About this file

This document is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for Solicitation W912QR23R0048, an Indefinite Delivery Indefinite Quantity (IDIQ) Design Build and Design Bid Build Multiple Award Task Order Contract (MATOC). The amendment changes the required response date from 11 June 2025 at 2:00 PM ET to 20 June 2025 at 2:00 PM ET, with a forthcoming amendment to address Request for Information (RFI) items closed through the ProjNet System.

The solicitation is issued by the U.S. Army Engineer District in Louisville and supports construction requirements for the Energy Resilience and Conservation Investment Program (ERCIP) nationwide. Offerors are required to acknowledge all amendments and submit signed SF-30 forms with their proposal. The contract aims to award approximately twelve contracts, with four set aside for small businesses, covering mechanical, electrical, and civil infrastructure projects in the Contiguous United States and Puerto Rico, with a total contract capacity not to exceed $2,000,000,000.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR23R0048

X 9B. DATED (SEE ITEM 11)

23-Aug-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended,X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation W912QR23R0048 Indefinite Delivery Indefinite Quantity (IDIQ) Design Build and Design Bid Build Multiple Award Task Order Contract (MATOC) to support construction requirements for the Energy Resilience and Conservation Investment Program (ERCIP) nationwide is hereby amended as follows:

a) The required response date has changed from 11 June 2025 at 2:00 PM ET to 20 June 2025 at 2:00 PM ET. A forthcoming amendment will be issued to address RFIs closed through the ProjNet System.

b) Offerors must acknowledge all Amendments and submit signed SF30s with their proposal.

c) All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10- June-2025

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR23R0048-0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

W912QR23R0048-0010

PBS - Sample Project - ERCIP Construction MATOC_21 May 25.pdf
NOTES FOR PRICE BREAKOUT SCHEDULE
Section 00 22 18 - Amendment 0001.pdf
1. Overview.
NOTE: The rating information from Phase I will not be considered in Phase II or in the final selection.
2. Submittal of Offers.
3. Proposal Evaluation Process.
4. Proposal Information and Related Evaluation Factors.
4.5 Volume II - Price and Pro Forma Information
4.6 Ratings
4.7 Definitions
5. Volume I – Factor I: Design
5.2 Evaluation Criteria:
6. Volume I – Factor II: Management Approach
6.2 Evaluation Criteria:
7. Volume I – Factor III: Small Business Participation Plan
8. Volume II - Price and Proforma Information
8.2 Tab B – Joint Venture Agreements, Mentor-Protégé Agreements, and Teaming Arrangements
8.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability
8.4 Tab D – Pre-Award Information
8.5 Tab E - Subcontracting Plan
DD-100 Purpose.
DD-101 Applicability.
DD-102 Goals.
DD-103 Evaluation Rating.
DD-104 Modification of Guide.
DD-105 Use of Preaward Surveys.
DD-201 Acceptable Plans.
DD-202 Unacceptable Plans.
DD-301 Requirements.

File details come from the government source that posted it. Updated .