1 2 3 4 5 6 7

E

F

4'-10"

10 10

1'-4"

7' -8

7 8 9 10 11 12 13

E

F

1 1

E

1 1

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:26 PM

AD103

F

IR

S T

F L O

O R

N O

R T

H W

IN

G

D E

M O

L

IT

IO

N

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

G .U

E C

K E

R

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

1/8" = 1'-0" A3

FIRST FLOOR NORTH WING WEST

DEMOLITION PLAN

1/8" = 1'-0" D3

FIRST FLOOR NORTH WING EAST

DEMOLITION PLAN

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

1 RE: AD001 FOR DEMOLITION LEGEND

2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT

REQUIRED TO BE REMOVED TO PERFORM NEW WORK

SHALL BE PROTECTED DURING CONSTRUCTION. THIS

INCLUDES BUT NOT LIMITED TO EXISTING

STRUCTURE, EXTERIOR WALLS PANELS AND

ROOFING SYSTEMS.

3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,

QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.

4 ROOF OVER HANGAR BAY AND HANGAR DOOR

POCKETS TO REMAIN. PROTECT DURING `

CONSTRUCTION.

5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO

REMAIN. SEE DRAWINGS FOR AREA OF ROOF

DEMOLITION FOR ELEVATOR SHAFT. PROTECT

NORTH ROOF DURING CONSTRUCTION.

6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP

REMOVE ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE

ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND

REPORT FOR SUSPECTED ASBESTOS CONTAINING

MATERIAL, LEAD BASED PAINT, AND

POLYCHLOINATED BIPHENYL FOR INFORMATION ON

IDENTIFIED MATERALS AND ABATEMENT

RECOMMENDATIONS.

9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE

SPECIFIC DEMOLITION.

10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN

OPERATIONAL DURING THE ENTIRE PROJECT.

PROTECT DURING CONSTRUCTION.

11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT

ARE TO BE REMEDIATED, ARE IDENTIFIED FOR

CONVENIENCE ONLY AND ARE NOT INTENDED TO BE

A COMPLETE LISTING, RE: HAZARDOUS MATERIALS

SURVEY REPORT IN THE SPECIFICATIONS. IF, DURING

DEMOLITION, THE CONTRACTOR EXPOSES

ADDITIONAL, UNFORSEEN HAZARDOUS MATERIALS

THEY SHALL BE REMEDIATED AS REQUIRED TO

RENDER THEM SAFE IN ACCORDANCE WITH THE

CONTRACTOR'S SUBMITTED ABATEMENT PLANS.

12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE

SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE

OR DECK AND PREPARE FOR NEW FINISHES.

GENERAL SHEET NOTES SHEET KEYNOTES:

1 REMOVE WALL SECTION AS REQUIRED FOR DOOR,

RE: DOOR SCHEDULE. EXTERIOR WALL PANEL

CONTAINS ASBESTOS. ABATE AS REQUIRED.

2 REMOVE MECHANICAL AND FIRE PROTECTION

EQUIPMENT AS REQUIRED TO INSTALL NEW

EQUIPMENT.

3 PROTECT EXISTING ELECTRICAL DISTRIBUTION

EQUIPMENT TO REMAIN WITHIN ROOM, RE: ELEC FOR

PANELS TO BE REMOVED

4 EXISTING COMPRESSOR SHED ADDITION TO BE

REMOVED IN ITS ENTIRETY. CONTAINS HAZARDOUS

MATERIALS (ASBESTOS AND LEAD BASED PAINT).

5 DEMOLISH CONCRETE SLAB AS REQUIRED FOR

ELEVATOR PIT. COORDINATE ACTUAL SIZE WITH

ELEVATOR MANUFACTURER SELECTED

6 REMOVE EXISTING STAIR CASE, LANDING AND

RAILING.

7 EXISTING EYE WASH STATION TO BE REMOVED. RE:

PLUMB.

8 PRE-ENGINEERED METAL BUILDING TO BE

DEMOLISHED IN ITS ENTIRETY. REMOVE CONCRETE

FOUNDATION UNDERNEATH. RE: CIVIL AND MECH.

9 TELECOMMUNICATIONS EQUIPMENT TO REMAIN

OPERATIONAL DURING THE ENTIRE DEMOLITION AND

CONSTRUCTION PHASE OF PROJECT.

10 CUT AND REMOVE PORTION(S) OF CONCRETE SLAB

AS REQUIRED FOR THE NEW CMU RATED WALL'S

FOOTINGS AND FOUNDATIONS BETWEEN

HANGAR BAY AND ADMIN. SHOP AREA. RE: STRUCT

11 REMOVE ALL ABANDONED UTILITIES IN EXISTING

CHASE. PROTECT ALL ACTIVE UTILITIES REQUIRED

TO REMAIN DURING CONSTRUCTION, RE: ELECTRICAL

12 REMOVE ELECTRICAL EQUIPMENT, RE: ELECTRICAL

13 REMOVE FDC, RE: FIRE PROTECTION

14 EXISTING TELECOMMUNICATIONS HUB WALL TO

REMAIN. TELECOMMUNICATIONS EQUIPMENT TO

REMAIN OPERATIONAL DURING THE ENTIRE

PROJECT.

15 REMOVE EXISTING BLOCK AND CONCRETE

WAINSCOT. ASBESTOS PANELS TO REMAIN

UNDISTURBED. IF DISTURBED, CONTRACTOR MUST

ABATE AND TAKE PRECAUTIONS AS REQUIRED.

16 BASE BID: EXISTING HANGAR DOORS TO REMAIN.

ALL STEEL WITH RUST AND/OR LIGHT CORROSION

MUST BE CLEANED AND PREPARED FOR NEW FINISH.

CLEAN EXISTING RAILS AND WHEEL SYSTEM.

BID OPTION 2: REMOVE EXISTING HANGAR DOORS,

BOTTOM RAILS, ASSOCIATED CONCRETE

FOUNDATION, AND TOP TRACK AND PREPARE FOR

NEW, RE: STRUCTURAL

17 EXISTING CMU WALLS ARE COATED WITH LBP,

REMEDIATE AS REQUIRED

18 ASBESTOS CONTAINING MATERIALS (ACM), RE:

HAZARDOUS MATERIALS SURVEY REPORT IN THE

SPECIFICATIONS

19 REMOVE EXISTING CARPET ENTIRELY AND PREPARE

FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND

ROOM FINISH SCHEDULE

20 REMOVE EXISTING RESILIENT FLOORING ENTIRELY

AND PREPARE FOR NEW FINISH, RE: FLOOR

PATTERN PLANS AND ROOM FINISH SCHEDULE

A

KEY PLAN

B

C

D E

0' 2' 4' 8' 16'

0' 2' 4' 8' 16'

PLAN NORTH

PLAN NORTH

W

2Q R

R

_P la ns -0

ARIMS: 200A Disposition: Maintain for 15 yrs after construction.

E

F

4'-5 1/2" 9'-10" +/-

7' -0

'-0

A R

E A

A

A R

E A

B

AREA C

7 8 9 10 11 12 13

E

F

E

A R

E A

A

A R

E A

B

AREA C

5 5

5 5

1/8" = 1'-0" A3

SECOND FLOOR NORTH WING WEST

DEMOLITION PLAN

1/8" = 1'-0" D3

SECOND FLOOR NORTH WING EAST

DEMOLITION PLAN

1 RE: AD001 FOR DEMOLITION LEGEND

2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT

REQUIRED TO BE REMOVED TO PERFORM NEW WORK

SHALL BE PROTECTED DURING CONSTRUCTION. THIS

INCLUDES BUT NOT LIMITED TO EXISTING

STRUCTURE, EXTERIOR WALLS PANELS AND

ROOFING SYSTEMS.

3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,

QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.

4 ROOF OVER HANGAR BAY AND HANGAR DOOR

POCKETS TO REMAIN. PROTECT DURING `

CONSTRUCTION.

5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO

REMAIN. SEE DRAWINGS FOR AREA OF ROOF

DEMOLITION FOR ELEVATOR SHAFT. PROTECT

NORTH ROOF DURING CONSTRUCTION.

6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP

REMOVE ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE

ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND

REPORT FOR SUSPECTED ASBESTOS CONTAINING

MATERIAL, LEAD BASED PAINT, AND

POLYCHLOINATED BIPHENYL FOR INFORMATION ON

IDENTIFIED MATERALS AND ABATEMENT

RECOMMENDATIONS.

9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE

SPECIFIC DEMOLITION.

10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN

OPERATIONAL DURING THE ENTIRE PROJECT.

PROTECT DURING CONSTRUCTION.

11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT

ARE TO BE REMEDIATED, ARE IDENTIFIED FOR

CONVENIENCE ONLY AND ARE NOT INTENDED TO BE

A COMPLETE LISTING, RE: HAZARDOUS MATERIALS

SURVEY REPORT. IF, DURING DEMOLITION, THE

CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN

HAZARDOUS MATERIALS THEY SHALL BE

REMEDIATED AS REQUIRED TO RENDER THEM SAFE

IN ACCORDANCE WITH THE CONTRACTOR'S

SUBMITTED ABATEMENT PLANS.

12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE

SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE

OR DECK AND PREPARE FOR NEW FINISHES.

GENERAL SHEET NOTES SHEET KEYNOTES:

1 DEMOLISH CONCRETE SLAB AS INDICATED FOR

ELEVATOR SHAFT. RE: STRUCT. COORDINATE WITH

ELEVATOR MANUFACTURER SELECTED FOR ACTUAL

PIT SIZE PRIOR TO POURING PIT.

2 REMOVE EXISTING STAIR CASE, LANDING AND

RAILING IN ITS ENTIRETY

3 REMOVE ALL PLUMBING FIXTURES AND TOILET

PARTITIONS (TYPICAL)

4 UNVERIFIED CHASE CONDITION. CONTRACTOR TO

ASSUME AN OPEN SHAFT WITH UTILITIES. INFILL

DECK AND ELEVATED SLAB, RE: STRUCTURAL.

5 REMOVE EXISTING CARPET ENTIRELY AND PREPARE

FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND

ROOM FINISH SCHEDULE

6 REMOVE EXISTING TILE ENTIRELY AND PREPARE FOR

NEW FINISH, RE: FLOOR PATTERN PLANS AND ROOM

FINISH SCHEDULE

7 REMOVE EXISTING RESILIENT FLOORING ENTIRELY

AND PREPARE FOR NEW FINISH, RE: FLOOR

PATTERN PLANS AND ROOM FINISH SCHEDULE

A

KEY PLAN

B

C

D E

0' 2' 4' 8' 16'

0' 2' 4' 8' 16'

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:28 PM

AD104

S E

C O

N D

F L O

O R

N O

R T

H W

IN

G

D E

M O

L

IT

IO

N

P L A

N

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

G .U

E C

K E

R

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

PLAN NORTH

PLAN NORTH

W

2Q R

R

_P la ns -0

A

B

C

D

5 5 5 5 5 5

A

B

C

D

4 4 422 22 2

A R

E A

D

A R

E A

E

AREA C

R E

: D O

O R

S C

H E

D U

LE

11 11 11 11

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:29 PM

AD105

F

IR

S T

F L O

O R

S O

U T

H W

IN

G

W E

S T

D E

M O

L

IT

IO

N

P L A

N

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

G .U

E C

K E

R

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

1/8" = 1'-0" A1

FIRST FLOOR SOUTH WING WEST

DEMOLITION PLAN

1 RE: AD001 FOR DEMOLITION LEGEND

2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT

REQUIRED TO BE REMOVED TO PERFORM NEW WORK

SHALL BE PROTECTED DURING CONSTRUCTION. THIS

INCLUDES BUT NOT LIMITED TO EXISTING

STRUCTURE, EXTERIOR WALLS PANELS AND

ROOFING SYSTEMS.

3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,

QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.

4 ROOF OVER HANGAR BAY AND HANGAR DOOR

POCKETS TO REMAIN. PROTECT DURING `

CONSTRUCTION.

5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO

REMAIN. SEE DRAWINGS FOR AREA OF ROOF

DEMOLITION FOR ELEVATOR SHAFT. PROTECT

NORTH ROOF DURING CONSTRUCTION.

6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP

REMOVE ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE

ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND

REPORT FOR SUSPECTED ASBESTOS CONTAINING

MATERIAL, LEAD BASED PAINT, AND

POLYCHLOINATED BIPHENYL FOR INFORMATION ON

IDENTIFIED MATERALS AND ABATEMENT

RECOMMENDATIONS.

9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE

SPECIFIC DEMOLITION.

10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN

OPERATIONAL DURING THE ENTIRE PROJECT.

PROTECT DURING CONSTRUCTION.

11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT

ARE TO BE REMEDIATED, ARE IDENTIFIED FOR

CONVENIENCE ONLY AND ARE NOT INTENDED TO BE

A COMPLETE LISTING, RE: HAZARDOUS MATERIALS

SURVEY REPORT. IF, DURING DEMOLITION, THE

CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN

HAZARDOUS MATERIALS THEY SHALL BE

REMEDIATED AS REQUIRED TO RENDER THEM SAFE

IN ACCORDANCE WITH THE CONTRACTOR'S

SUBMITTED ABATEMENT PLANS.

12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE

SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE

OR DECK AND PREPARE FOR NEW FINISHES.

GENERAL SHEET NOTES SHEET KEYNOTES:

1 DEMOLISH CMU WALL AS NEEDED FOR NEW DOOR

INSTALLATION, RE: FLOOR PLANS

2 REMOVE EXISTING CMU WALL INFILL FOR ADDITION.

CONCRETE STRUCTURE TO REMAIN.

3 CUT AND REMOVE PORTION(S) OF CONCRETE SLAB

AS REQUIRED FOR THE NEW CMU RATED WALL'S

FOOTINGS AND FOUNDATIONS BETWEEN

HANGAR BAY AND ADMIN. SHOP AREA. RE: STRUCT

4 REMOVE EXISTING OVERHEAD DOOR.

5 EXISTING CONCRETE STRUCTURE TO REMAIN

6 REMOVE PORTION OF STRUCTURAL CROSS BRACING

TO ACCOMMODATE REQUIRED EGRESS DOOR, RE:

STRUCTURAL

7 CUT AND REMOVE CONCRETE SLAB AND AND

PREPARE FOR NEW CONCRETE RAMP, RE:

STRUCTURAL

8 DEMOLISH EXISTING COOLING TOWER ENTIRELY,

RE: MECHANICAL

9 ASBESTOS CONTAINING MATERIALS (ACM), RE:

HAZARDOUS MATERIALS SURVEY REPORT IN THE

SPECIFICATIONS

10 REMOVE EXISTING CARPET ENTIRELY AND PREPARE

FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND

ROOM FINISH SCHEDULE

11 REMOVE EXISTING RESILIENT FLOORING ENTIRELY

AND PREPARE FOR NEW FINISH, RE: FLOOR

PATTERN PLANS AND ROOM FINISH SCHEDULE

A

KEY PLAN

B

C

D E 0' 2' 4' 8' 16'

PLAN NORTH

W

2Q R

R

_P la ns -0

UP

7 8 9 10 11 12 13

A

B

CC

D

A

B

C

D

A R

E A

E

A R

E A

D

AREA C

1313 1313

14 14 14

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:32 PM

AD106

F

IR

S T

F L O

O R

S O

U T

H W

IN

G

E A

S T

D E

M O

L

IT

IO

N

P L A

N

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

G .U

E C

K E

R

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

1/8" = 1'-0" A3

FIRST FLOOR SOUTH WING EAST

DEMOLITION PLAN

1 RE: AD001 FOR DEMOLITION LEGEND

2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT

REQUIRED TO BE REMOVED TO PERFORM NEW WORK

SHALL BE PROTECTED DURING CONSTRUCTION. THIS

INCLUDES BUT NOT LIMITED TO EXISTING

STRUCTURE, EXTERIOR WALLS PANELS AND

ROOFING SYSTEMS.

3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,

QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.

4 ROOF OVER HANGAR BAY AND HANGAR DOOR

POCKETS TO REMAIN. PROTECT DURING `

CONSTRUCTION.

5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO

REMAIN. SEE DRAWINGS FOR AREA OF ROOF

DEMOLITION FOR ELEVATOR SHAFT. PROTECT

NORTH ROOF DURING CONSTRUCTION.

6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP

REMOVE ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE

ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND

REPORT FOR SUSPECTED ASBESTOS CONTAINING

MATERIAL, LEAD BASED PAINT, AND

POLYCHLOINATED BIPHENYL FOR INFORMATION ON

IDENTIFIED MATERALS AND ABATEMENT

RECOMMENDATIONS.

9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE

SPECIFIC DEMOLITION.

10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN

OPERATIONAL DURING THE ENTIRE PROJECT.

PROTECT DURING CONSTRUCTION.

11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT

ARE TO BE REMEDIATED, ARE IDENTIFIED FOR

CONVENIENCE ONLY AND ARE NOT INTENDED TO BE

A COMPLETE LISTING, RE: HAZARDOUS MATERIALS

SURVEY REPORT. IF, DURING DEMOLITION, THE

CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN

HAZARDOUS MATERIALS THEY SHALL BE

REMEDIATED AS REQUIRED TO RENDER THEM SAFE

IN ACCORDANCE WITH THE CONTRACTOR'S

SUBMITTED ABATEMENT PLANS.

12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE

SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE

OR DECK AND PREPARE FOR NEW FINISHES.

GENERAL SHEET NOTES SHEET KEYNOTES:

1 REMOVE EXISTING CMU WALL INFILL FOR ADDITION.

CONCRETE STRUCTURE TO REMAIN

2 INTERIOR STAIR TO REMAIN, REMOVE ALL FINISHES

AND PREPARE FOR NEW

3 DEMOLISH CMU WALL AS NEEDED FOR NEW DOOR

INSTALLATION

4 CUT AND REMOVE PORTION(S) OF CONCRETE SLAB

AS REQUIRED FOR THE NEW CMU RATED WALL'S

FOOTINGS AND FOUNDATIONS BETWEEN

HANGAR BAY AND ADMIN. SHOP AREA RE: STRUCT

5 EXISTING STAIR LANDING, ABOVE. (EXISTING STAIR,

LANDINGS AND RAILING TO REMAIN.)

6 REMOVE EXISTING CANOPY IN ITS ENIRETY. REMOVE

ASSOCIATED STRUCTURE AND PAVING, RE: CIVIL AND

STRUCTURAL

7 REMOVE EXISTING CANOPY COLUMNS

8 EXISTING FDC TO REMAIN

9 CUT AND REMOVE CONCRETE SLAB AND AND

PREPARE FOR NEW CONCRETE RAMP, RE:

STRUCTURAL

10 EXISTING ABA CHAIRLIFT AND RAILS TO REMAIN.

PROTECT DURING CONSTRUCTION

11 EXISTING ENTRY CANOPY TO REMAIN, PREPARE FOR

NEW FINISH

12 REMOVE EXISTING LOCKERS

13 ASBESTOS CONTAINING MATERIALS (ACM), RE:

HAZARDOUS MATERIALS SURVEY REPORT IN THE

SPECIFICATIONS

14 REMOVE EXISTING CARPET ENTIRELY AND PREPARE

FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND

ROOM FINISH SCHEDULE

15 REMOVE EXISTING TILE ENTIRELY AND PREPARE FOR

NEW FINISH, RE: FLOOR PATTERN PLANS AND ROOM

FINISH SCHEDULE

16 REMOVE EXISTING RESILIENT FLOORING ENTIRELY

AND PREPARE FOR NEW FINISH, RE: FLOOR

PATTERN PLANS AND ROOM FINISH SCHEDULE

A

KEY PLAN

B

C

D E 0' 2' 4' 8' 16'

PLAN NORTH

W

2Q R

R

_P la ns -0

DN

7 8 9 10 11 12 13

A

B

C

D

8 9

10 10

13 13

13 13 13

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:33 PM

AD107

S E

C O

N D

F L O

O R

S O

U T

H D

E M

O L

IT

IO

N

P L A

N

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

G .U

E C

K E

R

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

1/8" = 1'-0" A2

SECOND FLOOR SOUTH WING

DEMOLITION PLAN

1 RE: AD001 FOR DEMOLITION LEGEND

2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT

REQUIRED TO BE REMOVED TO PERFORM NEW WORK

SHALL BE PROTECTED DURING CONSTRUCTION. THIS

INCLUDES BUT NOT LIMITED TO EXISTING

STRUCTURE, EXTERIOR WALLS PANELS AND

ROOFING SYSTEMS.

3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,

QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.

4 ROOF OVER HANGAR BAY AND HANGAR DOOR

POCKETS TO REMAIN. PROTECT DURING `

CONSTRUCTION.

5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO

REMAIN. SEE DRAWINGS FOR AREA OF ROOF

DEMOLITION FOR ELEVATOR SHAFT. PROTECT

NORTH ROOF DURING CONSTRUCTION.

6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP

REMOVE ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE

ROOFING AND ASSOCIATED FLASHINGS AND

INSULATION TO STRUCTURAL DECK.

8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND

REPORT FOR SUSPECTED ASBESTOS CONTAINING

MATERIAL, LEAD BASED PAINT, AND

POLYCHLOINATED BIPHENYL FOR INFORMATION ON

IDENTIFIED MATERALS AND ABATEMENT

RECOMMENDATIONS.

9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE

SPECIFIC DEMOLITION.

10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN

OPERATIONAL DURING THE ENTIRE PROJECT.

PROTECT DURING CONSTRUCTION.

11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT

ARE TO BE REMEDIATED, ARE IDENTIFIED FOR

CONVENIENCE ONLY AND ARE NOT INTENDED TO BE

A COMPLETE LISTING, RE: HAZARDOUS MATERIALS

SURVEY REPORT. IF, DURING DEMOLITION, THE

CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN

HAZARDOUS MATERIALS THEY SHALL BE

REMEDIATED AS REQUIRED TO RENDER THEM SAFE

IN ACCORDANCE WITH THE CONTRACTOR'S

SUBMITTED ABATEMENT PLANS.

12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE

SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE

OR DECK AND PREPARE FOR NEW FINISHES.

GENERAL SHEET NOTES SHEET KEYNOTES:

1 INTERIOR STAIR TO REMAIN, REMOVE ALL FINISHES

AND PREPARE FOR NEW

2 DEMOUNTABLE PARTITION SYSTEM WITH DOORS TO

BE REMOVED, (TYPICAL)

3 EXISTING METAL STAIR TO REMAIN PROTECT DURING

CONSTRUCTION

4 EXISTING RESTROOMS TO REMAIN. PROTECT DURING

CONSTRUCTION, AND PREPARE FOR NEW FINISHES.

REMOVE FIXTURES AND PREPARE FOR NEW IN

CURRENT LOCATIONS

5 REMOVE EXISTING ROOFING, ROOF INSULATION (TO

DECK), FLASHING, ALL EXISTING EQUIPMENT, WALL

PANELS AND LIGHTNING PROTECTION IN

PREPARATION FOR NEW ROOFING SYSTEM, RE:

INDIVIDUAL DISCIPLINES FOR DISCIPLINE SPECIFIC

DEMOLITION, RE: STRUCTURAL FOR ROOF INFILL AT

EXISTING PENETRATION LOCATIONS

7 REMOVE EXISTING GYP BOARD AT PLUMBING CHASE,

FRAMING TO REMAIN, PREPARE FOR NEW FINISHES

8 EXISTING SHAFT TO REMAIN REMOVE GYP BOARD AS

REQUIRED TO INSTALL NEW WORK

9 DEMOLISH CMU WALL AS REQUIRED FOR NEW

WINDOW INSTALLATION RE; WINDOW SCHEDULE

10 REMOVE AND REMEDIATE TRANSITE PANELS. PANELS

CONTAIN HAZARDOUS MATERIALS

11 REMOVE EXISTING METAL WALL PANELS TO ACCESS

ROOF FLASHINGS. SAVE TO BE REINSTALLED AFTER

NEW ROOF

12 EXISTING ABA CHAIRLIFT AND RAILS TO REMAIN.

PROTECT DURING CONSTRUCTION

13 REMOVE EXISTING RESILIENT FLOORING ENTIRELY

AND PREPARE FOR NEW FINISH, RE: FLOOR

PATTERN PLANS AND ROOM FINISH SCHEDULE

A

KEY PLAN

B

C

D E 0' 2' 4' 8' 16'

PLAN NORTH

W

2Q R

R

_P la ns -0

GUIDE ROLLERS DOOR STOP

TRANSLUCENT PANEL

GUIDE WHEEL

PAINTED STEEL

CLADDING

- 4

'-5

V .I.

F.

+/- 4'-0" V.I.F.

PAINTED STEEL CLADDING

STRUCTURAL STEEL FRAMING AROUND

ROLLING DOOR RE: STRUCTURAL

ANGLE WELDED TO STRUCTURAL FRAME

TRANSLUCENT PANEL WITH

ALUMINUM GRID CORE

PREFINISHED ALUMINUM FRAME COLOR

TO MATCH DOOR. ATTACH PER MFR.

RECOMMENDATIONS

STRUCTURAL STEEL FRAMING AROUND

ROLLING DOOR RE: STRUCTURAL

STRUCTURAL STEEL FRAMING AROUND

ROLLING DOOR RE: STRUCTURAL

STRUCTURAL STEEL FRAMING AROUND

ROLLING DOOR RE: STRUCTURAL

STRUCTURAL STEEL FRAMING AROUND

ROLLING DOOR RE: STRUCTURAL

PREFINISHED ALUMINUM FRAME COLOR

TO MATCH DOOR. ATTACH PER MFR.

RECOMMENDATIONS

ANGLE WELDED TO STRUCTURAL FRAME

ANGLE WELDED TO STRUCTURAL FRAME

PAINTED STEEL CLADDING

PAINTED STEEL CLADDING

PAINTED STEEL CLADDING

TRANSLUCENT PANEL WITH

ALUMINUM GRID CORE

TRANSLUCENT PANEL WITH

ALUMINUM GRID CORE

TRANSLUCENT PANEL WITH

ALUMINUM GRID CORE

PREFINISHED ALUMINUM FRAME COLOR

TO MATCH DOOR. ATTACH PER MFR.

RECOMMENDATIONS

PREFINISHED ALUMINUM FRAME COLOR

TO MATCH DOOR. ATTACH PER MFR.

RECOMMENDATIONS

5 JAMB

4 SILL

JAMB3

SILL / HEAD2

HEAD1

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:34 PM

AE507

H A

N G

A R

D O

O R

D E

T A

IL

S

B

ID

O

P T

IO

N

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

G .U

E C

K E

R

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

1/4" = 1'-0" A8

TYPICAL HANGAR DOOR LEAF

3/4" = 1'-0" A6

TRANSLUCENT PANEL DETAIL

3" = 1'-0"

A3

TYPICAL TRANSLUCENT PANEL

DETAILS

0' 1' 2' 4' 8'

0' 1' 2' 3'3" 6"0' 0.5' 1'1 1/2" 3"

GENERAL SHEET NOTES

1 INSTALL DOOR SWEEPS AND GASKETS PER

MANUFACTURERS' RECOMMENDATIONS. THERE

MUST BE NO GAPS OR OPENINGS THAT ALLOW

BIRD/OWL ACCESS TO THE HANGAR FOR

ROOSTING/NESTING WHEN DOORS ARE CLOSED.

2 PAINT HANGAR DOOR (TYPICAL)

3 REFER TO STRUCTURAL NOTES FOR MORE

INFORMATION (S-106). VERIFY ALL SIZES IN FIELD.

4 BID OPTION 2: REPLACE HANGAR DOORS IN THEIR

ENTIRETY. MAINTAIN THE HISTORIC CHARACTER OF

THE EXISTING DOORS.

W

2Q R

R

_P la ns -0

EXTERIOR FINISHES

CODE MFR/DESCRIPTION

INSULATED METAL PANEL:

MATCH EXISTING, PAINT, COLOR: BASE STANDARD "CONCH SHELL"

STUCCO:

MATCH EXISTING, PAINT, COLOR: BASE STANDARD "CONCH SHELL"

ROOF:

MODIFIED BITUMOUS ROOF, COLOR: WHITE

FASCIA:

COPPER

SOFFITS:

PREFINISHED METAL PANEL, COLOR: BASE STANDARD "CONCH SHELL"

GUTTERS:

COPPER

DOWNSPOUTS:

COPPER

ALUMINUM STOREFRONT SYSTEM - ALUMINUM STOREFRONT:

DOORS:

ALUMINUM, FACTORY FINISH, COLOR: ANODIZED BLACK WITH MATTE

FINISH

DOOR FRAMES:

ALUMINUM, FACTORY FINISHED, COLOR: ANODIZED BLACK WITH MATTE

FINISH

WINDOW FRAMES:

ALUMNIUM, FACTORY FINISHED, COLOR: ANODIZED BLACK WITH MATTE

FINISH

GLAZING:

COLOR: SOLAR GRAY

OVERHEAD DOORS:

INSULATED METAL, STAINLESS STEEL

HANGAR DOORS:

BASE BID MATCH EXISTING, PAINT, COLOR: BASE STANDARD "CONCH

SHELL"

BID OPTION 2 PAINT, COLOR: MATCH P-4, TRANSLUCENT PANEL: COLOR:

WHITE/CRYSTAL

HANDRAILS AND GUARDRAILS:

GALVANIZED STEEL

EXTERIOR SIGNAGE

BACKGROUND DARK BROWN

LETTERING REFLECTIVE WHITE

LOUVERS:

COLOR: BASE STANDARD "CONCH SHELL"

INTERIOR FINISHES GENERAL SHEET NOTES

CODE MFR/DESCRIPTION

FLOORS:

CPT-CARPET

CPT-1 MILLIKEN / LOW COUNTRY, STYLE: WATERWAY, COLOR: INDIGO

PLANT, SIZE: 9.85" X 39.4",

INSTALLATION: ASHLAR

T-TILE

T-1 DALTILE / PORTFOLIO, COLOR: PF04 DOVE GREY, SIZE: 12" X 24",

INSTALLATION: BRICK, GRT-1

LVT-LUXURY VINYL TILE

LVT-1 EF CONTRACT / PLAYBOOK, COLOR: EFCOB-005 FOSSIL,

SIZE: 7" X 48", INSTALLATION: ASHLAR

SC-SEALED CONCRETE

SC-1 SEALED CONCRETE

RF-RESILIENT FLOORING

RF-1 ROPPE / RAISED DESIGN RUBBER TILE,

STYLE: #992 LOW PROFILE RAISED CIRCULAR DESIGN, COLOR: M123

CHARCOAL

MT-METAL TRANSITION STRIP:

MT-1 SCHLUTER / RENO-U, COLOR: AE SATIN ANODIZED ALUMINUM, SIZE:

5/16"H

RT-RESILIENT TRANSITION STRIP:

RT-1 ROPPE / #42 CUSTOM CARPET EDGING, COLOR: 123

CHARCOAL

WALLS:

P-PAINT

P-1 SHERWIN WILLIAMS / SW7064 PASSIVE

P-2 SHERWIN WILLIAMS / SW7065 ARGOS

P-4 SHERWIN WILLIAMS / SW7674 PEPPERCORN

T-TILE

T-2 DALTILE / CAPE COAST, COLOR: PEDESTAL, SIZE: 12" X 24",

INSTALLATION: BRICK, GRT-1

T-3 DALTILE / COASTAL KEYSTONES, STYLE: 1" HEXAGON MOSAIC,

COLOR: MEDITERRANEAN MIST BLEND CK92, SIZE: 12" X 12",

INSTALLATION: STRAIGHT, GRT-1

T-4 DALTILE / CAPE COAST, COLOR: PEDESTAL, SIZE: 3" X 12",

INSTALLATION: STRAIGHT, GRT-1

TB-TILE COVE BASE

TB-1 DALTILE / PORTFOLIO, COLOR: PF04 DOVE GREY, SIZE: 3" X 12",

INSTALLATION: BRICK, GRT-1

RB-RESILIENT WALL BASE

RB-1 ROPPE / 700 SERIES WALL BASE, STYLE: STANDARD,

COLOR: 123 CHARCOAL

COUNTERTOPS & WINDOW SILLS:

SSM-SOLID SURFACE MATERIAL

SSM-1 CORIAN / RAIN CLOUD

KNEEGUARDS:

PLAM-PLASTIC LAMINATE

PLAM-1 FORMICA / INFINITY DUOTEX 6448-58, MATTE FINISH

PLAM-2 FORMICA / OILED WALNUT 5487-NT, NATURELLE FINISH

SHOWER PANS:

SSM-2 INPRO / SHOWER BASE PAN, COLOR: P9011 BRIGHT WHITE

A. COLORS LISTED ARE FOR COLOR IDENTIFICATION PURPOSES ONLY. THIS

LISTING IS NOT INTENDED TO LIMIT SELECTION OF SAME QUALITY AND

SIMILAR COLORS, TEXTURES AND PATTERNS FROM OTHER MANUFACTURERS.

B. ALL SOLID SURFACE COUNTERTOPS SHALL RECEIVE 4" HIGH INTEGRAL

BACKSPLASH, U.N.O.

C. FOR EXTERIOR MATERIALS, REFERENCE THE IDG EXTERIOR COLOR CHART

CODE MFR/DESCRIPTION

CEILINGS:

GYPSUM

P-3 SHERWIN WILLIAMS / SW7007 CEILING BRIGHT WHITE

ACT-ACOUSTICAL CEILING TILE

ACT-1 ARMSTRONG / OPTIMA SQUARE TEGULAR 3354, COLOR: WHITE,

SIZE: 24" X 24" x 1"

GRID: ARMSTRONG / PRELUDE XL, COLOR: WHITE, SIZE: 15/16"

TP-TOILETPARTITIONS/US-URINAL SCREENS:

TP-1 SCRANTON PRODUCTS / HINY HIDERS, COLOR: CONCRETE,

TEXTURE: ROTARY BRUSHED

US-1 MATCH TP-1

GRT-GROUT

GRT-1 TRUCOLOR RAPID CURE / URETHANE GROUT, COLOR: H144 MISTY

GRAY

DOORS:

WOOD DOORS STAIN TO MATCH WD-1

METAL DOORS MATCH P-4

DOOR FRAMES:

METAL MATCH P-4

WD-WOOD:

WD-1 MINWAX / MW439 WALNUT

FRP-FIBERGLASS REINFORCED PLASTIC

FRP-1 CRANE COMPOSITES / GLASBORD, COLOR: PEARL GRAY 48

WS-WINDOW SHADE:

WS-1 MERMET / E SCREEN, COLOR: 002020 WHITE/LINEN, 3% OPEN

WS-2 MERMET / AVILA TWILIGHT, COLOR: 000002 WHITE, 0% OPEN

SIGNAGE

BACKGROUND: MATCH P-4

LETTERING: MATCH P-3

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

P

BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt

7/24/2023 2:35:35 PM

AF001

F

IN

IS

H

M A

T E

R

IA

L S

L

IS

T

P A

T R

IC

K

S P

A C

E F

O R

C E

B A

S E

F

L O

R

ID

A

L O

U

IS

V

IL

L E

D

IS

T R

IC

T

D

R M

A R

T

IN

L U

T H

E R

K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E

K

Y

D R

E M

Y

B B

R A

D D

IC

K

D R

E M

Y

R W

E N

T E

M A

Y

CERTIFIED FINAL SUBMITTAL

R E

N O

V A

T E

H A

N G

A R

F

O R

R

Q W

P R

O J E

C T

N O

S

X H

T -9

R

E V

IS

E

D I

N A

C C

O R

D A

N C

E W

IT

H

A M

E N

D M

E N

T

J U

L Y

W

2Q R

R

_P la ns -0

Sheets
AD103 - FIRST FLOOR NORTH WING DEMOLITION
AD104 - SECOND FLOOR NORTH WING DEMOLITION PLAN
AD105 - FIRST FLOOR SOUTH WING WEST DEMOLITION PLAN
AD106 - FIRST FLOOR SOUTH WING EAST DEMOLITION PLAN
AD107 - SECOND FLOOR SOUTH DEMOLITION PLAN
AE507 - HANGAR DOOR DETAILS (BID OPTION 2)
AF001 - FINISH MATERIALS LIST