W912QR23R0041_Plans-0001.pdf
PDF 5 MB Posted
- Solicitation number
- W912QR23R0041
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
1 2 3 4 5 6 7
E
F
4'-10"
10 10
1'-4"
7' -8
7 8 9 10 11 12 13
E
F
1 1
E
1 1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:26 PM
AD103
F
IR
S T
F L O
O R
N O
R T
H W
IN
G
D E
M O
L
IT
IO
N
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
G .U
E C
K E
R
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
1/8" = 1'-0" A3
FIRST FLOOR NORTH WING WEST
DEMOLITION PLAN
1/8" = 1'-0" D3
FIRST FLOOR NORTH WING EAST
DEMOLITION PLAN
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
1 RE: AD001 FOR DEMOLITION LEGEND
2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT
REQUIRED TO BE REMOVED TO PERFORM NEW WORK
SHALL BE PROTECTED DURING CONSTRUCTION. THIS
INCLUDES BUT NOT LIMITED TO EXISTING
STRUCTURE, EXTERIOR WALLS PANELS AND
ROOFING SYSTEMS.
3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,
QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.
4 ROOF OVER HANGAR BAY AND HANGAR DOOR
POCKETS TO REMAIN. PROTECT DURING `
CONSTRUCTION.
5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO
REMAIN. SEE DRAWINGS FOR AREA OF ROOF
DEMOLITION FOR ELEVATOR SHAFT. PROTECT
NORTH ROOF DURING CONSTRUCTION.
6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP
REMOVE ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE
ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND
REPORT FOR SUSPECTED ASBESTOS CONTAINING
MATERIAL, LEAD BASED PAINT, AND
POLYCHLOINATED BIPHENYL FOR INFORMATION ON
IDENTIFIED MATERALS AND ABATEMENT
RECOMMENDATIONS.
9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE
SPECIFIC DEMOLITION.
10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN
OPERATIONAL DURING THE ENTIRE PROJECT.
PROTECT DURING CONSTRUCTION.
11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT
ARE TO BE REMEDIATED, ARE IDENTIFIED FOR
CONVENIENCE ONLY AND ARE NOT INTENDED TO BE
A COMPLETE LISTING, RE: HAZARDOUS MATERIALS
SURVEY REPORT IN THE SPECIFICATIONS. IF, DURING
DEMOLITION, THE CONTRACTOR EXPOSES
ADDITIONAL, UNFORSEEN HAZARDOUS MATERIALS
THEY SHALL BE REMEDIATED AS REQUIRED TO
RENDER THEM SAFE IN ACCORDANCE WITH THE
CONTRACTOR'S SUBMITTED ABATEMENT PLANS.
12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE
SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE
OR DECK AND PREPARE FOR NEW FINISHES.
GENERAL SHEET NOTES SHEET KEYNOTES:
1 REMOVE WALL SECTION AS REQUIRED FOR DOOR,
RE: DOOR SCHEDULE. EXTERIOR WALL PANEL
CONTAINS ASBESTOS. ABATE AS REQUIRED.
2 REMOVE MECHANICAL AND FIRE PROTECTION
EQUIPMENT AS REQUIRED TO INSTALL NEW
EQUIPMENT.
3 PROTECT EXISTING ELECTRICAL DISTRIBUTION
EQUIPMENT TO REMAIN WITHIN ROOM, RE: ELEC FOR
PANELS TO BE REMOVED
4 EXISTING COMPRESSOR SHED ADDITION TO BE
REMOVED IN ITS ENTIRETY. CONTAINS HAZARDOUS
MATERIALS (ASBESTOS AND LEAD BASED PAINT).
5 DEMOLISH CONCRETE SLAB AS REQUIRED FOR
ELEVATOR PIT. COORDINATE ACTUAL SIZE WITH
ELEVATOR MANUFACTURER SELECTED
6 REMOVE EXISTING STAIR CASE, LANDING AND
RAILING.
7 EXISTING EYE WASH STATION TO BE REMOVED. RE:
PLUMB.
8 PRE-ENGINEERED METAL BUILDING TO BE
DEMOLISHED IN ITS ENTIRETY. REMOVE CONCRETE
FOUNDATION UNDERNEATH. RE: CIVIL AND MECH.
9 TELECOMMUNICATIONS EQUIPMENT TO REMAIN
OPERATIONAL DURING THE ENTIRE DEMOLITION AND
CONSTRUCTION PHASE OF PROJECT.
10 CUT AND REMOVE PORTION(S) OF CONCRETE SLAB
AS REQUIRED FOR THE NEW CMU RATED WALL'S
FOOTINGS AND FOUNDATIONS BETWEEN
HANGAR BAY AND ADMIN. SHOP AREA. RE: STRUCT
11 REMOVE ALL ABANDONED UTILITIES IN EXISTING
CHASE. PROTECT ALL ACTIVE UTILITIES REQUIRED
TO REMAIN DURING CONSTRUCTION, RE: ELECTRICAL
12 REMOVE ELECTRICAL EQUIPMENT, RE: ELECTRICAL
13 REMOVE FDC, RE: FIRE PROTECTION
14 EXISTING TELECOMMUNICATIONS HUB WALL TO
REMAIN. TELECOMMUNICATIONS EQUIPMENT TO
REMAIN OPERATIONAL DURING THE ENTIRE
PROJECT.
15 REMOVE EXISTING BLOCK AND CONCRETE
WAINSCOT. ASBESTOS PANELS TO REMAIN
UNDISTURBED. IF DISTURBED, CONTRACTOR MUST
ABATE AND TAKE PRECAUTIONS AS REQUIRED.
16 BASE BID: EXISTING HANGAR DOORS TO REMAIN.
ALL STEEL WITH RUST AND/OR LIGHT CORROSION
MUST BE CLEANED AND PREPARED FOR NEW FINISH.
CLEAN EXISTING RAILS AND WHEEL SYSTEM.
BID OPTION 2: REMOVE EXISTING HANGAR DOORS,
BOTTOM RAILS, ASSOCIATED CONCRETE
FOUNDATION, AND TOP TRACK AND PREPARE FOR
NEW, RE: STRUCTURAL
17 EXISTING CMU WALLS ARE COATED WITH LBP,
REMEDIATE AS REQUIRED
18 ASBESTOS CONTAINING MATERIALS (ACM), RE:
HAZARDOUS MATERIALS SURVEY REPORT IN THE
SPECIFICATIONS
19 REMOVE EXISTING CARPET ENTIRELY AND PREPARE
FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND
ROOM FINISH SCHEDULE
20 REMOVE EXISTING RESILIENT FLOORING ENTIRELY
AND PREPARE FOR NEW FINISH, RE: FLOOR
PATTERN PLANS AND ROOM FINISH SCHEDULE
A
KEY PLAN
B
C
D E
0' 2' 4' 8' 16'
0' 2' 4' 8' 16'
PLAN NORTH
PLAN NORTH
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15 yrs after construction.
E
F
4'-5 1/2" 9'-10" +/-
7' -0
'-0
A R
E A
A
A R
E A
B
AREA C
7 8 9 10 11 12 13
E
F
E
A R
E A
A
A R
E A
B
AREA C
5 5
5 5
1/8" = 1'-0" A3
SECOND FLOOR NORTH WING WEST
DEMOLITION PLAN
1/8" = 1'-0" D3
SECOND FLOOR NORTH WING EAST
DEMOLITION PLAN
1 RE: AD001 FOR DEMOLITION LEGEND
2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT
REQUIRED TO BE REMOVED TO PERFORM NEW WORK
SHALL BE PROTECTED DURING CONSTRUCTION. THIS
INCLUDES BUT NOT LIMITED TO EXISTING
STRUCTURE, EXTERIOR WALLS PANELS AND
ROOFING SYSTEMS.
3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,
QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.
4 ROOF OVER HANGAR BAY AND HANGAR DOOR
POCKETS TO REMAIN. PROTECT DURING `
CONSTRUCTION.
5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO
REMAIN. SEE DRAWINGS FOR AREA OF ROOF
DEMOLITION FOR ELEVATOR SHAFT. PROTECT
NORTH ROOF DURING CONSTRUCTION.
6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP
REMOVE ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE
ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND
REPORT FOR SUSPECTED ASBESTOS CONTAINING
MATERIAL, LEAD BASED PAINT, AND
POLYCHLOINATED BIPHENYL FOR INFORMATION ON
IDENTIFIED MATERALS AND ABATEMENT
RECOMMENDATIONS.
9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE
SPECIFIC DEMOLITION.
10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN
OPERATIONAL DURING THE ENTIRE PROJECT.
PROTECT DURING CONSTRUCTION.
11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT
ARE TO BE REMEDIATED, ARE IDENTIFIED FOR
CONVENIENCE ONLY AND ARE NOT INTENDED TO BE
A COMPLETE LISTING, RE: HAZARDOUS MATERIALS
SURVEY REPORT. IF, DURING DEMOLITION, THE
CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN
HAZARDOUS MATERIALS THEY SHALL BE
REMEDIATED AS REQUIRED TO RENDER THEM SAFE
IN ACCORDANCE WITH THE CONTRACTOR'S
SUBMITTED ABATEMENT PLANS.
12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE
SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE
OR DECK AND PREPARE FOR NEW FINISHES.
GENERAL SHEET NOTES SHEET KEYNOTES:
1 DEMOLISH CONCRETE SLAB AS INDICATED FOR
ELEVATOR SHAFT. RE: STRUCT. COORDINATE WITH
ELEVATOR MANUFACTURER SELECTED FOR ACTUAL
PIT SIZE PRIOR TO POURING PIT.
2 REMOVE EXISTING STAIR CASE, LANDING AND
RAILING IN ITS ENTIRETY
3 REMOVE ALL PLUMBING FIXTURES AND TOILET
PARTITIONS (TYPICAL)
4 UNVERIFIED CHASE CONDITION. CONTRACTOR TO
ASSUME AN OPEN SHAFT WITH UTILITIES. INFILL
DECK AND ELEVATED SLAB, RE: STRUCTURAL.
5 REMOVE EXISTING CARPET ENTIRELY AND PREPARE
FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND
ROOM FINISH SCHEDULE
6 REMOVE EXISTING TILE ENTIRELY AND PREPARE FOR
NEW FINISH, RE: FLOOR PATTERN PLANS AND ROOM
FINISH SCHEDULE
7 REMOVE EXISTING RESILIENT FLOORING ENTIRELY
AND PREPARE FOR NEW FINISH, RE: FLOOR
PATTERN PLANS AND ROOM FINISH SCHEDULE
A
KEY PLAN
B
C
D E
0' 2' 4' 8' 16'
0' 2' 4' 8' 16'
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:28 PM
AD104
S E
C O
N D
F L O
O R
N O
R T
H W
IN
G
D E
M O
L
IT
IO
N
P L A
N
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
G .U
E C
K E
R
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
PLAN NORTH
PLAN NORTH
W
2Q R
R
_P la ns -0
A
B
C
D
5 5 5 5 5 5
A
B
C
D
4 4 422 22 2
A R
E A
D
A R
E A
E
AREA C
R E
: D O
O R
S C
H E
D U
LE
11 11 11 11
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:29 PM
AD105
F
IR
S T
F L O
O R
S O
U T
H W
IN
G
W E
S T
D E
M O
L
IT
IO
N
P L A
N
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
G .U
E C
K E
R
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
1/8" = 1'-0" A1
FIRST FLOOR SOUTH WING WEST
DEMOLITION PLAN
1 RE: AD001 FOR DEMOLITION LEGEND
2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT
REQUIRED TO BE REMOVED TO PERFORM NEW WORK
SHALL BE PROTECTED DURING CONSTRUCTION. THIS
INCLUDES BUT NOT LIMITED TO EXISTING
STRUCTURE, EXTERIOR WALLS PANELS AND
ROOFING SYSTEMS.
3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,
QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.
4 ROOF OVER HANGAR BAY AND HANGAR DOOR
POCKETS TO REMAIN. PROTECT DURING `
CONSTRUCTION.
5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO
REMAIN. SEE DRAWINGS FOR AREA OF ROOF
DEMOLITION FOR ELEVATOR SHAFT. PROTECT
NORTH ROOF DURING CONSTRUCTION.
6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP
REMOVE ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE
ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND
REPORT FOR SUSPECTED ASBESTOS CONTAINING
MATERIAL, LEAD BASED PAINT, AND
POLYCHLOINATED BIPHENYL FOR INFORMATION ON
IDENTIFIED MATERALS AND ABATEMENT
RECOMMENDATIONS.
9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE
SPECIFIC DEMOLITION.
10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN
OPERATIONAL DURING THE ENTIRE PROJECT.
PROTECT DURING CONSTRUCTION.
11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT
ARE TO BE REMEDIATED, ARE IDENTIFIED FOR
CONVENIENCE ONLY AND ARE NOT INTENDED TO BE
A COMPLETE LISTING, RE: HAZARDOUS MATERIALS
SURVEY REPORT. IF, DURING DEMOLITION, THE
CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN
HAZARDOUS MATERIALS THEY SHALL BE
REMEDIATED AS REQUIRED TO RENDER THEM SAFE
IN ACCORDANCE WITH THE CONTRACTOR'S
SUBMITTED ABATEMENT PLANS.
12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE
SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE
OR DECK AND PREPARE FOR NEW FINISHES.
GENERAL SHEET NOTES SHEET KEYNOTES:
1 DEMOLISH CMU WALL AS NEEDED FOR NEW DOOR
INSTALLATION, RE: FLOOR PLANS
2 REMOVE EXISTING CMU WALL INFILL FOR ADDITION.
CONCRETE STRUCTURE TO REMAIN.
3 CUT AND REMOVE PORTION(S) OF CONCRETE SLAB
AS REQUIRED FOR THE NEW CMU RATED WALL'S
FOOTINGS AND FOUNDATIONS BETWEEN
HANGAR BAY AND ADMIN. SHOP AREA. RE: STRUCT
4 REMOVE EXISTING OVERHEAD DOOR.
5 EXISTING CONCRETE STRUCTURE TO REMAIN
6 REMOVE PORTION OF STRUCTURAL CROSS BRACING
TO ACCOMMODATE REQUIRED EGRESS DOOR, RE:
STRUCTURAL
7 CUT AND REMOVE CONCRETE SLAB AND AND
PREPARE FOR NEW CONCRETE RAMP, RE:
STRUCTURAL
8 DEMOLISH EXISTING COOLING TOWER ENTIRELY,
RE: MECHANICAL
9 ASBESTOS CONTAINING MATERIALS (ACM), RE:
HAZARDOUS MATERIALS SURVEY REPORT IN THE
SPECIFICATIONS
10 REMOVE EXISTING CARPET ENTIRELY AND PREPARE
FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND
ROOM FINISH SCHEDULE
11 REMOVE EXISTING RESILIENT FLOORING ENTIRELY
AND PREPARE FOR NEW FINISH, RE: FLOOR
PATTERN PLANS AND ROOM FINISH SCHEDULE
A
KEY PLAN
B
C
D E 0' 2' 4' 8' 16'
PLAN NORTH
W
2Q R
R
_P la ns -0
UP
7 8 9 10 11 12 13
A
B
CC
D
A
B
C
D
A R
E A
E
A R
E A
D
AREA C
1313 1313
14 14 14
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:32 PM
AD106
F
IR
S T
F L O
O R
S O
U T
H W
IN
G
E A
S T
D E
M O
L
IT
IO
N
P L A
N
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
G .U
E C
K E
R
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
1/8" = 1'-0" A3
FIRST FLOOR SOUTH WING EAST
DEMOLITION PLAN
1 RE: AD001 FOR DEMOLITION LEGEND
2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT
REQUIRED TO BE REMOVED TO PERFORM NEW WORK
SHALL BE PROTECTED DURING CONSTRUCTION. THIS
INCLUDES BUT NOT LIMITED TO EXISTING
STRUCTURE, EXTERIOR WALLS PANELS AND
ROOFING SYSTEMS.
3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,
QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.
4 ROOF OVER HANGAR BAY AND HANGAR DOOR
POCKETS TO REMAIN. PROTECT DURING `
CONSTRUCTION.
5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO
REMAIN. SEE DRAWINGS FOR AREA OF ROOF
DEMOLITION FOR ELEVATOR SHAFT. PROTECT
NORTH ROOF DURING CONSTRUCTION.
6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP
REMOVE ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE
ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND
REPORT FOR SUSPECTED ASBESTOS CONTAINING
MATERIAL, LEAD BASED PAINT, AND
POLYCHLOINATED BIPHENYL FOR INFORMATION ON
IDENTIFIED MATERALS AND ABATEMENT
RECOMMENDATIONS.
9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE
SPECIFIC DEMOLITION.
10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN
OPERATIONAL DURING THE ENTIRE PROJECT.
PROTECT DURING CONSTRUCTION.
11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT
ARE TO BE REMEDIATED, ARE IDENTIFIED FOR
CONVENIENCE ONLY AND ARE NOT INTENDED TO BE
A COMPLETE LISTING, RE: HAZARDOUS MATERIALS
SURVEY REPORT. IF, DURING DEMOLITION, THE
CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN
HAZARDOUS MATERIALS THEY SHALL BE
REMEDIATED AS REQUIRED TO RENDER THEM SAFE
IN ACCORDANCE WITH THE CONTRACTOR'S
SUBMITTED ABATEMENT PLANS.
12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE
SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE
OR DECK AND PREPARE FOR NEW FINISHES.
GENERAL SHEET NOTES SHEET KEYNOTES:
1 REMOVE EXISTING CMU WALL INFILL FOR ADDITION.
CONCRETE STRUCTURE TO REMAIN
2 INTERIOR STAIR TO REMAIN, REMOVE ALL FINISHES
AND PREPARE FOR NEW
3 DEMOLISH CMU WALL AS NEEDED FOR NEW DOOR
INSTALLATION
4 CUT AND REMOVE PORTION(S) OF CONCRETE SLAB
AS REQUIRED FOR THE NEW CMU RATED WALL'S
FOOTINGS AND FOUNDATIONS BETWEEN
HANGAR BAY AND ADMIN. SHOP AREA RE: STRUCT
5 EXISTING STAIR LANDING, ABOVE. (EXISTING STAIR,
LANDINGS AND RAILING TO REMAIN.)
6 REMOVE EXISTING CANOPY IN ITS ENIRETY. REMOVE
ASSOCIATED STRUCTURE AND PAVING, RE: CIVIL AND
STRUCTURAL
7 REMOVE EXISTING CANOPY COLUMNS
8 EXISTING FDC TO REMAIN
9 CUT AND REMOVE CONCRETE SLAB AND AND
PREPARE FOR NEW CONCRETE RAMP, RE:
STRUCTURAL
10 EXISTING ABA CHAIRLIFT AND RAILS TO REMAIN.
PROTECT DURING CONSTRUCTION
11 EXISTING ENTRY CANOPY TO REMAIN, PREPARE FOR
NEW FINISH
12 REMOVE EXISTING LOCKERS
13 ASBESTOS CONTAINING MATERIALS (ACM), RE:
HAZARDOUS MATERIALS SURVEY REPORT IN THE
SPECIFICATIONS
14 REMOVE EXISTING CARPET ENTIRELY AND PREPARE
FOR NEW FINISH, RE: FLOOR PATTERN PLANS AND
ROOM FINISH SCHEDULE
15 REMOVE EXISTING TILE ENTIRELY AND PREPARE FOR
NEW FINISH, RE: FLOOR PATTERN PLANS AND ROOM
FINISH SCHEDULE
16 REMOVE EXISTING RESILIENT FLOORING ENTIRELY
AND PREPARE FOR NEW FINISH, RE: FLOOR
PATTERN PLANS AND ROOM FINISH SCHEDULE
A
KEY PLAN
B
C
D E 0' 2' 4' 8' 16'
PLAN NORTH
W
2Q R
R
_P la ns -0
DN
7 8 9 10 11 12 13
A
B
C
D
8 9
10 10
13 13
13 13 13
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:33 PM
AD107
S E
C O
N D
F L O
O R
S O
U T
H D
E M
O L
IT
IO
N
P L A
N
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
G .U
E C
K E
R
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
1/8" = 1'-0" A2
SECOND FLOOR SOUTH WING
DEMOLITION PLAN
1 RE: AD001 FOR DEMOLITION LEGEND
2 ALL EXISTING BUILDING ITEMS TO REMAIN AND NOT
REQUIRED TO BE REMOVED TO PERFORM NEW WORK
SHALL BE PROTECTED DURING CONSTRUCTION. THIS
INCLUDES BUT NOT LIMITED TO EXISTING
STRUCTURE, EXTERIOR WALLS PANELS AND
ROOFING SYSTEMS.
3 REFER TO MECHANICAL FOR VENT TYPE, LOCATIONS,
QUANTITY AND MINIMUM HEIGHT ABOVE ROOF LINE.
4 ROOF OVER HANGAR BAY AND HANGAR DOOR
POCKETS TO REMAIN. PROTECT DURING `
CONSTRUCTION.
5 ROOF OVER TWO (2) STORY NORTH ADMIN. / SHOP TO
REMAIN. SEE DRAWINGS FOR AREA OF ROOF
DEMOLITION FOR ELEVATOR SHAFT. PROTECT
NORTH ROOF DURING CONSTRUCTION.
6 ROOF OVER LOW BAY SOUTH ADMIN. / SHOP
REMOVE ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
7 ROOF OVER SECOND FLOOR SOUTH ADMIN REMOVE
ROOFING AND ASSOCIATED FLASHINGS AND
INSULATION TO STRUCTURAL DECK.
8 REFER TO THE HAZARDOUS MATERIALS SURVEY AND
REPORT FOR SUSPECTED ASBESTOS CONTAINING
MATERIAL, LEAD BASED PAINT, AND
POLYCHLOINATED BIPHENYL FOR INFORMATION ON
IDENTIFIED MATERALS AND ABATEMENT
RECOMMENDATIONS.
9 REFER TO DISCIPLINE DRAWINGS FOR DISCIPLINE
SPECIFIC DEMOLITION.
10 TELECOMMUNICATIONS EQUIPMENT TO REMAIN
OPERATIONAL DURING THE ENTIRE PROJECT.
PROTECT DURING CONSTRUCTION.
11 ITEMS IDENTIFIED AS HAZARDOUS MATERIALS, THAT
ARE TO BE REMEDIATED, ARE IDENTIFIED FOR
CONVENIENCE ONLY AND ARE NOT INTENDED TO BE
A COMPLETE LISTING, RE: HAZARDOUS MATERIALS
SURVEY REPORT. IF, DURING DEMOLITION, THE
CONTRACTOR EXPOSES ADDITIONAL, UNFORSEEN
HAZARDOUS MATERIALS THEY SHALL BE
REMEDIATED AS REQUIRED TO RENDER THEM SAFE
IN ACCORDANCE WITH THE CONTRACTOR'S
SUBMITTED ABATEMENT PLANS.
12 ALL FLOOR FINISHES ARE TO BE REMOVED TO THE
SLAB OR STRUCTURAL DECK. CLEAN THE CONCRETE
OR DECK AND PREPARE FOR NEW FINISHES.
GENERAL SHEET NOTES SHEET KEYNOTES:
1 INTERIOR STAIR TO REMAIN, REMOVE ALL FINISHES
AND PREPARE FOR NEW
2 DEMOUNTABLE PARTITION SYSTEM WITH DOORS TO
BE REMOVED, (TYPICAL)
3 EXISTING METAL STAIR TO REMAIN PROTECT DURING
CONSTRUCTION
4 EXISTING RESTROOMS TO REMAIN. PROTECT DURING
CONSTRUCTION, AND PREPARE FOR NEW FINISHES.
REMOVE FIXTURES AND PREPARE FOR NEW IN
CURRENT LOCATIONS
5 REMOVE EXISTING ROOFING, ROOF INSULATION (TO
DECK), FLASHING, ALL EXISTING EQUIPMENT, WALL
PANELS AND LIGHTNING PROTECTION IN
PREPARATION FOR NEW ROOFING SYSTEM, RE:
INDIVIDUAL DISCIPLINES FOR DISCIPLINE SPECIFIC
DEMOLITION, RE: STRUCTURAL FOR ROOF INFILL AT
EXISTING PENETRATION LOCATIONS
7 REMOVE EXISTING GYP BOARD AT PLUMBING CHASE,
FRAMING TO REMAIN, PREPARE FOR NEW FINISHES
8 EXISTING SHAFT TO REMAIN REMOVE GYP BOARD AS
REQUIRED TO INSTALL NEW WORK
9 DEMOLISH CMU WALL AS REQUIRED FOR NEW
WINDOW INSTALLATION RE; WINDOW SCHEDULE
10 REMOVE AND REMEDIATE TRANSITE PANELS. PANELS
CONTAIN HAZARDOUS MATERIALS
11 REMOVE EXISTING METAL WALL PANELS TO ACCESS
ROOF FLASHINGS. SAVE TO BE REINSTALLED AFTER
NEW ROOF
12 EXISTING ABA CHAIRLIFT AND RAILS TO REMAIN.
PROTECT DURING CONSTRUCTION
13 REMOVE EXISTING RESILIENT FLOORING ENTIRELY
AND PREPARE FOR NEW FINISH, RE: FLOOR
PATTERN PLANS AND ROOM FINISH SCHEDULE
A
KEY PLAN
B
C
D E 0' 2' 4' 8' 16'
PLAN NORTH
W
2Q R
R
_P la ns -0
GUIDE ROLLERS DOOR STOP
TRANSLUCENT PANEL
GUIDE WHEEL
PAINTED STEEL
CLADDING
- 4
'-5
V .I.
F.
+/- 4'-0" V.I.F.
PAINTED STEEL CLADDING
STRUCTURAL STEEL FRAMING AROUND
ROLLING DOOR RE: STRUCTURAL
ANGLE WELDED TO STRUCTURAL FRAME
TRANSLUCENT PANEL WITH
ALUMINUM GRID CORE
PREFINISHED ALUMINUM FRAME COLOR
TO MATCH DOOR. ATTACH PER MFR.
RECOMMENDATIONS
STRUCTURAL STEEL FRAMING AROUND
ROLLING DOOR RE: STRUCTURAL
STRUCTURAL STEEL FRAMING AROUND
ROLLING DOOR RE: STRUCTURAL
STRUCTURAL STEEL FRAMING AROUND
ROLLING DOOR RE: STRUCTURAL
STRUCTURAL STEEL FRAMING AROUND
ROLLING DOOR RE: STRUCTURAL
PREFINISHED ALUMINUM FRAME COLOR
TO MATCH DOOR. ATTACH PER MFR.
RECOMMENDATIONS
ANGLE WELDED TO STRUCTURAL FRAME
ANGLE WELDED TO STRUCTURAL FRAME
PAINTED STEEL CLADDING
PAINTED STEEL CLADDING
PAINTED STEEL CLADDING
TRANSLUCENT PANEL WITH
ALUMINUM GRID CORE
TRANSLUCENT PANEL WITH
ALUMINUM GRID CORE
TRANSLUCENT PANEL WITH
ALUMINUM GRID CORE
PREFINISHED ALUMINUM FRAME COLOR
TO MATCH DOOR. ATTACH PER MFR.
RECOMMENDATIONS
PREFINISHED ALUMINUM FRAME COLOR
TO MATCH DOOR. ATTACH PER MFR.
RECOMMENDATIONS
5 JAMB
4 SILL
JAMB3
SILL / HEAD2
HEAD1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:34 PM
AE507
H A
N G
A R
D O
O R
D E
T A
IL
S
B
ID
O
P T
IO
N
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
G .U
E C
K E
R
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
1/4" = 1'-0" A8
TYPICAL HANGAR DOOR LEAF
3/4" = 1'-0" A6
TRANSLUCENT PANEL DETAIL
3" = 1'-0"
A3
TYPICAL TRANSLUCENT PANEL
DETAILS
0' 1' 2' 4' 8'
0' 1' 2' 3'3" 6"0' 0.5' 1'1 1/2" 3"
GENERAL SHEET NOTES
1 INSTALL DOOR SWEEPS AND GASKETS PER
MANUFACTURERS' RECOMMENDATIONS. THERE
MUST BE NO GAPS OR OPENINGS THAT ALLOW
BIRD/OWL ACCESS TO THE HANGAR FOR
ROOSTING/NESTING WHEN DOORS ARE CLOSED.
2 PAINT HANGAR DOOR (TYPICAL)
3 REFER TO STRUCTURAL NOTES FOR MORE
INFORMATION (S-106). VERIFY ALL SIZES IN FIELD.
4 BID OPTION 2: REPLACE HANGAR DOORS IN THEIR
ENTIRETY. MAINTAIN THE HISTORIC CHARACTER OF
THE EXISTING DOORS.
W
2Q R
R
_P la ns -0
EXTERIOR FINISHES
CODE MFR/DESCRIPTION
INSULATED METAL PANEL:
MATCH EXISTING, PAINT, COLOR: BASE STANDARD "CONCH SHELL"
STUCCO:
MATCH EXISTING, PAINT, COLOR: BASE STANDARD "CONCH SHELL"
ROOF:
MODIFIED BITUMOUS ROOF, COLOR: WHITE
FASCIA:
COPPER
SOFFITS:
PREFINISHED METAL PANEL, COLOR: BASE STANDARD "CONCH SHELL"
GUTTERS:
COPPER
DOWNSPOUTS:
COPPER
ALUMINUM STOREFRONT SYSTEM - ALUMINUM STOREFRONT:
DOORS:
ALUMINUM, FACTORY FINISH, COLOR: ANODIZED BLACK WITH MATTE
FINISH
DOOR FRAMES:
ALUMINUM, FACTORY FINISHED, COLOR: ANODIZED BLACK WITH MATTE
FINISH
WINDOW FRAMES:
ALUMNIUM, FACTORY FINISHED, COLOR: ANODIZED BLACK WITH MATTE
FINISH
GLAZING:
COLOR: SOLAR GRAY
OVERHEAD DOORS:
INSULATED METAL, STAINLESS STEEL
HANGAR DOORS:
BASE BID MATCH EXISTING, PAINT, COLOR: BASE STANDARD "CONCH
SHELL"
BID OPTION 2 PAINT, COLOR: MATCH P-4, TRANSLUCENT PANEL: COLOR:
WHITE/CRYSTAL
HANDRAILS AND GUARDRAILS:
GALVANIZED STEEL
EXTERIOR SIGNAGE
BACKGROUND DARK BROWN
LETTERING REFLECTIVE WHITE
LOUVERS:
COLOR: BASE STANDARD "CONCH SHELL"
INTERIOR FINISHES GENERAL SHEET NOTES
CODE MFR/DESCRIPTION
FLOORS:
CPT-CARPET
CPT-1 MILLIKEN / LOW COUNTRY, STYLE: WATERWAY, COLOR: INDIGO
PLANT, SIZE: 9.85" X 39.4",
INSTALLATION: ASHLAR
T-TILE
T-1 DALTILE / PORTFOLIO, COLOR: PF04 DOVE GREY, SIZE: 12" X 24",
INSTALLATION: BRICK, GRT-1
LVT-LUXURY VINYL TILE
LVT-1 EF CONTRACT / PLAYBOOK, COLOR: EFCOB-005 FOSSIL,
SIZE: 7" X 48", INSTALLATION: ASHLAR
SC-SEALED CONCRETE
SC-1 SEALED CONCRETE
RF-RESILIENT FLOORING
RF-1 ROPPE / RAISED DESIGN RUBBER TILE,
STYLE: #992 LOW PROFILE RAISED CIRCULAR DESIGN, COLOR: M123
CHARCOAL
MT-METAL TRANSITION STRIP:
MT-1 SCHLUTER / RENO-U, COLOR: AE SATIN ANODIZED ALUMINUM, SIZE:
5/16"H
RT-RESILIENT TRANSITION STRIP:
RT-1 ROPPE / #42 CUSTOM CARPET EDGING, COLOR: 123
CHARCOAL
WALLS:
P-PAINT
P-1 SHERWIN WILLIAMS / SW7064 PASSIVE
P-2 SHERWIN WILLIAMS / SW7065 ARGOS
P-4 SHERWIN WILLIAMS / SW7674 PEPPERCORN
T-TILE
T-2 DALTILE / CAPE COAST, COLOR: PEDESTAL, SIZE: 12" X 24",
INSTALLATION: BRICK, GRT-1
T-3 DALTILE / COASTAL KEYSTONES, STYLE: 1" HEXAGON MOSAIC,
COLOR: MEDITERRANEAN MIST BLEND CK92, SIZE: 12" X 12",
INSTALLATION: STRAIGHT, GRT-1
T-4 DALTILE / CAPE COAST, COLOR: PEDESTAL, SIZE: 3" X 12",
INSTALLATION: STRAIGHT, GRT-1
TB-TILE COVE BASE
TB-1 DALTILE / PORTFOLIO, COLOR: PF04 DOVE GREY, SIZE: 3" X 12",
INSTALLATION: BRICK, GRT-1
RB-RESILIENT WALL BASE
RB-1 ROPPE / 700 SERIES WALL BASE, STYLE: STANDARD,
COLOR: 123 CHARCOAL
COUNTERTOPS & WINDOW SILLS:
SSM-SOLID SURFACE MATERIAL
SSM-1 CORIAN / RAIN CLOUD
KNEEGUARDS:
PLAM-PLASTIC LAMINATE
PLAM-1 FORMICA / INFINITY DUOTEX 6448-58, MATTE FINISH
PLAM-2 FORMICA / OILED WALNUT 5487-NT, NATURELLE FINISH
SHOWER PANS:
SSM-2 INPRO / SHOWER BASE PAN, COLOR: P9011 BRIGHT WHITE
A. COLORS LISTED ARE FOR COLOR IDENTIFICATION PURPOSES ONLY. THIS
LISTING IS NOT INTENDED TO LIMIT SELECTION OF SAME QUALITY AND
SIMILAR COLORS, TEXTURES AND PATTERNS FROM OTHER MANUFACTURERS.
B. ALL SOLID SURFACE COUNTERTOPS SHALL RECEIVE 4" HIGH INTEGRAL
BACKSPLASH, U.N.O.
C. FOR EXTERIOR MATERIALS, REFERENCE THE IDG EXTERIOR COLOR CHART
CODE MFR/DESCRIPTION
CEILINGS:
GYPSUM
P-3 SHERWIN WILLIAMS / SW7007 CEILING BRIGHT WHITE
ACT-ACOUSTICAL CEILING TILE
ACT-1 ARMSTRONG / OPTIMA SQUARE TEGULAR 3354, COLOR: WHITE,
SIZE: 24" X 24" x 1"
GRID: ARMSTRONG / PRELUDE XL, COLOR: WHITE, SIZE: 15/16"
TP-TOILETPARTITIONS/US-URINAL SCREENS:
TP-1 SCRANTON PRODUCTS / HINY HIDERS, COLOR: CONCRETE,
TEXTURE: ROTARY BRUSHED
US-1 MATCH TP-1
GRT-GROUT
GRT-1 TRUCOLOR RAPID CURE / URETHANE GROUT, COLOR: H144 MISTY
GRAY
DOORS:
WOOD DOORS STAIN TO MATCH WD-1
METAL DOORS MATCH P-4
DOOR FRAMES:
METAL MATCH P-4
WD-WOOD:
WD-1 MINWAX / MW439 WALNUT
FRP-FIBERGLASS REINFORCED PLASTIC
FRP-1 CRANE COMPOSITES / GLASBORD, COLOR: PEARL GRAY 48
WS-WINDOW SHADE:
WS-1 MERMET / E SCREEN, COLOR: 002020 WHITE/LINEN, 3% OPEN
WS-2 MERMET / AVILA TWILIGHT, COLOR: 000002 WHITE, 0% OPEN
SIGNAGE
BACKGROUND: MATCH P-4
LETTERING: MATCH P-3
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
D A
T E
File Path:
Plot Date:
M A
R K
D E
S C
R
IP
T
IO
N
P
BIM 360://Patrick SFB Hangar 750/Patrick AFB Renovate H-750_A-20.rvt
7/24/2023 2:35:35 PM
AF001
F
IN
IS
H
M A
T E
R
IA
L S
L
IS
T
P A
T R
IC
K
S P
A C
E F
O R
C E
B A
S E
F
L O
R
ID
A
L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L A
C E
L O
U
IS
V
IL
L E
K
Y
D R
E M
Y
B B
R A
D D
IC
K
D R
E M
Y
R W
E N
T E
M A
Y
CERTIFIED FINAL SUBMITTAL
R E
N O
V A
T E
H A
N G
A R
F
O R
R
Q W
P R
O J E
C T
N O
S
X H
T -9
R
E V
IS
E
D I
N A
C C
O R
D A
N C
E W
IT
H
A M
E N
D M
E N
T
J U
L Y
W
2Q R
R
_P la ns -0
| Sheets |
| AD103 - FIRST FLOOR NORTH WING DEMOLITION |
| AD104 - SECOND FLOOR NORTH WING DEMOLITION PLAN |
| AD105 - FIRST FLOOR SOUTH WING WEST DEMOLITION PLAN |
| AD106 - FIRST FLOOR SOUTH WING EAST DEMOLITION PLAN |
| AD107 - SECOND FLOOR SOUTH DEMOLITION PLAN |
| AE507 - HANGAR DOOR DETAILS (BID OPTION 2) |
| AF001 - FINISH MATERIALS LIST |
File details come from the government source that posted it. Updated .