

11A

M11L-3

M11L-1

M11L-2

M L

12C

12B

12A

M L

M13L-2

M13L-5

M L

M L

13C

13B

13A

14C

14B

14A

15C

15B

15A

16C

16B

16A

17C

17B

M17L-1

M L 3M L

M17L-4 M L

M L

18C

18B

18A

M18L-3 M L

M18L-2

M19L-1

19C

19B

19A

20C

20B

20A

48B

48A

M L

M21L-1

M L

M L

M21L-6

M21L-4

M24L-4

M L

M24L-1

M L

M L

M L

M25L-3 M L

M25L-1

M26L-1

M L

M26L-7

M26L-3

M26L-2

M26L-5

M26L-6

M L

M26L-9 M26L-10

M26L-11

M26L-12 M26L-13

M26L-14 M26L-15 M26L-16

M26L-17

M L

M26L-19

M26L-20

M L

M L

M L

M26L-24

M4M-20

M4M-5

M23M-2

M4R-5

M26M-8

M26M-37

CHAIN

CHAIN

CHAIN

C H A I N

C H A I N

C H A I N

CHAIN

CHAIN

CHAIN

CHAIN

M25L-4

)WE(McGR

ROY SURVEOM FRON PORTIISTH

u n l o a d i n g f a c i l i t y

A

W S

LOAD

A kV

0A

STA

CONEX

GENERATOR

TANK

FUEL

PNL

C

F I B E R

R E P

A I R

ELEV 383.28

E 1033258.21

N 326163.53

INV ELEV 335.44

36" RCP

UP

-3

4" D

RAI

N

OFN IOR SURVEYGH ENOUOTN

SSE GU AIS NE LIISTH

B

CA

C

PL

ELEV 339.18

E 1034693.81

N 326642.47

BOT BRIDGE

P I P E

A B O V E

G R A D E

INV ELEV 317.9350

36 STEEL culvert

INV ELEV 327.0310

24 STEEL culvert

INV ELEV 319.4390

24 STEEL culvert

INV ELEV 308.6720

36 STEEL culvert

M1L-1

E

APP

ROXIMAT

LOCATION

L

PEDESTA

DIS

CONNECT

RECEPTACLE

PORTABLE

E

APP

ROXIMAT

LOCATION

L

PEDESTA

SERVICE

POWER

DOCK

A117 A118

A61

A62

A63

A64

A65

A66

A67

A68

A69

A70

A71

A72

A73 A74

A75

A76 A77A78

A79 A80

A81

A82A83 A84

A85

A86

A87

A88

A89

A90

A91 A92

A93 A94

A95

A96

A97

A98

A99 A100

A101

A102

A104

A105

A106

A107

A108

A109 A110

A111

A112

A113

A114

A115

A116

CONDUIT

BURIED CABLE

IC

ALBERI

EL

0.

E

1.

N

.8

EL

0.

E

5.

N

.9

EL

3.

E

8.

N

.1

EL

3.

E

8.

N

.3

EL

3.

E

2.

N

.5

S

J-B

OXE

BREAK

LOAD

d i a c u l v e r t

4"

STU

B U P

4"

STU

B U P (

SPA

RE)

4" PVC C

4" PVC C

L

PANE

S

ACC

ESRXFM

A

500k V

4" PVC C

4" PVC C

6"

PVC

C

TO

DOC

K A

REA

4" PVC C

4" PVC CDIRECT BURIAL CABLE TO PCY 250

0kVA XFMR

C

DISFU

C

DISFU

SAND FI

LLED TRENCH

SAND FI

LLED TRENCH

12.5 kVA DI

RECT B

URIAL

CABLE

FEED FROM SC 75

4"

STU

B U P

4"

STU

B U P (

SPA

RE)

4" C

PVC

4" C

PVC (S

PARE)

#UL094

W S

15kV 7

#054 R

METE

N

AMERE

MRALA

RO

MONIT

ESPHA

n unknow size e approximatlocation

4 #pullbox

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

G-001

C

V E

R S

H E

T

S A

L R

A W

I

B H

A R

T M

A N of Engineers

US Army Corps

DRAWING SET.

ALL SHEETS INCLUDED IN THE FOLLOWING

INCLUDE DESIGNERS AND CHECKERS ON

SIGNATURES BELOW AND TO THE LEFT

MECHANICAL

DESIGNER: FIRST NAME LAST NAME

CHECKER: FIRST NAME LAST NAME

APPROVAL OF ALL DRAWINGS IN THIS SET.

OFFICIAL RECOMMENDATION AND

SIGNATURES AFFIXED BELOW INDICATE

APPROVAL RECOMMENDED: *

CERTIFICATION.

REVIEWS ARE COMPLETE, INCLUDING ITR/ATR

INDICATES DESIGN AND QUALITY CONTROL

*APPROVAL RECOMMENDED SIGNATURE

FIRST NAME LAST NAME, PE/RA

TECHNICAL LEAD

CHIEF, ENGINEERING DIVISION

IAN F. MITCHELL, PE

ER 1110-1-8152.

SIGNATURES ARE REQUIRED BY

THE SCOPE OF THIER EMPLOYMENT.

THESE DOCUMENTS ARE OPERATING WITHIN

REGISTRATION DESIGNATIONS APPEAR ON

INDIVIDUALS WHOSE SIGNATURES AND

DISTRICT.

ARMY CORPS OF ENGINEERS, LOUISVILLE

** THIS PROJECT WAS DESIGNED BY THE U.S.

APPROVED: **

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

LOUISVILLE DISTRICT

OLMSTED LOCKS AND DAMS

BACKUP LOCK OPERATING SYSTEM

VOLUME #

B

C

B

BB

CC

AA

S

A

A

BBCH A

G

ACB C PB C

S

S S

S

A1

SCALE: 1"=70'-0"

PLAN OF LOCK

P

P

P

P

P G

H

S

A

MM

S

H

G

S

H

G

S

H

G

S

H

G

FLOW

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

G-002

L

A N

O F

L O

K

A

L R

A W

I

B H

A R

T M

T

A

S T

A

.4

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

S T

A

.5

S T

A

.5

S T

A

MIDDLE WALL

110' X 1200' RIVERSIDE LOCK CHAMBER

110' X 1200' LANDSIDE LOCK CHAMBER

M-4

L S T

A

C P

IN

T

L E

S T

A

L O

C K

S T

A

LC

IN

T

L E

LC

D

A M

C LOCK

DAM

STA. 12+63.38

L

OUTLET BUCKET

TRENCHES

ELECTRICAL

UTILITY AND

LAND WALL

RIVER WALLTRENCHES

ELECTRICAL

UTILITY AND

GENERAL NOTES

UTILITY TRENCH MANHOLE LOCATIONS.U

EXISTING HYDRAULIC POWER UNIT.P

CONTROL STATION.S

PORTABLE HYDRAULIC POWER UNIT.H

GENERATOR.G

CULVERT VALVE HYDRAULIC CYLINDER CONNECTION.C

MITER GATE LATCH HYDRAULIC CYLINDER CONNECTION.B

MITER GATE HYDRAULIC CYLINDER CONNECTION.A

LEGEND

60' 120'0

NORTH

PLAN

TIME AND NO MORE THAN THREE TIMES A WEEK.

LOCK MAY BE TEMPORARILY CLOSED FOR NO MORE THAN 4 HOURS AT A

CLOSURE TIMES FOR INSTALLING THE PREMANUFACTURED PIPING. ONE

OPERATIONS DIVISION TO ESTABLISH REASONABLE TEMPORARY LOCK

THE CONTRACTOR MUST COLLABORATE WITH LOCK PERSONNEL AND THE 17.

OPERATIONS.

APPROVAL NOT LESS THAN 10-DAYS BEFORE START OF CLEANING

PROCEDURE SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR

AFTER ALL TESTING HAS BEEN COMPLETED. A DETAILED FIELD CLEANING

16. THE HYDRAULIC OIL SYSTEM PIPING/ HOSES SHALL BE CLEANED

15. PLACE RAILING AROUND OPEN RECESSES, SLOTS, AND TRENCHES.

LOCK SIDES MUST BE NPT.

THE QUICK COUPLING CONNECTION ON BOTH OF THE HOSE AND THE 14.

MATERIALS AND SIZES USED.

BENDS MUST SATISFY THE REQUIREMENTS OF ASME B31.1 FOR PIPE

OF FABRICATION. PIPE BENDS MAY BE USED IN LIEU OF FITTINGS. PIPE

FINAL ARRANGEMENTS SHALL BE DEVELOPED BY THE CONTRACTOR AT TIME

ESS OF THE PIPING BEING FITTED. FITTING QUANTITIES AND THICKN

FILLET WELD LEG SIZE OF AT LEAST 1.10 TIMES THE NOMINAL WALL

THE FILLET WELDS ON ALL SOCKETWELD FITTINGS MUST HAVE A 13.

M-1 M-2 M-3 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-25M-24M-23 M-26

B31.1.

PRESSURE-TESTED, AND FLUSHED IN ACCORDANCE WITH ASTM

NEW PREFABRICATED PIPE SPOOLS SHALL BE WELDED, 5.

DETAIL SHEET.

FLANGES ON BOTH SIDES, AS INDICATED IN THE MECHANICAL

SPOOLS SHALL BE WELDED TO CODE-61 STAINLESS STEEL

AND MADE FROM NEW PIECES OF PIPE. NEW PREFABRICATED PIPE

4. ALL WELDING AND PIPE MODIFICATIONS MUST BE PREFABRICATED

INSTALLED BY THE CONTRACTOR.

INSTALLATION OF ALL EQUIPMENT SHALL BE FURNISHED AND

MISCELLANEOUS PARTS FOR THE COMPLETE ASSEMBLY AND

FLEXIBLE HOSE, QUICK CONNECTION FITTING, AND

DOWELS, SCREWS, PIPES, PIPE FITTINGS, PIPE SUPPORTS,

ALL STUD-BOLTS, BOLTS, ANCHOR BOLTS, NUTS, WASHERS, SHIMS, .3

OPERATABLE.UNITS

HYDRAULIC POWER REQUIRED TO MAKE THE NEW PORTABLE

2. THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSION THAT

WITH LIFTING LUGS.

ASSOCIATED WITH THE BACKUP OPERATING SYSTEM MUST COME

EQUIPMENT, FITTINGS AND ACCESSORIES’. ALL EQUIPMENT

CONTROL STATION, FLEXIBLE HOSES WITH NECESSARY

GALLON HYDRAULIC TANK, MOTOR PUMP ASSEMBLY GROUP,

HYDRAULIC UNIT MUST INCLUDE BUT IS NOT LIMITED TO 400

TESTING OF THE PORTABLE HYDRAULIC POWER UNITS. EACH

MANUFACTURE, SUPPLY, DELIVERY, STORAGE, INSTALLATION AND

THE CONTRACTOR WILL BE RESPONSIBLE FOR THE DESIGN, 1.

- WELDING PROCEDURE SPECIFICATION IN ACCORDANCE WITH B31.1

- WELDER PERFORMANCE QUALIFICATION IN ACCORDANCE WITH B31.1

THE CONTRACTOR MUST SUBMIT;12.

B31.1.

FITTINGS. ALL WELDING MUST BE CONDUCTED IN ACCORDANCE WITH ASME

11. THE HYDRAULIC SYSTEM PIPE FITTINGS MUST BE 3000# SOCKETWELD

PRIOR TO FABRICATION.

SHALL BE SUBMITTED IN WRITING TO CONTRACTING OFFICER FOR APPROVAL

CONSTRUCTION. REQUESTS FOR SUBSTITUTION TO THE MATERIALS SHOWN

NOTES. QUANTITIES SHALL BE DETERMINED BY FABRICATOR AT THE TIME OF

MATERIAL SCHEDULE OR AS DESCRIBED BY GENERAL NOTES AND KEY

EQUIPMENT SHOWN ON THE DRAWINGS SHALL BE AS SHOWN IN THE

10. THE MATERIALS OF CONSTRUCTION USED DURING THE FABRICATION OF THE

CONTRACTOR.

ACCORDANCE WITH THE MECHANICAL EQUIPMENT FURNISHED BY THE

9. DETAIL DRAWINGS ARE TO BE MODIFIED AS REQUIRED TO BE IN

ADMINISTRATION (OSHA).

DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH

OF BOTH THE STATE OF KENTUCKY AND THE US FEDERAL GOVERNMENT

MAINTENANCE SHALL MEET THE APPLICABLE REGULATORY REQUIREMENTS

HYDRAULIC OIL SYSTEM EQUIPMENT SELECTION, INSTALLATION AND 8.

SYSTEM.

NO CUTTING OR WELDING IS ALLOWED ON THE EXISTING HYDRAULIC 7.

THE NEW PREFABRICATED PIPE SPOOL MUST RECEIVE APPROVAL FOR USE.6.

CA

2"

M18

M18 M18

M18

.3

.6

CL. EL. 308.25'

4" DIA. SLEEVE

12'-0"

.3

3'-0"

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A8

SCALE: NTS

LOCK PARTIAL PLAN/ DOWNSTREAM -MIDDLE WALLMITER GATE CYLINDERS AND HYDRAULIC PIPING

REPLACED WITH THE MODIFIED SPOOL.

THE PIPE SEGMENT NEEDS TO BE

SCALE: NTS

A1

M-101

W N

S T

R E

A M

M

IT

E R

G A

T E

P

IP

IN

G

M O

D

IF

IC

A

T

IO

N

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

NORTH

PLAN

M-501

J12

M-

J1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M5 M6 M7

T

A

.5

S T

A

.5

M5 M6

M7

M A

T C

H L

IN

E

S

T A

.0

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A8

SCALE: NTS

LOCK PARTIAL PLAN / UPSTREAM -MIDDLE WALL

A1

SCALE: NTS

MITER GATE CYLINDERS AND HYDRAULIC PIPING

REPLACED WITH THE MODIFIED SPOOL.

THE PIPE SEGMENT NEEDS TO BE

M-102

U

S T

R E

A M

M

IT

E R

G A

T E

P

IP

IN

G

M O

D

IF

IC

A

T

IO

N

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

M-

J1

M-501

J12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S

C2

2"

C1

2"

RH

RH

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A8

SCALE: NTS

LOCK PARTIAL PLAN / UPSTREAM - LAND WALLMITER GATE CYLINDERS AND HYDRAULIC PIPING

REPLACED WITH THE MODIFIED SPOOL.

THE PIPE SEGMENT NEEDS TO BE

SCALE: NTS M-103

S T

R E

A M

M

IT

E R

G A

T E

P

IP

IN

G

M O

D

IF

IC

A

T

IO

N

L A

N D

W A

L L

S A

L R

A W

I

B H

A R

T M

M-501

J12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S

EL. 306.29'

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A8

SCALE: NTS

LOCK PARTIAL PLAN / DOWNSTREAM - LAND WALLMITER GATE CYLINDERS AND HYDRAULIC PIPING

REPLACED WITH THE MODIFIED SPOOL.

THE PIPE SEGMENT NEEDS TO BE

SCALE: NTS M-104

W N

S T

R E

A M

M

IT

E R

G A

T E

P

IP

IN

G

M O

D

IF

IC

A

T

IO

N

L A

N D

W A

L L

S A

L R

A W

I

B H

A R

T M

M-501

J12

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11

M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22

M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A8

SCALE: NTS

LOCK PARTIAL PLAN / UPSTREAM - RIVER WALL

M-105

S T

R E

A M

M

IT

E R

G A

T E

P

IP

IN

G

M O

D

IF

IC

A

T

IO

N

R

IV

E R

W A

L L

S A

L R

A W

I

B H

A R

T M

M-

J1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S

CA

1" AIR LINE AT CL. EL. 308.25'

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A8

SCALE: NTS

LOCK PARTIAL PLAN / UPSTREAM - RIVER WALL

M-106

W N

S T

R E

A M

M

IT

E R

G A

T E

P

IP

IN

G

M O

D

IF

IC

A

T

IO

N

R

IV

E R

W A

L L

S A

L R

A W

I

B H

A R

T M

M-

J1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK RIVER WALL, UPSTREAM CULVERT VALVE

STEEL PIPE

HOSE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-107

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

R

IV

E R

W A

L L

S A

L R

A W

I

B H

A R

T M

M-501

J1

.4

.3

.5

.3

.7

.5

.1

.9

.1

.9

.3

.1

.4

.3

.3

.1

.5

.3

.8

.6

.0

.0

.1

.3

.7

.9

.9

.2

.3

.7

.0

.1

.9

.3

.4

.7

.2

.5

.6

.9

.8

.1

.3

.6

.8

.2

.8

.1

.8

.1

.4

.7

.5

.8

.4

.6

.1

.2

.0

.3

.5

.7

.3

.0

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A7

SCALE: NTS

RIVER-CHAMBER, DOWNSTREAM CULVERT VALVE

STEEL PIPE

HOSE

A1

SCALE: NTS

EMPTYING CULVERT VALVE EQUIPMENT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

NORTH

M-108

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

R

IV

E R

W A

L L

S A

L R

A W

I

B H

A R

T M

R6 R7 R7 R8

R8 R5 R9 R9 R9

R7A

S T

A

.8

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK RIVER WALL - DOWNSTREAM MITER GATE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-109

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

R

IV

E R

W A

L L

S A

L R

A W

I

B H

A R

T M

M-

J1

D1

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK MIDDLE WALL - UPSTREAM LATCHING CYLINDER

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-110

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

M-501

D1

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK MIDDLE WALL - RIVER CHAMBER UPSTREAM CULVERT VALVE

STEEL PIPE

HOSE

M-111

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

IN CONMRACM

WALL SHOWN

STEEL PIPE

HOSE

A1

SCALE: NTS

UPSTREAM LAND CHAMBER CULVERT VALVE EQUIPMENT

A7

SCALE: NTS

LOCK MIDDLE WALL - UPSTREAM LAND CHAMBER CULVERT VALVE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-112

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK MIDDLE WALL - DOWNSTREAM RIVER CHAMBER CULVERT VALVE

STEEL PIPE

HOSE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-113

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

.3

.4

.7

.2

.5

.3

.6

.6

.9

.8

.1

.3

.6

.8

.2

.8

.1

.9

.2

.8

.1

.4

.7

.5

.8

.3

.4

.6

.7

.3

.0

.1

.8

.1

.4

.9

.1

.1

.1

.4

.6

.6

.2

.3

.8

.5

.0

.7

.5

.5

.3

.0

.5

.7

.3

.5

.7

.8

.6

.9

.7

.1

.9

.3

.1

.5

.3

.1

.0

.8

.1

.9

.0

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK MIDDLE WALL - DOWNSTREAM LAND CHAMBER CULVERT VALVE

STEEL PIPE

HOSE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-114

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK MIDDLE WALL - DOWNSTREAM MG LATCHING CYLINDERS (TOP ONLY)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11

M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22

M23 M24 M25 M26 M27 M28 M29 M30 M31 M32 M33

M-115

R T

IA

L

P L

A N

S T

A

.5

T

O S

T A

.0

L O

C K

M

ID

D L

E W

A L

L

S A

L R

A W

I

B H

A R

T M

M-501

D1

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK LAND WALL - UPSTREAM LAND WALL MG LATCHING CYLINDER (TOP ONLY)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-116

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

L A

N D

W A

L L

S A

L R

A W

I

B H

A R

T M

.0

.8

.7

.5

.1

.9

.1

.9

.3

.1

.4

.3

.3

.1

.5

.3

.8

.6

.0

.0

.1

.3

.7

.9

.9

.2

.7

.0

.1

.9

.3

.4

.7

.2

.5

.6

.9

.8

.1

.3

.6

.8

.2

.8

.1

.8

.1

.4

.7

.5

.8

.4

.6

.1

.2

.0

.3

.5

.7

.1

.0

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK LAND WALL - UPSTREAM LAND CHAMBER CULVERT VALVE

STEEL PIPE

HOSE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-117

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

L A

N D

W A

L L

S A

L R

A W

I

B H

A R

T M

.0

.8

.7

.5

.1

.9

.1

.9

.3

.1

.4

.3

.3

.1

.5

.3

.8

.6

.0

.0

.1

.3

.7

.9

.9

.2

.7

.0

.1

.9

.3

.4

.7

.2

.5

.6

.9

.8

.1

.3

.6

.8

.2

.8

.1

.8

.1

.4

.7

.5

.8

.4

.6

.1

.2

.0

.3

.5

.7

.1

.0

2'-11 1/2 "3'-8 7/8 "3'-8 7/8 "7 1/2 "

MODIFICAMION

PROPOSED WALL

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK LAND WALL - DOWNSTREAM CULVERT VALVE

STEEL PIPE

HOSE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-118

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

L A

N D

W A

L L

S A

L R

A W

I

B H

A R

T M

IN CONMRACM

WALL SHOWN

A1

SCALE: NTS

LOCK LAND WALL - DOWNSTREAM MG LATCHING CYLINDER (TOP ONLY)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-119

R T

IA

L

P L

A N

S T

A

.0

T

O S

T A

.0

L O

C K

L A

N D

W A

L L

S A

L R

A W

I

B H

A R

T M

J12

SCALE: NTS

MITER GATE / PIPING MODIFICATION

J1

SCALE: NTS

CULVERT VALVE PIPING MODIFICATION DETAIL

A12

SCALE: NTS

CONTROL STATION

D1

SCALE: NTS

MITER GATE LATCHING / PIPING MODIFICATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

BOTTOM OF STEEL

GRADING LEVEL

CONCRETE SURFACE LEVEL

QUICK COUPLING

1" HYDRAULIC

BALL VALVE

1/2" 3-PIECE SS

AIR RELEASE

FLUID DRAIN AND

SECTION 'A - A'

NOTE:

ALL FLANGES MUST BE SAE CODE 62

EXISTING 2" SS PIPE

VALVE

2" 3-PIECE SS BALL

2" SS PIPE

BALL VALVE

1 1/4" 3-PIECE SS

HOSE

CYLINDER

HYDRAULIC

TO CV

1 1/4" HYDRAULIC QUICK COUPLING

BOTTOM OF STEEL

GRADING LEVEL

CONCRETE SURFACE LEVEL

QUICK COUPLING

1 1/4" HYDRAULIC

BALL VALVE

1/2" 3-PIECE SS

AIR RELEASE

FLUID DRAIN AND

SECTION 'A - A'

NOTE:

ALL FLANGES MUST BE SAE CODE 62

1 1/2" SS PIPE

BALL VALVE

1 1/4" 3-PIECE SS

HOSE

CYLINDER

HYDRAULIC

TO CV

SS BALL VALVE

EXISTING 1 1/2" 3-PIECE

1 1/4" HYDRAULIC QUICK COUPLING

EXISTING 1 1/2" SS PIPE

BALL VALVE

3-PIECE SS

EXISTING 1 1/2"

1-1/4" ø RETURN, FROM MITER GATE

1-1/4" ø SUPPLY, TO MITER GATE

3/4" ø RETURN, FROM LATCHING CYLINDERS

3/4" ø SUPPLY, TO LATCHING CYLINDERS

1-1/4" ø RETURN, FROM CULVERT VALVE

1-1/4" ø SUPPLY, TO CULVERT VALVE RETURN 2" ø TO HPU

SUPPLY 3/4" ø TO HPU

SUPPLY 1-1/2" ø TO HPU

PRESSURE GAUGE PRESSURE GAUGE

ON / OFF

SWITCHES

MITER GATE

LATCHING

CYLINDERS

CULVERT

VALVE

MITER GATE

CONTROL VALVES

DIRECTIONAL

MANUAL 4-WAY

BOTTOM OF STEEL

GRADING LEVEL

CONCRETE SURFACE LEVEL

BALL VALVE

1/2" 3-PIECE SS

AIR RELEASE

FLUID DRAIN AND

BALL VALVE

1/2" 3-PIECE SS

3/4" HYDRAULIC QUICK COUPLING

BALL VALVE

1/2" 3-PIECE SS

BALL VALVE

1/2" 3-PIECE SS

A

NOTE:

ALL FLANGES MUST BE SAE CODE 62

HOSE

CYLINDER

HYDRAULIC

TO CV

A

SS BALL VALVE

EXISTING 1/2" 3-PIECE

1/2" FLUID DRAIN AND AIR RELEASE

1/2" FLUID DRAIN AND AIR RELEASE

1/2" 3-PIECE SS BALL VALVE

T A

IL

A

L R

A W

I

B H

A R

T M

1.25"

(6

/2 L

G

.5

R

E F

A1

SCALE: 1 1/2"=1'-0"

PORTABLE HYDRAULIC POWER UNIT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

D

DRAIN

FILL

MOTOR - PUMP GROUP ASSEMBLY

(4) 5/8" DIA MOUNTING HOLES

1" S.S. BALL VALVE

IMMERSION HEATER

400 GALLON S.S. RESERVOIR

LEVEL INDICATOR

S.S. ELECTRICAL BOX

BREATHER

DISCHARGE AND RETURN FILTER

VALVES BOX

M-502

H Y

D R

A U

L

IC

P O

W E

R U

IT

A

L R

A W

I

B H

A R

T M

SCALE: NTS

PORTABLE HYDRAULIC UNIT

x

3" SCH.40

1" SCH.40

125\F

0\F

2300 PSI

Q1

Q2

M

RESERVIOR

HYDRAULIC

400 GALLON

2" SCH.803/4" SCH. 40

1/2" SCH.40

1 1/2" SCH. 80

#1

FILTER

#2

FILTER

FLUSHING CONNECTION

RESERVOR FILL/

n = 1750 RPM

M = 30 HP

P2 = 450 PSI

P1 = 500-2000 PSI

Q2 = 10 GPM

Q1 = 65 GPM

MITER GATE LATCH

1/2" SCH. 40

500 PSI

#3

FILTER

MITER GATE CULVERT VALVE

3/4" SCH. 40

1 1/2" SCH. 80

1 1/2" SCH. 80

SET @

2000 PSI

PORTABLE HYDRAULIC UNIT

HYDRAULIC UNIT SCHEMATIC (TYPICAL OF 2)

SET @

2000 PSI

SET @

2000 PSI

SET @

2000 PSI

SET @

450 PSI

SET @

450 PSI

1 1/2" SCH. 80 40

1" SCH.

SCH. 80

1 1/2" 40

1" SCH.

SCH. 80

1 1/2"

PC1 PC2 PC3 PC4

PC5 PC6

3/4" SCH. 40

1 1/2" SCH. 80

111111 11

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

C E

R T

IF

IE

D F

IN

A

L

O L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

O P

E R

A T

IN

G

S Y

S T

E M

P

E R

M

-6

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

J U

L Y

A N

S I

M-601

R T

A B

L E

H Y

D R

A U

L

IC

U N

IT

S C

H E

M A

T

IC

S A

L R

A W

I

B H

A R

T M

Q1

Q2

M

FILTER

VALVE

COUNTERBALANCE

ASSEMBLY

MOTOR

AND

PUMP

SWITCH

TEMPERATURE

ALARM

LEVEL

FLUID

HOSE

HYDRAULIC

VALVE

CHECK

(OPEN)

BALL VALVE

(CLOSED)

BALL VALVE

VALVE

RELIEF

LOGIC

VALVE

RELIEF

CYLINDER

HYDRAULIC

OVERIDE.

ACTUATED MANUAL

VALVE WITH MANUAL LEVER

AUTO CENTERING CONTROL

DIRECTIONAL CONTROL

3-POSITION, 4 WAY

CHECK VALVE

PILOT OPERATED

CONNECTION

TEST

VALVE

CONTROL

FLOW

ENGAGE, VALVE

MIITER GATE LATCHPC6 -

RELEASE, VALVE

MITER GATE LATCH PC5 -

PROPORTIONAL, VALVE

CULVERT VALVE CLOSE,PC4 -

CULVERT VALVE OPEN,PC3 -

MITER GATE CLOSE,PC2 -

MITER GATE OPEN,PC1 -

V

V

VALVE

SHUTTLE

RESTRICTOR

FLOW

BREATHER

FILTER/

DESSICANT

GAGE

PRESSURE

OF 0 TO 3000 PSI.

COMBINATION PRESSURE GAUGE. BOURDON TUBE, DIAL TYPE GAUGE,OVER RANGE 8.

AND ALL 1/2 INCH DRAIN PIPES.

MODIFICATIONS, AND SCHEDULE 40 FOR MITER GATE LATCHING MODIFICATIONS

STAINLESS STEEL, HYDRAULIC PIPING FOR MITER GATES AND CULVERT VALVES

PIPES: PROVIDE SCHEDULE 80 MINIMUM WALL THICKNESS IAW ASTM A 312, 304L 7.

MINIMUM WORKING PRESSURE OF 3000 PSI.

ALL NEW FITTING UNIONS, VALVE AND HYDRAULIC PIPING TO BE RATED FOR A 6.

BAFFLES TO SEPARATE INTAKES FROM RETURN SIDE.

THE RESERVOIR WITH ADDED CIRCULATION PASSAGES. INSURE SUFFICIENT

INCHES. EQUIPPED WITH INTERNAL BAFFLE THAT EXTENDS THE FULL HEIGHT OF

MUST HAVE A MINIMUM CLEARANCE FROM THE FLOOR OF NOT LESS THAN 6

MOUNTING FEET OUTWARD FROM THE ENDS. THE BOTTOM OF THE RESERVOIR

LIFTING LUGS MOUNTED ON ALL FOUR CORNERS AND HAVE LOW PROFILE

BOTTOM, AND MINIMUM OF 1/2 INCH ON TOP OF RESERVOIR. RESERVOIR WILL HAVE

RESERVOIR WITH A MINIMUM WALL THICKNESS OF 3/8 INCH ON ALL SIDES AND

NEW 400 GALLON CAPACITY, ASTM A 240, 304L STAINLESS STEEL DOUBLE WALL 5.

.CONNECTIONS

USE SAE J518-1 CODE-61 FITTINGS FOR ALL VALVES, MANIFOLDS, AND PIPE 4 .

LOCK EQUIPMENT CONTROL SYSTEM.

COORDINATION OF MACHINERY DETAILS AS REQUIRED TO PROVIDE COMPLETE

RESPONSIBLE FOR DESIGN OF HYDRAULIC MANIFOLDS, SELECTION OF VALVES AND

OF HYDRAULIC SYSTEM. CONTROL SYSTEM MANUFACTURER SHALL BE

SCHEMATIC AND OPERATING MACHINERY DETAILS INDICATE ONE POSSIBLE DESIGN 3.

P2 = 450 PSI

Q2 = 10 GPM

OPERATING PRESSURE IS 450 PSI. MAXIMUM OPERATING PRESSURE IS 3600 PSI.

Q2 SHALL BE A CONSTANT VOLUME PUMP WITH AN OUTPUT OF 10 GPM. NOMINAL 2.

P1 = 500-2000 PSI

Q1 = 0-65 GPM

PRESSURE CAPABILITY OF 5100 PSI AT HYDRAULIC RESERVOIR

OPERATING PRESSURE RANGE IS 500-2000 PSI, WITH MAXIMUM OPERATING

Q1 SHALL BE A VARIABLE VOLUME PUMP WITH AN OUTPUT OF 0 TO 65 GPM.NOMINAL 1.

GENERAL NOTES

SHEET KEYNOTES

LEGEND

BOUNDARIES

CONTROL STATION

1/2" DRAINE LINE11.

10. TO THE EXISTING SYSTEM

CONNECTION POINT WITH THE EXISTING SYSTEM9.

3/4" REINFORCED HYDRAULIC HOSE. MITER GATE LATCH CYLINDER-HEAD END8.

3/4" REINFORCED HYDRAULIC HOSE. MITER GATE LATCH CYLINDER-ROD END7.

1" SCH. 40 RELEASE6.

2" SCH. 80 RELIEF RETURN5.

1 1/4" REINFORCED HYDRAULIC HOSE. CULVERT VALVE CYLINDER-ROD END4.

1 1/4" REINFORCED HYDRAULIC HOSE. CULVERT VALVE CYLINDER-HEAD END3.

1 1/4" REINFORCED HYDRAULIC HOSE. MITER GATE CYLINDER-ROD END2.

1 1/4" REINFORCED HYDRAULIC HOSE. MITER GATE CYLINDER-HEAD END1.

HEATER

IMMERSION

GLASS

LEVEL SIGHT

GENERAL SITE ELECTRICAL NOTES

1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING WORK. THESE DRAWINGS ARE

GENERALLY DIAGRAMMATIC AND DO NOT SHOW ALL DETAILS REQUIRED FOR THE COMPLETE SYSTEM. THEY

SHOULD HOWEVER BE FOLLOWED AS CLOSELY AS POSSIBLE IN THE GENERAL ARRANGEMENT AND

LOCATION OF EQUIPMENT. ALL DIMENSIONS SHALL BE CHECKED AT THE SITE AND ALL STRUCTURAL AND

FINISH CONDITIONS INVESTIGATED. THE CONTRACTOR SHALL ARRANGE HIS WORK TO MEET THESE

CONDITIONS AND PROVIDE SUCH EQUIPMENT AND ACCESSORIES AS MAY BE REQUIRED.

2. ALL WORK SHOWN ON THE EXISTING CONDITIONS AND DEMOLITION DRAWINGS IS BASED ON FIELD

OBSERVATION OF THE ACTUAL EXISTING CONDITIONS AND ON EXISTING ''AS-BUILT'' DRAWINGS OF THE

AREAS AFFECTED. THEY ARE THEREFORE CONSIDERED TO BE SCHEMATIC. IT IS THE INTENT OF THE

DEMOLITION DRAWINGS THAT ALL EQUIPMENT, DEVICES, FIXTURES, WIRING MATERIALS, SYSTEMS AND

APPURTENANCES, ETC., WHICH ARE NO LONGER REQUIRED AS A RESULT OF THE PROJECT BE REMOVED

UNLESS OTHERWISE NOTED. UNDERGROUND POWER AND DATA CABLES MAY BE ABANDONED IN PLACE

UNLESS THEY MUST BE REMOVED TO ACCOMMODATE NEW CONSTRUCTION.

3. EXISTING CONDUIT, DUCT BANK, CIRCUITING AND UTILITY INFORMATION IS BASED ON ''AS-BUILT'' AND

''RECORD'' DRAWINGS, AND SITE VISITS BY THE UTILITIES AND THE ENGINEER. THE EXISTING UTILITY

LOCATIONS SHOWN ON THE PLANS ARE APPROXIMATE AND SHALL NOT BE SCALED FOR EXACT LOCATIONS.

IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTACT THE APPROPRIATE DEPARTMENT AT THE

BASE, PRIOR TO STARTING WORK, AND THE CONTRACTOR SHALL STAKE/MARK THE LOCATION OF ALL

EXISTING UTILITIES. ANY INTERRUPTION OF AN EXISTING SYSTEM OR UTILITY SERVICE SHALL BE

COORDINATED AND APPROVED BY THE GOVERNMENT, PRIOR TO STARTING WORK.

4. BEFORE INSTALLING EQUIPMENT, MAKE FIELD MEASUREMENTS TO INSURE THAT ALL ITEMS OF EQUIPMENT

FURNISHED WILL FIT INTO THE SPACE AS SHOWN ON THE DRAWINGS. WHERE EQUIPMENT WILL NOT FIT AS

SHOWN ON THE DRAWINGS, PROVIDE A DRAWING TO THE CONTRACTING OFFICER FOR APPROVAL WITH A

PROPOSED REVISED ARRANGEMENT BEFORE INSTALLING THE EQUIPMENT.

5. ADJUST EQUIPMENT AND FIXTURES TO AVOID INTERFERENCES WITH OTHER EQUIPMENT AND UTILITIES.

6. UPON DISCOVERY OF ANY DISCREPANCY OR POINTS OF CONFLICT IN THE DRAWINGS OR THE

SPECIFICATIONS, IMMEDIATELY NOTIFY THE CONTRACTING OFFICER IN WRITING. THE CONTRACTING

OFFICER WILL CLARIFY SUCH DISCREPANCY OR POINTS OF CONFLICT IN WRITING PRIOR TO THE PROGRESS

OF THE WORK BEYOND THE POINT CONCERNED.

7. PROPERLY SUPPORT ALL WORK AND EQUIPMENT INSTALLED UNDER THIS CONTRACT PLUMB AND PARALLEL

WITH GRADE OR STRUCTURE LINES. STUDY ALL DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO

DETERMINE HOW EQUIPMENT, ACCESSORIES, PIPING, FIXTURES, AND RELATED ITEMS ARE TO BE

SUPPORTED, MOUNTED, OR SUSPENDED. PROVIDE ALL BOLTS, INSERTS, PIPE STANDS, BRACKETS, STRUCTURAL SUPPORTS, AND ACCESSORIES FOR PROPER SUPPORT OF EQUIPMENT FURNISHED UNDER

THIS CONTRACT. COORDINATE THE ELECTRICAL WORK WITH ALL OTHER CONTRACTORS BEFORE

BEGINNING WORK TO INSURE THAT THE ELECTRICAL WORK DOES NOT INTERFERE WITH OTHER WORK.

LINES WHICH REQUIRE SLOPE SHALL TAKE PRECEDENCE OVER ELECTRICAL WORK.

8. ALL EXISTING SYSTEMS/UTILITIES TO REMAIN SHALL BE PROTECTED FROM DAMAGE. REPLACEMENT OF ANY

DAMAGED EXISTING SYSTEMS/UTILITIES TO REMAIN SHALL BE AT NO ADDITIONAL COST TO THE

GOVERNMENT. ALL DAMAGED SYSTEMS SHALL BE IMMEDIATELY REPAIRED WITHIN 24 HOURS TO THE

SATISFACTION OF THE GOVERNMENT.

9. WHERE THE LENGTH OF ANY 120V BRANCH CIRCUIT EXCEEDS 50 FEET, CONDUCTORS SHALL NOT BE

SMALLER THAN #10 AWG TO THE FIRST OUTLET.

10. CONTRACTOR SHALL INCREASE WIRE SIZE BY ONE SIZE FOR BRANCH CIRCUIT WIRING THAT EXCEEDS 100'

IN LENGTH. CONTRACTOR SHALL INCREASE THE WIRE SIZE FOR BRANCH CIRCUIT WIRING ADDITIONALLY BY

ONE SIZE FOR EVERY ADDITIONAL 100' IN LENGTH BEYOND 100'.

11. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING FOR THEIR WORK.

12. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT FOR THE CONSTRUCTION AND

COMPLETION IN EVERY DETAIL OF THE WORK DESCRIBED, UNLESS OTHERWISE NOTED. IT IS FURTHER

INTENDED THAT THE CONTRACTOR SHALL FURNISH ALL LABOR, SUPERVISION, MATERIALS, EQUIPMENT, TOOLS, TRANSPORTATION, SUPPLIES, TESTING AND INCIDENTALS REQUIRED TO COMPLETE THE WORK IN

ACCORDANCE WITH THE DRAWINGS (PLANS), SPECIFICATIONS, AND TERMS OF THE CONTRACT.

13. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS, LICENSES, ETC., PRIOR TO

COMMENCEMENT OF WORK. THE COST OF PERMITS, LICENSES, CONNECTIONS, ETC. SHALL BE THE

RESPONSIBILITY OF THE CONTRACTOR.

14. ITEMS SHOWN IN SCREEN (GHOST) ARE EXISTING ITEMS. ITEMS SHOWN IN SOLID (BOLD) ARE NEW TO BE

INSTALLED UNDER THIS CONTRACT, UNLESS OTHERWISE NOTED.

15. ITEMS SHOWN INSIDE HEAVY DASHED LINES ARE ELECTRICAL CONTRACT OPTIONS AS NOTED.

16. ALL EXCAVATION WITHIN 5 FEET OF AN UNDERGROUND UTILITY SHALL BE PERFORMED BY HAND

EXCAVATION METHODS. EXISTING DIRECT BURIED CABLES TO REMAIN THAT ARE EXPOSED DURING

REGRADING SHALL BE ENCLOSED IN SPLIT DUCT AND ENCASED IN A 3'' ENVELOPE OF CONCRETE (03 30

00.00 10)

17. ALL DAMAGE TO UTILITIES OR EXISTING STRUCTURES SHALL BE IMMEDIATELY REPORTED TO THE

CONTRACTING OFFICER. THE CONTRACTING OFFICER SHALL DETERMINE WHETHER REPAIR OR

REPLACEMENT IS NECESSARY. ALL REPAIR METHODS SHALL BE SUBMITTED TO THE CONTRACTING OFFICER

FOR REVIEW AND APPROVAL PRIOR TO INITIATING THE WORK.

18. CONTRACTOR SHALL ATTEND THE CONSTRUCTION MEETINGS FOR THE DURATION OF THE PROJECT.

19. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AN ELECTRICAL PHASING PLAN THAT IS TO BE

COORDINATED WITH OTHER DISCIPLINES. ELECTRICAL DEMOLITION WORK SHALL BE LIMITED TO THE AREAS

AND SCHEDULES IDENTIFIED IN THE APPROVED PHASING PLAN.

20. ALL REMOVED CABLES, TRANSFORMERS, CCR's, ETC. SHALL BE PROPERLY AND LEGALLY DISPOSED OF OFF

THE SITE BY THE CONTRACTOR. ALL ITEMS TO BE RELOCATED SHALL BE REMOVED FIRST AND PROPERLY

STORED FOR FUTURE INSTALLATION.

21. CONTRACTOR SHALL HAVE ALL COMMUNICATIONS CABLES, BOTH TO REMAIN AND TO BE DEMOLISHED, MARKED PRIOR TO WORK IN PROJECT AREAS.

22. ANY ITEMS INSTALLED INCORRECTLY PER CONTRACT DOCUMENTS SHALL BE COMPLETELY REMOVED AND

REPLACED AT THE CONTRACTOR'S EXPENSE.

23. DEWATERING FOR THE REMOVAL AND INSTALLATION OF CABLE ARE INCIDENTAL. THE CONTRACTOR SHALL

BE RESPONSIBLE TO PAY FOR AND OBTAIN ANY AND ALL PERMITS REQUIRED FOR DEWATERING.

24. EXISTING EQUIPMENT THAT IS TO BE RE-USED AS NOTED IN THE DESIGN SHALL BE REMOVED, SAFELY

STORED, AND RE-INSTALLED AS DESCRIBED IN THE DESIGN. PRIOR TO REMOVAL, THE CONTRACTOR SHALL

DEMONSTRATE AND DOCUMENT IN A REPORT THE EQUIPMENT'S OPERABILITY IN THE PRESENCE OF THE

CONTRACTING OFFICER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RETURNING THE EQUIPMENT TO

ITS ORIGINAL CONDITION AT THE COMPLETION OF THE PROJECT AT NO ADDITIONAL COST TO THE

GOVERNMENT.

AC ABOVE COUNTERTOP

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AMP AMPERES

AL ALUMINUM

AHU AIR HANDLING UNIT

BLDG BUILDING

CKT CIRCUIT

C CONDUIT

CONN CONNECTION

COND CONDUCTOR

CU COPPER

DET DETAIL

DN DOWN

DISC DISCONNECT

DP DISTRIBUTION PANEL

EA EACH

ELEC ELECTRICAL

EM EMERGENCY

EMT ELECTRIC METALLIC TUBING

ENT ELECTRIC NON-METALLIC TUBING

EP EXPLOSIONPROOF

EWC ELECTRIC WATER COOLER

F FUSE

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FLR FLOOR

FLOUR FLUORESCENT

GND GROUND

GALV GALVANIZED

GFI GROUND FAULT INTERRUPT

HID HIGH INTENSITY DISCHARGE

HP HORSEPOWER

H HEIGHT

IAW IN ACCORDANCE WITH

IDF INTERMEDIATE DISTRIBUTION FRAME

IG ISOLATED GROUND

INC INCANDESCENT

IN INCH

IMT INTERMEDIATE METAL CONDUIT

JB JUNCTION BOX

KCM 1000 CIRCULAR MILS

KVA KILOVOLT AMPS

KVAR KILOVOLT AMPS REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

LA LIGHTNING ARRESTOR

LTG LIGHTING

LV LOW VOLTAGE

MAX MAXIMUM

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDF MAIN DISTRIBUTION FRAME

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MFG MANUFACTURER

MG MOTOR GENERATOR

MH MANHOLE, METAL HALIDE, MOUNTING HEIGHT

MIC MICROPHONE

MIN MINIMUM

MLO MAIN LUGS ONLY

MTD MOUNTED

N/A NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRIC MANUFACTURERS ASSOCIATION

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTACT

NTS NOT TO SCALE

NO NORMALLY OPEN, NUMBER

PB PULL BOX, PUSH BUTTON

PH

PHASE

PNL PANEL

POC POINT OF CONNECTION

PS

PULL SWITCH

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RCPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

SCH SCHEDULE

SQ FT SQUARE FOOT

SW SWITCH

SYS SYSTEM

TEL TELEPHONE

TVSS TRANSIENT VOLTAGE SUPPRESSION SYSTEM

TYP TYPICAL

UH UNIT HEATER

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

V VOLTAGE

W WIRE

W/ WITH

W/O WITHOUT

WP WEATHERPROOF

WT WEIGHT

REF REFERENCE, REFER

XFMR TRANSFORMER

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

A.

B.

C.

D.

E.

F.

G.

SYMBOLS, NOTES AND ABBREVIATIONS ON THIS SHEET ARE STANDARD AND MAY

NOT ALL APPEAR ON THIS PROJECT.

VERIFY CONDITIONS PRIOR TO STARTING WORK. THESE DRAWINGS ARE

GENERALLY DIAGRAMMATIC AND DO NOT SHOW ALL DETAILS REQUIRED FOR THE

COMPLETE SYSTEM. THEY SHOULD HOWEVER BE FOLLOWED AS CLOSELY AS

POSSIBLE IN THE GENERAL ARRANGEMENT AND LOCATION OF EQUIPMENT.

CHECK ALL DIMENSIONS AND INVESTIGATE STRUCTURAL/FINISH CONDITIONS AT

THE SITE. ARRANGE WORK TO MEET THESE CONDITIONS AND PROVIDE SUCH

EQUIPMENT AND ACCESSORIES AS MAY BE REQUIRED. PROVIDE ALL EQUIPMENT

FOR A FULLY FUNCTIONING SYSTEM.

BEFORE INSTALLING EQUIPMENT, MAKE FIELD MEASUREMENTS TO ENSURE THAT

ALL ITEMS OF EQUIPMENT FURNISHED WILL FIT INTO THE SPACE AS SHOWN ON

THE DRAWINGS. WHERE EQUIPMENT WILL NOT FIT AS SHOWN ON THE

DRAWINGS, PROVIDE DRAWINGS TO THE CONTRACTING OFFICER FOR APPROVAL

WITH A PROPOSED REVISED ARRANGEMENT BEFORE INSTALLING THE

EQUIPMENT.

ADJUST EQUIPMENT AND FIXTURES TO AVOID INTERFERENCES WITH OTHER

EQUIPMENT AND UTILITIES.

UPON DISCOVERY OF ANY DISCREPANCY OR POINTS OF CONFLICT IN THE

DRAWINGS OR THE SPECIFICATIONS, IMMEDIATELY NOTIFY THE CONTRACTING

OFFICER IN WRITING. THE CONTRACTING OFFICER WILL CLARIFY SUCH

DISCREPANCY OR POINTS OF CONFLICT IN WRITING PRIOR TO THE PROGRESS OF

THE WORK BEYOND THE POINT CONCERNED.

PROPERLY SUPPORT ALL WORK AND EQUIPMENT INSTALLED UNDER THIS

CONTRACT PLUMB AND PARALLEL WITH GRADE OR STRUCTURE LINES. STUDY

ALL DRAWINGS, SHOP DRAWINGS, AND CATALOG DATA TO DETERMINE HOW

EQUIPMENT, ACCESSORIES, PIPING, FIXTURES, AND RELATED ITEMS ARE TO BE

SUPPORTED, MOUNTED, OR SUSPENDED. PROVIDE ALL BOLTS, INSERTS, PIPE

STANDS, BRACKETS, STRUCTURAL SUPPORTS, AND ACCESSORIES FOR PROPER

SUPPORT OF EQUIPMENT FURNISHED UNDER THIS CONTRACT. COORDINATE THE

ELECTRICAL WITH ALL OTHER CONTRACTORS BEFORE BEGINNING WORK TO

INSURE THAT THE ELECTRICAL WORK DOES NOT INTERFERE WITH OTHER WORK.

NOT USED

FURNISH AND INSTALL ALL EQUIPMENT FOR THE CONSTRUCTION AND

COMPLETION IN EVERY DETAIL OF THE WORK DESCRIBED, UNLESS OTHERWISE

NOTED. FURNISH ALL LABOR, SUPERVISION, MATERIALS,EQUIPMENT, TOOLS,

TRANSPORTATION, SUPPLIES, TESTING AND INCIDENTALS REQUIRED TO

COMPLETE THE WORK IN ACCORDANCE WITH THE DRAWINGS (PLANS),

SPECIFICATIONS, AND TERMS OF THE CONTRACT.

NOT USED

REPORT ALL DAMAGES TO UTILITIES OR EXISTING STRUCTURES IMMEDIATELY TO

THE CONTRACTING OFFICER. THE CONTRACTING OFFICER SHALL DETERMINE

WHETHER REPAIR OR REPLACEMENT IS NECESSARY. SUBMIT ALL REPAIR

METHODS TO THE CONTRACTING OFFICER FOR REVIEW AND APPROVAL PRIOR

TO INITIATING THE WORK.

COMPLETELY REMOVE AND REPLACE ANY ITEMS INSTALLED INCORRECTLY PER

CONTRACT DOCUMENTS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT.

PERFORM ALL ELECTRICAL WORK IN ACCORDANCE WITH THE MOST RECENT

EDITION OF NFPA 70 - NATIONAL ELECTRICAL CODE.

DO NOT WORK ON ENERGIZED ELECTRICAL CIRCUITS UNLESS PROOF IS

PROVIDED THAT NO OTHER MEANS EXIST. IF IT IS DETERMINED THAT EQUIPMENT

MUST BE WORKED ON IN AN ENERGIZED CONDITION, SUBMIT AN ENERGIZED

WORK REQUEST TO THE GOVERNMENT VIA THE CONTRACTING OFFICER FOR

ACCEPTANCE. THE ENERGIZED WORK REQUEST SHALL CONTAIN INFORMATION

REQUIRED BY USACE EM 385-1-1 PARAGRAPH 11.A.02.C REFERENCE NFPA 70E.

ENERGIZED CIRCUITS: WHEN ENERGIZED WORK IS DEEMED ABSOLUTELY

NECESSARY, IT SHOULD BE ACCOMPLISHED WITH EXTREME CAUTION AND ONLY

WHEN THE BASIC ENERGIZED WORK PROCEDURES LISTED IN AFI 32-1064 ARE

FOLLOWED AND REVIEWED WITH ALL PERSONNEL IMMEDIATELY BEFORE

STARTING. ENERGIZED WORK SHALL NOT BE ALLOWED WITHOUT MEETING THE

FOLLOWING REQUIREMENTS:

SAFETY OFFICER MUST APPROVE ENERGIZED WORK IN ADVANCE.

USE TWO-PERSON TEAMS TO PERFORM WORK.

A QUALIFIED SUPERVISOR MUST BE CONSULTED AND MUST APPROVE ANY

PLAN TO WORK ON ENERGIZED EQUIPMENT AND ENSURE PROPER USE OF

PERSONAL PROTECTIVE EQUIPMENT.

THE ENERGIZED WORK REQUEST MUST BE PREPARED IN ADVANCE.

PLACE SPECIAL EMPHASIS ON PERSONAL PROTECTIVE EQUIPMENT AND

APPROPRIATE SUPERVISION. PROPER SUPERVISION, TRAINING, AND

PLANNING ARE PARAMOUNT TO ENSURE SAFETY.

CONVENTIONAL CIRCUIT DE-ENERGIZING/RE-ENERGIZING METHODS (I.E.,

TURNING OFF/ON A SWITCH, OPENING AND CLOSING SWITCHES, OR

OPERATING CIRCUIT BREAKERS/DISCONNECTS) FOR THE PURPOSE OF

ISOLATING CIRCUITS IS CONSIDERED PERFORMING "ENERGIZED WORK" AND

ALL THE PROCEDURES ABOVE SHALL BE FOLLOWED; HOWEVER, FOR THE

PURPOSES OF THIS PARAGRAPH,BASE CIVIL ENGINEER APPROVAL IS

GRANTED THROUGH A WRITTEN SAFE CLEARANCE FORM.

WHILE THE JOB IS IN PROGRESS, AN ON-SITE SUPERVISOR MUST CLOSELY

SUPERVISE THE WORKERS, CHECKING THEM CONSTANTLY TO MAKE SURE

THEY ARE IN SAFE WORKING POSITIONS, HANDLING TOOLS SAFELY, AND

COMPLYING WITH THE ENERGIZED WORK PERMIT.

WALL MOUNTED DUPLEX RECEPTACLE MOUNTED AT 18"AFF.

GFI = GROUND FAULT INTERRUPTER

MOTOR

X DENOTES HORSEPOWER

X

PANELBOARD, SURFACE MOUNTED

WALL SWITCH 120-277 VOLT, 20 AMP SINGLE POLE, MOUNTED 48"

AFF.

ELECTRICAL SAFETY NOTES

1. LOCAL ''LOCKOUT/TAGOUT'' PROCEDURES AND NFPA 70E SHALL BE COMPLIED

WITH BY THE CONTRACTOR.

2. NO WORK SHALL BE PERFORMED ON ENERGIZED ELECTRICAL CIRCUITS

UNLESS PROOF IS PROVIDED THAT NO OTHER MEANS EXIST. IF IT IS

DETERMINED THAT EQUIPMENT MUST BE WORKED IN AN ENERGIZED

CONDITION, AN ENERGIZED WORK REQUEST SHALL BE SUBMITTED TO THE

CONTRACTING OFFICER FOR ACCEPTANCE AND SHALL CONTAIN

INFORMATION REQUIRED BY USACE EM 385-1-1 PARAGRAPH 11.A.02.C.

REFERENCE NFPA70E.

3. ENERGIZED CIRCUITS: WHEN ENERGIZED WORK IS DEEMED ABSOLUTELY

NECESSARY, IT SHOULD BE ACCOMPLISHED WITH EXTREME CAUTION AND

ONLY WHEN THE BASIC ENERGIZED WORK PROCEDURES LISTED IN AFI 32-

1064 ARE FOLLOWED AND REVIEWED WITH ALL PERSONNEL IMMEDIATELY

BEFORE STARTING. ENERGIZED WORK SHALL NOT BE ALLOWED WITHOUT

MEETING THE FOLLOWING REQUIREMENTS:

A. THE CONTRACTING OFFICER MUST APPROVE ENERGIZED WORK IN

ADVANCE.

B. USE TWO-PERSON TEAMS TO PERFORM WORK.

C. A QUALIFIED SUPERVISOR MUST BE CONSULTED AND MUST APPROVE

ANY PLAN TO WORK ON ENERGIZED EQUIPMENT AND ENSURE

PROPER USE OF PERSONAL PROTECTIVE EQUIPMENT.

D. THE ENERGIZED WORK REQUEST MUST BE PREPARED IN ADVANCE.

E. PLACE SPECIAL EMPHASIS ON PERSONAL PROTECTIVE EQUIPMENT

AND APPROPRIATE SUPERVISION. PROPER SUPERVISION, TRAINING,

AND PLANNING ARE PARAMOUNT TO ENSURE SAFETY.

F. CONVENTIONAL CIRCUIT DE-ENERGIZING/RE-ENERGIZING METHODS

(I.E., TURNING OFF/ON A SWITCH, OPENING AND CLOSING SWITCHES,

OR OPERATING CIRCUIT (BREAKERS/DISCONNECTS) FOR THE

PURPOSE OF ISOLATING CIRCUITS IS CONSIDERED PERFORMING

"ENERGIZED WORK" AND ALL THE PROCEDURES ABOVE SHALL BE

FOLLOWED; HOWEVER, FOR THE PURPOSES OF THIS PARAGRAPH,

BASE CIVIL ENGINEER APPROVAL IS GRANTED THROUGH A WRITTEN

SAFE CLEARANCE FORM.

G. WHILE THE JOB IS IN PROGRESS, AN ON-SITE SUPERVISOR MUST

CLOSELY SUPERVISE THE WORKERS, CHECKING THEM CONSTANTLY

TO MAKE SURE THEY ARE IN SAFE WORKING POSITIONS, HANDLING

TOOLS SAFELY, AND COMPLYING WITH THE ENERGIZED WORK PERMIT.

4. CONTRACTOR SHALL PROVIDE PERSONAL PROTECTIVE EQUIPMENT (PPE).

ELECTRICAL ABBREVIATIONS GENERAL ELECTRICAL NOTES POWER EQUIPMENT AND DEVICE LEGEND

ELECTRICAL ONE LINE DIAGRAM SYMBOLS

POTENTIAL TRANSFORMER

MOTOR

TRANSFORMER

CIRCUIT BREAKER

G

SURGE PROTECTION DEVICE

X DENOTES HORSEPOWER

MOTOR CONTACTOR AND OVERLOADS

CONNECTION OF BRANCH CIRCUITS.

INTEGRATED PIN AND SLEEVE CONNECTOR RECEPTACLES USED FOR

ELECTRICAL "BANGBOARD" - MOBILE POWER DISTRIBUTION PANEL.

MOTOR CONTROL SYMBOLS

FUSE

MOTOR RUNNING LIGHT

RELAY

CONTACTOR

NORMALLY OPEN

CONTACTOR

NORMALLY CLOSED

TRANSFORMER

STOP BUTTON START BUTTON

THERMAL OVERLOAD CIRCUIT BREAKER

NEMA MOTOR STARTERDISCONNECT SWITCH

SPD

R

M1

X

E C

T R

IC

A

L L

E G

E N

D A

N D

N O

T

E-001

L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

L O

C K

O P

E R

A T

IN

G

S Y

S T

E M

P

M

O R

R

IS

O N

R M

O R

R

IS

O N

J T

IM

B

A S

K

S T

A G

G S

A N

S I

D

J A

N

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

IS

S

U E

D A

T E

D

E S

IG

N

E D

B Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S I Z

E

C E

R T

IF

IE

D F

IN

A1 NOT TO SCALE

CONTROL SHACK LAYOUT

SHEET KEYNOTES

1. 36" X 80" DOOR

2. PANELBOARD PS1

3. NOT USED

4. WINDOW

5. MINI-SPLIT HVAC SYSTEM.

6. GENERATOR

7. 480V BANGBOARD

8. 480V TO 120/208V TRANSFORMER

9. 120/208V BANGBOARD

10. PORTABLE LOAD CENTER

1. GENERAL LAYOUT OF THE CONTROL SHACK IS FOR BIDDING PURPOSES

ONLY. LIGHTING RECEPTACLES AND MINI-SPLIT LOCATIONS SHOWN CAN BE

ALTERED DEPENDING THE PREENGINEERED FACILITY PURCHSED. PS1 IS AN

ASSUMED PANELBOARD THAT WOULD BE A PART OF THE PREENGINEERED

FACILITY AND WOULD NOT BE PURCHASED SEPARETELY. FACILITY MUST BE

APPROVED BY THE COR.

2. THE DISTRIBUTION EQUIPMENT ELEVATION VIEW IS FOR BIDDING PURPOSES

ONLY. ALL EQUIPMENT LOCATIONS MUST BE CONFIRMED WITH THE COR TO

ENSURE THE LENGTH OF CABLES CONNECTING EQUIPMENT ARE

APPROPRIATELY SIZED. THE CABLES ASSOCIATED WITH EACH BACKUP

OPERATING SYSTEM MUST BE THE SAME LENGTH. ALL EQUIPMENT

ASSOCIATED WITH THE BACKUP OPERATING SYSTEM MUST COME WITH

LIFTING LUGS.

3. CONNECTIONS SHOWN IN THE DISTRIBUTION EQUIPMENT ELEVATION VIEW

DO NOT REPRESENT HOW CABLES CONNECT EACH PIECE OF EQUIPMENT TO

EACH OTHER. ALL CONNECTIONS BETWEEN ELECTRICAL EQUIPMENT ARE TO

BE MADE USING A DOUBLE LOCKING, PIN AND SLEEVE RECEPTACLE.

CONTRACTOR TO COORDINATE WITH COR PRIOR TO PURCHASING ANY PIN

AND SLEEVE CONNECTORS TO ENSURE COMPATIBILITY WITH PIN AND

SLEEVE CONNECTORS ALREADY AT THE SITE LOCATION.

4. A HYDRAULIC CONTROL MANIFOLD MUST BE INSTALLED INSIDE THE

CONTROL SHACK. THIS WILL CONSIST OF THREE HAND STICK CONTROLS TO

OPERATE THE MITER GATE, FILLING/EMPTYING VALVE AND THE LATCHING

CYLINDER. COORDINATE WITH THE COR FOR FINAL LAYOUT OF THIS

MANIFOLD.

5. REFER TO SHEET E-601 FOR INFORMATION ON GROUNDING REQUIREMENTS

OF THE SYSTEM.

6. FOUR 3' DRIVE OVER CABLE PROTECTORS THAT ARE CAPABLE OF

WITHSTANDING A MINIMUM OF 20,000 LBS MUST BE PROVIDED FOR EACH

BACKUP OPERATING SYSTEM. THE CHANNEL DIAMETER FOR THE CABLE

PROTECTORS MUST BE ABLE TO FIT THE HYDRAULIC HOSING OR

ELECTRICAL CABLES IN SEPARATE CHANNELS. SIZING OF CHANNEL

DIAMETER WILL BE DETERMINED OFF OF LARGER DIAMETER BETWEEN

HYDRAULIC HOSING AND ELECTRICAL CABLES.

GENERAL SHEET NOTES

5 5

A7 NOT TO SCALE

DISTRIBUTION EQUIPMENT ELEVATION VIEW

PS1 (1)

PS1 (2)

PS1 (6)

PS1 (6)

PS1 (3)

N T

R O

L S

H A

C K

D E

T

E-401

L

M S

T E

D L

O C

K S

A N

D D

A M

B A

C K

U P

L O

C K

O P

E R

A T

IN

G

S Y

S T

E M

P

M

O R

R

IS

O N

R M

O R

R

IS

O N

J T

IM

B

A S

K

S T

A G

G S

A N

S I

D

J A

N

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G

J R

P

L

L O

U

IS

V

IL

L E

K

Y

O

N T

R O

L S

H A

C K

D E

T A

IL

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

IS

S

U E

D A

T E

D

E S

IG

N

E D

B Y

D R

A W

N B

Y

C H

E C

K E

D B

Y

S U

B M

IT

T

E D

B Y

S O

L

IC

IT

A

T

IO

N N

O

C O

N T

R A

C T

N O

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

S I Z

E

C E

R T

IF

IE

D F

IN

1. FILLET WELD A ONE HOLE GROUNDING PLATE AT EACH HYDRAULIC BACKUP

OPERATING SYSTEM LOCATION ON THE CORNER PROTECTION ARMOR. ALL

GROUNDING CLAMP POINTS ARE TO BE COORDINATED WITH THE COR PRIOR

TO INSTALLATION. REMOVE THE EXISTING VINYL AND PAINT LAYER ON THE

CORNER PROTECTION ARMOR PRIOR TO FILLET WELDING.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .