W912QR24R0002_Specs-0001.pdf

PDF 1 MB Posted

Attached to
Design-Bid-Build Construction of Collective Training Enlisted Barracks East at Fort McCoy, Wisconsin
Solicitation number
W912QR24R0002
Issued by

About this file

This document is an amendment to the solicitation for the Design-Bid-Build Construction of Collective Training Enlisted Barracks East at Fort McCoy, Wisconsin. The amendment updates the project title, replaces or adds several specification sections, revises and replaces multiple plan sheets, and modifies the price breakout schedule. It requires acknowledgement of all amendments by offerors and confirms that all other terms and conditions remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

(See Continuation Page)

1. CONTRACT ID CODE PAGE OF PAGES

1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR24R0002

X 9B. DATED (SEE ITEM 11)

06-Nov-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Nov-2023

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR24R0002_Specs-0001

W912QR24R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

Solicitation No. W912QR24R0002 for the Design-Bid-Build Construction of the Collective Training Enlisted Barracks East at Ft. McCoy, Wisconsin is hereby amended as follows:

A. Section 00 10 00 - Solicitation, Price Breakout Schedule project title has been updated from "ORTC Transient Training Enlisted Barracks" to "Collective Training Enlisted Barracks East."

B. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:

02 41 00 DEMOLITION

32 13 13.06 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

C. The following SPECIFICATION SECTIONS have been added in their entirety:

NONE for Amendment 0001

D. The following SPECIFICATION SECTIONS have been deleted in their entirety:

E. The following PLAN SHEETS have been revised and replaced in their entirety:

G-001 COVER SHEET

GC501 EROSION CONTROL DETAILS

GC502 EROSION CONTROL DETAILS

GC503 EROSION CONTROL DETAILS

CD101 OVERALL DEMOLTION PLAN

CD102 DEMOLTION PLAN

CD103 DEMOLTION PLAN

CS101 OVERALL SITE PLAN

CS102 SITE PLAN

CS103 SITE PLAN

CS501 SITE DETAILS

CS502 SITE DETAILS

CS503 SITE DETAILS

CS504 SITE DETAILS

CG502 GRADING DETAILS

CU501 UTILITY DETAILS

CU502 UTILITY DETAILS

CU503 UTILITY DETAILS

ES101 OVERALL ELECTRICAL SITE PLAN

ES102 ELECTRICAL SITE PLAN 1

ES103 ELECTRICAL SITE PLAN 2

ES104 ELECTRICAL SITE PLAN 3

ES502 ELECTRICAL SITE DETAILS

ES503 ELECTRICAL & TELECOMMUNICATIONS SITE DETAILS

A-202 ENLARGED SOUTH ELEVATION

A-407 ENLARGED MECHANICAL YARD PLAN

IF120 SECOND, THIRD, AND FOURTH FLOOR FURNITURE PLAN - COMPREHENSIVE

FA001 FIRE ALARM AND MASS NOTIFICATION SYSTEM LEGEND

P-112 COMPOSITE DOMESTIC WATER PLAN - 1ST FLOOR

M-001 HVAC LEGEND

M-150 HEATING PIPING PLAN - 1ST FLOOR COMPREHENSIVE

M-401 ENLARGED MECHANICAL ROOM PLAN - 1ST FLOOR

M-402 ENLARGED MECHANICAL ROOM SECTIONS - 1ST FLOOR

M-403 ENLARGED MECHANICAL ROOM SECTIONS - 1ST FLOOR

M-501 MECHANICAL DETAILS

M-503 MECHANICAL DETAILS

M-602 MECHANICAL EQUIPMENT SCHEDULES

M-703 AHU-1 SCHEMATIC DIAGRAM

M-703A AHU-2 SCHEMATIC DIAGRAM

M-716 DRYER FAN LOGIC & LADDER DIAGRAMS & SEQUENCE

E-110 FIRST FLOOR PLAN - COMPREHENSIVE

E-121 FIRE FLOOR MECHANICAL POWER PLAN – COMPREHENSIVE

E-401 ENLARGED PLANS

E-402 ENLARGED PLANS

E-403 ENLARGED PLANS

E-404 ENLARGED PLANS

E-405 ENLARGED PLANS

E-602 PANEL SCHEDULES

E-603 PANEL SCHEDULES

E-604 PANEL SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-607 PANEL SCHEDULES

E-701 ONE-LINE DIAGRAM AND FEEDER SCHEDULE

T-001 TELECOMMUNICATIONS AND LOW VOLTAGE SYSTEMS LEGEND

X-110 FIRST FLOOR - LIFE SAFETY PLAN

X-120 SECOND FLOOR - LIFE SAFETY PLAN

X-130 THIRD FLOOR - LIFE SAFETY PLAN

X-140 FOURTH FLOOR - LIFE SAFETY PLAN

F. The following PLAN SHEETS have been added new:

M-716B DRYER FAN POINT SCHEDULE

G. The following PLAN SHEETS have been DELETED:

H. Offerors must acknowledge all Amendments.

I. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The following have been modified:

PRICE BREAKOUT SCHEDULE

PRICE BREAKOUT SCHEDULE

PROJECT : Collective Training Enlisted Barracks East

LOCATION : Ft McCoy – Ft, McCoy, Wisconsin

PROPOSER’S NAME :

BASE PROPOSAL

Item No. Description Unit Amount

0001 Primary Facilities JOB $ ____________

0002 Project Site Work JOB $ ____________

0003 Xcel Energy (Gas and Electric) JOB $ 98,346.00

BASE PROPOSAL SUBMITTAL $ ____________

OPTION ITEMS

0004 Optional Bid Item ‘A’ – Operations and Maintenance, Army Reserve (OMAR) Funded Laundry Equipment JOB $ ____________

0005 Optional Bid Item ‘B’ – Bona Fide Need Operations and Maintenance, Army Reserve (OMAR) Funded Equipment JOB $ ____________

0006 Optional Bid Item ‘C’ – Mow strip, sidewalks including fire lane, pad for bicycle rack JOB $ ____________

0007 Optional Bid Item ‘D’ – Southern third of concrete parking lot JOB $ ____________

0008 Optional Bid Item ‘E’ – Middle third of concrete parking lot JOB $ ____________

0009 Optional Bid Item ‘F’ – Northern third of concrete parking lot JOB $ ____________

TOTAL BASE PROPOSAL + OPTION ITEMS $ ____________

Description of Base Proposal Items

(a) Item No. 0001 “Primary Facilities – Barracks Building” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0006, 0007, 0008, and 0009.

(b) Item No. 0002 “Project Site Work”, includes all Base Proposal construction work required beyond a line five feet outside the building, except that work covered by Items No. 0006, 0007, and 0008.

(c) Item No. 0003 “Xcel Energy”, include all Base Proposal construction work required to pay Xcel Energy to route and install gas and electrical infrastructure including pipeline, conduits, wiring and equipment including manholes and handholds from the utility main to the building.

Description of Option Items

(d) Item No. 0004 “Option ‘A’ – Operations, Maintenance – Army Reserve (OMAR) Funded Laundry Equipment Items” includes all work required to furnish and install “OMAR Funded Laundry Equipment Items” as noted below, which are items that are not permanently attached to the construction. OMAR laundry equipment is to be contractor provided and contractor installed (CFCI).

CFCI OMAR Funded Laundry Equipment Items Consist of:

1. Washers at Laundry Rooms 126, 226, 326, 426

2. Dryers at Laundry Rooms 126, 226, 326, 426

***NOTE: This option may be exercised within 450 calendar days from Notice to Proceed.

(e) Item No. 0005 “Option ‘B’ – “Bona Fide Need” Operations, Maintenance – Army Reserve (OMAR)” Funded

Equipment Items” includes all work required to furnish and install “OMAR Funded Equipment Items” which are items that are not permanently attached to the construction. OMAR equipment is to be contractor provided and contractor installed (CFCI).

CFCI “Bona Fide Need” OMAR Funded Equipment Items consist of:

1. Metal Shelving at Janitor Rooms 114, 214, 314. 414

2. Fire Extinguishers as indicated by FEC on enlarged architecture plans.

3. Window Blinds ‘S3’’ at all Exterior Windows as indicated by Finish Plan Interior Design Note 5 on sheet I-602

***NOTE: This option may be exercised within 450 calendar days from Notice to Proceed.

(f) Item No. 0006 “Option ‘C’ – Sidewalks, Fire land, Mow strip Concrete” See sheet CS102 and CS103 for the option location limits of the mow strips, sidewalks including fire lanes, and pad for bicycle racks.

1. Includes all work to install concrete pavement on the mow strips, sidewalks including the fire lane and pad for bicycle rack. See sheets CS102 and CS103 for locations of all these entities.

***NOTE: This option may be exercised within 120 calendar days from Notice to Proceed.

(g) Item No. 0007 “Option ‘D’ – Southern Third Concrete Parking Lot” See sheets CS103 for the option location limits of the new parking lot. This is a dependent and sequential bid option that will only be awarded if Item No. 0006 “Option ‘C’” is awarded.

1. Includes all civil, grading, and pavement work to install a portion of the parking lot. Pavement limits are defined by coordinates on sheet CS103. Grading limits and work beyond the pavement are defined on sheet CG103.

2. Includes all work to install the lighting system for the constructed portion of the parking lot as seen on sheets ES101-ES104.

(h) Item No. 0008 “Option ‘E’ – Middle Third Concrete Parking Lot” See sheet CS102 and CS103 for the option location limits of the new parking lot. This is a dependent and sequential bid option that will only be awarded if Items No. 0006 “Option ‘C’” and No. 0007 “Option ‘D’” are awarded.

limits are defined by coordinates on sheets CS102 and CS103. Grading limits and work beyond the pavement are defined on sheets CG102 and CG103.

2. Includes all work to install the lighting system for the constructed portion of the parking lot as

(i) Item No. 0009 “Option ‘F’ – Northern Third Concrete Parking Lot” See sheet CS102 for the option location limits of the new parking lot. This is a dependent and sequential bid option that will only be awarded if Items No. 0006 “Option ‘C’” and No. 0007 “Option ‘D’” and No. 0008 “Option E” are awarded.

limits are defined by coordinates on sheet CS102. Grading limits and work beyond the pavement are defined on sheet CG102.

2. Includes all work to install the lighting system for the constructed portion of the parking lot as

(End of Summary of Changes)

SECTION 02 41 00

DEMOLITION

08/22

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AIR-CONDITIONING, HEATING AND REFRIGERATION INSTITUTE (AHRI)

AHRI Guideline K (2009) Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes

AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AMERICAN SOCIETY OF SAFETY PROFESSIONALS (ASSP)

ASSP A10.6 (2006) Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition Operations

ASTM INTERNATIONAL (ASTM)

ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)

CARPET AND RUG INSTITUTE (CRI)

CRI 104 (2015) Carpet Installation Standard for Commercial Carpet

CRI 105 (2015) Carpet Installation Standard for Residential Carpet

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety -- Safety and Health

AMENDMENT 0001

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

Fort McCoy, WI

Requirements Manual

U.S. DEFENSE LOGISTICS AGENCY (DLA)

DLA 4145.25 (Jun 2000; Reaffirmed Oct 2010) Storage and Handling of Liquefied and Gaseous Compressed Gases and Their Full and Empty Cylinders;

https://www.dla.mil/Portals/104/Documents/DispositionSer /ddsr/docs/cylinderjointpub.pdf

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 4000.25-1-M (2006) MILSTRIP - Military Standard Requisitioning and Issue Procedures

MIL-STD-129 (2014; Rev R; Change 1 2018; Change 2 2019) Military Marking for Shipment and Storage

U.S. FEDERAL AVIATION ADMINISTRATION (FAA)

FAA AC 70/7460-1 (2016; Rev L; Change 2) Obstruction Marking and Lighting

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 82 Protection of Stratospheric Ozone

49 CFR 173.301 Shipment of Compressed Gases in Cylinders and Spherical Pressure Vessels

1.2 PROJECT DESCRIPTION

1.2.1 Definitions

1.2.1.1 Demolition

Demolition is the process of tearing apart and removing any feature of a facility together with any related handling and disposal operations.

1.2.1.2 Demolition Plan

Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.

1.2.2 Demolition Plan

Prepare a Demolition Plan and submit proposed demolition and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, and a detailed description of methods and

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

equipment to be used for each operation and of the sequence of operations.

Coordinate with Waste Management Plan in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Provide procedures for safe conduct of the work in accordance with EM 385-1-1. Plan must be approved by Contracting Officer prior to work beginning.

1.2.3 General Requirements

Do not begin demolition until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations inside or outside the building. The work includes demolition,, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer. In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1, Section 23, Demolition, and other applicable Sections.

1.3 ITEMS TO REMAIN IN PLACE

Comply with FAR 52.236-9 to protect existing vegetation, structures, equipment, utilities, and improvements. Coordinate the work of this section with all other work indicated. Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain.

Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.

1.3.1 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove snow, dust, dirt, and debris from work areas daily.

1.3.2 Weather Protection

For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.

1.3.3 Trees

Protect trees within the project site which might be damaged during demolition, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

1.3.4 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

1.3.5 Facilities

Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer. Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.

1.4 BURNING

The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.5 AVAILABILITY OF WORK AREAS

The area within the Contractor Work Limits (CWL) will be avilable upon Notice to Proceed. Refer to the Phasing Plans for the available Contractor Work Limits during each phase of construction.

1.6 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Demolition Plan; G, RO

Existing Conditions

SD-07 Certificates

Notification; G, RO

SD-11 Closeout Submittals

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

Receipts

1.7 QUALITY ASSURANCE

Submit timely notification of demolition projects to Federal, State, regional, and local authorities in accordance with 40 CFR 61, Subpart M.

Notify the State's environmental protection agency and the Contracting Officer in writing 10 working days prior to the commencement of work in accordance with 40 CFR 61, Subpart M. Comply with federal, state, and local hauling and disposal regulations. In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSP A10.6. Comply with the Environmental Protection Agency requirements specified. Use of explosives will not be permitted.

1.7.1 Dust and Debris Control

Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution.

1.8 PROTECTION

1.8.1 Traffic Control Signs

a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.

1.8.2 Protection of Personnel

Before, during and after the demolition work continuously evaluate the condition of the site specific features being demolished and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.9 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.

1.10 EXISTING CONDITIONS

Before beginning any demolition work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs or electronic images with a minimum resolution of 3072 x 2304 pixels, capable of a print resolution of 300 dpi, will be acceptable as a record of existing conditions. Include in the

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to starting work.

It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results to the Contracting Officer .

PART 2 PRODUCTS

2.1 FILL MATERIAL

a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition of structures.

b. Fill material shall conform to the definition of satisfactory soil material as defined in specification section 31 00 00.00 06 EARTHWORK.

In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.

c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as defined in specification section

31 00 00.00 06 EARTHWORK.

PART 3 EXECUTION

3.1 EXISTING FACILITIES TO BE REMOVED

Inspect and evaluate existing structures onsite for reuse. Disassemble existing construction scheduled to be removed for reuse. Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified. Designate materials for reuse onsite whenever possible.

3.1.1 Utilities and Related Equipment

Amendment 0001*************************************************************

3.1.1.1 General Requirements

Demolition of telecommunication lines to be performed by contractor upon confirmation, coodination and approval of COR. Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition work until all utility disconnections have been made. Shut off and cap utilities for future use, as indicated.

****************************************************************Amendment 0001

3.1.1.2 Disconnecting Existing Utilities

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

Remove existing utilities as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.

3.1.2 Paving and Slabs

Remove and/or sawcut concrete and asphaltic concrete paving and slabs including aggregate base as indicated. Provide neat sawcuts at limits of pavement removal as indicated. Move, grind and store pavement and slabs designated to be recycled and utilized in this project as directed by the Contracting Officer. Remove pavement and slabs not to be used in this project from the installation at Contractor's expense.

3.1.3 Concrete

Saw concrete along straight lines to a depth of a minimum 2 inch. Make each cut in walls perpendicular to the face and in alignment with the cut in the opposite face. Break out the remainder of the concrete provided that the broken area is concealed in the finished work, and the remaining concrete is sound. At locations where the broken face cannot be concealed, grind smooth or saw cut entirely through the concrete. Salvage removed concrete.

3.2 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition work in areas occupied by structures to be demolished until all demolition in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.

3.3 DISPOSITION OF MATERIAL

3.3.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, become the property of the Contractor and must be removed from Government property. Materials approved for storage by the Contracting Officer must be removed before completion of the contract.

Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.3.2 Reuse of Materials and Equipment

Remove and store materials and equipment listed in the Demolition Plan to be reused or relocated to prevent damage, and reinstall as the work progresses. Coordinate the re-use of materials and equipment with the re-use requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture re-use of materials in the diversion

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

calculations for the project.

3.3.3 Salvaged Materials and Equipment

Remove materials and equipment that are listed in the Demolition Plan to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site .

a. Salvage items and material to the maximum extent possible.

b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. Coordinate the salvaged materials with tracking requirements in accordance with Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. Capture salvaged materials in the diversion calculations for the project.

f. Remove and capture all Class I ODS refrigerants in accordance with the Clean Air Act Amendment of 1990, and turn in to the Navy by shipping the refrigerant container to the Defense Logistics Agency at the following address:

Defense Depot Richmond VA (DDRV)

SW0400

Cylinder Operations 8000 Jefferson Davis Highway Richmond, VA 23297-5900

3.3.4 Disposal of Ozone Depleting Substance (ODS)

Class I and Class II ODS are defined in Section, 602(a) and (b), of The Clean Air Act. Prevent discharge of Class I and Class II ODS to the atmosphere. Place recovered ODS in cylinders meeting AHRI Guideline K suitable for the type ODS (filled to no more than 80 percent capacity) and provide appropriate labeling. Recovered ODS must be Remove recovered ODS from Government property and dispose of in accordance with 40 CFR 82.

Dispose products, equipment and appliances containing ODS in a sealed, self-contained system (e.g. residential refrigerators and window air conditioners) in accordance with 40 CFR 82. Submit Receipts or bills of lading, as specified. Submit a shipping receipt or bill of lading for all containers of ozone depleting substance (ODS) shipped to the Defense Depot, Richmond, Virginia.

3.3.4.1 Special Instructions

No more than one type of ODS is permitted in each container. Apply a warning/hazardous label to the containers in accordance with Department of Transportation regulations. Provide a tag with the following information on all cylinders including but not limited to fire extinguishers, spheres, or canisters containing an ODS:

a. Activity name and unit identification code

b. Activity point of contact and phone number

c. Type of ODS and pounds of ODS contained

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

d. Date of shipment

e. National stock number (for information, call (804) 279-4525).

3.3.4.2 Fire Suppression Containers

Deactivate fire suppression system cylinders and canisters with electrical charges or initiators prior to shipment. Also, safety caps must be used to cover exposed actuation mechanisms and discharge ports on these special cylinders.

3.3.5 Transportation Guidance

Ship all ODS containers in accordance with MIL-STD-129, DLA 4145.25 (also referenced one of the following: Army Regulation 700-68, Naval Supply Instruction 4440.128C, Marine Corps Order 10330.2C, and Air Force Regulation 67-12), 49 CFR 173.301, and DOD 4000.25-1-M.

3.3.6 Unsalvageable and Non-Recyclable Material

Dispose of unsalvageable and non-recyclable noncombustible material off the site. Dispose of unsalvageable and non-recyclable combustible material off the site .

3.4 CLEANUP

Remove debris and rubbish from project site and similar excavations.

Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.

3.5 DISPOSAL OF REMOVED MATERIALS

3.5.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan .

Storage of removed materials on the project site is prohibited.

3.5.2 Burning on Government Property

Burning of materials removed from demolished structures will not be permitted on Government property .

3.5.3 Removal to Spoil Areas on Government Property

Local spoil areas on Government property are not available. Transport noncombustible materials and construction waste removed from demolition off base, per Par. 3.5.4.

3.5.4 Removal from Government Property

Transport waste materials removed from demolition , except waste soil, from Government property for legal disposal. Dispose of waste soil per Section

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

3.6 REUSE OF SALVAGED ITEMS

Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.

-- End of Section --

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

SECTION 32 13 13.06.06

PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE FACILITIES

06/18

AMENDMENT 0001

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete

ACI 301 (2016) Specifications for Structural Concrete

ACI 305.1 (2014) Specification for Hot Weather Concreting

ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting

ACI 325.12R (2002; R 2013) Guide for Design of Jointed Concrete Pavements for Streets and Local Roads

ACI 330R (2008) Guide for the Design and Construction of Concrete Parking Lots

AMERICAN WATER WORKS ASSOCIATION (AWWA)

AWWA C215 (2016) Extruded Polyolefin Coatings for Steel Water Pipe

ASTM INTERNATIONAL (ASTM)

ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A775/A775M (2017) Standard Specification for Epoxy-Coated Steel Reinforcing Bars

ASTM A996/A996M (2016) Standard Specification for Rail Steel and Axle-Steel Deformed Bars for Concrete Reinforcement

ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for

SECTION 32 13 13.06 06 Page 3

CORRECTED FINAL

Amendment 0001

Testing Agency Evaluation

ASTM C1157/C1157M (2017) Standard Performance Specification for Hydraulic Cement

ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)

ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C150/C150M (2017) Standard Specification for Portland Cement

ASTM C1549 (2016) Standard Test Method for Determination of Solar Reflectance Near Ambient Temperature Using a Portable Solar Reflectometer

ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM C171 (2016) Standard Specification for Sheet Materials for Curing Concrete

ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete

ASTM C31/C31M (2018) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2016) Standard Specification for Concrete Aggregates

ASTM C494/C494M (2017) Standard Specification for Chemical Admixtures for Concrete

ASTM C595/C595M (2017) Standard Specification for Blended Hydraulic Cements

ASTM C618 (2017a) Standard Specification for Coal

SECTION 32 13 13.06 06 Page 4

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C94/C94M (2017a) Standard Specification for Ready-Mixed Concrete

ASTM C989/C989M (2017) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM D6155 (2015) Nontraditional Coarse Aggregate for Bituminous Paving Mixtures

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-250-01 (2016) Pavement Design for Roads and Parking Areas

1.2 DESIGN

This materials and construction specification is intended to be used on projects where the design was completed using UFC 3-250-01 Pavement Design for Roads, Streets, Walks, and Open Storage Areas, ACI 330R , Guide for the Design and Construction of Concrete Parking Lots or ACI 325.12R , Guide for Design of Jointed Concrete Pavements for Streets and Local Roads, or equivalent.

1.3 RELATED SECTIONS

Portland cement concrete pavement must use Section 32 11 23 AGGREGATE BASE COURSE, in addition to this section.

Amendment 0001***************************************************************

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 *************************************************************Amendment 0001

SUBMITTAL PROCEDURES:

SD-03 Product Data

Curing Materials; G

Admixtures; G

Dowel; G

Reinforcement; G

Submit a complete list of materials including type, brand and applicable reference specifications.

Cementitious Materials; G

SECTION 32 13 13.06 06 Page 5

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

Aggregate; G

Albedo; G

Provide information identifying the reflectance of the pavement.

SD-04 Samples

Field-Constructed Mockup

SD-05 Design Data

Concrete Mix Design; G , AE

Thirty days minimum prior to concrete placement, submit a mix design, with applicable tests, for each strength and type of concrete for approval. Submit a complete list of materials including type; brand; source and amount of cement, fly ash, slag, and admixtures; and applicable reference specifications. Provide mix proportion data using at least three different water-cement ratios for each type of mixture, which will produce a range of strength encompassing those required for each class and type of concrete required. Submittal must clearly indicate where each mix design will be used when more than one mix design is submitted.

Obtain acknowledgement of approvals prior to concrete placement.

Submit a new mix design for each material source change.

SD-06 Test Reports

Aggregate Tests; G

Concrete Slump Tests; G

Air Content Tests; G

Flexural Strength Tests; G

Cementitious Materials; G

SD-07 Certificates

Ready-mixed Concrete Plant; G

Batch Tickets; G

Cementitious Materials; G

1.5 DELIVERY, STORAGE, AND HANDLING

ASTM C94/C94M.

1.6 QUALITY ASSURANCE

1.6.1 Ready-mixed Concrete Plant Certification

Unless otherwise approved by the Contracting Officer, ready mixed concrete must be produced and provided by a National Ready-Mix Concrete Association (NRMCA) certified plant. If a volumetric mobile mixer is used to produce

SECTION 32 13 13.06 06 Page 6

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

the concrete, rather than ready-mixed concrete, the mixer(s) must conform to the standards of the Volumetric Mixer Manufacturers Bureau (VMMB).

Verification must be made by a current VMMB conformance plate affixed to the volumetric mixer equipment.

1.6.2 Contractor Qualifications

Unless waived by the Contracting Officer, the Contractor must meet one of the following criteria:

a. Contractor must have at least one National Ready Mixed Concrete Association (NRMCA) certified concrete craftsman and at least one American Concrete Institute (ACI) Flatwork Finisher Certified craftsman on site, overseeing each placement crew during all concrete placement.

b. Contractor must have no less than three NRMCA certified concrete installers and at least two American Concrete Institute (ACI) Flatwork Finisher Certified installers, who must be on site working as members of each placement crew during all concrete placement.

1.6.3 Required Information

Submit copies of laboratory test reports showing that the mix has been successfully tested to produce concrete with the properties specified and that mix will be suitable for the job conditions. The laboratory test reports must include mill test and all other test for cementitious materials, aggregates, and admixtures. Provide maximum nominal aggregate size, combined aggregate gradation analysis, percentage retained and passing sieve, and a graph of percentage retained verses sieve size.

Submit test reports along with the concrete mix design. Sampling and testing of materials, concrete mix design, sampling and testing in the field must be performed by a commercial testing laboratory which conforms to ASTM C1077. The laboratory must be approved in writing by the Contracting Officer.

1.6.4 Batch Tickets

ASTM C94/C94M. Submit mandatory batch ticket information for each load of ready-mixed concrete.

1.6.5 Field-Constructed Mockup

Install a minimum 400 square feet to demonstrate typical joints, surface finish, texture, color, thickness, and standard of workmanship. Test panels must be placed using the mixture proportions, materials, and equipment as proposed for the project. Test mock up panels in accordance with requirements in FIELD QUALITY CONTROL.

When a test panel does not meet one or more of the requirements, the test panel must be rejected, removed, and replaced at the Contractor's expense.

If the test panels are acceptable, they may be incorporated into the project with the approval of the Contracting Officer.

SECTION 32 13 13.06 06 Page 7

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Cementitious Materials

Cementitious materials in concrete mix must be 20 to 50 percent non-portland cement pozzolanic materials or slag by weight. Provide test data demonstrating compatibility and performance of concrete satisfactory to Contracting Officer.

2.1.1.1 Cement

ASTM C150/C150M, Type I or II or ASTM C595/C595M, Type IS, IP, or P MS MH mortar expansion or ASTM C1157/C1157M MS HS.

2.1.1.2 Fly Ash and Pozzolan

ASTM C618, Type F or N. Fly ash certificates must include test results in accordance with ASTM C618.

2.1.1.3 Ultra Fine Fly Ash and Ultra Fine Pozzolan

Ultra Fine Fly Ash (UFFA) and Ultra Fine Pozzolan (UFP) must conform to ASTM C618, Class F or N, and the following additional requirements:

a. The strength activity index at 28 days of age must be at least 95 percent of the control specimens.

b. The average particle size must not exceed 6 microns.

2.1.1.4 Slag

ASTM C989/C989M, Slag Cement (formerly Ground Granulated Blast Furnace Slag) Grade 100 or 120. Certificates must include test results in accordance with ASTM C989/C989M.

2.1.1.5 Supplementary Cementitious Materials (SCM) Content

The concrete mix must always contain one of the SCMs listed in Table 1 within the range specified therein, whether or not the aggregates are found to be reactive in accordance with the paragraph ALKALI REACTIVITY

TEST".

TABLE 1

SUPPLEMENTARY CEMENTITIOUS MATERIALS CONTENT

Supplementary Cementitious Material Minimum Content (percent)

Maximum Content (percent)

Class N Pozzolan and Class F Fly Ash

SiO2 + Al2O3 + Fe2O3 > 70 percent 25 35

SiO2 + A12O3 + Fe2O3 > 80 percent 20 35

SECTION 32 13 13.06 06 Page 8

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

TABLE 1

SUPPLEMENTARY CEMENTITIOUS MATERIALS CONTENT

Supplementary Cementitious Material Minimum Content (percent)

Maximum Content (percent)

SiO2 + A12O3 + Fe2O3 > 90 percent 15 35

UFFA and UFP 7 16

GGBF Slag 40 50

2.1.2 Water

Water must conform to ASTM C1602/C1602M . Hot water must not be used unless approved by the Contracting Officer.

2.1.3 Aggregate

Coarse aggregate must consist of crushed or uncrushed gravel, crushed stone, or a combination thereof. Provide coarse aggregate with a minimum of 25 percent recycled porcelain, concrete, stone, or other recycled material complying with ASTM D6155. Aggregates, as delivered to the mixers, must consist of clean, hard, uncoated particles. Coarse aggregate must be washed. Washing must be sufficient to remove dust and other coatings. Fine aggregate must consist of natural sand, manufactured sand, or a combination of the two, and must be composed of clean, hard, durable particles. Both coarse and fine aggregates must meet the requirements of

ASTM C33/C33M.

2.1.3.1 Alkali Reactivity Test

Aggregates to be used in all concrete in projects over 50,000 SF in size must be evaluated and tested for alkali-aggregate reactivity in accordance with ASTM C1260. The types of aggregates must be evaluated in a combination which matches the proposed mix design (including Class F fly ash or GGBF slag), utilizing ASTM C1567. Test results of the combination must have a measured expansion of less than 0.08 percent at 28 days.

Should the test data indicate an expansion of greater than 0.08%, the aggregate(s) must be rejected and new aggregate sources must be submitted for retesting or may submit additional test results incorporating Lithium Nitrate for consideration.

ASTM C1567 must be performed as follows to include one of the following options:

a. Utilize the low alkali Portland cement and Class F fly ash in combination for the test proportioning. The laboratory must use the Contractor's proposed percentage of cement and fly ash.

b. Utilize the low alkali Portland cement and ground granulated blast furnace (GGBF) slag in combination for the test proportioning. The laboratory must use the Contractor's proposed percentage of cement and

GGBF.

c. Utilize the low alkali Portland cement and Class F fly ash and ground granulated blast furnace (GGBF) slag in combination for the test proportioning. The laboratory must use the Contractor's proposed

SECTION 32 13 13.06 06 Page 9

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

percentage of cement, fly ash and GGBF.

2.1.3.2 Fine Aggregates

ASTM C33/C33M.

2.1.3.3 Coarse Aggregates

ASTM C33/C33M.

2.1.4 Admixtures

ASTM C494/C494M: Type A, water reducing; Type B, retarding; Type C, accelerating; Type D, water-reducing and retarding; and Type E, water-reducing and accelerating admixture. Do not use calcium chloride admixtures. Where not shown or specified, the use of admixtures is subject to written approval of the Contracting Officer.

ASTM C260/C260M: Air-entraining.

2.1.5 Reinforcement

2.1.5.1 Coated Dowel Bars

Bars must conform to ASTM A615/A615M , Grade 60 for plain billet-steel bars of the size and length indicated. Remove all burrs or projections from the dowel bars. Coating system must conform to AWWA C215, Type 2. Coat the bars with a double coat system or an epoxy coating system for resistance to penetration of oil and salt solutions. The systems must be in accordance with manufacturer's recommendation for coatings which are not bondable to concrete. Bond the coating to the dowel bar to resist laps or folds during movement of the joint. Coating thickness must be 7 mils minimum and 20 mils maximum.

2.1.5.2 Tie Bars

Bars must be billet or axle steel deformed bars and conform to ASTM A615/A615M or ASTM A996/A996M Grade 60. Epoxy coated in accordance with ASTM A775/A775M .

2.1.6 Curing Materials

2.1.6.1 White-Burlap-Polyethylene Sheet

ASTM C171, 0.004 inch thick white opaque polyethylene bonded to 10 oz/linear yard (40 inch) wide burlap.

2.1.6.2 Liquid Membrane-Forming Compound

ASTM C309, white pigmented, Type 2, Class B, free of paraffin or petroleum.

2.1.7 Joint Fillers and Sealants

Provide as specified in Section 32 01 19 FIELD MOLDED SEALANTS FOR SEALING

JOINTS IN RIGID PAVEMENTS

2.1.8 Biodegradable Form Release Agent

Provide form release agent that is colorless and biodegradable. A minimum

SECTION 32 13 13.06 06 Page 10

CORRECTED FINAL

Amendment 0001

494485 COLLECTIVE TRAINING ENLISTED BARRACKS

of 87 percent of the total product must be biobased material. Provide product that does not bond with, stain, or adversely affect concrete surfaces and does not impair subsequent treatments of concrete surfaces.

Provide form release agent that does not contain diesel fuel, petroleum-based lubricating oils, waxes, or kerosene.

2.2 CONCRETE PAVEMENT

2.2.1 Joint Layout Drawings

If jointing requirements on the project drawings are not compatible with the proposed placement sequence, submit a joint layout plan shop drawing to the Contracting Officer for approval. No work must be allowed to start until the joint layout plan is approved. The joint layout plan must indicate and describe in the detail the proposed jointing plan for contraction joints, expansion joints, and construction joints, in accordance with the following:

a. Indicate locations of contraction joints, construction joints, and expansion joints. Spacing between contraction joints must not exceed 15 feet unless noted otherwise or approved by the Contracting Officer.

b. The larger dimension of a panel must not be greater than 125% of the smaller dimension.

c. The minimum angle between two intersecting joints must be 80 degrees, unless noted otherwise or approved by the Contracting Officer.

d. Joints must intersect pavement-free edges at a 90 degree angle the pavement edge and must extend straight for a minimum of 1.5 feet from the pavement edge, where possible .

e. Align joints of adjacent panels.

f. Align joints in attached curbs with joints in pavement when possible.

g. Ensure joint depth, widths, and dimensions are specified.

h. Minimum contraction joint depth must be 1/4 of the pavement thickness.

The minimum joint width must be 1/8 inch.

i. Use expansion joints only where pavement abuts buildings, foundations, manholes, and other fixed objects.

2.2.

This is the start of the file's text. The full file is on GovTribe.