This document is an Asbestos Removal Report for Fort McCoy, Wisconsin. The report identifies various building components containing asbestos, including water pipes, boilers, furnaces, ducts, heaters, tanks, milboard, transite pads, flooring, chimneys, and siding. The report provides square footage estimates for each asbestos-containing material and indicates whether the material was sampled and the percentage of asbestos present.
The related federal contract opportunity is for the Construction of two (2) new 48,000SF, 4-story, Collective Training Officers Quarters (CTOQ) at Fort McCoy, Wisconsin. The solicitation number is W912QR24R0003, and the contracting agency is the Department of the Army Corps of Engineers Engineering District Louisville.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4/5/2024
ASBESTOS REMOVAL REPORT
FORT MCCOY, WISCONSIN
WATER WATER ROOF Selected for Demolition in Future BLDG PIPE BOILER FURNACE DUCT HEATER TANK MILBOARD TRANCITE PAD FLOOR SAMPLED CHIMNEY ROOF SAMPLED JACK SIDING SAMPLED See Remarks
NO. TYPE LN. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. SQ. FT. EACH SQ. FT. YES/NO EACH SQ. FT. YES/NO EACH SQ. FT. YES/NO REMARKS
1657 BOQ 0 0 0 0 0 0 0 0 0 9360 NO 0 4680 YES (0%) 0 7968 YES (40%) 10/09 NOI <50 SF for repairs 1658 BOQ 0 0 0 0 0 0 0 0 0 9360 YES (5%) 0 4680 YES (0%) 0 7968 YES (40%) 10/09 NOI <50 SF for repairs. TILE MASTIC 10% ACM 1660 BOQ 0 0 0 0 0 0 0 0 0 9360 NO 0 4680 YES (0%) 0 7968 YES (40%) 10/09 NOI <50 SF for repairs 1661 BOQ 0 0 0 0 0 0 0 0 0 9360 YES(13%) 0 4680 YES (0%) 0 7968 YES (40%) 10/09 NOI < 50 SF for repairs.FLOOR TILE 3% ACM, MASTIC 10% ACM
1662 BOQ 0 0 0 0 0 0 0 0 0 4800 NO 0 4680 YES (0%) 0 7968 YES (40%)
AMENDMENT 0003*********************************************************** *************************************
*********************************************************** *************************************AMENDMENT 0003
W912QR24R0003_Reference-Drawings-0003
LEAD BASED PAINT FINAL REPORT
BLDG # ROOM # WALL SQ FT COLOR COND. SURFACE TYPE LBP Year Tested
1657 NOT TESTED 1996
1658 NOT TESTED 1996 Partial 2006 No Lead
1659 NOT TESTED 1996
1660 NOT TESTED 1996 Partial 2005 No Lead 1661 ENTIRE BR F INTERIOR DOOR PC 1996 Partial 2007 No Lead
1661 ENTIRE BR F INTERIOR DOOR FRAME PC 1996
1662 ENTIRE BR F INTERIOR DOOR PC 1996
1662 ENTIRE BR F INTERIOR DOOR FRAME PC 1996
AMENDMENT 0003*********************************************************** *************************************
*********************************************************** *************************************AMENDMENT 0003
W912QR24R0003_Reference-Drawings-0003
| Bldgs 1657-1662 Asbestos Report |
| ASBESTOS |
| Bldgs 1657-1662 LBP Report |
| McCoy |