This document provides specifications for the construction of a new main gate at Youngstown Air Reserve Station in Ohio. The specifications cover pre-engineered metal building systems including structural framing, panel materials, accessories, fasteners, frames and materials for openings, and miscellaneous metal framing. Requirements include primary and secondary framing systems, rigid modular frames, metal roof and wall panels, doors, windows, insulation, coatings, and other building components. The specifications establish performance criteria for air infiltration, water penetration, thermal resistance, finishes, fire ratings, and structural loading. The project will be awarded on a design-bid-build basis with responses due by the date specified in the solicitation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUI
ATTENTION
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
ATTENTION
All individuals handling this information are required to protect it from unauthorized disclosure.
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
CUI
Certified Final
W912QR23B0005_CUI_Specs_Vol2-0000
Solicitation For Controlled Unclassified Information (CUI)
Relocate Main Gate Youngstown Air Reserve Station, Ohio
P2: 473738 Design-Bid-Build
Specifications Vol.2 (Div. 13-34) Certified Final Design
17 July 2023
W912QR23B0005
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
ARCHITECTURAL
ELECTRICAL MECHANICAL
STRUCTURAL CIVIL
FIRE PROTECTION
TELECOMMUNICATIONS
2023.05.23
5/17/2023
2023.05.17
5/23/2023 5/23/2023
5/23/2023
473738 – RELOCATE MAIN GATE
YOUNGSTOWN AIR RESERVE STATION, YOUNGSTOWN OHIO
PROJECT TABLE OF CONTENTS Page | 1
CUI
PROJECT TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
ATTACHMENT TO SECTION 00 80 00.00 06
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 32 01.00 06 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
CUI
PROJECT TABLE OF CONTENTS Page | 2
CUI
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 02 BULLET-RESISTANT COMPONENTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 26 00 CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 73 26.39 PRE-ENGINEERED CANOPY COVER
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
DIVISION 13 - SPECIAL CONSTRUCTION
13 12 90 PREFABRICATED MODULAR GATEHOUSE BUILDING
13 12 93 PREFABRICATED MODULAR OVERWATCH BUILDING
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 – FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page | 3
CUI
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 33.00 40 ELECTRIC AND ELECTRONIC CONTROL SYSTEM FOR HVAC
23 11 20 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
23 30 00 HVAC AIR DISTRIBUTION
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 32 15.00 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH
AUXILIARIES
26 36 23 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM,
ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 .61 SEALING OF JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
CUI
PROJECT TABLE OF CONTENTS Page | 4
CUI
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 – TRANSPORTATION
34 75 13.13 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
-- End of Project Table of Contents –
CUI
P2 473738 - Relocate Main Gate Youngstown Air Reserve Station, Ohio
SECTION 13 12 90
PREFABRICATED MODULAR GATEHOUSE BUILDING
12/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 (2016) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 55 (2013) Thermal Environmental Conditions for Human Occupancy
ASHRAE 62.1 (2013) Ventilation for Acceptable Indoor Air Quality
ASTM INTERNATIONAL (ASTM)
ASTM A513/A513M (2020a) Standard Specification for Electric-Resistance-Welded Carbon and Alloy Steel Mechanical Tubing
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A1008/A1008M (2021a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B632/B632M (2008) Standard Specification for Aluminum-Alloy Rolled Tread Plate
ASTM C578 (2019) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum
SECTION 13 12 90 Page 1
CUI
CUI
Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.1 (2021) Butts and Hinges
ANSI/BHMA A156.13 (2017) Mortise Locks & Latches Series 1000
ANSI/BHMA A156.21 (2019) Thresholds
ANSI/BHMA A156.4 (2013) Door Controls - Closers
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-410-01 (2017) HEATING, VENTILATING, AND AIR
CONDITIONING SYSTEMS, WITH CHANGE 4
UFC 3-530-01 (2016) INTERIOR AND EXTERIOR LIGHTING
SYSTEMS AND CONTROLS, WITH CHANGE 3
UFC 4-022-01 (2017) SECURITY ENGINEERING: ENTRY CONTROL
FACILITIES / ACCESS CONTROL POINTS
UFC 4-023-03 (2009) DESIGN OF BUILDINGS TO RESIST
PROGRESSIVE COLLAPSE, WITH CHANGE 3
UNDERWRITERS LABORATORIES (UL)
UL 752 (2005; Reprint Dec 2015) Standard for Bullet-Resisting Equipment
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2021; TIA 21-1) Life Safety Code
1.2 DESIGN REQUIREMENTS
1.2.1 General
Provide factory built, prefabricated structure capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated.
1.2.2 Wind Loads
Determine loads based on minimum design wind pressures indicated on Drawings.
1.2.3 Seismic Performance
Provide factory built, prefabricated structures capable of withstanding the effects of earthquake motions determined according to ASCE 7-1 6, Section 9 .
SECTION 13 12 90 Page 2
CUI
CUI
1.2.4 Thermal Movements
Thermal Movements: Provide factory built, prefabricated structures that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. Temperature Change (Range): 120 deg F , ambient; 180 deg F , material surfaces.
1.2.5 Electrical Devices
Devices UL listed with wiring bearing UL classification and conforming to the current NEC.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Gatehouse fabrication drawings ; G, A/E
SD-03 Product Data
Modular Gatehouse Structure ; G, A/E SD-04 Samples
Finishes ; G, A/E
SD-05 Design Data
Gatehouse Design Calculations
SD-11 Closeout Submittals
Warranty
1.4 QUALITY CONTROL
1.4.1 Manufacturer Qualification
Company specializing in manufacturing prefabricated structures with a minimum documented experience of twenty years and with a quality assurance program utilizing an independent third party quality control firm with a 5-stage, 35 step, quality inspection for each system.
1.4.2 Preinstallation Meetings
Conduct meetings to verify project requirements, substrate conditions, utility connections, manufacturer's installation instructions, and warranty requirements. Comply with Division 1 requirements.
SECTION 13 12 90 Page 3
CUI
CUI
1.4.3 Fabrication Drawing Requirements
Submit Gatehouse fabrication drawings for approval prior to fabrication.
Fabrication drawings must not be reproductions of contract drawings. Sign and seal fabrication drawings by a registered professional engineer.
Include complete information for the fabrication and erection of the unit's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts.
Use AWS A2.4 standard welding symbols. Clearly highlight any deviations from the details shown on the contract drawings highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings.
1.4.4 Delegated Connection Design
Design Modular Structure using the loads indicated. Submit Gatehouse design calculations signed and sealed by a registered professional engineer.
1.5 DELIVERY, STORAGE, AND HANDLING
Store products in manufacturer's unopened packaging until ready for installation.
Protect all components and accessories from corrosion, deformation, damage and deterioration when stored at job site. Keep materials free from dirt and foreign matter.
1.6 PROJECT/SITE CONDITIONS
Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
1.7 WARRANTY
Provide the manufacturer's 5 year limited warranty on anodized aluminum surfaces against oxidation and the manufacturers 20 year limited warranty against peeling, flaking and chipping of deck and fascia when properly maintained.
Provide manufacturer's warrantees on all accessory items provided such as, but not limited to, air conditioning, lights, and heating units.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Pre-engineered, pre-fabricated modular Gatehouse structure , equiped with all building engineering systems installed. Provide enclosure consisting of prefabricated, bullet-resistant, modular insulated wall and ceiling panels with doors, windows, and all necessary connecting posts, hardware and accessories. Complete enclosure shall be of minimum dimensions shown on the drawings. Components shall be factory-welded assemblies. All metal components shall be factory painted with rust inhibitive primer unless indicated otherwise. All exposed welds shall be dressed smooth.
Workmanship shall be rigid, neat in appearance, and free from defects.
Enclosure shall be designed to be relocatable by forklift.
SECTION 13 12 90 Page 4
CUI
CUI
2.1.1 General Design Requirements
Provide building of size and shape indicated on Drawings.
1. Exterior wall insulation of R-1 9 Ci .
2. Roofing minimum solar reflectance index (SRI) of 78 with minimum R-
10+R11 LS liner or r-20 liner.
3. Exterior walls, doors, window framing, glazing, and all exterior ancillary components shall meet UL 752 Level 5 Ballistic Resistance.
2.1.2 Structural
Structural framing system shall be a pre-manufactured building, including walls, roof, and floor, constructed of all-welded ballistic steel blast-resistant panel construction.
The building is considered a one-story building in terms of UFC 4-023-03 ;
therefore, progressive collapse is not required.
2.1.3 Mechanical Design Criteria
The mechanical system shall provide an energy efficient system in accordance with ASHRAE 90.1 , provide acceptable indoor air quality per ASHRAE 62.1 , provide acceptable thermal comfort design in accordance with ASHRAE 55, provide acceptable noise levels per ASHRAE Applications Handbook, and provide a maintenance accessible system. Clearances for service access will be determined by equipment manufacturer’s documentation.
2.1.3.1 Outside Design Conditions
The facility’s heating, ventilation, and air conditioning (HVAC) loads will be performed utilizing TraneTrace 700 with outdoor conditions for Climate Zone 5a. The outside Design Conditions are as follows based on the 99% and 1% design for Youngstown-Warren Regional,OH:
Design Condition Month DB WB
Heating Design January 8.1 deg F Cooling Design July 85.6 deg F 70.7 deg F De-humidification
Design July 77.5 deb F 72.5 deg F
2.1.3.2 Indoor Design Conditions
The facility’s indoor cooling and heating conditions are determined as follows per UFC 3-410-01 unless approved by the authority having jurisdiction (AHJ).
Design Condition Season DB WB
Comfort Conditioning*1 Cooling 78.0 deg F 64.9 deg F Comfort Conditioning*1 Heating 68.0 deg F Notes:
*1-Comfort Conditioning applies to all internal spaces that are regularly occupied (other spaces are noted separately).
SECTION 13 12 90 Page 5
CUI
CUI
2.1.3.3 HVAC Equipment
The HVAC equipment for the facility shall consist of a manufacturer's packaged rooftop air conditioning unit with integral electric heat. The air conditioning unit shall meet ASHRAE standard efficiencies and provide a nominal capacity of 13,500 BTU/h with an integral 5,110 BTU/h (1.5 kW) electric heater. Unit shall be powered by 110V/60Hz/1Phase and utilize R410A refrigerant. The unit shall be furnished, installed, and tested by the factory with a 5 year parts warranty.
Facility shall include electric in-floor radiant heat as the main source for heating which will be field installed.
2.1.3.3.1 Drain Piping
HVAC Condensate Drain piping shall be Type “L” copper.
2.1.3.3.2 Seismic Restraint
HVAC equipment and accessories will be seismically and wind restrained per the sites seismic use group, design category and importance factor.
2.1.3.3.3 Insulation
HVAC condensate drain piping will be insulated with 1" closed-cell elastomeric piping insulation.
2.1.3.4 HVAC Controls
The controls for the facility shall be stand-alone. Provide with manufacturer's integral controls to include cover plate, digital display, temperature adjustments, on/off, and fan speed adjustment.
2.1.3.5 Operations and Maintenance Manuals
Operation Manuals, Maintenance Manuals and recommended spare parts lists for each piece of mechanical equipment will be required in the specifications for the Contract or to provide. Contractor will also be required to furnish control diagrams as part of the record documentation.
Contract or training of Air Station personnel will be required for all HVAC systems. Training will be on-site and will include proper operating and maintenance procedures, troubleshooting procedures and calibration.
2.1.4 Electrical and Communications
Lighting will comply with UFC 3-530-01 , UFC 4-022-01 , SDDC TEA Pamphlet 55-15 Traffic and Safety Engineering for Better Entry Control Facilities, and ASHRAE 90.1 . All lighting will be LED. Lighting will be controlled by either ceiling mounted or mounted occupancy sensors and will have dimming capabilities with manual overrides.
2.1.4.1 Lighting
Interior lighting shall be two (2) LED ceiling mounted fixtures controlled by an occupancy sensor(s) and one (1) LED task light.
SECTION 13 12 90 Page 6
CUI
CUI
2.1.4.2 Emergency Lighting
Provide integral emergency battery backup drivers with 90 minutes of battery capacity, along interior egress paths and at the exterior entries per NFPA 101 .
2.1.4.3 Interior Electrical Power
Provide a 100 AMP, 208Y/120V, 3-phase panelboard with a Main Circuit Breaker (MCB) to provide power. Power will derive from the Visitor’s Center. Size conductors to limit the voltage drop to two percent for feeders and three percent for branch circuits. All conductors shall be copper and installed in rigid conduit except where EMT, IMC, schedule 40 PVC or FMC are permitted.
1. Provide one exterior duplex receptacle in a weatherproof (while in use) enclosure with integral ground-fault protection.
2. Provide required disconnects, breakers, receptacles and conduit/wire feeders for mechanical equipment.
3. One(1)24 strand bundle and two(2)4-inch conduits will enter from the exterior handhole and terminations will be made in the building.
4. Provide a 4 inch x 12 inch x 1/4 inch pre-drilled Telecommunications Main Ground Busbar (TMGB). The bonding conductors from the TMGB shall be connected to the electrical panel board that shall be provided in the building and structural steel per 13A and EIA/TIA607-B standard. All bonding conductors shall be green jacket cable and have two-hole long barrel irreversible crimp connectors on both ends.
5. Provide four (4) voice/data outlets at each workstation.
6. Provide conduit home runs for all telecom drops to support all horizontal cabling.
6. Data jacks shall be Category 6 (CAT6) RJ45 connections in a 4-port face plate for telecom outlets and will be terminated back at a patch panel.
7. Labeling in accordance with the Air Reserve Station standards shall be required.
8. Provide power and conduit rough-in for Government provided CCTV cameras. CAT6 RJ45 will be used.
9. Provide an Advantor IDS system. The IDS and CCTV system communications shall report back to Building 402.
10. Power provided to the Gate House will also accommodate an electric radiant floor heating system within the slab. Electric radiant floor heating system shall be on a GFI protected circuit breaker.
2.2 MATERIALS
2.2.1 Aluminum
Alloy and temper recommended by manufacturer for type of use and finish specified, and as follows
1. Sheet: ASTM B209.
2. Extruded Shapes: ASTM B221.
3. Rolled Tread Plate: ASTM B632/B632M , Alloy 6061-T4 or 6061-T6.
2.2.2 Cold-Rolled Steel Sheet
ASTM A1008/A1008M , Commercial Steel (CS), Type B.
SECTION 13 12 90 Page 7
CUI
CUI
2.2.3 Zinc-Coated (Galvanized) Steel Sheet
ASTM A653/A653M /A, commercial quality, G90 (Z275) coating designation;
mill phosphatized.
2.2.4 Aluminum Treadplate
1/8-inch aluminum plate conforming to ASTM B209.
2.2.5 Steel Mechanical Tubing
ASTM A513/A513M , welded steel mechanical tubing.
2.2.6 Expanded Polystyrene (EPS) Core
Minimum of 0.95 pcf complying with ASTM C578 Type 1.
2.2.7 Oriented Strand Board (OSB)
Standard Grade; minimum physical properties conforming to APA PRP-108.
2.2.8 Ballistics-Resistant Glazing
Comply with requirements of UL 752 and/or NIJ. Provide Level 5 Ballistic Resistant glazing.
2.3 SYSTEM COMPONENTS
2.3.1 Size
As indicated on Drawings.
2.3.2 Framing System
Prefabricated with 14 gauge mechanical tube, welded framing system.
Exterior smooth and flat with no exposed fasteners on building exterior.
2.3.3 Roof
Flat deck of galvanized steel, 20 gauge, G-60 zinc coating, interlocking pan sections, 3 inches high varying widths and capable of supporting a minimum 40 psf live load. Roof shall drain into full perimeter gutter system; 4 inch overhang.
2.3.4 Wall Panels
Exterior face of manufacturers standard 16 gauge galvanized steel, an E.P.S. insulation core and a 18 gauge galvanized steel interior face.
Panels shall be welded into place.
1. Overall thickness: Minimum 3 inches.
2. R-value minimum R-1 9.
3. Provide ballistic resistant wall panels in accordance with UL 752 Level 5.
2.3.5 Ceiling Panels
Prefinished steel, 20 gauge panel system providing a smooth flat interior with batt insulation above.
SECTION 13 12 90 Page 8
CUI
CUI
2.3.6 Base/Floor
No floor required. Unit shall be placed on field constructed heated concrete floor slab.
2.3.7 Swinging Doors
Fabricators standard steel tubular-frame, half-glass design. Provide ballistic resistant doors in accordance with UL 752 Level 5.
1. Lockset: ANSI/BHMA A156.13 lockset, Type F07 with lever handle and removable cylinder core compatible with Best core.
2. Glazing: UL 752 , Level 5 bullet resistant protection clear glazing.
3. Threshold: ANSI/BHMA A156.21 , Type J35100 aluminum with vinyl or silicone rubber insert in face of stop.
4. Hinges ANSI/BHMA A156.1 , A5111 stainless steel, NRP - non-removable pins.
5. Closer: ANSI/BHMA A156.4 , C03021 type.
2.3.8 Ballistic Fixed Windows
UL 752 , Level 5 bullet resistant protection clear glazing, gramed to building using steel/aluminum framing system with no exterior exposed fasteners.
2.3.9 Counter
Full width by 24 inch deep by 3/4 inch stainless steel counter with counter tip drop wire grommets. Provide with 18 gage stainless steel, key lockable drawers and storage attached to underside of counter.
2.3.10 Finishes
2.3.10.1 Walls
Interior and exterior panel faces shall have a manufacturer's epoxy primer with a urethane finish. Color as selected from manufacturers standard colors.
2.3.10.2 Ceiling
Manufacturers standard white
2.4 FABRICATION
Fabricate factory build, prefabricated modular structures in factory.
1. Preglaze windows and doors at factory.
2. Prewire factory unit at factory, ready for connection to service at Project site.
3. Separate dissimilar materials using nonconductive tape, paint, or other material not visible in finished work.
4. Fabricate units for forklift unloading under base of structures with forklift pockets in base of booth or welded in place concealed lifting lugs at roof that are suitable for placement of the structure on prepared foundations.
SECTION 13 12 90 Page 9
CUI
CUI
PART 3 EXECUTION
3.1 PREPARATION
Examine supporting foundations for compliance with manufacturer's requirements, including installation tolerances and other conditions affecting performance of supporting members.
1. Check installed anchor bolts for accuracy. Verify that bearing surfaces are ready to receive the work.
2. Verify the rough-in of required mechanical and electrical services prior to placement of the structure.
3. If preparation is the responsibility of another installer, notify Contracting Officer of unsatisfactory preparation before proceeding.
3.1.1 Surface Preparation
Clean surfaces thoroughly prior to installation.
Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
3.2 INSTALLATION
Install in accordance with manufacturer's instructions.
1. Separate dissimilar materials using nonconductive tape, paint, or other material not visible in finished work.
2. Anchor securely in place, allowing for required movement, including expansion and contraction.
3. Connect mechanical services as specified under Division 23.
4. Connect electrical services as specified in Division 26.
3.3 PROTECTION
Protect installed products until completion of project. Touch-up, repair or replace damaged products before Substantial Completio
-- End of Section --
SECTION 13 12 90 Page 10
CUI
CUI
SECTION 13 12 93
PREFABRICATED MODULAR OVERWATCH BUILDING
12/18
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 62.1 (2013) Ventilation for Acceptable Indoor Air Quality
ASHRAE 90.1 (2016) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 55 (2013) Thermal Environmental Conditions for Human Occupancy
ASTM INTERNATIONAL (ASTM)
ASTM A513/A513M (2020a) Standard Specification for Electric-Resistance-Welded Carbon and Alloy Steel Mechanical Tubing
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A1008/A1008M (2021a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B632/B632M (2008) Standard Specification for Aluminum-Alloy Rolled Tread Plate
ASTM C578 (2019) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum
SECTION 13 12 93 Page 1
CUI
CUI
Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS A2.4 (2012) Standard Symbols for Welding, Brazing and Nondestructive Examination
BUILDERS HARDWARE MANUFACTURERS ASSOCIATION (BHMA)
ANSI/BHMA A156.5 (2020) Cylinder and Input Devices for Locks
UNIFIED FACILITIES CRITERIA (UFC)
UFC 3-410-01 (2017) HEATING, VENTILATING, AND AIR
CONDITIONING SYSTEMS, WITH CHANGE 4
UFC 3-530-01 (2016) INTERIOR AND EXTERIOR LIGHTING
SYSTEMS AND CONTROLS, WITH CHANGE 3
UFC 4-022-01 (2017) SECURITY ENGINEERING: ENTRY CONTROL
FACILITIES / ACCESS CONTROL POINTS
UFC 4-023-03 (2009) DESIGN OF BUILDINGS TO RESIST
PROGRESSIVE COLLAPSE, WITH CHANGE 3
UNDERWRITERS LABORATORIES (UL)
UL 752 (2005; Reprint Dec 2015) Standard for Bullet-Resisting Equipment
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2021; TIA 21-1) Life Safety Code
1.2 DESIGN REQUIREMENTS
1.2.1 General
Provide factory built, prefabricated structure capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated.
1.2.2 Wind Loads
Determine loads based on minimum design wind pressures indicated on Drawings.
1.2.3 Seismic Performance
Provide factory built, prefabricated structures capable of withstanding the effects of earthquake motions determined according to ASCE 7-1 6.
1.2.4 Thermal Movements
Thermal Movements: Provide factory built, prefabricated structures that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, SECTION 13 12 93 Page 2
CUI
CUI
failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. Temperature Change (Range): 120 deg F , ambient; 180 deg F , material surfaces.
1.2.5 Electrical Devices
Devices UL listed with wiring bearing UL classification and conforming to the current NEC.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Overwatch fabrication drawings ; G
SD-03 Product Data
Modular Overwatch Structure ; G
SD-04 Samples
Finishes ; G
SD-05 Design Data
Overwatch Design Calculations
SD-11 Closeout Submittals
Warranty
1.4 QUALITY CONTROL
1.4.1 Manufacturer Qualification
Company specializing in manufacturing prefabricated structures with a minimum documented experience of twenty years and with a quality assurance program utilizing an independent third party quality control firm with a 5-stage, 35 step, quality inspection for each system.
1.4.2 Preinstallation Meetings
Conduct meetings to verify project requirements, substrate conditions, utility connections, manufacturer's installation instructions, and warranty requirements. Comply with Division 1 requirements.
1.4.3 Fabrication Drawing Requirements
Submit Overwatch fabrication drawings for approval prior to fabrication.
Fabrication drawings must not be reproductions of contract drawings. Sign and seal fabrication drawings by a registered professional engineer.
Include complete information for the fabrication and erection of the
SECTION 13 12 93 Page 3
CUI
CUI
unit's components, including the location, type, and size of bolts, welds, member sizes and lengths, connection details, blocks, copes, and cuts.
Use AWS A2.4 standard welding symbols. Clearly highlight any deviations from the details shown on the contract drawings highlighted on the fabrication drawings. Explain the reasons for any deviations from the contract drawings.
1.4.4 Delegated Connection Design
Design Modular Structure using the loads indicated. Submit Overwatch design calculations signed and sealed by a registered professional engineer.
1.5 DELIVERY, STORAGE, AND HANDLING
Store products in manufacturer's unopened packaging until ready for installation.
Protect all components and accessories from corrosion, deformation, damage and deterioration when stored at job site. Keep materials free from dirt and foreign matter.
1.6 PROJECT/SITE CONDITIONS
Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's absolute limits.
1.7 WARRANTY
Provide the manufacturer's 5 year limited warranty on anodized aluminum surfaces against oxidation and the manufacturers 20 year limited warranty against peeling, flaking and chipping of deck and fascia when properly maintained.
Provide manufacturer's warrantees on all accessory items provided such as, but not limited to, air conditioning, lights, and heating units.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Pre-engineered, pre-fabricated modular Overwatch structure , equiped with all building engineering systems installed. Provide enclosure consisting of prefabricated, bullet-resistant, modular insulated wall and ceiling and floor panels with doors, windows, and all necessary connecting posts, hardware and accessories. Complete enclosure shall be of minimum dimensions shown on the drawings. Components shall be factory-welded assemblies. All metal components shall be factory painted with rust inhibitive primer unless indicated otherwise. All exposed welds shall be dressed smooth. Workmanship shall be rigid, neat in appearance, and free from defects. Enclosure shall be designed to be relocatable by forklift.
2.1.1 General Design Requirements
Provide building of size and shape indicated on Drawings.
1. Exterior wall insulation of R-1 9 Ci .
SECTION 13 12 93 Page 4
CUI
CUI
2. Roofing minimum solar reflectance index (SRI) of 78 with minimum R- 10+R11 LS liner or r-20 liner.
3. Exterior walls, doors, window framing, glazing, and all exterior ancillary components shall meet UL 752 Level 5 Ballistic Resistance.
2.1.2 Structural
Structural framing system shall be a pre-manufactured building, including walls, roof, and floor, constructed of all-welded ballistic steel blast-resistant panel construction.
The building is considered a one-story building in terms of UFC 4-023-03 ;
therefore, progressive collapse is not required.
2.1.3 Mechanical Design Criteria
The mechanical system shall provide an energy efficient system in accordance with ASHRAE 90.1 , provide acceptable indoor air quality per ASHRAE 62.1 , provide acceptable thermal comfort design in accordance with ASHRAE 55, provide acceptable noise levels per ASHRAE Applications Handbook, and provide a maintenance accessible system. Clearances for service access will be determined by equipment manufacturer’s documentation.
2.1.3.1 Outside Design Conditions
The facility’s heating, ventilation, and air conditioning (HVAC) loads will be performed utilizing TraneTrace 700 with outdoor conditions for Climate Zone 5a. The outside Design Conditions are as follows based on the 99% and 1% design for Youngstown-Warren Regional,OH:
Design Condition Month DB WB
Heating Design January 8.1 deg F Cooling Design July 85.6 deg F 70.7 deg F De-humidification Design July 77.5 deb F 72.5 deg F
2.1.3.2 Indoor Design Conditions
The facility’s indoor cooling and heating conditions are determined as follows per UFC 3-410-01 unless approved by the authority having jurisdiction (AHJ).
Design Condition Season DB WB
Comfort Conditioning*1 Cooling 78.0 deg F 64.9 deg F Comfort Conditioning*1 Heating 68.0 deg F Notes:
*1-Comfort Conditioning applies to all internal spaces that are regularly occupied (other spaces are noted separately).
2.1.3.3 HVAC Equipment
The HVAC equipment for the facility shall consist of manufacturer's packaged rooftop air conditioning unit with a wall mounted electric heater. The air conditioning unit shall meet ASHRAE standard efficiencies and provide a nominal capacity of 13,500 BTU/h with a 10,200 BTU/H (3kW) wall mounted fan forced electric heater. AC unit shall be powered by
SECTION 13 12 93 Page 5
CUI
CUI
110V/60Hz/1Phase and utilize R410A refrigerant and the electric heater shall be powered by 208V/60Hz/1Phase. The unit shall be furnished, installed, and tested by the factory with a 5 year parts warranty.
2.1.3.3.1 Drain Piping
HVAC Condensate Drain piping shall be Type “L” copper.
2.1.3.3.2 Seismic Restraint
HVAC equipment and accessories will be seismically and wind restrained per the sites seismic use group, design category and importance factor.
2.1.3.3.3 Insulation
HVAC condensate drain piping will be insulated with 1" closed-cell elastomeric piping insulation.
2.1.3.4 HVAC Controls
The controls for the facility shall be stand-alone. Provide with manufacturer's integral controls to include cover plate, digital display, temperature adjustments, on/off, and fan speed adjustment.
2.1.3.5 Operations and Maintenance Manuals
Operation Manuals, Maintenance Manuals and recommended spare parts lists for each piece of mechanical equipment will be required in the specifications for the Contract or to provide. Contractor will also be required to furnish control diagrams as part of the record documentation.
Contract or training of Air Station personnel will be required for all HVAC systems. Training will be on-site and will include proper operating and maintenance procedures, troubleshooting procedures and calibration.
2.1.4 Electrical and Communications
Lighting will comply with UFC 3-530-01 , UFC 4-022-01 , SDDC TEA Pamphlet 55-15 Traffic and Safety Engineering for Better Entry Control Facilities, and ASHRAE 90.1 . All lighting will be LED. Lighting will be controlled by either ceiling mounted or wall mounted occupancy sensors and will have dimming capabilities with manual overrides.
2.1.4.1 Lighting
Interior lighting shall be two (2) LED ceiling mounted fixtures controlled by an occupancy sensor(s) and one (1) task light located over counter and controlled by wall switch.
2.1.4.2 Emergency Lighting
Provide integral emergency battery backup drivers with 90 minutes of battery capacity, along interior egress paths and at the exterior entries per NFPA 101 .
2.1.4.3 Interior Electrical Power
Provide a 100 Amp, 208Y/120V, 3-phase panelboard with a Main Circuit Breaker (MCB) to provide power. Power will derive from the Visitor’s
SECTION 13 12 93 Page 6
CUI
CUI
Center. Size conductors to limit the voltage drop to two percent for feeders and three percent for branch circuits. All conductors shall be copper and installed in rigid conduit except where EMT, IMC, schedule 40 PVC or FMC are permitted.
1. Provide one exterior duplex receptacle in a weatherproof (while in use) enclosure with integral ground-fault protecion.
2. Provide required disconnects, breakers, receptacles and conduit/wire feeders for mechanical equipment.
3. One(1)24 strand bundle and two(2)4-inch conduits will enter from the exterior handhole and terminations will be made in the building.
4. Provide a 4 inch x 12 inch x 1/4 inch pre-drilled Telecommunications Main Ground Busbar (TMGB). The bonding conductors from the TMGB shall be connected to the electrical panel board that shall be provided in the building and structural steel per 13A and EIA/TIA607-B standard. All bonding conductors shall be green jacket cable and have two-hole long barrel irreversible crimp connectors on both ends.
5. Provide four (4) voice/data outlets at the workstation.
6. Provide conduit home runs for all telecom drops to support all horizontal cabling.
6. Data jacks shall be Category 6 (CAT6) RJ45 connections in a 4-port face plate for telecom outlets and will be terminated back at a patch panel.
7. Labeling in accordance with the Air Reserve Station standards shall be required.
8. Provide power and conduit rough-in for Government provided CCTV cameras. CAT6 RJ45 will be used.
9. Provide an Advantor IDS system. The IDS and CCTV system communications shall report back to Building 402.
2.2 MATERIALS
2.2.1 Aluminum
Alloy and temper recommended by manufacturer for type of use and finish specified, and as follows
1. Sheet: ASTM B209.
2. Extruded Shapes: ASTM B221.
3. Rolled Tread Plate: ASTM B632/B632M , Alloy 6061-T4 or 6061-T6.
2.2.2 Cold-Rolled Steel Sheet
ASTM A1008/A1008M , Commercial Steel (CS), Type B.
2.2.3 Zinc-Coated (Galvanized) Steel Sheet
ASTM A653/A653M /A, commercial quality, G90 (Z275) coating designation;
mill phosphatized.
2.2.4 Aluminum Treadplate
1/8-inch aluminum plate conforming to ASTM B209.
2.2.5 Steel Mechanical Tubing
ASTM A513/A513M , welded steel mechanical tubing.
SECTION 13 12 93 Page 7
CUI
CUI
2.2.6 Expanded Polystyrene (EPS) Core
Minimum of 0.95 pcf complying with ASTM C578 Type 1.
2.2.7 Oriented Strand Board (OSB)
Standard Grade; minimum physical properties conforming to APA PRP-108.
2.2.8 Ballistics-Resistant Glazing
Comply with requirements of UL 752 and/or NIJ. Provide Level 5 Ballistic Resistant glazing.
2.3 SYSTEM COMPONENTS
2.3.1 Size
As indicated on Drawings.
2.3.2 Framing System
Prefabricated with 14 gauge mechanical tube, welded framing system.
Exterior smooth and flat with no exposed fasteners on building exterior.
2.3.3 Roof
Flat deck of galvanized steel, 20 gauge, G-60 zinc coating, interlocking pan sections, 3 inches high varying widths and capable of supporting a minimum 40 psf live load. Roof shall drain into full perimeter gutter system; 4 inch overhang.
2.3.4 Wall Panels
Exterior face of manufacturers standard 16 gauge galvanized steel, an E.P.S. insulation core and a 18 gauge galvanized steel interior face.
Panels shall be welded into place.
1. Overall thickness: Minimum 3 inches.
2. R-value minimum R- 19 Ci .
3. Provide ballistic resistant wall panels in accordance with UL 752 Level 5.
2.3.5 Ceiling Panels
Prefinished steel, 20 gauge panel system providing a smooth flat interior with batt insulation above.
2.3.6 Base/Floor
Steel angle/steel tube perimeter frame with 1/8 inch thick diamond tread plate.
2.3.7 Sliding Door
Fabricators standard steel tubular-frame, half-glass design, top hung with an overhead track. Provide ballistic resistant doors in accordance with UL 752 Level 5.
1. Lockset: ANSI/BHMA A156.5 , Type E0291 narrow stile deadlock with
SECTION 13 12 93 Page 8
CUI
CUI
lever handle and removable cylinder core compatible with Best core.
2. Glazing: UL 752 , Level 5 bullet resistant protection clear glazing.
3. Track and Trolley: Steel channel type with heavy duty ball bearing steel tires and steel hub.
2.3.8 Ballistic Fixed Windows
UL 752 , Level 5 bullet resistant protection clear glazing, gramed to building using steel/aluminum framing system with no exterior exposed fasteners.
2.3.9 Counter
Full width by 24 inch deep by 3/4 inch stainless steel counter with counter tip drop wire grommets. Provide with 18 gage stainless steel, key lockable drawers and storage attached to underside of counter.
2.3.10 Finishes
2.3.10.1 Walls
Interior and exterior panel faces shall have a manufacturer's epoxy primer with a urethane finish. Color as selected from manufacturers standard colors.
2.3.10.2 Ceiling
Manufacturers standard white
2.4 FABRICATION
Fabricate factory build, prefabricated modular structures in factory.
1. Preglaze windows and doors at factory.
2. Prewire factory unit at factory, ready for connection to service at Project site.
3. Separate dissimilar materials using nonconductive tape, paint, or other material not visible in finished work.
4. Fabricate units for forklift unloading under base of structures with forklift pockets in base of booth or welded in place concealed lifting lugs at roof that are suitable for placement of the structure on prepared foundations.
PART 3 EXECUTION
3.1 PREPARATION
Examine supporting foundations for compliance with manufacturer's requirements, including installation tolerances and other conditions affecting performance of supporting members.
1. Check installed anchor bolts for accuracy. Verify that bearing surfaces are ready to receive the work.
2. Verify the rough-in of required mechanical and electrical services prior to placement of the structure.
3. If preparation is the responsibility of another installer, notify Contracting Officer of unsatisfactory preparation before proceeding.
SECTION 13 12 93 Page 9
CUI
CUI
3.1.1 Surface Preparation
Clean surfaces thoroughly prior to installation.
Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions.
3.2 INSTALLATION
Install in accordance with manufacturer's instructions.
1. Separate dissimilar materials using nonconductive tape, paint, or other material not visible in finished work.
2. Anchor securely in place, allowing for required movement, including expansion and contraction.
3. Connect mechanical services as specified under Division 23.
4. Connect electrical services as specified in Division 26.
3.3 PROTECTION
Protect installed products until completion of project. Touch-up, repair or replace damaged products before Substantial Completio
-- End of Section --
SECTION 13 12 93 Page 10
CUI
CUI
SECTION 13 34 19
METAL BUILDING SYSTEMS
08/20, CHG 1: 02/21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA)
AAMA/WDMA/CSA 101/I.S.2/A440 (2017) North American Fenestration Standard/Specification for Windows, Doors, and Skylights
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2017) Steel Construction Manual
AISC 360 (2016) Specification for Structural Steel Buildings
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISC/AISI 121 (2007) Standard Definitions for Use in the Design of Steel Structures
AISI D100 (2017) Cold-Formed Steel Design Manual
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7-16 (2017; Errata 2018; Supp 1 2018) Minimum Design Loads and Associated Criteria for Buildings and Other Structures
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 90.1 - IP (2019; Errata 1 2019; Errata 2-6 2020;
Addenda BY-CP 2020; Addenda AF-DB 2020;
Addenda A-G 2020; Addenda F-Y 2021;
Errata 7-8 2021; Interpretation 1-4 2020;
Interpretation 5-8 2021; Addenda AS-CB 2022) Energy Standard for Buildings Except Low-Rise Residential Buildings
ASHRAE 90.1 - SI (2013) Energy Standard for Buildings Except Low-Rise Residential Buildings
AMERICAN WELDING SOCIETY (AWS)
AWS A5.1/A5.1M (2012) Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding
SECTION 13 34 19 Page 1
CUI
CUI
AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel
AWS D1.3/D1.3M (2018) Structural Welding Code - Sheet Steel
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2019) Standard Specification for Carbon Structural Steel
ASTM A53/A53M (2020) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153/A153M (2016a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A193/A193M (2022a) Standard Specification for Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service and Other Special Purpose Applications
ASTM A307 (2021) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
ASTM A500/A500M (2021a) Standard Specification for Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes
ASTM A501/A501M (2014) Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing
ASTM A529/A529M (2019) Standard Specification for High-Strength Carbon-Manganese Steel of Structural Quality
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A563M (2007; R 2013) Standard Specification for Carbon and Alloy Steel Nuts (Metric)
ASTM A572/A572M (2021) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium Structural Steel
ASTM A606/A606M (2018) Standard Specification for Steel Sheet and Strip, High-Strength, Low-Alloy, Hot-Rolled and Cold-Rolled, with Improved Atmospheric Corrosion Resistance
SECTION 13 34 19 Page 2
CUI
CUI
ASTM A653/A653M (2020) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM A755/A755M (2018) Standard Specification for Steel Sheet, Metallic Coated by the Hot-Dip Process and Prepainted by the Coil-Coating Process for Exterior Exposed Building Products
ASTM A780/A780M (2020) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings
ASTM A992/A992M (2020) Standard Specification for Structural Steel Shapes
ASTM A1008/A1008M (2021a) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A1011/A1011M (2018a) Standard Specification for Steel Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength
ASTM B117 (2019) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B209 (2014) Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate
ASTM B221 (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM B221M (2021) Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric)
ASTM B695 (2021) Standard Specification for Coatings of Zinc Mechanically Deposited on Iron and Steel
ASTM C518 (2017) Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus
ASTM C665 (2017) Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
SECTION 13 34 19 Page 3
CUI
CUI
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM C1363 (2019) Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus
ASTM D522/D522M (2017) Mandrel Bend Test of Attached Organic Coatings
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
ASTM D714 (2002; R 2017) Standard Test Method for Evaluating Degree of Blistering of Paints
ASTM D822 (2013; R 2018) Filtered Open-Flame Carbon-Arc Exposures of Paint and Related Coatings
ASTM D968 (2017) Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
ASTM D1056 (2020) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1308 (2002; R 2013) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D1667 (2017) Standard Specification for Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)
ASTM D2244 (2016) Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates
ASTM D2247 (2015) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D2794 (1993; R 2019) Standard Test Method for Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D3363 (2005; E 2011; R 2011; E 2012) Film Hardness by Pencil Test
ASTM D4214 (2007; R…