This document is an Amendment (SF 30, Amendment Number 0012) to Solicitation W912QR23R0048, a Multiple Award Task Order Contract (MATOC) for Design Build and Design Bid Build construction projects supporting the Energy Resilience and Conservation Investment Program (ERCIP) nationwide. The amendment revises the Price Breakout Schedule - Sample Project document and requires offerors to acknowledge all amendments by submitting signed SF30 forms with their proposal.
The sample project includes base proposal line items for constructing two 1.979 MW generators with associated site work, switch gear, enclosures, SCR, CO catalyst, and 67 dBA enclosure, as well as gas line work by a local gas company. The document provides a template for pricing construction disciplines and roles including Project Manager, Superintendent, CQC Manager, and Site Safety Health Officer, with a note that the sample project is representative of the type of work to be ordered under the MATOC. Offerors are instructed to insert prices on all blank numbered items of the schedule, including options.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR23R0048 Indefinite Delivery Indefinite Quantity (IDIQ) Design Build and Design Bid Build Multiple Award Task Order Contract (MATOC) to support construction requirements for the Energy Resilience and Conservation Investment Program (ERCIP) nationwide is hereby amended as follows:
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR23R0048
X 9B. DATED (SEE ITEM 11)
23-Aug-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jun-2025
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES AMDT 0012
Solicitation W912QR23R0048 Indefinite Delivery Indefinite Quantity (IDIQ) Design Build and Design Bid Build
Multiple Award Task Order Contract (MATOC) to support construction requirements for the Energy Resilience and
Conservation Investment Program (ERCIP) nationwide is hereby amended as follows:
a) Section 00 10 00 – The Price Breakout Schedule – Sample Project document is hereby revised and replaced in its entirety.
b) Offerors must acknowledge all Amendments and submit signed SF30s with their proposal.
c) All other terms and conditions remain unchanged.
(End of Summary of Changes)
W912QR23R0048-0012
PRICE BREAKOUT SCHEDULE – SAMPLE PROJECT
00 10 00
PRICE BREAKOUT SCHEDULE
02/13
Sample Project
Line Item
No. Description Unit Amount
BASE PROPOSAL
0001. Construction. Provide 2 Gensets, Job $ minimum 1.979 MW each, including
Site work, switch gear, enclosures and related work as well as SCR, CO catalyst and 67 dBA enclosure.
0002. Construction. Gas Line work by Job $24,627.00
Local Gas Company.
0003. Construction. Provide all Job $ construction work not included in any other Contract Line Item
Number that is necessary to deliver a complete and usable facility in accordance with the plans and specifications.
0004. Design. All work, materials, Job $ and labor required to design the facilities required by this project, including design of option(s) below and design during construction.
Total Base Proposal $
OPTION
0005. Construction. Provide 1 Genset, Job $
Minimum 1.979 MW, including connecting work, SCR, CO catalyst, and 67dBa enclosure.
Total Option Proposal $
TOTAL
PROPOSAL
NOTES FOR PRICE BREAKOUT SCHEDULE
NOTE NO. 1. The sample project Price Breakout Schedule will be removed at time of contract award, as this is only for evaluation purposes.
NOTE NO. 2. The sample project is representative of the type of work that will be ordered under this MATOC.
NOTE NO. 3. Offerors must insert a price on all blank numbered items of the
Schedule, including options.
NOTE NO. 4. Offerors shall utilize the price provided in the Schedule for
CLIN 0002, Gas Line work by Local Gas Company.
--END OF PRICE BREAKOUT SCHEDULE—
USE OF MATOC NOT TO EXCEED RATES IN SAMPLE
PROJECT PRICE
Provide the MATOC Not To Exceed (NTE)rates included in job prices above for all base tasks and the option task.
Not To Exceed Rate Construction
Discipline
Project Manager
Superintendent
CQC Manager
Site Safety
Health Officer