ERCIP Nationwide MATOC Virtual Preproposal Conference Slides 12 SEP.pdf
PDF 849 KB Posted
- Solicitation number
- W912QR23R0048
About this file
This document is a virtual pre-proposal conference slide presentation for a Department of the Army Corps of Engineers multiple-award task order contract (MATOC) solicitation for the Energy Resilience and Conservation Investment Program (ERCIP). The MATOC will be for design-build and design-bid-build construction projects related to mechanical, electrical, and civil infrastructure, microgrids, water conservation, and resilience efforts within the Contiguous United States and Puerto Rico. The solicitation, W912QR23R0048, plans to award up to twelve contracts with a 10-year ordering period, including a 3-year base and seven 1-year options. The procurement will use a two-phase best value tradeoff selection process, with Phase I focusing on past performance and technical approach, and Phase II considering design/technical, management, small business participation, and price. Up to 18 offerors may be selected for Phase II. The total contract capacity is $2 billion, with individual project values between $10-25 million. This procurement has a small business reserve target of 4 awards.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1CUI
CUI
DESIGN BUILD & DESIGN BID BUILD
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
FOR THE
ENERGY RESILIENCE AND CONSERVATION INVESTMENT
PROGRAM (ERCIP)
VIRTUAL PRE-PROPOSAL CONFERENCE
Solicitation: W912QR23R0048 Date: September 12, 2024 Elizabeth Moehlenbrock, Contracting Officer, Louisville District
• Procedure
• ERCIP Overview
• W912QR-23-R-0048 SF1442 Requirements
• Source Selection Overview
• Proposal Submission and Evaluation
• JVs and Teaming Arrangements
• Other Terms
• Known Items Pending RFP Amendment
• Question and Answer
AGENDA
PROCEDURE
• This pre-proposal conference will be recorded. Slides will be provided via RFP amendment or otherwise made publicly available after today’s conference.
• Information provided in this conference is for informational purposes only. The formal solicitation and associated amendments supersede any information provided herein.
• Question and Answer (Q&A) time will be provided after the presentation.
• The Government will answer as many questions as possible in real time during Q&A.
• Where an immediate response cannot be provided during today’s conference, the vendor shall submit the question as outlined in RFP Section 00 21 00 “Projnet Instructions” via Bidder Inquiry in ProjNet no later than the closing date and time for ProjNet bidder inquiries.
ERCIP OVERVIEW
AVAILABLE AT: HTTPS://WWW.LRD.USACE.ARMY.MIL/OPPORTUNITY-FORECAST/
https://www.lrd.usace.army.mil/Opportunity-Forecast/
ERCIP OVERVIEW
AVAILABLE AT: HTTPS://WWW.LRD.USACE.ARMY.MIL/OPPORTUNITY-FORECAST/
https://www.lrd.usace.army.mil/Opportunity-Forecast/
W912QR-23-R-0048 SF1442 REQUIREMENTS
SOURCE SELECTION OVERVIEW
• Phase I is governed by FAR Part 36 – Construction and Architect-Engineer Contracts
• Phase II is governed by FAR Part 15 – Contracting by Negotiation
• RFP Section 4.1: “The Government may evaluate Phase I proposals as submitted, without further exchanges. However, the Government reserves the right to communicate with offerors during Phase I and to request additional information or Phase I proposal revisions.”
• No pricing in Phase I!
• Ratings from Phase I are not considered in Phase II!
SOURCE SELECTION OVERVIEW
Phase I proposals will be evaluated based on the below, in descending order of importance:
• Volume I – Factor I: Past Performance 1st Most Important Factor
• Prime Equal to A/E
• A-E Equal to Prime
• Volume I – Factor II: Technical Approach 2nd Most Important Factor
• Capability and Experience with Water Resiliency Projects
• Collaborative Approach to Design-Build
• Volume II – Pro Forma Information Not Rated
• Tab A: Standard Form 1442
• Tab B: Joint Venture Agreements, Mentor-Protégé Agreements, Teaming Arrangements
• Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability
• Tab D: Pre-Award Information
PROPOSAL SUBMISSION & EVALUATION
JVS AND TEAMING ARRANGEMENTS
NOTE:
RFP
contains the similar language for Technical Approach.
TEAMING ARRANGEMENTS
OTHER TERMS
OTHER TERMS
• RFP p. 4, Sec 00 00 00 - change "within the United States" to "within the Contiguous United States“
• RFP p. 46, Sec 00 70 00 - change Minimum Quantity and Minimum Amount from $10M to $10K
• RFP p. 23, Section 6.2 - change two (2) references from "xxx" to Section 6.1.1 and Section 6.1.2, respectively
KNOWN ITEMS PENDING RFP AMENDMENT
Questions/Comments
| Design Build & Design Bid Build �Multiple Award Task Order Contract (MATOC) �for the �Energy Resilience and Conservation Investment Program (ERCIP)��Virtual Pre-Proposal Conference |
| AGENDA |
| Procedure |
| ERCIP OVERVIEW�available at: https://www.lrd.usace.army.mil/Opportunity-Forecast/ |
| ERCIP OVERVIEW�available at: https://www.lrd.usace.army.mil/Opportunity-Forecast/ |
| W912QR-23-R-0048 SF1442 REQUIREMENTS |
| SOURCE SELECTION OVERVIEW |
| SOURCE SELECTION overview |
| PROPOSAL SuBMISSION & Evaluation |
| JVs AND TEAMING ARRANGEMENTs |
| TEAMING ARRANGEMENTs |
| Other terms |
| Other terms |
| KNOWN ITEMS pending RFP AMENDMENT |
| Slide Number 15 |