W912QR24R0002_CERT_FINAL_Plans-0004.pdf
PDF 9 MB Posted
- Attached to
- Design-Bid-Build Construction of Collective Training Enlisted Barracks East at Fort McCoy, Wisconsin
- Solicitation number
- W912QR24R0002
About this file
This package includes plans and specifications for the design and construction of Collective Training Enlisted Barracks East at Fort McCoy, Wisconsin. The project involves demolition of existing buildings and site utilities, site work including grading and utilities, and construction of new barracks buildings. Key details include mechanical, electrical and plumbing plans, civil site plans, structural details, and panel schedules. The solicitation number for the project is W912QR24R0002. The contract is a design-bid-build project to be awarded by the U.S. Army Corps of Engineers Louisville District. Construction must meet all applicable building codes and standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16531
G G
G
C
C
CCC
C
C
C
C
C
C
C
E
E
C
T
T
T
T
S
CP
CP
CP
CP
CP
CP CP
CP
CP CP
S
S
CO
S
S
S
S
S S
CO
S
CO
S
S
S
M
E
S
CO
S
CO
G
PIV
W
MW
MW
P
AC
AC
AC
AC
AC
BLDG
1501FY 22 TRANSIENT
TRAINING BARRACKS
F Y
T
R A
N S
IE
N T
T R
A
IN
IN
G B
A R
R A
C K
S
FY 20 TRANSIENT
TRAINING BARRACKS
CD102
CD103
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:2
A
M
/5
/2
M il it a ry
\4
\4
C
D
S
H T
.d g n
CERTIFIED FINAL
SIDEWALKS).
EXCAVATED MATERIAL IN ANY NON-STRUCTURAL AREAS (LANDSCAPE AND
SPECIFICATION 31 00 00. BACKSLOPE NO STEEPER THAN 1H:1V. RE-USE
GROUNDWATER CONDITIONS MAY BE ENCOUTERED, REFER TO
OVER-EXCAVATION TO BE DETERMINED BASED ON SPECIFICATION 31 00 00.
FOR BIDDING PURPOSES, ASSUME EXCAVATION TO ELEVATION 862'. ACTUAL
OVER-EXCAVATE SOIL BELOW EXTENTS OF NEW BUILDING FOUNDATIONS. 14.
CONTRACTOR UPON CONFIRMATION OF APPROVAL OF COR.
DEMOLITION OF TELECOMMUNICATION LINES TO BE PERFORMED BY 13.
TREMIE GROUT.
THE TEMPORARY OBSERVATION WELLS SHALL BE DECOMMISIONED USING 12.
UNDERGROUND PRIOR TO CONSTRUCTION.
CONSTRUCTION. ANY REMAINING OVERHEAD UTILITIES TO BE MOVED
OVERHEAD ELECTRICAL LINES TO BE REMOVED BY UTILITY PRIOR TO 11.
CONSTRUCTION.
UNDERGROUND ELECTRICAL LINES TO BE REMOVED BY UTILITY PRIOR TO 10.
DEMOLITION OF EXISTING SITE AND UTILITIES
TO PROCEED. CONTRACTOR MUST BE RESPONSIBLE TO VERIFY THE
DEMOLITION SHOWN AS BY OTHERS WILL BE COMPLETED PRIOR TO NOTICE 9.
DEMOLITION OF EXISTING SITE AND UTILITIES.
CONSTRUCTION. CONTRACTOR MUST BE RESPONSIBLE TO VERIFY THE
DEMOLITION SHOWN AS BY OTHERS WILL BE COMPLETED PRIOR TO 8.
REMOVAL MUST BE SAWCUT FULL DEPTH.
PAVEMENT LAYOUT AND JOINTING PLAN. PAVEMENT DESIGNATED FOR
COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL WITH PROPOSED 7.
UNINTERRUPTED SERVICE.
CONSTRUCTED BEFORE REMOVAL OF EXISTING UTILITIES TO ENSURE
EXISTING UTILITIES IN SERVICE. RELOCATED UTILITIES SHALL BE
CONTRACTOR MUST COORDINATE WITH THE COR PRIOR TO REMOVAL OF 6.
LOCAL REGULATIONS.
BE DISPOSED OF OFF BASE IN ACCORDANCE WITH ALL FEDERAL, STATE AND
ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS MUST 5.
SURVEY RESULTS AS REQUIRED IN SPECIFICATION 02 41 00.
CONTRACTING OFFICER BASED ON THE SUBMITTED EXISTING CONDITIONS
DETERMINATIONS OF REPAIR RESPONSIBILITY WILL BE MADE BY THE
EXISTING STRUCTURES AND PAVEMENTS THAT ARE TO REMAIN.
CONTRACTOR MUST BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO 4.
USE.
STRIP TOPSOIL IN EXISTING TURF AREAS. STOCKPILE ON SITE FOR LATER 3.
CONSTRUCTION.
DEMOLITION MUST BE PROTECTED DURING DEMOLITION AND
EXISTING TREES, UTILITIES, AND SITE STRUCTURES NOT IDENTIFIED FOR 2.
RESPONSIBLE TO VERIFY ALL EXISITING UTILITIES.
PRIOR TO ANY AND ALL CONSTRUCTION, CONTRACTOR MUST BE 1.
GENERAL SHEET NOTES
CONTRACTOR WORK LIMITS
LEGEND
LINEAR REMOVAL, BY OTHERS
STRUCTURE REMOVAL, BY OTHERS
ITEM REMOVAL, BY OTHERS
PAVEMENT REMOVAL, BY OTHERS
SOUTH 10TH AVE
SOUTH 11TH AVE
S O
U T
H J
T
CD101
F T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
B G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S I
D
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
V E
R A
L L
D E
M O
L
IT
IO
N
P L
A N
A1
SCALE: 1"=60'
OVERALL DEMOLITION PLAN
NORTH
PLAN
60' 120'0
N O
V
A
M D
T
R E
V
IS
E D
G E
N E
R A
L N
O T
E S
FOR REFERENCE ONLY
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
C
S
CO
SOUTH 11TH AVE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:2
A
M
/5
/2
M il it a ry
\4
\4
C
D
S
H T
.d g n
CERTIFIED FINAL
SIDEWALKS).
EXCAVATED MATERIAL IN ANY NON-STRUCTURAL AREAS (LANDSCAPE AND
SPECIFICATION 31 00 00. BACKSLOPE NO STEEPER THAN 1H:1V. RE-USE
GROUNDWATER CONDITIONS MAY BE ENCOUTERED, REFER TO
OVER-EXCAVATION TO BE DETERMINED BASED ON SPECIFICATION 31 00 00.
FOR BIDDING PURPOSES, ASSUME EXCAVATION TO ELEVATION 862'. ACTUAL
OVER-EXCAVATE SOIL BELOW EXTENTS OF NEW BUILDING FOUNDATIONS. 14.
CONTRACTOR UPON CONFIRMATION OF APPROVAL OF COR.
DEMOLITION OF TELECOMMUNICATION LINES TO BE PERFORMED BY 13.
TREMIE GROUT.
THE TEMPORARY OBSERVATION WELLS SHALL BE DECOMMISIONED USING 12.
UNDERGROUND PRIOR TO CONSTRUCTION.
CONSTRUCTION. ANY REMAINING OVERHEAD UTILITIES TO BE MOVED
OVERHEAD ELECTRICAL LINES TO BE REMOVED BY UTILITY PRIOR TO 11.
CONSTRUCTION.
UNDERGROUND ELECTRICAL LINES TO BE REMOVED BY UTILITY PRIOR TO 10.
DEMOLITION OF EXISTING SITE AND UTILITIES
TO PROCEED. CONTRACTOR MUST BE RESPONSIBLE TO VERIFY THE
DEMOLITION SHOWN AS BY OTHERS WILL BE COMPLETED PRIOR TO NOTICE 9.
DEMOLITION OF EXISTING SITE AND UTILITIES.
CONSTRUCTION. CONTRACTOR MUST BE RESPONSIBLE TO VERIFY THE
DEMOLITION SHOWN AS BY OTHERS WILL BE COMPLETED PRIOR TO 8.
REMOVAL MUST BE SAWCUT FULL DEPTH.
PAVEMENT LAYOUT AND JOINTING PLAN. PAVEMENT DESIGNATED FOR
COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL WITH PROPOSED 7.
UNINTERRUPTED SERVICE.
CONSTRUCTED BEFORE REMOVAL OF EXISTING UTILITIES TO ENSURE
EXISTING UTILITIES IN SERVICE. RELOCATED UTILITIES SHALL BE
CONTRACTOR MUST COORDINATE WITH THE COR PRIOR TO REMOVAL OF 6.
LOCAL REGULATIONS.
BE DISPOSED OF OFF BASE IN ACCORDANCE WITH ALL FEDERAL, STATE AND
ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS MUST 5.
SURVEY RESULTS AS REQUIRED IN SPECIFICATION 02 41 00.
CONTRACTING OFFICER BASED ON THE SUBMITTED EXISTING CONDITIONS
DETERMINATIONS OF REPAIR RESPONSIBILITY WILL BE MADE BY THE
EXISTING STRUCTURES AND PAVEMENTS THAT ARE TO REMAIN.
CONTRACTOR MUST BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO 4.
USE.
STRIP TOPSOIL IN EXISTING TURF AREAS. STOCKPILE ON SITE FOR LATER 3.
CONSTRUCTION.
DEMOLITION MUST BE PROTECTED DURING DEMOLITION AND
EXISTING TREES, UTILITIES, AND SITE STRUCTURES NOT IDENTIFIED FOR 2.
RESPONSIBLE TO VERIFY ALL EXISITING UTILITIES.
PRIOR TO ANY AND ALL CONSTRUCTION, CONTRACTOR MUST BE 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
UTILITY REMOVAL, BY OTHERS8.
NOT USED7.
BUILDING REMOVAL, BY OTHERS6.
CONCRETE PAVEMENT REMOVAL, BY OTHERS5.
REMOVAL, BY OTHERS
12" DIAMETER CORRUGATED METAL PIPE AND ASSOCIATED ENDWALLS 4.
SIGN, SIGNPOST, AND POST FOUNDATION REMOVAL, BY OTHERS3.
ACCESS RAMP REMOVAL, BY OTHERS2.
ASPHALT PAVEMENT REMOVAL, BY OTHERS1.
CONTRACTOR WORK LIMITS
LEGEND
LINEAR REMOVAL, BY OTHERS
STRUCTURE REMOVAL, BY OTHERS
ITEM REMOVAL, BY OTHERS
PAVEMENT REMOVAL, BY OTHERS
BLDG 1644
5 5
MAINTAIN CONNECTION OF SERVICE MAIN
CD102
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
M
O L
IT
IO
N P
L A
N
A1
SCALE: 1"=20'
DEMOLITION PLAN
NORTH
PLAN
20' 40'0
MATCH LINE SEE SHEET CD103
A M
D T
R
E V
IS
E
D G
E N
E R
A L
N O
T E
S A
N D
K E
Y N
O T
E S
N O
V
1 1
FOR REFERENCE ONLY
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
G
C
CP
CO
S
BLDG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:2
A
M
/5
/2
M il it a ry
\4
\4
C
D
S
H T
.d g n
CERTIFIED FINAL
SIDEWALKS).
EXCAVATED MATERIAL IN ANY NON-STRUCTURAL AREAS (LANDSCAPE AND
SPECIFICATION 31 00 00. BACKSLOPE NO STEEPER THAN 1H:1V. RE-USE
GROUNDWATER CONDITIONS MAY BE ENCOUTERED, REFER TO
OVER-EXCAVATION TO BE DETERMINED BASED ON SPECIFICATION 31 00 00.
FOR BIDDING PURPOSES, ASSUME EXCAVATION TO ELEVATION 862'. ACTUAL
OVER-EXCAVATE SOIL BELOW EXTENTS OF NEW BUILDING FOUNDATIONS. 14.
CONTRACTOR UPON CONFIRMATION OF APPROVAL OF COR.
DEMOLITION OF TELECOMMUNICATION LINES TO BE PERFORMED BY 13.
TREMIE GROUT.
THE TEMPORARY OBSERVATION WELLS SHALL BE DECOMMISIONED USING 12.
UNDERGROUND PRIOR TO CONSTRUCTION.
CONSTRUCTION. ANY REMAINING OVERHEAD UTILITIES TO BE MOVED
OVERHEAD ELECTRICAL LINES TO BE REMOVED BY UTILITY PRIOR TO 11.
CONSTRUCTION.
UNDERGROUND ELECTRICAL LINES TO BE REMOVED BY UTILITY PRIOR TO 10.
DEMOLITION OF EXISTING SITE AND UTILITIES
TO PROCEED. CONTRACTOR MUST BE RESPONSIBLE TO VERIFY THE
DEMOLITION SHOWN AS BY OTHERS WILL BE COMPLETED PRIOR TO NOTICE 9.
DEMOLITION OF EXISTING SITE AND UTILITIES.
CONSTRUCTION. CONTRACTOR MUST BE RESPONSIBLE TO VERIFY THE
DEMOLITION SHOWN AS BY OTHERS WILL BE COMPLETED PRIOR TO 8.
REMOVAL MUST BE SAWCUT FULL DEPTH.
PAVEMENT LAYOUT AND JOINTING PLAN. PAVEMENT DESIGNATED FOR
COORDINATE LIMITS OF SAWCUT AND PAVEMENT REMOVAL WITH PROPOSED 7.
UNINTERRUPTED SERVICE.
CONSTRUCTED BEFORE REMOVAL OF EXISTING UTILITIES TO ENSURE
EXISTING UTILITIES IN SERVICE. RELOCATED UTILITIES SHALL BE
CONTRACTOR MUST COORDINATE WITH THE COR PRIOR TO REMOVAL OF 6.
LOCAL REGULATIONS.
BE DISPOSED OF OFF BASE IN ACCORDANCE WITH ALL FEDERAL, STATE AND
ALL DEMOLITION, WASTE, DEBRIS, AND UNSATISFACTORY MATERIALS MUST 5.
SURVEY RESULTS AS REQUIRED IN SPECIFICATION 02 41 00.
CONTRACTING OFFICER BASED ON THE SUBMITTED EXISTING CONDITIONS
DETERMINATIONS OF REPAIR RESPONSIBILITY WILL BE MADE BY THE
EXISTING STRUCTURES AND PAVEMENTS THAT ARE TO REMAIN.
CONTRACTOR MUST BE RESPONSIBLE FOR REPAIRING ANY DAMAGE TO 4.
USE.
STRIP TOPSOIL IN EXISTING TURF AREAS. STOCKPILE ON SITE FOR LATER 3.
CONSTRUCTION.
DEMOLITION MUST BE PROTECTED DURING DEMOLITION AND
EXISTING TREES, UTILITIES, AND SITE STRUCTURES NOT IDENTIFIED FOR 2.
RESPONSIBLE TO VERIFY ALL EXISITING UTILITIES.
PRIOR TO ANY AND ALL CONSTRUCTION, CONTRACTOR MUST BE 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
UTILITY REMOVAL, BY OTHERS8.
NOT USED7.
BUILDING REMOVAL, BY OTHERS6.
CONCRETE PAVEMENT REMOVAL, BY OTHERS5.
REMOVAL, BY OTHERS
12" DIAMETER CORRUGATED METAL PIPE AND ASSOCIATED ENDWALLS 4.
SIGN, SIGNPOST, AND POST FOUNDATION REMOVAL, BY OTHERS3.
ACCESS RAMP REMOVAL, BY OTHERS2.
ASPHALT PAVEMENT REMOVAL, BY OTHERS1.
CONTRACTOR WORK LIMITS
LEGEND
LINEAR REMOVAL, BY OTHERS
STRUCTURE REMOVAL, BY OTHERS
ITEM REMOVAL, BY OTHERS
PAVEMENT REMOVAL, BY OTHERS
E1 ON SHEET CS503
EXISTING AFTER DEMO. SEE DETAIL
REPLACE CONCRETE TO MATCH
CD103
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
M
O L
IT
IO
N P
L A
N
A1
SCALE: 1"=20'
DEMOLITION PLAN
NORTH
PLAN
20' 40'0
MATCH LINE SEE SHEET CD102
N O
V
A
M D
T
R E
V
IS
E D
G E
N E
R A
L N
O T
E S
A N
D K
E Y
N O
T E
S
FOR REFERENCE ONLY
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
SOUTH TENTH AVE
ELEV 867.13E 1,787,499.73N 734,985.61TB 2
SOUTH TENTH AVE
SOUTH TENTH AVE
SOUTH 10TH AVE
SPIKE IN PPELEV 869.69E 1,788,038.12N 735,166.13
ELEV 869.48E 1,788,211.55N 735,216.98DPW332
ELEV 870.37E 1,788,363.658N 735,213.513FM 3
SOUTH 10TH AVE
SOUTH J STR
EET
SOUTH HEAD
QUARTERS AV
E
SPIKE IN PPELEV. 871.18E. 1,788,068.31N. 735,462.90
SOUTH J STR
EET
SOUTH HEAD
QUARTERS AV
E
SOUTH 11TH AVE
SOUTH J STR
EET
SOUTH HEAD
QUARTERS AV
E
ELEV 867.585E 1787777.03N 735799.69FM2
ELEV 866.98E 1787678.12N 735865.09110
ELEVENTH STREET
ELEV 866.642E 1787525.72N 735772.96102
ELEV 865.954E 1787105.27N 735696.36100
ELEV 866.751E 1787279.45N 735806.87101
SOUTH TENTH AVE
FM3
MW
MW
P
AC
AC
AC
AC
AC
G
C
C
C C
C
C
C
C
C
C
E
C
T
T
CP
CP
CP
CP
CP
CP
CP
CP
CP
CO
M
E
PIV
S
CO
G
W
16531
BLDG
1501FY 22 TRANSIENT
TRAINING BARRACKS
F Y
T
R A
N S
IE
N T
T R
A
IN
IN
G B
A R
R A
C K
S
FY 20 TRANSIENT
TRAINING BARRACKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:4
A
M
/5
/2
M il it a ry
\4
\4
C
S
S
H T
.d g n
CERTIFIED FINAL
DETAIL SHEETS CS500.
STRIP WITH A MINIMUM 12" WIDTH ON ALL SIDES. MOW STRIPS SHOWN IN
SURROUND ALL NEW FEATURES PLACED IN GRASS WITH A CONCRETE MOW 9.
SIDEWALKS).
EXCAVATED MATERIAL IN ANY NON-STRUCTURAL AREAS (LANDSCAPE AND
SPECIFICATION 31 00 00. BACKSLOPE NO STEEPER THAN 1H:1V. RE-USE
GROUNDWATER CONDITIONS MAY BE ENCOUTERED, REFER TO
OVER-EXCAVATION TO BE DETERMINED BASED ON SPECIFICATION 31 00 00.
FOR BIDDING PURPOSES, ASSUME EXCAVATION TO ELEVATION 862'. ACTUAL
OVER-EXCAVATE SOIL BELOW EXTENTS OF NEW BUILDING FOUNDATIONS. 8.
READY.
DEMOLITION, SECTION 3.1.1.1 GENERAL REQUIREMENTS TO ENSURE SITE IS
PRIOR TO ANY CONSTRUCTION ON SITE, REFER TO SPECIFICATION 02 41 00 7.
OPTION C, D, E, F REPLACE GRAVEL PAVEMENT WITH CONCRETE PAVEMENT6.
IS DRILLED
VIEW. DO NOT BEGIN BUILDING FOUNDATION WORK UNTIL ELEVATOR SHAFT
ELEVATOR SHAFT. ELEVATOR SHAFT COORDINATES ARE NOTED IN THE PLAN
COMPLETE EARTHWORK TO ESTABLISH BUILDING PAD, THEN DRILL 5.
REFER TO SHEETS CS401 THROUGH CS404 FOR CONCRETE JOINT PLANS.4.
REFER TO SHEET CS201 FOR PARKING LOT PROFILE.3.
FOR CONTRACTOR WORK LIMITS, REFER TO SHEET G-005.2.
PAVEMENT UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE IN U.S. SURVEY FEET. DIMENSIONS ARE TO EDGE OF 1.
GENERAL SHEET NOTES
CONCRETE PAVEMENT, AS NOTED
CONTRACTOR WORK LIMITS
LEGEND
SEE DETAIL A1, SHEET CS501
CONCRETE SIDEWALK, TYPE "PEDESTRIAN";
SEE DETAIL A1, SHEET CS501
CONCRETE SIDEWALK, TYPE "FIRE LANE";
SOUTH 10TH AVE
SOUTH 11TH AVE
S O
U T
H J
S T
BARRACKS
TRAINING
TRANSIENT
FY23
CS102
CS103
CS101
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
E
R A
L L
S
IT
E P
L A
N
A1
SCALE: 1"=60'
OVERALL SITE PLAN
NORTH
PLAN
60' 120'0
A M
D T
R E
V
IS
E D
G E
N E
R A
L N
O T
E S
N O
V
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
ELEVENTH STREET
1644BLDG
0+00
1+00
2+00
3+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:5
A
M
/5
/2
M il it a ry
\4
\4
C
S
S
H T
.d g n
CERTIFIED FINAL
DETAIL SHEETS CS500.
STRIP WITH A MINIMUM 12" WIDTH ON ALL SIDES. MOW STRIPS SHOWN IN
SURROUND ALL NEW FEATURES PLACED IN GRASS WITH A CONCRETE MOW 9.
SIDEWALKS).
EXCAVATED MATERIAL IN ANY NON-STRUCTURAL AREAS (LANDSCAPE AND
SPECIFICATION 31 00 00. BACKSLOPE NO STEEPER THAN 1H:1V. RE-USE
GROUNDWATER CONDITIONS MAY BE ENCOUTERED, REFER TO
OVER-EXCAVATION TO BE DETERMINED BASED ON SPECIFICATION 31 00 00.
FOR BIDDING PURPOSES, ASSUME EXCAVATION TO ELEVATION 862'. ACTUAL
OVER-EXCAVATE SOIL BELOW EXTENTS OF NEW BUILDING FOUNDATIONS. 8.
READY.
DEMOLITION, SECTION 3.1.1.1 GENERAL REQUIREMENTS TO ENSURE SITE IS
PRIOR TO ANY CONSTRUCTION ON SITE, REFER TO SPECIFICATION 02 41 00 7.
OPTION C, D, E, F REPLACE GRAVEL PAVEMENT WITH CONCRETE PAVEMENT6.
IS DRILLED
VIEW. DO NOT BEGIN BUILDING FOUNDATION WORK UNTIL ELEVATOR SHAFT
ELEVATOR SHAFT. ELEVATOR SHAFT COORDINATES ARE NOTED IN THE PLAN
COMPLETE EARTHWORK TO ESTABLISH BUILDING PAD, THEN DRILL 5.
REFER TO SHEETS CS401 THROUGH CS404 FOR CONCRETE JOINT PLANS.4.
REFER TO SHEET CS201 FOR PARKING LOT PROFILE.3.
FOR CONTRACTOR WORK LIMITS, REFER TO SHEET G-005.2.
PAVEMENT UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE IN U.S. SURVEY FEET. DIMENSIONS ARE TO EDGE OF 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
PAVEMENT, REFER TO DETAIL A1, SHEET CS501
SIDEWALK PAVEMENT; TYPE PEDESTRIAN. BASE BID IS CONCRETE 27.
ELEVATOR DRILL PIT; REFER TO GENERAL NOTE 5 FOR MORE INFORMATION26.
CONCRETE DUMPSTER PAD; REFER TO DETAIL M15, SHEET CS50425.
GRASS SHOULDER; REFER TO DETAIL G15, SHEET CG50124.
CURB TAPER; REFER TO DETAIL E7, SHEET CS50323.
CONCRETE PAVEMENT, REFER TO DETAIL A1, SHEET CS501
REFER TO DETAIL L4 ON SHEET CS502. OPTION C REPLACES GRAVEL WITH
SIDEWALK PAVEMENT; TYPE PEDESTRIAN. BASE BID IS GRAVEL PAVEMENT, 22.
CONCRETE PAVEMENT, REFER TO DETAIL A1, SHEET CS501.
REFER TO DETAIL L4 ON SHEET CS502. OPTION C REPLACES GRAVEL WITH
SIDEWALK PAVEMENT, TYPE FIRE LANE. BASE BID IS GRAVEL PAVEMENT, 21.
SHEET CS504
BOLLARD; REFER TO DETAIL C17, SHEET CS502; AND REFER TO DETAIL K7, 20.
TYPE PARKING; REFER TO DETAIL E1, SHEET CS503
SHEET CS502. OPTION D,E,F REPLACES GRAVEL WITH CONCRETE PAVEMENT,
PARKING LOT. BASE BID IS GRAVEL PAVEMENT, REFER TO DETAIL L4 ON 19.
NOT USED18.
NOT USED17.
SIGN, TYPE "STOP"; REFER TO DETAIL H17, SHEET CS50216.
PAVEMENT MARKING, TYPE "STOP BAR", WHITE THERMOPLASTIC, 12"15.
NOT USED14.
PAVEMENT MARKING, TYPE "NO PARKING"; REFER TO DETAIL A7, SHEET CS50313.
CS503
PAVEMENT MARKING, TYPE "CROSSWALK"; REFER TO DETAIL A13, SHEET 12.
REFER TO DETAIL E1, SHEET CS504
PAVEMENT MARKING TYPE "PARKING SPACE", WHITE 4";11.
SIDEWALK RAMP; REFER TO DETAIL E12, SHEET CS50310.
HEADER CURB; REFER TO DETAIL A1, SHEET CS5039.
CURB AND GUTTER; REFER TO DETAIL L12, SHEET CS5028.
12 BICYCLE RACKS ON EACH PAD.
CANOPY OVER CONCRETE PAD, REFER TO SPECIFICATION 05 50 13. PROVIDE
REFER TO DETAIL J1, SHEET CS503 AND SPECIFICATION 05 50 13. FOR
BICYCLE PAD,RACKS AND CANOPY; BASE BID IS CONCRETE PAVEMENT, 7.
SIGN, TYPE "NO SMOKING"; REFER TO DETAIL A9, SHEET CS5026.
FENCE; REFER TO ARCHITECHTURAL DETAILS5.
CABLE BARRIER; REFER TO DETAIL G1, SHEET CS5014.
DETAIL J13, SHEET CS501
CS502. OPTION C REPLACES GRAVEL WITH CONCRETE PAVEMENT, REFER TO
MOW STRIP; BASE BID IS GRAVEL PAVEMENT, REFER TO DETAIL L4 ON SHEET 3.
REFER TO DETAIL 1 SHEET S-503.
MECHANICAL PAD; BASE BID CONCRETE PAVEMENT, TYPE MECHANICAL PAD; 2.
511.
SHEET A-406. FOR BUILDING CONNECTION, REFER TO DETAIL 2 ON SHEET S-
TO DETAIL M1, SHEET CS501. FOR LAYOUT AND DIMENSIONS, REFER TO
STOOP; BASE BID CONCRETE PAVEMENT, TYPE STOOP. FOR SECTION REFER 1.
GRAVEL SHOULDER, SEE DETAIL J15, SHEET CS504
ON BASE AND OPTIONS
REFER TO KEYNOTES FOR DELINEATION
CONCRETE PAVEMENT, AS NOTED.
CONTRACTOR WORK LIMITS
LEGEND
PAVEMENT , TYPE "PEDESTRIAN"
REPLACES GRAVEL WITH CONCRETE SIDEWALK
BASE BID IS GRAVEL PAVEMENT. OPTION C
TYPE "FIRE LANE"
REPLACES GRAVEL WITH CONCRETE SIDEWALK,
BASE BID IS GRAVEL PAVEMENT. OPTION C
OPTION DELINEATION
PI
STA 0+57.44
N 735,801.27
E 1,787,860.78
PI
STA 0+63.44
N 735,795.34
E 1,787,861.71
POB
STA 0+00.00
N 735,858.01
E 1,787,851.82
P O
B
S T A
.0
N ,8 .4
E ,7 ,0 .6
P O
E
S T
A
.5
N
,7
.8
E ,7
,6
.1
P
CS
T A
.8
P T
S T
A
.8
P O
E
S T
A
.1
N
,6
.7
E ,7
,6
.6
P O
B
S T
A
.0
N
,6
.1
E ,7
,8
.6
REPLACE CONCRETE FLARE OUT TO MATCH EXISTING
N ,7
.9
,7
,6
.5
N 735,790.25
E 1,787,829.45
N ,8
,7 ,9
N 735,809.85
E 1,787,953.57
N 735,591.89
E 1,787,765.13 N 735,584.92
E 1,787,721.01
SPACE SETBACK
33' UNOBSTRUCTED
N 735,669.95
E 1,787,868.35 N 735,679.62
E 1,787,929.59
N 735,839.71
E 1,787,816.15 N 735,851.86
E 1,787,891.14
N 735,818.62
E 1,787,842.85
N 735,644.38
E 1,787,661.98
N 735,584.12
E 1,787,671.50
N 735,625.56
E 1,787,690.26
N 735,611.73
E 1,787,692.44
735,449.03
N 735,485.88
E 1,787,778.57
N 735,823.30
E 1,787,872.49
N 735,803.30
E 1,787,873.62
N 735,620.16
E 1,787,732.99
N 735,637.512
E 1,787,855.250
N 735,656.836
E 1,787,977.630
FY23
TRANSIENT
TRAINING
BARRACKS
TYP.
3' 3'
10'
6'
1'
18'
26'
18' 18'
26'
.8
.5
23'
R
R
23'
R23
R
3'
R
3'
R
R
3'
R
R
3' R
3' R
3' R
26'
SOUTH 11TH AVE
4'4'4'4'
4'4'4'4'
.3
6'
4'
6'
4'
28'
.8
36'18'
OPTION F- REPLACES GRAVEL PAVEMENT
WITH CONCRETE PAVEMENT
OPTION E- REPLACES GRAVEL PAVEMENT
WITH CONCRETE PAVEMENT
2'
2'2'
CS102
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
IT
E
P L
A N
NORTH
PLAN
20' 40'0
MATCH LINE SEE SHEET CS103
A1
SCALE: 1"=20'
SITE PLAN
A M
D T
R
E V
IS
E
D G
E N
E R
A L
N O
T E
S A
N D
K E
Y N
O T
E S
N O
V
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
CO
BLDG
4+00
5+00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:5
A
M
/5
/2
M il it a ry
\4
\4
C
S
S
H T
.d g n
CERTIFIED FINAL
DETAIL SHEETS CS500.
STRIP WITH A MINIMUM 12" WIDTH ON ALL SIDES. MOW STRIPS SHOWN IN
SURROUND ALL NEW FEATURES PLACED IN GRASS WITH A CONCRETE MOW 9.
SIDEWALKS).
EXCAVATED MATERIAL IN ANY NON-STRUCTURAL AREAS (LANDSCAPE AND
SPECIFICATION 31 00 00. BACKSLOPE NO STEEPER THAN 1H:1V. RE-USE
GROUNDWATER CONDITIONS MAY BE ENCOUTERED, REFER TO
OVER-EXCAVATION TO BE DETERMINED BASED ON SPECIFICATION 31 00 00.
FOR BIDDING PURPOSES, ASSUME EXCAVATION TO ELEVATION 862'. ACTUAL
OVER-EXCAVATE SOIL BELOW EXTENTS OF NEW BUILDING FOUNDATIONS. 8.
READY.
DEMOLITION, SECTION 3.1.1.1 GENERAL REQUIREMENTS TO ENSURE SITE IS
PRIOR TO ANY CONSTRUCTION ON SITE, REFER TO SPECIFICATION 02 41 00 7.
OPTION C, D, E, F REPLACE GRAVEL PAVEMENT WITH CONCRETE PAVEMENT6.
IS DRILLED
VIEW. DO NOT BEGIN BUILDING FOUNDATION WORK UNTIL ELEVATOR SHAFT
ELEVATOR SHAFT. ELEVATOR SHAFT COORDINATES ARE NOTED IN THE PLAN
COMPLETE EARTHWORK TO ESTABLISH BUILDING PAD, THEN DRILL 5.
REFER TO SHEETS CS401 THROUGH CS404 FOR CONCRETE JOINT PLANS.4.
REFER TO SHEET CS201 FOR PARKING LOT PROFILE.3.
FOR CONTRACTOR WORK LIMITS, REFER TO SHEET G-005.2.
PAVEMENT UNLESS OTHERWISE NOTED.
ALL DIMENSIONS ARE IN U.S. SURVEY FEET. DIMENSIONS ARE TO EDGE OF 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
PAVEMENT, REFER TO DETAIL A1, SHEET CS501
SIDEWALK PAVEMENT; TYPE PEDESTRIAN. BASE BID IS CONCRETE 27.
ELEVATOR DRILL PIT; REFER TO GENERAL NOTE 5 FOR MORE INFORMATION26.
CONCRETE DUMPSTER PAD; REFER TO DETAIL M15, SHEET CS50425.
GRASS SHOULDER; REFER TO DETAIL G15, SHEET CG50124.
CURB TAPER; REFER TO DETAIL E7, SHEET CS50323.
CONCRETE PAVEMENT, REFER TO DETAIL A1, SHEET CS501
REFER TO DETAIL L4 ON SHEET CS502. OPTION C REPLACES GRAVEL WITH
SIDEWALK PAVEMENT; TYPE PEDESTRIAN. BASE BID IS GRAVEL PAVEMENT, 22.
CONCRETE PAVEMENT, REFER TO DETAIL A1, SHEET CS501.
REFER TO DETAIL L4 ON SHEET CS502. OPTION C REPLACES GRAVEL WITH
SIDEWALK PAVEMENT, TYPE FIRE LANE. BASE BID IS GRAVEL PAVEMENT, 21.
SHEET CS504
BOLLARD; REFER TO DETAIL C17, SHEET CS502; AND REFER TO DETAIL K7, 20.
TYPE PARKING; REFER TO DETAIL E1, SHEET CS503
SHEET CS502. OPTION D,E,F REPLACES GRAVEL WITH CONCRETE PAVEMENT,
PARKING LOT. BASE BID IS GRAVEL PAVEMENT, REFER TO DETAIL L4 ON 19.
NOT USED18.
NOT USED17.
SIGN, TYPE "STOP"; REFER TO DETAIL H17, SHEET CS50216.
PAVEMENT MARKING, TYPE "STOP BAR", WHITE THERMOPLASTIC, 12"15.
NOT USED14.
PAVEMENT MARKING, TYPE "NO PARKING"; REFER TO DETAIL A7, SHEET CS50313.
CS503
PAVEMENT MARKING, TYPE "CROSSWALK"; REFER TO DETAIL A13, SHEET 12.
REFER TO DETAIL E1, SHEET CS504
PAVEMENT MARKING TYPE "PARKING SPACE", WHITE 4";11.
SIDEWALK RAMP; REFER TO DETAIL E12, SHEET CS50310.
HEADER CURB; REFER TO DETAIL A1, SHEET CS5039.
CURB AND GUTTER; REFER TO DETAIL L12, SHEET CS5028.
12 BICYCLE RACKS ON EACH PAD.
CANOPY OVER CONCRETE PAD, REFER TO SPECIFICATION 05 50 13. PROVIDE
REFER TO DETAIL J1, SHEET CS503 AND SPECIFICATION 05 50 13. FOR
BICYCLE PAD,RACKS AND CANOPY; BASE BID IS CONCRETE PAVEMENT, 7.
SIGN, TYPE "NO SMOKING"; REFER TO DETAIL A9, SHEET CS5026.
FENCE; REFER TO ARCHITECHTURAL DETAILS5.
CABLE BARRIER; REFER TO DETAIL G1, SHEET CS5014.
DETAIL J13, SHEET CS501
CS502. OPTION C REPLACES GRAVEL WITH CONCRETE PAVEMENT, REFER TO
MOW STRIP; BASE BID IS GRAVEL PAVEMENT, REFER TO DETAIL L4 ON SHEET 3.
REFER TO DETAIL 1 SHEET S-503.
MECHANICAL PAD; BASE BID CONCRETE PAVEMENT, TYPE MECHANICAL PAD; 2.
511.
SHEET A-406. FOR BUILDING CONNECTION, REFER TO DETAIL 2 ON SHEET S-
TO DETAIL M1, SHEET CS501. FOR LAYOUT AND DIMENSIONS, REFER TO
STOOP; BASE BID CONCRETE PAVEMENT, TYPE STOOP. FOR SECTION REFER 1.
GRAVEL SHOULDER, SEE DETAIL J15, SHEET CS504
ON BASE AND OPTIONS
REFER TO KEYNOTES FOR DELINEATION
CONCRETE PAVEMENT, AS NOTED.
CONTRACTOR WORK LIMITS
LEGEND
PAVEMENT , TYPE "PEDESTRIAN"
REPLACES GRAVEL WITH CONCRETE SIDEWALK
BASE BID IS GRAVEL PAVEMENT. OPTION C
TYPE "FIRE LANE"
REPLACES GRAVEL WITH CONCRETE SIDEWALK,
BASE BID IS GRAVEL PAVEMENT. OPTION C
OPTION DELINEATION
POE
STA 5+44.32
N 735,320.35
E 1,787,936.71
FY23
TRANSIENT
TRAINING
BARRACKS
N 735,391.17
E 1,787,707.02
N 735,450.51
E 1,787,813.28
N 735,496.10
E 1,788,004.80
N 735,331.12
E 1,787,806.30
N 735,324.15
E 1,787,762.18
SPACE SETBACK
33' UNOBSTRUCTED
N 735,470.37
E 1,787,873.88
N 735,434.94
E 1,787,695.05
N 735,449.03
E 1,787,692.83
N 735,295.88
E 1,787,794.32
1,787,778.57
N 735,473.539
E 1,787,881.141 N 735,492.879
E 1,788,003.624
E1 ON SHEET CS503
EXISTING. SEE DETAIL
REPLACE CONCRETE TO MATCH
TYP.
.3
9'
3' 3'
10'
6'
30'
.0
18'
26'
18'18'
1'
26'
.5
8'
8'
3'
R
R
R
3'
R3' R
3' R
R
10'
36' 18'
OPTION E- REPLACES GRAVEL PAVEMENT
WITH CONCRETE PAVEMENT
OPTION D- REPLACES GRAVEL PAVEMENT
WITH CONCRETE PAVEMENT
CS103
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
IT
E
P L
A N
NORTH
PLAN
20' 40'0
MATCH LINE SEE SHEET CS102
A1
SCALE: 1"=20'
SITE PLAN
A M
D T
R
E V
IS
E
D G
E N
E R
A L
N O
T E
S A
N D
K E
Y N
O T
E S
N
O V
M O
V E
D F
E N
C E
1 1
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
R
R
R
R
R
R
EJ/TE
R
.4
E J /T
E
E J /T
E
.1
R R R
R R
R R
.1
R
2'
DUMPSTER PAD
SEE CS401 FOR
ENTRANCE DETAIL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:4
P
M
/3
/2
M il it a ry
\4
\4
C
S
S
H T
.d g n
CERTIFIED FINAL
CONSTRUCTION JOINTS.
CONTRACTION JOINT. REFER TO DETAIL A5 SHEET CS504 FOR TRANSVERSE
CONSTRUCTION JOINTS WHERE THERE WOULD ALREADY BE A PLANNED
TIME FOR THE CONCRETE TO START TO SET. LOCATE TRANSVERSE
THE PLACING OF CONCRETE IS DISCONTINUED A SUFFICIENT LENGTH OF
PAVING OPERATION AND AT OTHER POINTS WITHIN A PAVING LANE WHERE
INSTALL TRANSVERSE CONSTRUCTION JOINTS AT THE END OF EACH DAY'S 4.
CONSTRUCTION EQUIPMENT CAPABILITY.
SEPARATE SUCCESSIVELY PLACED PAVING LANES, DEPENDENT ON
CONSTRUCTION JOINTS. PROVIDE LONGITUDINAL CONSTRUCTION JOINTS TO
THE PLAN SHOWS A MINIMUM CONFIGURATION FOR LONGITUDINAL 3.
MANHOLES, AND OTHER STRUCTURES AS NOTED ON THE PLANS.
PLACE EXPANSIONS JOINTS AROUND ALL BUILDINGS, CATCH BASINS, 2.
AND DETAILS.
REFER TO DETAIL A1 SHEET CS501 FOR SIDEWALK JOINT REQUIREMENTS 1.
GENERAL SHEET NOTES
LEGEND
CONTRACTION JOINT; DETAIL A5, SHEET CS504
EXPANSION JOINT; DETAIL A5, SHEET CS504
DETAIL A5, SHEET CS504
EXPANSION JOINT / THICKENED EDGE;
REINFORCED PANEL; DETAIL F13, SHEET CS503R
CJ
EJ
EJ/TE
NEW CONCRETE PAVEMENT. SEE CS SHEETS
EXISTING CONCRETE PAVEMENT
EXISTING JOINT
DETAIL A5, SHEET CS504
LONGITUDINAL CONSTRUCTION JOINT;
LCJ
TIED JOINT; DETAIL A5, SHEET CS504TJ
SOUTH 11TH AVE
10'9'9'11'11'11'11'11'10'10'10'11'
.8
.8
12' 13' 13' 13' 13' 12'
' (T
Y P
(T
Y P
.9
N
V
A
D T
R E
N A
M E
D O
P T
IO
CS402
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
JO
IN
T
P L
A N
A1
JOINT PLANOPTION F
1"=10'SCALE:
NORTH
PLAN
10' 20'0
MATCH LINE SEE SHEET CS403
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
J
8' 8' 8' 8' R R
EJ/TE
EJ/TE
CJ
CJ
CJ
CJ
.5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:4
P
M
/3
/2
M il it a ry
\4
\4
C
S
S
H T
.d g n
CERTIFIED FINAL
CONSTRUCTION JOINTS.
CONTRACTION JOINT. REFER TO DETAIL A5 SHEET CS504 FOR TRANSVERSE
CONSTRUCTION JOINTS WHERE THERE WOULD ALREADY BE A PLANNED
TIME FOR THE CONCRETE TO START TO SET. LOCATE TRANSVERSE
THE PLACING OF CONCRETE IS DISCONTINUED A SUFFICIENT LENGTH OF
PAVING OPERATION AND AT OTHER POINTS WITHIN A PAVING LANE WHERE
INSTALL TRANSVERSE CONSTRUCTION JOINTS AT THE END OF EACH DAY'S 4.
CONSTRUCTION EQUIPMENT CAPABILITY.
SEPARATE SUCCESSIVELY PLACED PAVING LANES, DEPENDENT ON
CONSTRUCTION JOINTS. PROVIDE LONGITUDINAL CONSTRUCTION JOINTS TO
THE PLAN SHOWS A MINIMUM CONFIGURATION FOR LONGITUDINAL 3.
MANHOLES, AND OTHER STRUCTURES AS NOTED ON THE PLANS.
PLACE EXPANSIONS JOINTS AROUND ALL BUILDINGS, CATCH BASINS, 2.
AND DETAILS.
REFER TO DETAIL A1 SHEET CS501 FOR SIDEWALK JOINT REQUIREMENTS 1.
GENERAL SHEET NOTES
LEGEND
CONTRACTION JOINT; DETAIL A5, SHEET CS504
EXPANSION JOINT; DETAIL A5, SHEET CS504
DETAIL A5, SHEET CS504
EXPANSION JOINT / THICKENED EDGE;
REINFORCED PANEL; DETAIL F13, SHEET CS503R
CJ
EJ
EJ/TE
NEW CONCRETE PAVEMENT. SEE CS SHEETS
EXISTING CONCRETE PAVEMENT
EXISTING JOINT
DETAIL A5, SHEET CS504
LONGITUDINAL CONSTRUCTION JOINT;
LCJ
TIED JOINT; DETAIL A5, SHEET CS504TJ
.8
.8
C J
C J
C J
C J
C J
C J
J
V
D T
R E
N A
M E
D O
P T
IO
CS403
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
T
P L
A N
A1
JOINT PLANOPTION C, OPTION E AND OPTION F
1"=10'SCALE:
NORTH
PLAN
10' 20'0
MATCH LINE SEE SHEET CS404
MATCH LINE SEE SHEET CS402
1 1
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
10'9'9'11'11'11'11'11'10'10'10'11'
11'
CJ
CJ
CJ
CJ
.5
.5
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:4
P
M
/3
/2
M il it a ry
\4
\4
C
S
S
H T
.d g n
CERTIFIED FINAL
CONSTRUCTION JOINTS.
CONTRACTION JOINT. REFER TO DETAIL A5 SHEET CS504 FOR TRANSVERSE
CONSTRUCTION JOINTS WHERE THERE WOULD ALREADY BE A PLANNED
TIME FOR THE CONCRETE TO START TO SET. LOCATE TRANSVERSE
THE PLACING OF CONCRETE IS DISCONTINUED A SUFFICIENT LENGTH OF
PAVING OPERATION AND AT OTHER POINTS WITHIN A PAVING LANE WHERE
INSTALL TRANSVERSE CONSTRUCTION JOINTS AT THE END OF EACH DAY'S 4.
CONSTRUCTION EQUIPMENT CAPABILITY.
SEPARATE SUCCESSIVELY PLACED PAVING LANES, DEPENDENT ON
CONSTRUCTION JOINTS. PROVIDE LONGITUDINAL CONSTRUCTION JOINTS TO
THE PLAN SHOWS A MINIMUM CONFIGURATION FOR LONGITUDINAL 3.
MANHOLES, AND OTHER STRUCTURES AS NOTED ON THE PLANS.
PLACE EXPANSIONS JOINTS AROUND ALL BUILDINGS, CATCH BASINS, 2.
AND DETAILS.
REFER TO DETAIL A1 SHEET CS501 FOR SIDEWALK JOINT REQUIREMENTS 1.
GENERAL SHEET NOTES
LEGEND
CONTRACTION JOINT; DETAIL A5, SHEET CS504
EXPANSION JOINT; DETAIL A5, SHEET CS504
DETAIL A5, SHEET CS504
EXPANSION JOINT / THICKENED EDGE;
REINFORCED PANEL; DETAIL F13, SHEET CS503R
CJ
EJ
EJ/TE
NEW CONCRETE PAVEMENT. SEE CS SHEETS
EXISTING CONCRETE PAVEMENT
EXISTING JOINT
DETAIL A5, SHEET CS504
LONGITUDINAL CONSTRUCTION JOINT;
LCJ
TIED JOINT; DETAIL A5, SHEET CS504TJ
11' 10' 10' 10' 11' 11' 11' 11' 9'
.8
.8
9'
V
D T
R E
N A
M E
D O
P T
IO
CS404
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
T
P L
A N
A1
JOINT PLANOPTION D AND OPTION E
1"=10'SCALE: 10' 20'0
NORTH
PLAN
MATCH LINE SEE SHEET CS403
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
CO
BLDG
INV EL. 858.15
10" PVC
RIM EL = 867.69
18" PVC
4" SANITARY
1" GAS
2" WATER
WATER
ABANDONED
WATER
ABANDONED
ABANDONED WATER
SANITARY
ABANDONED
4" GAS
10" PVC
10" PVC
RIM EL = 868.04
INV EL. = 859.29
10" PVC
FY23
TRANSIENT
TRAINING
BARRACKS
TO COMPLETE LOOP
TWO EXISTING VALVES
WATER LINE BETWEEN
CONTRACTOR TO EXTEND
PIV
EX-MH-1-2
N 735,421.73
E 1,787,862.27
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:0
:5
A
M
/5
/2
M il it a ry
\4
\4
C
U
S
H T
.d g n
CERTIFIED FINAL
(MUTCD), LATEST EDITION.
ACCORDANCE WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
THE CLOSED LANE PROVIDE ONE LANE TEMPORARY TRAFFIC CONTROL IN
ONE LANE OF TRAFFIC AT ALL TIMES, DO NOT FULLY CLOSE THE ROAD. FOR
FOR UTILITY CONNECTIONS UNDER SOUTH 10TH AVENUE, MAINTAIN AT LEAST 11.
PAVEMENT.
MINIMIZE THE AMOUNT OF TRENCHING DISTURBANCE TO THE EXISTING
UTILITY CONNECTION IS REQUIRED UNDER AN EXISTING PAVEMENT,
IN HORIZONTAL DIRECTIONALLY DRILLED UTILITY SEGMENTS, WHERE A 10.
DETAIL SHEETS.
PAD WITH A MINIMUM 12" WIDTH ON ALL SIDES. MOW PADS SHOWN IN CU
SURROUND ALL NEW FEATURES PLACED IN GRASS WITH A CONCRETE MOW 9.
FOR TELECOMMUNICATION LOCATION, SEE COMMUNICATION SITE PLAN.8.
FOR POWER LINE LOCATION, SEE ELECTRCAL SITE PLAN.7.
SEWER SERVICE. TIE IN SHALL BE LIVE TAPPED.
CONSTRUCTED BY THE CONTRACTOR TO PROVIDE CONTINUOUS SANITARY
SANITARY SEWER CONSTRUCTION SHALL BE SEQUENCED AND 6.
EXISTING.
CONTRACTOR SHALL BE RESPONSIBLE FOR TIE-IN OF NEW WATER LINES TO 5.
EMAIL: EDWARD.R.PRZYTARSKI@XCELENERGY.COM
SCHEDULE. THE CONTACT AT XCEL FOR THIS WORK IS EDWARD PRZYTARSKI.
CONTRACTOR SHALL COORDINATE WITH XCEL FOR LOCATIONS, SIZING, AND
PROVIDED BY GAS COMPANY (XCEL ENERGY). METER TO PROVIDE 5200 CFH.
GAS SERVICE LINE, METER, AND CONNECTION TO EXISTING LINE SHALL BE 4.
OUTAGE.
AND THE CONTRACTING OFFICER 14 CALENDAR DAYS PRIOR TO THE
ANY UTILITY OUTAGES SHALL BE COORDINATED WITH THE UTILITY COMPANY 3.
FEATURES. ACTUAL LOCATION SHALL BE VERIFIED BY THE CONTRACTOR.
LOCATIONS OF EXISTING UTILITIES PROVIDED FROM BASE MAPS AND VISIBLE 2.
NOTIFIED OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO INSTALLATION.
VERIFYING ALL EXISTING UTILITIES. THE CONTRACTING OFFICER SHALL BE
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL UTILITIES AND FIELD 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
EXISTING PAVEMENT IN ACCORDANCE WITH SPECIFICATION 33 05 23.13
HORIZONTALLY DIRECTIONALLY DRILL NEW UTILITY PIPE UNDERNEATH 14.
WATER VALVE13.
HOT TAP GAS CONNECTION (BY OTHERS)12.
SANITARY MANHOLE; DETAIL A1 ON SHEET CU50311.
DOMESTIC WATER SERVICE LINE, 6" DIAMETER, PVC10.
GAS METER BY OTHERS9.
GAS LINE BY OTHERS8.
WATER LINE EXTENSION POINT7.
2 WITH VALVE; DETAIL F1, SHEET CU50FIRE HYDRANT6.
FIRE WATER LINE, 8" DIAMETER, PVC5.
WATER MAIN, 8" DIAMETER, PVC4.
1DETAIL A13, SHEET CU50
;CONNECT NEW SANITARY LINE TO EXISTING MANHOLE3.
1; DETAIL A1, SHEET CU50SANITARY CLEANOUT2.
8" SANITARY SEWER LINE1.
LEGEND
PROPOSED WATER LINE
PROPOSED GAS LINE
PROPOSED SANITARY LINE
EXISTING FIBER OPTIC LINE
PIV
SANITARY MANHOLE
SANITARY CLEANOUT
GAS METER
POST INDICATOR VALVE
FIRE HYDRANT
WATER VALVE VAULT
EXISTING COMMUNICATIONS LINE
EXISTING ELECTRICAL LINE
S
G
S
W
G
CO
C
D T
M
O V
E D
P
IV
CU103
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
G
R E
G O
R Y
B S
A Y
L O
R
A C
O M
B S
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
U
IL
IT
Y
P L
A N
A1
SCALE: 1"=20'
UTILITY PLAN
NORTH
PLAN
20' 40'0
MATCH LINE SEE SHEET CU102
1 1
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
P
C
C C
C
C
C
C
C
C
E
C
T
T
CP
CP
CP
CP
CP
CP
CP
CP
CP
E
FY 22 TRANSIENT
TRAINING BARRACKS
FY 20 TRANSIENT
TRAINING BARRACKS
SOUTH 11TH AVE.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:5
A
M
/5
/2
M il it a ry
\4
\4
E
S
S
H T
.d g n
CERTIFIED FINAL
STATIONS. CONDUIT RUNS NOT SHOWN ON SHEETS FOR CLARITY.
CHARGING STATIONS LOCATIONS IS INTENDED TO FEED TWO CHARGING
EACH CONDUIT RUN SHOWN ON SHEET ES504 FROM THE EVHHS TO THE EV
EV CHARGING STATION LOCATIONS SHOWN IN PARKING LOT NEAR EVHHS. 3.
EXTERIOR DISTRIBUTION WORK TO BE COORDINATED WITH XCEL ENERGY.2.
WITH THE FORT MCCOY NETWORK ENTERPRISE CENTER (NEC).
ALL OUTSIDE PLANT (OSP) COMMUNICATIONS WORK TO BE COORDINATED 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
UNDERGROUND ELECTRICAL PRIMARY
LEGEND
UNDERGROUND ELECTRICAL SECONDARY
UNDERGROUND FIBER OPTICS
UNDERGROUND COMMUNICATIONS
BARRACKS
TRAINING
TRANSIENT
FY23
ES101
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
P N
F
Y
P
W
Y O
U N
G
W
Y O
U N
G
M L
A W
R E
N C
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
E
R A
L L
E L
E C
T R
IC
A
L S
IT
E
P L
A N
A1
OVERALL ELECTRICAL SITE PLAN
1"=60'SCALE:
ES102
ES103 ES104
CONSTRUCTION LIMITS
D E
C
A
M E
N D
M E
N T
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:4
A
M
/5
/2
M il it a ry
\4
\4
E
S
S
H T
.d g n
CERTIFIED FINAL
STATIONS. CONDUIT RUNS NOT SHOWN ON SHEETS FOR CLARITY.
CHARGING STATIONS LOCATIONS IS INTENDED TO FEED TWO CHARGING
EACH CONDUIT RUN SHOWN ON SHEET ES504 FROM THE EVHHS TO THE EV
EV CHARGING STATION LOCATIONS SHOWN IN PARKING LOT NEAR EVHHS. 3.
EXTERIOR DISTRIBUTION WORK TO BE COORDINATED WITH XCEL ENERGY.2.
WITH THE FORT MCCOY NETWORK ENTERPRISE CENTER (NEC).
ALL OUTSIDE PLANT (OSP) COMMUNICATIONS WORK TO BE COORDINATED 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
UNDERGROUND ELECTRICAL PRIMARY
LEGEND
UNDERGROUND ELECTRICAL SECONDARY
UNDERGROUND FIBER OPTICS
UNDERGROUND COMMUNICATIONS
FY23
TRANSIENT
TRAINING
BARRACKS
ES102
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
Y O
U N
G
W
Y O
U N
G
M L
A W
R E
N C
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
E
C T
R
IC
A L
S
IT
E P
L A
N
A1
1ELECTRICAL SITE PLAN
1"=20'SCALE:
EV CHARGING STATION LOCATION15.
CONDUIT. PLACE RED STUB MARKER ABOVE GROUND OVER THE CAPPED ENDS.
BARRACKS WHERE OPEN ENDS ARE TO BE CAPPED. PLACE PULL WIRES IN EACH
(2) 6" CONDUIT DUCTBANK. CONDUITS TO BE LAID IN THE GROUND TO END OF 14.
FOR DUCT DETAIL AND BUTTERFLY DIAGRAMS.
(3) 1-1/4" PVC 40 DUCTBANK BETWEEN EVHH-1 AND EVHH-2. SEE SHEET ES504 13.
FOR DUCT DETAIL AND BUTTERFLY DIAGRAMS.
(5) 1-1/4" PVC 40 DUCTBANK BETWEEN EVHH-1 AND EVHH-3. SEE SHEET ES504 12.
FOR DUCT DETAIL AND BUTTERFLY DIAGRAMS.
(3) 1-1/4" PVC 40 DUCTBANK BETWEEN EVHH-3 AND EVHH-4. SEE SHEET ES504 11.
DETAIL ON ES503 FOR DUCTBANK. (TYPICAL)
PARKING LOT LIGHTING SHALL CONNECT TO 2/C #8 -#10 G IN 1-1/2" CONDUIT. SEE 10.
FOR DETAIL. (TYPICAL)
MOUNT OUTDOOR LUMINAIR TO 30' ALUMINUM LIGHTING POLE. SEE SHEET ES502 9.
EVHH-4. SEE SHEET ES504 FOR BUTTERFLY DIAGRAM.8.
EVHH-3. SEE SHEET ES504 FOR BUTTERFLY DIAGRAM.7.
EVHH-1. SEE SHEET ES504 FOR BUTTERFLY DIAGRAM.6.
SCHEDULE.
CIRCUITS. SEE SHEET ES504 FOR DUCTBANK DETAIL. SEE SHEET E-50X FOR PANEL
ELECTRICAL VEHICLE INFRUSTRUCTURE DUCTBANK. (10) 1-1/2" CONDUITS W/ EV 5.
PEDESTAL.
COMMUNICATIONS ROOM. OTHERS (NEC) TO TERMINATE IN THE MANHOLE AND
TELEPHONE CABLE AND FIBER OPTICE CABLES FROM THE MANHOLE TO THE
INNERDUCT AND BE PROVIDED WITH PULLWIRES. OTHERS (NEC) TO PROVIDE COPPER
THE REMAINDER OF THE RUN. EACH DUCT IS REQUIRED TO HAVE 3-CELL, 1-INCH
THE RUN UNDER ROADWAYS. ROAD CUTS ARE NOT PERMITTED. CONCRETE ENCASE
TELECOMMUNICATIONS ROOM. UTILIZE DIRECTIONAL BORING FOR ALL PORTIONS OF
FOUR-WAY, 4-INCH DUCT BANK FROM MANHOLE TO 1ST FLOOR 4.
AT THE TRANSFORMER AND SCC.
350 KCMIL, EACH SET IN 4" CONDUIT. XCEL ENERGY TO COMPLETE FINAL CONNECTION
PROVIDE SECONDARY SERVICE ENTRANCE FEEDERS AND INSTALL 4 SETS OF 4-3.
REFER TO COORDINATION MATRIX ON LEGEND SHEET ES001.
SERVICE CONNECTION CABINET (SCC) ON CONTRACTOR PROVIDED CONCRETE PAD.
SERVICE TRANSFORMER BY XCEL ENERGY AND CONTRACTOR PROVIDED 2.
DUCT. PRIMARY CABLING WILL BE PROVIDED AND INSTALLED BY XCEL ENERGY.
TWO-WAY, 6-INCH, CONCRETE ENCASED DUCTBANK. INSTALL PULLWIRE IN EACH 1.
A
M E
N D
M E
N T
D E
C
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
C
E
CP
TRAINING BARRACKS
FY 22 TRANSIENT
E1 ON SHEET CS503
EXISTING. SEE DETAIL
REPLACE CONCRETE TO MATCH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:0
A
M
/5
/2
M il it a ry
\4
\4
E
S
S
H T
.d g n
CERTIFIED FINAL
STATIONS. CONDUIT RUNS NOT SHOWN ON SHEETS FOR CLARITY.
CHARGING STATIONS LOCATIONS IS INTENDED TO FEED TWO CHARGING
EACH CONDUIT RUN SHOWN ON SHEET ES504 FROM THE EVHHS TO THE EV
EV CHARGING STATION LOCATIONS SHOWN IN PARKING LOT NEAR EVHHS. 3.
EXTERIOR DISTRIBUTION WORK TO BE COORDINATED WITH XCEL ENERGY.2.
WITH THE FORT MCCOY NETWORK ENTERPRISE CENTER (NEC).
ALL OUTSIDE PLANT (OSP) COMMUNICATIONS WORK TO BE COORDINATED 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
UNDERGROUND ELECTRICAL PRIMARY
LEGEND
UNDERGROUND ELECTRICAL SECONDARY
UNDERGROUND FIBER OPTICS
UNDERGROUND COMMUNICATIONS
ES103
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
Y O
U N
G
W
Y O
U N
G
M L
A W
R E
N C
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
E
C T
R
IC
A L
S
IT
E P
L A
N
A1
ELECTRICAL SITE PLAN 2
1"=20'SCALE:
EV CHARGING STATION LOCATION.9.
INDICATED ON PLANS. COORDINATED WITH COR.
THE SIX ADDITIONAL LIGHTING POLES TO BE INSTALLED UNDER THIS PROJECT AS
BARRACKS PROJECT. CONTRACTOR TO INTERCEPT LIGHTING CIRCUIT AND EXTEND TO
EXISTING PARKING LOT LIGHTING CIRCUIT ASSOCIATED WITH THE SOUTHERN 8.
G IN 1-1/2" CONDUIT. SEE DETAIL ON ES503 FOR DUCTBANK. (TYPICAL)
PARKING LOT LIGHTING POLE. CONNECT POLES TO EACH OTHER WITH 2/C #8 -#10 7.
EVHH-2. SEE SHEET ES504 FOR BUTTERFLY DIAGRAM.6.
FOR DUCT DETAIL AND BUTTERFLY DIAGRAMS.
(3) 1-1/2" PVC 40 DUCTBANK BETWEEN EVHH-1 AND EVHH-2. SEE SHEET ES504 5.
CONDUIT TERMINATION LOCATION WITH NEC.
APPROXIMATE LOCATION OF TELECOMMUNICATIONS TIE-IN. COORDINATE 4.
PEDESTAL.
COMMUNICATIONS ROOM. OTHERS (NEC) TO TERMINATE IN THE MANHOLE AND
TELEPHONE CABLE AND FIBER OPTICE CABLES FROM THE MANHOLE TO THE
INNERDUCT AND BE PROVIDED WITH PULLWIRES. OTHERS (NEC) TO PROVIDE COPPER
THE REMAINDER OF THE RUN. EACH DUCT IS REQUIRED TO HAVE 3-CELL, 1-INCH
THE RUN UNDER ROADWAYS. ROAD CUTS ARE NOT PERMITTED. CONCRETE ENCASE
TELECOMMUNICATIONS ROOM. UTILIZE DIRECTIONAL BORING FOR ALL PORTIONS OF
FOUR-WAY, 4-INCH DUCT BANK FROM MANHOLE TO 1ST FLOOR 3.
BE COORDINATED WITH THE COR PRIOR TO THIS WORK COMMENCING.
SECOND 6" CONDUIT WILL BE CAPPED AT THE COORDINATION POINT. THIS WORK MUST
ASSOCIATED WITH THE TWO CONDUIT DUCTBANK ASSOCIATED WITH KEYNOTE 1. THE
FROM THE EASTERN TRANSFORMER MUST BE CONNECTED TO THE SPARE CONDUIT
CONDUIT DUCTBANK ASSOCIATED WITH KEYNOTE 1. ONE OF THE THE 6" CONDUITS
THE EASTERN BARRACKS TO THE UTILITY BORING CONNECTION POINT AND THE TWO 6"
ROUTE (2) 6" CONDUITS FROM THE UTILITY TRANSFORMER PAD ASSOCIATED WITH 2.
THE SOUTHERN BARRACKS TRANSFORMER.
CONSTRUCTION. THIS CONNECTION POINT WILL BE APPROXIMATELY 150 FEET EAST OF
CONDUIT DUCTBANK CONNECTION POINT TO BE COORDINATED WITH COR PRIOR TO
CONTRACT. EXACT LOCATION OF THE UTILITY BORING CONDUIT AND THE TWO 6"
SOUTHERN BARRACKS PROJECT WHICH HAS BEEN AWARDED UNDER AN EXISTING
XCEL ENERGY CONDUIT AND THE TWO 6" CONDUITS ARE ASSOCIATED WITH THE
SOUTHERN BARRACKS UTILITY TRANSFORMER. ALL WORK ASSOCIATED WITH THE
DUCTBANK CONTAINING TWO 6" CONDUITS. THE TWO 6" CONDUITS CONNECT TO THE
XCEL ENERGY TO BORE A 6" UTILITY CONDUIT FROM PMH-9 ENCLOSURE TO 1.
A M
E N
D M
E N
T
D
E C
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
SHEET ID
®of Engineers
US Army Corps
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
N O
V E
M B
E R
M B
A R
R Y
D S
L
R L
S c re e n
F u ll
S iz e .d s c ri p t.
d s c ri p t
P D
L
R L p d f.
p lt c fg
:2
:3
A
M
/5
/2
M il it a ry
\4
\4
E
S
S
H T
.d g n
CERTIFIED FINAL
STATIONS. CONDUIT RUNS NOT SHOWN ON SHEETS FOR CLARITY.
CHARGING STATIONS LOCATIONS IS INTENDED TO FEED TWO CHARGING
EACH CONDUIT RUN SHOWN ON SHEET ES504 FROM THE EVHHS TO THE EV
EV CHARGING STATION LOCATIONS SHOWN IN PARKING LOT NEAR EVHHS. 3.
EXTERIOR DISTRIBUTION WORK TO BE COORDINATED WITH XCEL ENERGY.2.
WITH THE FORT MCCOY NETWORK ENTERPRISE CENTER (NEC).
ALL OUTSIDE PLANT (OSP) COMMUNICATIONS WORK TO BE COORDINATED 1.
GENERAL SHEET NOTES
SHEET KEYNOTES
UNDERGROUND ELECTRICAL PRIMARY
LEGEND
UNDERGROUND ELECTRICAL SECONDARY
UNDERGROUND FIBER OPTICS
UNDERGROUND COMMUNICATIONS
ES104
T
M
C C
O Y
W
I
C O
L L
E C
T
IV
E T
R A
IN
IN
G E
N L
IS
T
E D
B A
R R
A C
K S
E
A S
T
P N
F
Y
P
Y O
U N
G
W
Y O
U N
G
M L
A W
R E
N C
E
A N
S
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G
J R
P
L
L O
U
IS
V
IL
L E
K
Y
E
C T
R
IC
A L
S
IT
E P
L A
N
A1
ELECTRICAL SITE PLAN 3
1"=20'SCALE:
EV CHARGING STATION LOCATION. 5.
G IN 1-1/2" CONDUIT. SEE DETAIL ON ES503 FOR DUCTBANK. (TYPICAL)
PARKING LOT LIGHTING POLE. CONNECT POLES TO EACH OTHER WITH 2/C #8 -#10 4.
INDICATED ON PLANS. COORDINATE WITH COR.
THE SIX ADDITIONAL LIGHTING POLES TO BE INSTALLED UNDER THIS PROJECT AS
BARRACKS PROJECT. CONTRACTOR TO INTERCEPT LIGHTING CIRCUIT AND EXTEND TO
EXISTING PARKING LOT LIGHTING CIRCUIT ASSOCIATED WITH THE SOUTHERN 3.
6" CONDUIT DUCTBANK.
ES103 FOR APPROXIMATE LOCATION OF THE UTILITY CONNECTION POINT TO THE TWO
CONNECTION POINT MUST BE COORDINATED WITH COR PRIOR TO CONSTRUCTION. SEE
CONTRACT. EXACT LOCATION OF THE UTILITY BORING CONDUIT AND DUCTBANK
SOUTHERN BARRACKS PROJECT WHICH HAS BEEN AWARDED UNDER AN EXISTING
XCEL ENERGY CONDUIT AND THE TWO 6" CONDUITS ARE ASSOCIATED WITH THE
SOUTHERN BARRACKS UTILITY TRANSFORMER. ALL WORK ASSOCIATED WITH THE
DUCTBANK CONTAINING TWO 6" CONDUITS. THE TWO 6" CONDUITS CONNECT TO THE
XCEL ENERGY TO BORE A 6" UTILITY CONDUIT FROM PMH-9 ENCLOSURE TO 2.
XCEL ENERGY PMH-9 SECTIONALIZED SWITCH. 1.
A M
E N
D M
E N
T
D
E C
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
EVHH-2 EVHH-1 EVHH-3 EVHH-4
NOTES:
1. ALL CONDUITS ARE 1-1/4" SCHEDULE 40 PVC
2. CONDUCTORS FOR EV SPACES WILL BE PROVIDED WITH THIS CONTRACT.
CONDUCTORS WILL BE CAPPED INSIDE EVHHs AND EXTENDED WHEN EV
STATIONS ARE PROVIDED AT THE SITE. REFER TO PANEL SCHEDULES FOR
SIZING DETAILS.
FY23 TRANSIENT
TRAINING BARRACKS
ELECTRICAL ROOM 111
CONDUITS FOR EV
CONNECTIONS. SEE ES101,
ES102 AND ES103 FOR
APPROXIMATE EV CHARGING
STATION LOCATIONS.
CONDUITS FOR EV
CONNECTIONS. SEE ES101,
ES102 AND ES103 FOR
APPROXIMATE EV CHARGING
STATION LOCATIONS.
CONDUITS FOR EV
CONNECTIONS. SEE ES101,
ES102 AND ES103 FOR
APPROXIMATE EV CHARGING
STATION LOCATIONS.
ELEVATION
NOTE:
MINIMUM REQUIREMENTS: BOX INTERIOR SIZE 20" LONG X 13"
WIDE X 12" DEEP WITH 1" THICK WALLS AND 2" THICK COVER
CAPABLE OF WITHSTANDING H20 HIGHWAY LOADING.
SCH 40 PVC CONDUIT TO
EA BUILDING, ROOM 126
AS SHOWN ON PLANS
MARK COVER
APPROPRIATELY
PROVIDE WIRE
FABRIC
REINFORCING
2' MAX. DISTANCE
TO POINT WHERE
CONDUIT MUST
BE 2' BELOW
GRADE
6" DEEP GRAVEL
CAPILLARY FILL
SCH 40 PVC CONDUIT
GRADE
1/2"
PLAN
1/2" DIAMETER X 3"
LONG WITH 2" ARM FOR
HOLD DOWN BOLTING
ELECTRIC
LIFT HOLES
SCH 40 PVC CONDUIT AS
SHOWN ON PLANS
2' MAX. DISTANCE
TO POINT WHERE
CONDUIT MUST
BE 2' BELOW
GRADE
SCH 40 PVC CONDUIT
MARKER TAPE
RE-COMPACT
SUBGRADE TO
95% ASTM 1556
PULL WIRE IN
SPARE CONDUITS
M
IN
3" 3" 3" 3" 3" 3"
NOTE:
1. ALL EV CHARGING
CONDUITS MUST BE 1
1/2". DIMENSIONS
BETWEEN CONDUITS
WILL REMAIN AS
SHOWN IN DETAIL.
MARKER TAPE
RE-COMPACT
SUBGRADE TO
95% ASTM 1556
PULL WIRE IN
SPARE CONDUITS
(M
IN
3" 3" 3" 3"
NOTE:
1. ALL EV CHARGING
CONDUITS MUST BE 1
1/2". DIMENSIONS
BETWEEN CONDUITS
WILL REMAIN AS
SHOWN IN DETAIL.
MARKER TAPE
RE-COMPACT
SUBGRADE TO
95% ASTM 1556
PULL WIRE IN
SPARE CONDUITS
3" 3" 3"
(M
IN
NOTE:
1. ALL EV CHARGING
CONDUITS MUST BE 1
1/2". DIMENSIONS
BETWEEN CONDUITS
WILL REMAIN AS
SHOWN IN DETAIL.
MARKER TAPE
RE-COMPACT
SUBGRADE TO
95% ASTM 1556
(M
IN
9"
NOTE:
1. ALL EV CHARGING
CONDUITS MUST BE 1
1/2". DIMENSIONS
BETWEEN CONDUITS
WILL REMAIN AS
SHOWN IN DETAIL.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
CERTIFIED FINAL
N O
V
F T
M c C
O Y
W
I C
O L L E
C T
IV
E
T R
A
IN
IN
G
E N
L
IS
T E
D B
A R
R A
C K
S
E A
S T
P
N
F
Y P
CTEB
F ile
P a th
/5
/2
:2
:1
A
M C
U s e rs
\h e d d rj m \D o c u m e n ts
\4 R e v it E
C
T E
B h e d d rj m
.r v t
ES504
E L E
C T
R
IC
A L S
IT
E
D E
T A
IL
S
W Y
O U
N G
W Y
O U
N G
J G
R E
E N
W E
L L
NTSA1
EV POWER HANDHOLE BUTTERFLY DIAGRAMS
12" = 1'-0"A15
ELECTRICAL PULL BOX
1" = 1'-0"K4
EV POWER DUCT DETAIL
1" = 1'-0"K10
DIRECT BURIED 6 WAY DUCT BANK
1" = 1'-0"K15
DIRECT BURIED 4 WAY DUCT BANK
1" = 1'-0"F15
DIRECET BURIED 1 WAY DUCT BANK
A
M E
N D
M E
N T
D E
C
W
2Q R
R
_C
ER
T_
FI
N
AL
_P la ns -0
GFI
WP
W
K.8
'-2
3/
/1 6"
A-407 A5
EQ
EQ
EQ
V.
I.F
EQ. EQ. EQ. EQ.
V.I.F.
4"
EQ
EQ
EQ
V.
I.F
REAR COVER
ENTRANCE
ROOF LINES
EQ. V.I.F.
4"
10'-5"
A-407 A15
'-0
SL
PE
D
O W
N
LINE OF
SIDEWALK
2" INSIDE OF
POST
INSIDE OF
POST
PANEL
INFILL
PANEL
INFILL
± 1/4"
T S 2"x2-1/2"x11GA POST
STEEL 1/8" TH U-CLAMPING
CHANNEL
4"x4"x1/4" STEEL POST BOLT PLATE
8' -0
(SEE PLAN VIEW)
CENTER LINE POST VARY
2" POST,
COLOR - DARK BRONZE
MECH. YARD FENCE,
COLOR - DARK BRONZE
2"
8"
MECH. YARD FENCE,
COLOR - DARK BRONZE
10'-5"
DOUBLE GATES
10'-3"
3" SQ. POST 12GA.
METAL FENCE
STRONG ARM
DOUBLE GATE LATCH
2" SQ. GATE
3" CLEAR
DOUBLE COMMERICAL
HINGE KIT
HOT-DIP GALVANIZED
DROP BOLT
PLAN
ELEVATION
10'-5"
DOUBLE GATE
10'-3"
3" SQ. POST 12GA.
METAL FENCE
STRONG ARM
DOUBLE GATE LATCH
2" SQ. GATE
DOUBLE COMMERICAL
HINGE KIT
10'-5"
DOUBLE GATES
10'-3"
3" SQ. POST 12GA.
2" SQ. GATE
3" CLEAR
MECH. YARD FENCE,
COLOR - DARK BRONZE
3" SQ. POST 12GA.
METAL FENCE
STRONG ARM
DOUBLE GATE LATCH
DOUBLE COMMERICAL
HINGE KIT
HOT-DIP GALVANIZED
DROP BOLT
4 EQUAL SECTION FENCES
2" SQ. POST
A-407 A15
A-407 A10
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R M
AR
TI
N L
U
TH
ER
K
IN
G
J R
P
LA
C E
LO
U
IS
VI
LL
E, K Y
CERTIFIED FINAL
N O
V
FT
. M cC
O Y, W I
C O
LL
EC
TI
VE
T R
AI
N
IN
G
E N
LI
ST
ED
B
AR
R
AC
KS
(E
AS
T)
PN
F
Y2
3, P
CTEB
Fi le
P at h:
/5 /2
1:
:2
PM
C
:\U se rs \h
2e dd ra h\
D oc um en ts \4
5_ R ev it2
0_
A_ C
TE
B_ h2 ed dr ah
.rv t
A-407
EN
LA
R G
ED
M
EC
H
AN
IC
AL
Y
AR
D
P
LA
N A
N D
D
ET
AI
LS
M . J
O H
N
SO
N
R . H
O O
E
M . B
AR
R
Y
1/4" = 1'-0"A-110
G1 MECHANICAL YARD PLAN
3" = 1'-0"A5 MECHANICAL YARD POST DETAIL
1/2" = 1'-0"A10 MECH. YARD SCREEN TYP. PANEL
3" = 1'-0"
A1 SCREEN SPACING DETAIL
MECHANICAL YARD NOTES
1 WELDED WIRE SECURITY FENCE, HIGH SECURITY, 2"x 8" MESH WITH 1/4" VERTICAL
WIRE AND TWO 5/16" HORIZONTAL WIRES. PANEL WIDTH OF 98-13/16" AND HEIGHTS
OF 4,6, AND 8 FEET - 2" SQUARE TUBE POSTS ON 99-1/4" IN DARK BRONZE.
2 MANUFACTURERS REFERENCED ARE BASIS OF DESIGN AND ARE INTENDED TO
ESTABLISH COLOR, PATTERN AND TEXTURE ONLY, AND ARE NOT INTENDED TO LIMIT
SELECTIONS FROM OTHER MANUFACTURERS. WHEN ALTERNATE SELECTIONS ARE
SUBMITTED, SUBMITTAL SHALL INCLUDE COLOR SAMPLES OF MATERIALS LISTED FOR
COMPARISON.
3 COORDINATE MECHANICAL YARD RAMP AND CONNECTING SIDEWALK WITH WITH
CIVIL. SEE SHEET CS103 AND CS401
1/2" = 1'-0"A15 MECH. YARD DOUBLE GATES ELEVATION
1/4" = 1'-0"
1 MECH. YARD ELEVATION
A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .