This solicitation is for the design, bid, and construction of a Squadron Operations and Aircraft Maintenance Facility at Beale Air Force Base in California. The estimated construction cost is between $25 million and $100 million. The NAICS code is 236220 and the size standard is $39.5 million. This is a full and open procurement requiring compliance with System for Award Management registration requirements. Technical inquiries should be submitted through the ProjNet bidder inquiry system. Site visits are available and described in FAR 52.236-27. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville. The HUBZone price evaluation preference applies in accordance with FAR 19.1307. Responses are due as specified on ProjNet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912QR22R0064-0002.pdf | ||
| Sign-In Sheet AMU Squad OPS Site Walk 29Aug2022.pdf | ||
| J and A for Sole Source_Trane redacted.pdf | ||
| J and A for Sole Source_Monaco redacted.pdf | ||
| J and A for Sole Source_Vindicator redacted.pdf | ||
| J and A for Sole Source_Best Coremax redacted.pdf | ||
| J and A for Sole Source_FFE redacted.pdf | ||
| J and A for Sole Source_Siemens redacted.pdf | ||
| W912QR22R0064-0001.pdf | ||
| W912QR22R0064_Specs_Vol1-0000.pdf | ||
| W912QR22R0064_Specs_Vol2-0000.pdf | ||
| W912QR22R0064_Plans-0000.pdf | ||
| Solicitation Attachment_Site Visit_EAL Form SAMPLE.xlsx | XLSX spreadsheet | |
| W912QR22R0064_Specs_Vol4-0000.pdf | ||
| W912QR22R0064_FFE-0000.pdf | ||
| W912QR22R0064_Specs_Vol3-0000.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For 940 ARW Squad Ops & AMU Complex, Beale AFB CA
P2: 473244
Design-Bid-Build
Specifications - SID Certified Final Design
12 August 2022
W912QR22R0064
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR22R0064_SID-0000
940 ARW Squad Ops & AMU Complex Structural Interior Design Beale Air Force Base, California 17 JUNE 2022
Table of Contents
1. Narrative of Interior Design Objective ...................................................................................Tab 1
2. Floor Plan..............................................................................................................................Tab 2
3. Reflected Ceiling Plan........................................................................................................... Tab 3
4. Schedule for Finishes ........................................................................................................... Tab 4
5. Interior Color Boards .............................................................................................................Tab 5
6. Room Finish Schedule ...........................................................................................................Tab 6
7. Finish Plans ...........................................................................................................................Tab 7
8. Signage Plans and Details ......................................................................................................Tab 8
9. Interior Elevations .................................................................................................................Tab 9
10. Exterior Elevations .............................................................................................................. Tab 10
11. Exterior Color Boards .......................................................................................................... Tab 11
940 ARW Squad Ops & AMU Complex Corrected Final Design Submittal Beale AFB, California 17 JUNE 2022
Statement of Interior Design Objective This project consists of the construction of a new Squadron Operations (SQ OPS) and Aircraft Maintenance Unit (AMU) at Beale Air Force Base, California for the Air Force Reserves 940th Air Refueling Wing (940 ARW). These two squadron functions will be combined in the new two-story facility with the AMU (23,118SF) on the ground floor and the SQ OPS (18,400SF) on the second floor. This squadron operates throughout the United States and around the world in carrying out the aerial refueling mission. Eight KC-135 Stratotanker aircraft are currently assigned to the facility.
The design team’s main focus for the interior design is to provide a comfortable environment for the 940 ARW personnel to perform their administrative and light industrial functions. A structural interior design (SID) package is provided which addresses floors, walls, ceilings, and miscellaneous interior finishes.
The overall color palette is neutral and modern without being trendy. All finish selections will be in accordance with all applicable codes and Beale Air Force Base Installation Facilities Standards.
The majority of the interior spaces will be provided with painted gypsum wallboard.
Demountable walls (part of the FF&E package) are provided for flexibility in reconfiguring for the future. Porcelain wall tile will be provided in restrooms for ease of maintenance. Briefing rooms will have felt acoustical tiles to reduce reverberation and painted walls. Wall protection such as corner guards will be provided where required.
The floor finishes throughout the facility are durable and enhance the design whenever possible. The office areas and conference rooms are carpeted in a medium toned carpet. Rubber athletic tiles are used in the fitness room. Sealed concrete floors are to be provided in janitorial closets, mechanical rooms, comm rooms and electrical rooms.
Corridors will have sealed concreate flooring as the Base Bid with Luxury Vinyl Tile as a Bid Option. Maintenance and Equipment rooms will have sealed concrete flooring as the Base Bid and either Luxury Vinyl Tile or a 3-Coat Fuel Resistive Resinous Flooring system as a Bid Option as indicated on the Floor Finish Plans.
The restrooms have 12” x 24” neutral colored porcelain floor tile as well as a 12” x 24” porcelain wall tile with a subtle textured pattern. Floor tile will have a dark grout color, selected for ease of maintenance. The countertops in the restrooms will be a solid surface material. Locker rooms will have a porcelain floor and tile base with painted walls. Shower rooms will have fiberglass shower pan and wall. Toilet partitions are to be textured solid plastic.
Interior doors are stained white birch with painted hollow metal frames to match. The wood stain and hollow metal frame paint color are selected to coordinate with other finishes and furnishings in the building.
940 ARW Squad Ops & AMU Complex Corrected Final Design Submittal Beale AFB, California 17 JUNE 2022
Signage will be designed in accordance with UFC 3-120-01 and Beale Air Force Base IFS. They will be professionally made and appropriately sized for viewing distance and provided with tactical lettering (braille) as required for ABA standards.
Ceilings will be primarily 2’ x 2’ lay-in acoustical ceiling tiles with tegular edge. Toilets and wet areas will be provided with an epoxy paint finish on a suspended gypsum board ceiling.
The design shall deliver a professional environment that is aesthetically pleasing, sustainable, efficient, and can be easily maintained. Our objective is to instill pride in the facility and promote productivity and excellence within the user.
W D
D W
UP
B1
AE202
C1
AE202
B1
AE201
C1
AE201
STAIR
S1
VEST.
LOBBY
AMU
OFFICER/
FLIGHT
CHIEF
MNT. OPS
OFFICER
104SUPPORT
FLIGHT
CHIEF &
SUPER
1ST SGT.
SQUAD
COMMANDER
BREAK
MEN'S
RESTROOM
COM-NAV
MAINT.
BRIEFING
PROPULSION
HYDRAULICS
AFIN
CONTINUATION
CLASSROOM
TRAINING
AFE ADMIN
EQUIPMENT
COMM/SERVER
ELEC
476 SF
MECH
BRIEFING
ROOM
116 ELEV.
STORAGE
CORRIDOR
COMPUTER
WORKSTATION
SIPR
BRIEFING
CONF.
CORRIDOR
CORR
E&E
CREW CHIEF
SECTION
SUPER
EXPEDITOR,
PRODUCTION
& PROD.
SUPERV.
STAIR
S2
MOBILITY
STORAGE
CORR
AIRCREW
SUPPORT
SECTION
SUPPORT
EQUIP. MX
ALT.
MISSION
EQUIPMENT
CSS & AMU
SUPER
NVD
CONF. RM
W/D
COMPRESSOR
ROOM
O2 ROOM
ELEC
COMM
AIRCRAFT
SUPPORT
SECTION
TAIL NO.
BINS
TOOL ROOM
SUPPORT
SUPER
JAN.
(40)(14)
WOMEN'S
LOCKERS
SUPPORT
COPY
AE301
B1
AE301
B1
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
A
A
B
B
C
C
D
D
F
F
G
G
H
H
J
J
E
E
28' - 6" 28' - 6" 28' - 6" 27' - 5" 29' - 0" 28' - 0" 29' - 0" 28' - 0"
3'
0"
7'
1"
1'
/8
4'
7" 9 9
1' - 10 5/8" 226' - 11" 1' - 10 5/8"
VEST.
CORRIDOR
D.3
D.3
D.4
D.4
D.7
D.7
E.5
E.5
E.8
E.8
F.5
F.5
G.1
G.1
B.9
B.9
5.4 5.4
AE301
C1
AE301
C1
AE302
C1
AE302
C1
AE301
A1
AE301
A1
AE301
B3
AE301
B3
A1
AE401
MEN'S
LOCKERS
2' - 0"
AE305
A1
AE305
A4
AE307
A1
7'
4"
1'
/8
2'
1/ 4"
7'
1"
1'
/8
8'
6"
1'
/8
1' - 10 5/8" 226' - 11" 1' - 10 5/8"
WOMEN'S
RESTROOM
F.8
MEN'S
SHOWERS
WOMEN'S
SHOWERS
PRINTER
MECHANICAL
ENCLOSURE
0.8
0.5
D.1
TECH
ORDER
LIBRARY
LACTATION/HUDDLE
ROOM
HELMET
STORAGE
SERVICE
COUNTER
AFEO
NCOIC
(88)
TRASH
ENCLOSURE
AE307
A5
A1
AE406
B1
AE502
C3
AE401
AE504
A1
D3
AE407
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:2
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE110
CERTIFIED FINAL SUBMITTAL
C O
M
PO
SI
TE
P
LA
N
G R
O U
N D
F
LO
O R
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 3/32" = 1'-0"
COMPOSITE PLAN - GROUND FLOORA1 SCALE: = 1'-0"3/32"
0 8 16 248
1. 8" CONCRETE FILLED BOLLARD. RE:
CIVIL
2. SHOWN FOR REFERENCE ONLY IN
APPROXIMATE LOCATION. REFER TO
CIVIL FOR LOCATION OF ENCLOSURE.
3. PROVIDE A BID OPTION TO ADD
DUMPSTER ENCLOSURE AS SHOWN
ON PLAN.
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C H
D W
AE301
B1
AE301
B1
A B C D E
PROPULSION
HYDRAULICS
AFIN
CONTINUATION
CLASSROOM
TRAINING
AFE ADMIN
SECTION
SUPER
MOBILITY
STORAGE
AIRCREW
SUPPORT
SECTION
CONF. RM
W/D
O2 ROOM
AIRCRAFT
SUPPORT
SECTION
D.3 D.4 D.7B.9
M
AT
C H
LI
N
E
SE
E A
AE
MATCHLINE
SEE A1 /
AE113
5.4
AE301
C1
AE301
C1
AE302
C1
AE302
C1
AE301
B3
AE301
B3
129A
163A
128A
128B
135A
142A
125A
126A
136A
134A
133A
132B
132A
124A
133C 133B
A4
A4
A4
D1
A2
A2
A4
A4
A4
A4
A4
A4
A4A4
A4
A4
A4
A4 A4
A4
A4
AE307
A1
1'-10 5/8" 28'-6" 26'-6" 2'-0" 28'-6" 10'-0" 2'-0" 6'-9" 8'-8"
9 1/8" 27'-5" 1'-1" 15'-3" 11'-3" 9" 1'-3"
5'-6" 23'-0" 8'-0" 2'-0" 17'-5" 8"
3' -0
'-4
/8
1/
8"
'-5
5'
-7
7' -6
'-1 1"
1' -1
'-4
9 1/8" 27'-5" 1'-1" 26'-6" 9" 1'-3"10'-8" 17'-10" 8'-0" 2'-0"
2'-0" 6'-9" 8'-8" 8 3/8"
5' -2
5'
-3
8' -1
2'
-8
'-6
5'
-7
'-2
/4
7'
-2
/4
3' -0
1/ 8"
3' -0
'-0
'-6
1/
8" 3'
-0
9' -8
'-4
'-9
'-9
8' -4
7'
-8
5'-6" 5'-2" 17'-10" 10'-0" 2'-0" 6'-9" 2'-2"
6'-6"
3'-3 3/4"
8 3/8" A4
A4
A4 A2 A2
D1
A2
D1
D2
D1
5'-11" 6'-4" 2'-0" 12'-0" 2'-3" 26'-6" 2'-0" 1'-11" 3'-4" 23'-3" 11" 3'-4" 2'-8" 12'-0" 8'-6"
C
D2 D1
A1
AE500
4' -0
CORR
PRINTER
SERVICE
COUNTER
AE500 B3
6' -0
1'
-6
5' -0
166A
AFEO
NCOIC
HELMET
STORAGE
127B
A4
142A
127A
33 3
1/
8"
8"
AE401
C4
A2
A4
A4
A2
A2
A2
A4
163B
123A
131A 131B
A2
2'-3" 9"
A4
A4
A4
AE504
A1
NVD
A4
D1
A4
D2
A4 A4
A1
A1
A1
A1
D2
A4
A4 A4
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
EXTENT OF MECHANICAL PLATFORM ABOVE
REF. C3/AE404
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:3
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE111
CERTIFIED FINAL SUBMITTAL
G R
O U
N D
F
LO
O R
P
LA
N
SE
C
TO
R
A
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 1/8" = 1'-0"
GROUND FLOOR PLAN - SECTOR AA1
SCALE: = 1'-0"
0 8 168
1/8"
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR
FACE OF MASONRY.
B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,
FACE OF CMU OR FACE OF STUD.
C. PROVIDE SUPPORT BLOCKING AT ALL WALL
MOUNTED EQUIPMENT INCLUDING MILLWORK,
MARKER BOARDS, PROJECTION SCREENS AND
ALL OTHER ITEMS REQUIRING BLOCKING.
D. CENTER TRANSITION STRIPS UNDER DOORS,
TYP.
E. PROVIDE BLINDS IN ALL EXTERIOR WINDOWS
UNO.
F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.
G. REFER TO SHEET AE001 AND FURNITURE PLANS
FOR MONITOR MOUNTING REQUIREMENTS.
1. 5" X 5" PREFINISHED METAL DOWNSPOUT.
2. ALIGN FINISH FACE.
3. 8" CONCRETE FILLED BOLLARD. RE:
STRUCTURAL A4/S-005.
4. SHOP SINK.
5. FAUCET/EYEWASH COMBO.
6. DOORBELL.
7. RAFT LAYOUT AREA.
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
UP
C1
AE202
F G H JE
COM-NAV
MAINT.
BRIEFING
AFIN
E&E
CREW CHIEF
SECTION
SUPER
EXPEDITOR,
PRODUCTION
& PROD.
SUPERV.
STAIR
S2
SUPPORT
EQUIP. MX
TAIL NO.
BINS
TOOL ROOM
SUPPORT
SUPER
SUPPORT
E.5 E.8 F.5 G.1
M
AT
C H
LI
N
E
SE
E A
AE
MATCHLINE
SEE A1 /
AE114
5.4
AE301
C1
AE301
C1
AE301
A1
AE301
A1
B1
AE403
S2B
S2A
147A
146A
148A
141B
141A
137A 138A
140A
139A
143A
147B
A2
A2 B3
A2
A2
A4
A4
A4
A2
A4
A4
A4
1/
8" 3'
-0
9' -8
'-4
'-9
'-9
8' -4
7'
-8
15'-0" 10'-3" 3'-9" 14'-0" 8'-0" 6'-0" 2'-0" 27'-0" 28'-0" 1'-10 5/8"
3'-3 3/4"
6'-0" 6'-0" 12'-0" 25'-8 7/8" 3'-4" 2'-6"
10'-8" 6'-0" 12'-0" 6'-4" 22'-0"
3' -0
1'
-1
5/ 8"
'-8
3'
-4
1' -6
1' -1
5/
8" 3'
-0
'-0
'-6
'-0
4' -5
'-0
'-6
1/ 8"
14'-0" 19'-4" 8'-8" 7'-11" 6'-1" 9 1/8"
1'-2 7/8" 55'-0" 9 1/8"
1/ 8"
'-8
7'
-1
8' -3
'-8
'-1
0" 9'
-3
6' -9
1/ 4"
10'-0" 5'-0" 18'-0" 24'-9"
8 3/8" 10'-2" 5'-2" 9'-2 5/8" 9" 7'-11" 9'-1"
7'-11"
6'-1" 3'-9"
53'-3"
A4
D2D2
A4A4
A4
11C D
F.8
CORR
PRINTER
147C
145A
TECH
ORDER
LIBRARY
142A
4 4
1/
8"
8"
A1
AE406
3'-0" 7'-0" 19'-4" 7'-0"
A4
A4
A2
A2
A2
A4
A4
A4
A4
A4
A4
A4
A2
A4 13'-9"
AE407
A3
D2 D2
A4 A4
147D
7' -6
C
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
EXTENT OF MECHANICAL PLATFORM ABOVE
REF. C3/AE404
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:0
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE112
CERTIFIED FINAL SUBMITTAL
G R
O U
N D
F
LO
O R
P
LA
N
SE
C
TO
R
B
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 1/8" = 1'-0"
GROUND FLOOR PLAN - SECTOR BA1
SCALE: = 1'-0"
0 8 168
1/8"
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR
FACE OF MASONRY.
B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,
FACE OF CMU OR FACE OF STUD.
C. PROVIDE SUPPORT BLOCKING AT ALL WALL
MOUNTED EQUIPMENT INCLUDING MILLWORK,
MARKER BOARDS, PROJECTION SCREENS AND
ALL OTHER ITEMS REQUIRING BLOCKING.
D. CENTER TRANSITION STRIPS UNDER DOORS,
TYP.
E. PROVIDE BLINDS IN ALL WINDOWS UNO.
F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.
G. REFER TO SHEET AE001 AND FURNITURE PLANS
FOR MONITOR MOUNTING REQUIREMENTS.
1. 5" X 5" PREFINISHED METAL DOWNSPOUT.
2. SHOP SINK.
3. FAUCET/EYEWASH COMBO.
4. 8" CONCRETE FILLED BOLLARD. RE:
STRUCTURAL A4/S-005.
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
B1
AE201
A B C D E
STAIR
S1
VEST.
LOBBY
AMU
OFFICER/
FLIGHT
CHIEF
BREAK
MEN'S
RESTROOM
EQUIPMENT
COMM/SERVER
ELEC
MECH
BRIEFING
ROOM
ELEV.
STORAGE
CORRIDOR
CORR
AIRCREW
SUPPORT
SECTION
CSS & AMU
SUPER
COMPRESSOR
ROOM
WOMEN'S
LOCKERS
D.3 D.4 D.7
MATCHLINE
SEE A1 /
AE111
M
AT
C H
LI
N
E
SE
E
A
AE
AE302
C1
AE302
C1
AE301
B3
AE301
B3
B1
AE402
S1A
115A
116B 116A
121A
120A
117A
130A
162A
156A
100B
121B
119A
118A
100A
E1
A4
A4 A4
A4 A4
A4
A4
E1
E1
E1
VEST.
WOMEN'S
RESTROOM
A1
AE401
Sim
AE305
A1
AE305
A4
1' -1
5/
8"
'-1
/8
'-0
'-9
7' -1
28'-6" 28'-6" 28'-6" 10'-0" 2'-0" 6'-9" 8'-8" 1'-10 5/8" 26'-7 3/8" 1'-10 5/8" 26'-7 3/8" 1'-10 5/8" 4'-11 1/2" 7'-7 5/8" 2'-0" 8'-10" 2'-0"
1'-11 7/8" 1'-10 5/8"
1' -3
/8
'-2
'-6
1' -4
"15 '-1
1/
2" 9'
-3
/2
3' -1
0"
9 1/8"
1'-3" 5'-6"
A4
A4
1 1
1 1
B
A
G
7' -1
'-9
1' -1
5/
8" 3'
-1
1/ 4"
6' -4
6'
-4
6' -4
5'
-0
4' -6
6'
-4
1'-10 5/8" 26'-7 3/8"
160A
1'-3" 4'-5" 17'-2" 5'-8" 12'-10" 10'-7"
A4
A4
A4
A4
A4
EQ 16'-0" EQ 3
MECHANICAL
ENCLOSURE
0.8
0.5
D.1
WOMEN'S
SHOWERS
MEN'S
SHOWERS
AE407D1 AE407 C1
122A
CORRIDOR
LACTATION/HUDDLE
ROOM
166A
4 4
4 4
127A
E1
AE404
A3
22'-0" CLR
AE307
A5
2'-0 1/4" D1
AE502
D3
AE504
A2
4' -6
6"
A4 D4
A2
D2
NCOIC
AFEO
A4 A4 A4
D5
'-0
" C
LR
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
EXTENT OF MECHANICAL PLATFORM ABOVE
REF. C3/AE404
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:1
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE113
CERTIFIED FINAL SUBMITTAL
G R
O U
N D
F
LO
O R
P
LA
N
SE
C
TO
R
C
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 1/8" = 1'-0"
GROUND FLOOR PLAN - SECTOR CA1
SCALE: = 1'-0"
0 8 168
1/8"
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR
FACE OF MASONRY.
B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,
FACE OF CMU OR FACE OF STUD.
C. PROVIDE SUPPORT BLOCKING AT ALL WALL
MOUNTED EQUIPMENT INCLUDING MILLWORK,
MARKER BOARDS, PROJECTION SCREENS AND
ALL OTHER ITEMS REQUIRING BLOCKING.
D. CENTER TRANSITION STRIPS UNDER DOORS,
TYP.
E. PROVIDE BLINDS IN ALL WINDOWS UNO.
F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.
G. REFER TO SHEET AE001 AND FURNITURE PLANS
FOR MONITOR MOUNTING REQUIREMENTS.
1. 5" X 5" PREFINISHED METAL DOWNSPOUT.
2. MASONRY ENCLOSURE W/ REMOVEABLE WIRE
MESH CAP. REFER TO CIVIL FOR LOCATION.
3. WALL LADDER TO MECHANICAL PLATFORM.
4. ABA WHEELCHAIR SPACE.
5. RECESSED KNOX BOX.
6. PROVIDE A BID OPTION TO ADD A SLOPED
CONCRETE FLOOR AND FIXED SEATING AS
SHOWN ON PLAN.
7. PROVIDE A BID OPTION TO ADD WING WALL AS
SHOWN ON PLAN.
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
B1
AE202
C1
AE201
F G H JE
AMU
OFFICER/
FLIGHT
CHIEF
MNT. OPS
OFFICER
SUPPORT
FLIGHT
CHIEF &
SUPER
1ST SGT.
SQUAD
COMMANDER
MEN'S
RESTROOM
MEN'S
LOCKERS
COM-NAV
MAINT.
BRIEFING
COMPUTER
WORKSTATION
SIPR
BRIEFING
CONF.
CORRIDOR
CORR
ALT.
MISSION
EQUIPMENT
CSS & AMU
SUPER
ELEC
COMM
JAN.
COPY
E.5 E.8 F.5
M
AT
C H
LI
N
E
SE
E A
AE
MATCHLINE
SEE A1 /
AE112
AE301
A1
AE301
A1
110A
102A
150C
150B 150A
104A
153A
159A
151A
152A
107A106A
109A
A4
A5
A4
A5
A5
A5
A4
A5
A4
A4
A5
A5
A5
1'-10 5/8"
1'-6 5/8" 6'-0" 3'-6" 6'-0" 3'-6" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 4'-6 3/4" 1'-10 5/8" 55'-1 3/8" 1'-10 5/8"
57' - 0" 57' - 0"
1'
/8
1"
4'
1" 1'
3'
4"
2' -2
/2
9'
-9
1' -1
9'
-8
5' -9
/2
/2
7' -1
/2
'-1 1"
4' -6
'-1 0"
A4
A5
A5 A5
C C C C C
F.8
'-3
3'
-2
7' -1
'-9
/2
CORRIDOR
MEN'S
SHOWERS
A1
AE401
Sim
EQ
12'-0"
EQ
20'-0" CLR
2'- 0"
TRASH
ENCLOSURE
'-0
'-0
AE404
A4
A4
A4
A4
A4
A5
A4
A4 A4
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
EXTENT OF MECHANICAL PLATFORM ABOVE
REF. C3/AE404
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:2
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE114
CERTIFIED FINAL SUBMITTAL
G R
O U
N D
F
LO
O R
P
LA
N
SE
C
TO
R
D
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 1/8" = 1'-0"
GROUND FLOOR PLAN - SECTOR DA1
SCALE: = 1'-0"
0 8 168
1/8"
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR
FACE OF MASONRY.
B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,
FACE OF CMU OR FACE OF STUD.
C. PROVIDE SUPPORT BLOCKING AT ALL WALL
MOUNTED EQUIPMENT INCLUDING MILLWORK,
MARKER BOARDS, PROJECTION SCREENS AND
ALL OTHER ITEMS REQUIRING BLOCKING.
D. CENTER TRANSITION STRIPS UNDER DOORS,
TYP.
E. PROVIDE BLINDS IN ALL WINDOWS UNO.
F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.
G. REFER TO SHEET AE001 AND FURNITURE PLANS
FOR MONITOR MOUNTING REQUIREMENTS.
1. 5" X 5" PREFINISHED METAL DOWNSPOUT.
2. 8" CONCRETE FILLED BOLLARD. RE:
STRUCTURAL A4/S-005.
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
H
R
H R
1 HR1 HR 1 HR
H
R
H R
H
R
H R
1 HR1 HR
2 HR
H
R
2 HR
H
R
H R
H
R
H R
2 HR
2 HR
H
R
H
R
B1
AE202
C1
AE202
B1
AE201
C1
AE201
STAIR
S2
D.O.
CORR
CORRIDOR
CORRIDOR
MOBILITY
TRAINING
TRAINING
PILOT/
ENGINEER
WORKROOM
AIRCREW
BRIEFING
MEN'S
RESTROOM
WOMEN'S
RESTROOM
FITNESS
209HERITAGE
ROOM
COMM/SERVER
STAIR
S1
STAND &
EVALUATION
TESTING
FLIP ROOM
COMBAT
CREW
COMM AREA
(CCC)
CORRIDOR
EXEC/SEC
COMMANDER
1ST SGT
SCHEDULING
CURRENT
OPS
SARM
CONFERENCE
A.D.O.
CSS
SUPERVISOR
SAFE ROOM/
KIT
BUILDING
SERE
OFFICE
SAFETY
GROUP
COMANDER
CHIEF BOOM
CHIEF PILOT
INTEL
OP PLANS
JAN.
MISSON
PLANNING
WEAPONS
AND
TACTICS
SIO OFFICE
SHREDDER
ROOM
(90)
COMMANDER
AE301
B1
AE301
B1
ELEV
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
A
A
B
B
C
C
D
D
F
F
G
G
H
H
J
J
ELEC
E
E
9 9
D.3
D.3
D.4
D.4
D.7
D.7
E.5
E.5
E.8
E.8
F.5
F.5
G.1
G.1
B.9
B.9
5.4 5.4
AE301
C1
AE301
C1
AE302
C1
AE302
C1
AE301
A1
AE301
A1
AE301
B3
AE301
B3
OFFICE
AREA
F.8
F.8
0.8
0.5
D.1
DN
ELEV.
ACCESS
1ST SGT
STORAGE
AE307
A5
B1
AE502
COMM
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
SECURE AREA BOUNDARY
TWO HOUR CONSTRUCTION2 HR
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:2
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE120
CERTIFIED FINAL SUBMITTAL
C O
M
PO
SI
TE
P
LA
N
SE
C
O N
D F
LO
O
R
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: = 1'-0"3/32"
0 8 16 248
SCALE: 3/32" = 1'-0"
COMPOSITE PLAN - SECOND FLOORA1
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
AE202
5 5
6 6
7 7
8 8
C D F GE
9 9
STAIR
S2
D.O.
CORRIDOR
CORRIDOR
MOBILITY
TRAINING
TRAINING
PILOT/
ENGINEER
WORKROOM
AIRCREW
BRIEFING
FITNESS
HERITAGE
ROOM
FLIP ROOM
CORRIDOR
EXEC/SEC
COMMANDER
1ST SGT
SCHEDULING
CURRENT
OPS
SARM
CONFERENCE
A.D.O.
CSS
SUPERVISOR
SERE
OFFICE
SAFETY
225 GROUP
COMANDER
CHIEF BOOM
CHIEF PILOT
OP PLANS
MISSON
PLANNING
WEAPONS
AND
TACTICS
COMMANDER
ELEC
D.3 D.4 D.7 E.5 E.8 F.5 G.1B.9
5.4 5.4
AE301
C1
AE301
C1
AE302
C1
AE302
C1
AE301
A1
AE301
A1
C1
AE403
S2C222A 223A 224A
231B
226A
210A
247A247B
228A227A
212A
232A
236A
235A
241A
233A 231A
234A
219A
220A 221A218A 246A
209A
213A
DM
B3
A4
A4
A4
DM
A4
DMDM
DM
DM
DM
A2
DM
A4
C1
DM A4
A4
DM
DM
C1
A4
A4
A4
C1
C1
A4
A4
A4
A4
A2
DM
DM
DM
DM
A4A4
A4
E1
OFFICE
AREA
MATCHLINE
SEE A1 /
AE122
DM DM DM DM
DM
DM
A2
A4
A4
C1
A4
A4
C1
C1
AE406
B1
F F F F F F F F
F.8
1'-3 1/8" 9'-2 1/2" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 29'-8 1/2" 1'-3 1/8"
115'-5 1/4"
1' -3
/8
'-6
13'-9" 9'-8" 9'-11" 12'-4" 12'-6" 16'-6" 14'-3" 14'-10" 9'-2"
6" 14'-6" 12'-9" 10'-9"
1'-9"
6'-4" 9'-4" 7" 18'-8" 9'-10" 21'-11" 6'-0"
'-8
20'-8 1/2" 1'-1" 16'-9" 1'-6"
10'-7" 12'-9" 3'-0" 14'-3" 4'-2"
'-8
5'
-6
9' -1
0" 4'
-7
7' -1
1"
'-0
3' -0
6'
-7
'-5
7'
-0
1' -0
1'
-2
'-1
1" 6'
-7
3' -2
'-8
'-2
5' -7
7' -3
9"
3' -2
4'-10" 12'-3" 9'-3"
6'-1" 20'-0" 5'-8 1/2" 6 1/4"
AE407B1 A1
233B
DM
212B
DM
C1C1
C1
A4
2 2
2 2
1ST SGT
DM
STORAGE
B3
AE504
B5
AE504
AE501
A4
E1E1
E1
A4A4E1
A4
DM
D1
D2
A4
A4
ALIGN
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
SECURE AREA BOUNDARY
TWO HOUR CONSTRUCTION2 HR
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
FI
LE
N U
M B
ER
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
S
VI
LL
E
D
IS
TR
IC
T
BE
AL
E
AI
R
F O
R C
E
BA
SE
6/
/2
:0 9:
P
M C
:\U se rs \tb
\D oc um en ts \M y R ev it\
0_ Ar ch _T
Br un ga rd
.rv t
AE121
CERTIFIED FINAL SUBMITTAL
SE
C
O N
D F
LO
O
R P
LA
N
SE
C
TO
R S
A
B
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN - SECTORS A & BA1
SCALE: = 1'-0"
0 8 168
1/8"
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR
FACE OF STUD.
B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,
FACE OF CMU OR FACE OF STUD.
C. PROVIDE SUPPORT BLOCKING AT ALL WALL
MOUNTED EQUIPMENT INCLUDING MILLWORK,
MARKER BOARDS, PROJECTION SCREENS AND
ALL OTHER ITEMS REQUIRING BLOCKING.
D. CENTER TRANSITION STRIPS UNDER DOORS,
TYP.
E. PROVIDE BLINDS IN ALL WINDOWS UNO.
F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.
G. REFER TO SHEET AE001 AND FURNITURE PLANS
FOR MONITOR MOUNTING REQUIREMENTS.
1. 5" X 5" PREFINISHED METAL DOWNSPOUT.
2. ABA WHEELCHAIR SPACE.
3. PROVIDE A BID OPTION TO ADD A SLOPED
CONCRETE FLOOR AND FIXED SEATING AS
SHOWN ON PLAN.
4. WALL SPANNING BELOW ROOF DECK TO 2ND
FLOOR SLAB IS TO BE 1-HR RATED:
- AT NON-SECURE AREAS MATCH PARTITION
TYPE B3
- AT SECURE AREAS MATCH PARTITION
TYPE C2
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
1 1
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
AE201
1 1
2 2
3 3
4 4
5 5
C D F GE
CORR
MEN'S
RESTROOM
WOMEN'S
RESTROOM
COMM/SERVER
STAIR
S1
STAND &
EVALUATION
TESTING
FLIP ROOM
COMBAT
CREW
COMM AREA
(CCC)
SUPERVISOR
SAFE ROOM/
KIT
BUILDING
INTEL
243JAN.
WEAPONS
AND
TACTICS
SIO OFFICE
SHREDDER
ROOM
ELEV
D.3 D.4 D.7 E.5 E.8 F.5 G.1B.9
AE302
C1
AE302
C1
AE301
A1
AE301
A1
B2
AE402
C1
AE401
206A
207A
205A
S1B
200A
201A
243A
242A
234A
244A
204A
209A
208A
A4
E1
A4
C1
A2
A4
C1 A4
A2
A2
A4
A2
A2
A4
A4A4
OFFICE
AREA
MATCHLINE
SEE A1 /
AE121 A4C1
B3B3
E
F.8
CORR
7' -0
1'
-0
1' -2
7' -3
9"
4'-10" 35'-3" 7'-1" 12'-6" 13'-2" 18'-7" 12'-3" 9'-3"
'-9
'-0
/2
'-2
9'
-5
'-5
/8
'-0
1'
-3
/8
'-6
/8
1'
-3
/8
6' -3
1/
1'-3 1/8" 27'-2 7/8" 1'-3 1/8" 4'-11 1/2"
7'-7 5/8" 12'-10" 3'-3" 55'-8 7/8" 1'-3 1/8"
'-0
'-0
'-9
7'
-1
1' -1
5/
8"
4' -7
"0.8 0.8
0.5 0.5
D.1
HERITAGE
ROOM
FITNESS
S1C
ELEV.
ACCESS
AE307
A5
B1
AE504
B2
AE504
BELOW ROOF1'
-3
/8
A4
11 1
E1
E1
D2D2D2D2
COMM
'-0
237A
A4
A4
A4A4
6"6"6"
FLOOR PLAN LEGEND
ONE HOUR CONSTRUCTION1 HR
SECURE AREA BOUNDARY
TWO HOUR CONSTRUCTION2 HR
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:5
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE122
CERTIFIED FINAL SUBMITTAL
SE
C
O N
D F
LO
O
R P
LA
N
SE
C
TO
R S
C
D
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 1/8" = 1'-0"
SECOND FLOOR PLAN - SECTORS C & DA1
SCALE: = 1'-0"
0 8 168
1/8"
GENERAL NOTES
A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR
FACE OF MASONRY.
B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,
FACE OF CMU OR FACE OF STUD.
C. PROVIDE SUPPORT BLOCKING AT ALL WALL
MOUNTED EQUIPMENT INCLUDING MILLWORK,
MARKER BOARDS, PROJECTION SCREENS AND
ALL OTHER ITEMS REQUIRING BLOCKING.
D. CENTER TRANSITION STRIPS UNDER DOORS,
TYP.
E. PROVIDE BLINDS IN ALL WINDOWS UNO.
F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.
G. REFER TO SHEET AE001 AND FURNITURE PLANS
FOR MONITOR MOUNTING REQUIREMENTS.
1. 5" X 5" PREFINISHED METAL DOWNSPOUT.
2. FIRE HOSE CABINET. REF. NOTE 2 ON SHEET
F-102.
3. PROVIDE A BID OPTION TO ADD WING WALL AS
SHOWN ON PLAN.
4. PROVIDE A BID OPTION TO ADD GLAZING TYPE E
AS SHOWN ON PLAN IN LIEU OF GLAZING TYPE
D (BASE BID).
5. WALL SPANNING BELOW ROOF DECK TO 2ND
FLOOR SLAB IS TO BE 1-HR RATED:
- AT NON-SECURE AREAS MATCH PARTITION
TYPE B3
- AT SECURE AREAS MATCH PARTITION
TYPE C2
SHEET KEYNOTES
NOTE:
FURNITURE SHOWN FOR REFERENCE
ONLY. RE: IF SHEETS
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
J J
J J
S1
103 104105 106 107
160 153
142 143 S2133
4 4
157 155 121 122
165 166
AE500
B2
5 4
6 6
AE504
A1
TYPICAL CEILING LEGEND
2' x 2' CEILING GRID
GYP BD CEILING
2' x 2' LED FIXTURE - EMERGENCY
RECESSED DOWNLIGHT
EXIT SIGNS
WALL MTD EXTERIOR LIGHT
SUPPLY AIR DIFFUSERS
RETURN AIR GRILLES
2' x 2' LED FIXTURE
LED FIXTURE - SUSPENDED
WALL MTD EXTERIOR LIGHT - EMERGENCY
RECESSED DOWNLIGHT - EMERGENCY
ACCESS DOORS
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:1
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE140
CERTIFIED FINAL SUBMITTAL
C O
M
PO
SI
TE
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
G
R O
U N
D
FL
O O
R
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 3/32" = 1'-0"
COMPOSITE REFLECTED CEILING PLAN - GROUND FLOORA1
SCALE: = 1'-0"3/32"
0 8 16 248
ROOM NAME - 1ST FL
RM # ROOM NAME
134 AFIN
135 HYDRAULICS
136 PROPULSION
137 COM-NAV
138 MAINT. BRIEFING
139 E&E
140 SUPPORT
141 CREW CHIEF
142 SECTION SUPER
143 EXPEDITOR, PRODUCTION &
PROD. SUPERV.
144 CORR
145 TECH ORDER LIBRARY
146 SUPPORT SUPER
147 SUPPORT EQUIP. MX
148 TAIL NO. BINS
149 TOOL ROOM
150 ALT. MISSION EQUIPMENT
151 COMM
152 ELEC
153 MEN'S RESTROOM
154 MEN'S LOCKERS
155 MEN'S SHOWERS
156 WOMEN'S RESTROOM
157 WOMEN'S SHOWERS
158 WOMEN'S LOCKERS
159 JAN.
160 BREAK
161 PRINTER
161 PRINTER
162 LACTATION/HUDDLE ROOM
163 SERVICE COUNTER
164 HELMET STORAGE
165 AFEO
166 NCOIC
ROOM NAME - 1ST FL
RM # ROOM NAME
100 VEST.
101 LOBBY
102 CORRIDOR
103 AMU OFFICER/ FLIGHT CHIEF
104 MNT. OPS OFFICER
105 SUPPORT FLIGHT CHIEF &
SUPER
106 1ST SGT.
107 SQUAD COMMANDER
108 COPY
109 SIPR
110 BRIEFING CONF.
111 COMPUTER WORKSTATION
112 CSS & AMU SUPER
113 CORRIDOR
114 ELEV.
115 STORAGE
116 BRIEFING ROOM
117 ELEC
118 COMPRESSOR ROOM
119 COMM/SERVER
120 MECH
121 VEST.
122 CORRIDOR
123 NVD
124 CONF. RM
125 W/D
126 O2 ROOM
127 AIRCREW SUPPORT SECTION
128 AIRCRAFT SUPPORT SECTION
129 CORR
130 EQUIPMENT
131 AFE ADMIN
132 CONTINUATION CLASSROOM
TRAINING
133 MOBILITY STORAGE
GENERAL NOTES
A. ALL CEILINGS TO BE 9'-0" AFF UNO.
B. ALL ACT TO BE 2 x 2 UNO.
C. INSTALL ACCESS PANELS AS REQUIRED IN ALL
GYP BD CEILINGS. LOCATION AND QUANTITIES
TO BE COORDINATED WITH INSTALLED
EQUIPMENT NEEDING ACCESS.
SHEET KEYNOTES
1. PAINTED EXPOSED STRUCTURE.
2. CABLE TRAY.
3. CANOPY.
4. 8" x 8" PREFINISHED METAL GUTTER AND
DOWNSPOUT.
5. PRE-FINISHED METAL SOFFIT PANEL WITH 2-
INCH CONTINUOUS SOFFIT VENTILATION
6. ADD LAYER OF 6" UNFACED ACOUSTICAL BATTS
ABOVE CEILING. OVERHANG INSULATION 2'-0"
AT ALL PERIMETER WALLS BELOW.
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
S2
S1
223222
215216
5 44
4 45 5
13' - 0"
6 6 6 6 6
9 9 9 9 9 9
CEILING OPEN
TO STRUCTURE.
RE: SHEET AE140
CEILING OPEN
TO STRUCTURE.
RE: SHEET AE140
4 4 4 45 5
88 236
TYPICAL CEILING LEGEND
2' x 2' CEILING GRID
GYP BD CEILING
2' x 2' LED FIXTURE - EMERGENCY
RECESSED DOWNLIGHT
EXIT SIGNS
WALL MTD EXTERIOR LIGHT
SUPPLY AIR DIFFUSERS
RETURN AIR GRILLES
2' x 2' LED FIXTURE
LED FIXTURE - SUSPENDED
WALL MTD EXTERIOR LIGHT - EMERGENCY
RECESSED DOWNLIGHT - EMERGENCY
ACCESS DOORS
KEYPLAN
NTS
BA
DC
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
NORTH
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:2
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE141
CERTIFIED FINAL SUBMITTAL
C O
M
PO
SI
TE
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
SE
C O
N D
FL
O
O R
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
D
AP
D
AP
JM
I
J
U N
E
SCALE: 3/32" = 1'-0"
COMPOSITE REFLECTED CEILING PLAN - SECOND FLOORA1
SCALE: = 1'-0"3/32"
0 8 16 248
ROOM NAME - 2ND FL
RM # ROOM NAME
200 STAND & EVALUATION
201 TESTING
202 CORR
203 ELEV
204 COMM/SERVER
205 WOMEN'S RESTROOM
206 MEN'S RESTROOM
207 JAN.
208 HERITAGE ROOM
209 FITNESS
210 TRAINING
211 MOBILITY TRAINING
212 PILOT/ ENGINEER WORKROOM
213 ELEC
214 CHIEF BOOM
215 SCHEDULING CURRENT OPS
216 SARM
217 CORRIDOR
218 A.D.O.
219 CHIEF PILOT
220 D.O.
221 COMMANDER
222 COMMANDER
223 EXEC/SEC
224 GROUP COMANDER
225 SAFETY
226 CSS
227 1ST SGT
228 CONFERENCE
229 CORRIDOR
230 CORRIDOR
231 AIRCREW BRIEFING
232 MISSON PLANNING
233 SERE OFFICE
234 WEAPONS AND TACTICS
234 WEAPONS AND TACTICS
235 OP PLANS
236 OFFICE AREA
237 COMM
238 SUPERVISOR
239 SHREDDER ROOM
240 SAFE ROOM/ KIT BUILDING
241 FLIP ROOM
242 COMBAT CREW COMM AREA
(CCC)
243 INTEL
244 SIO OFFICE
245 ELEV. ACCESS
246 1ST SGT
247 STORAGE
GENERAL NOTES
A. ALL CEILINGS TO BE 9'-0" AFF UNO.
B. ALL ACT TO BE 2 x 2 UNO.
C. INSTALL ACCESS PANELS AS REQUIRED IN ALL
GYP BD CEILINGS. LOCATION AND QUANTITIES
TO BE COORDINATED WITH INSTALLED
EQUIPMENT NEEDING ACCESS.
D. REF. STRUCTURAL SHEETS SF111 & SF112 FOR
STRUCTURAL GRID INFORMATION.
SHEET KEYNOTES
1. PAINTED EXPOSED STRUCTURE.
2. CABLE TRAY.
3. CANOPY.
4. 8" x 8" PREFINISHED METAL GUTTER AND
DOWNSPOUT.
5. PRE-FINISHED METAL SOFFIT PANEL WITH 2-
INCH CONTINUOUS SOFFIT VENTILATION
6. GYP BD WINDOW HEAD POCKET. RE: D4/AE501
7. INSTALL 2-HR RATED LID PER DETAIL A2, SHEET
AE002.
8. INSTALL SECURE LID PER DETAIL A3, SHEET
AE002.
9. ADD LAYER OF 6" UNFACED ACOUSTICAL BATTS
ABOVE CEILING. OVERHANG INSULATION 2'-0"
AT ALL PERIMETER WALLS BELOW.
M
AR
K D
E
SC
R
IP
TI
O
N D
A
TE
SHEET ID
PR
O
JE
C
T N
O
Q
JK
L1
P2
: 3
M
SP
A
ER
IA
L
PO
R
T
FA
C
IL
IT
Y
M
IN
N
EA
PO
LI
S-
SA
IN
T
PA
U
L
IA
P
AR
S M
IN
N
ES
O
TA
CERTIFIED FINAL DESIGN SUBMITTAL
G-002
SH
EE
T
IN
D E
X
RICHARD S.
JOHNSON
B.
P
AR
SO
N
D . P
AL
M
ER
D . P
AL
M
ER
J.
IS
C
BEALE AFB, CALIFORNIA, P2#473244 CERTIFIED FINAL SUBMITTAL
940 ARW SQUADRON OPERATIONS & AMU COMPLEX 17 JUNE 2022
SECTION 09 06 00
SCHEDULES FOR FINISHES
05/09, CHG 1: 11/13
PART 1 GENERAL
1.1 SUMMARY
This section covers only the color of exterior and interior materials and products that are exposed to view in the finished construction. The word "color", as used herein, includes surface color and pattern. Requirements for quality, product specifications, and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings if not identified in this specification. Items not designated for color in this section may be specified in other sections. When color is not designated for items, propose a color for approval.
PART 2 PRODUCTS
2.1 COLOR SCHEDULE
The color schedule information provided in the following paragraphs lists the colors, patterns and textures required for exterior and interior finishes, including both factory applied and field applied colors. Where color is shown as being specific to one manufacturer, an equivalent color by another manufacturer may be submitted for approval. Manufacturers and materials specified are not intended to limit the selection of equal colors from other manufacturers. In the case of difference between the drawings and specifications, colors identified in this specification govern.
2.2 EXTERIOR FINISHES
Reference drawings for manufacturer and color information.
2.2.1 Exterior Walls
Exterior wall colors apply to exterior wall surfaces including recesses at entrances and projecting vestibules. When applicable, paint conduit to closely match the adjacent surface color. Provide wall colors to match the colors listed below.
2.2.1.1 Mortar
Grey
2.2.1.2 Concrete Masonry Units (Rock/Split-Faced)
Dolese 4" Split Faced CMU, Hartshorne Gray, Basis-of-Design
2.2.1.3 Metal Wall Panels, Hardware, and Associated Trim
IMWP1: Centria, Formawall Dimension Series, color to match 142 Surrey Beige, Basis-of-Design
SECTION 09 06 00 Page 1
IMWP2: Centria, Formawall Dimension Series, color to match Spartan-Bronze, Basis-of-Design
IMSP3: Centria, Formawall Dimension Series, color to match Kingspan-Champagne Gold, Basis-of-Design
IMWP4: Centria, Formawall Dimension Series, color to match Spartan-Bronze, Basis-of-Design
2.2.1.4 Glass and Glazing
PPG Solarban z50 (2) Optiblue + Clear Glass Insulating Glass Unit, Basis-of-Design
2.2.1.5 Screen Wall
Dolese 4" Split Faced CMU, Hartshorne Gray, Basis-of-Design
2.2.2 Exterior Trim
Provide exterior trim to match the colors listed below.
2.2.2.1 Steel Doors and Door Frames
Painted: Spartan-Bronze (to match IMWP2)
2.2.2.2 Aluminum Doors and Door Frames
Kawneer, 451T Entrances and Storefronts,Permanodic - Anodized, Clear 14, Basis-of-Design
2.2.2.3 Aluminum Windows (mullion, muntin, sash, trim, and sill)
Kawneer, 415T Entrances and Storefronts, Permanodic - Anodized, Clear 14, Basis-of-Design
2.2.2.4 Fascia
Color to Match: Federal Standard 595b #30108 Dark Brown
2.2.2.5 Soffits and Ceilings
Color to Match: Federal Standard 595b #20108 Dark Brown
2.2.2.6 Overhangs
Color to Match: Federal Standard 595b #20108 Dark Brown
2.2.2.7 Downspouts and Gutters
Color to Match: Federal Standard 595b #20108 Dark Brown
2.2.2.8 Scuppers
Color to Match: Federal Standard 595b #20108 Dark Brown
2.2.2.9 Louvers
Match adjacent material in color.
SECTION 09 06 00 Page 2
2.2.2.10 Flashings
Match adjacent material in color.
2.2.2.11 Architectural Precast Stone
Match adjacent ent CMU color.
2.2.2.12 Caulking and Sealants
Match adjacent material in color.
2.2.2.13 Bollards
Painted: Safety Yellow
2.2.2.14 Sun Shades
Kawneer, Permanodic - Anodized, Clear 14, Basis-of-Design
2.2.2.15 Control Joints
Match adjacent material in color.
2.2.2.16 Expansion Joint and/or Covers
Match adjacent material in color.
2.2.3 Exterior Roof
Apply roof color to exterior roof surfaces including sheet metal flashings and copings, snow guards, mechanical units, mechanical penthouses, roof trim, pipes, conduits, electrical appurtenances, and similar items.
Provide roof color to match the colors listed below.
2.2.3.1 Metal
Color Number Federal Standard 595b #330108 Dark Brown
2.2.3.2 Penetrations
Match roof in color.
2.3 INTERIOR FINISHES
2.3.1 Interior Floor Finishes
Provide flooring materials to match the colors listed below.
2.3.1.1 Carpet Tile
CPT1: Shaw Contract, Hand Drawn Collection, Fine Point Tile 5T113, Gouache 13761, 18 by 36 inches, Ashlar Installation; Basis of Design.
CPT2: Shaw Contract, Hand Drawn Collection, Stipple Tile 5T116, Gouache 13761, 18 by 36 inches, Boxed In Installation; Basis of Design.
SECTION 09 06 00 Page 3
2.3.1.2 Luxury Vinyl Tile
LVT1 (BID OPTION): Shaw Contract, Surface + Strand, Strand 0516V, Clay 16761, 18 by 36 inches, Ashlar Installation; Basis of Design
2.3.1.3 Stair Flooring
RST1: Roppe, #92 Low Profile Raised Circular Tread & Riser, color 178 Pewter; Basis of Design
2.3.1.4 Stair Landings
RSL1: Roppe, #992 Low Profile Circular Tile, color 178 Pewter, 19 11/16 by 19 11/16 inches, Basis of Design
2.3.1.5 Porcelain Tile
PRC1A: Daltile, Chord, Forte Gray CH25, 12 by 24 inches; Basis of Design
PRC1B: Daltile, Chord, Forte Gray CH25, 6 by 12 inches Cove Base;
Basis of Design
PRC1C: Daltile, Chord, Forte Gray CH25, 3 inch Triangle Mosaic;
Basis of Design
2.3.1.6 Grout
GRT1: Mapei, Kerapoxy, color 02 Pewter; Basis of Design
GRT2: Mapei, Kerapoxy, color 103 Cobblestone; Basis of Design
2.3.1.7 Stainless Steel Transition
TR1: Schluter Systems, Reno-U, Stainless Steel; Basis of Design
TR2: Schluter Systems, Reno-TK, Stainless Steel; Basis of Design
TR4: Schluter Systems, Schiene, Stainless Steel; Basis of Design
TR5: Schluter Systems,Dilex-AHK, Clear Anodized Aluminum
TR6: Schluter Systems, Rondec, Clear Anodized Aluminum
2.3.1.8 Entrance Flooring
EF1: Milliken, Obex Tile, Cut, Thread, TDC145 Mocha, 50cm x 50 cm, Quarter Turn Installation; Basis of Design
2.3.1.9 Resilient Athletic Flooring
RAF1: Ecore, Econight, Total Eclipse 626, 23 by 23 inches Interlocking Tile; Basis of Design
2.3.1.10 Concrete (Sealed)
CONC
SECTION 09 06 00 Page 4
2.3.1.11 Industrial Floor Coating
EP1: Stonclad GS/GS4, color Cool Shale with Texture 2; Basis of Design
2.3.2 Interior Base Finishes
Provide base materials to match the colors listed below.
2.3.2.1 Resilient Base and Moldings
RB1: Roppe, color 178 Pewter; Basis of Design
TR3: Roppe,#43 Edge Guard, color 178 Pewter; Basis of Design
2.3.3 Interior Wall Finishes
Apply interior wall color to the entire wall surface, including reveals, vertical furred spaces and columns, grilles, diffusers, electrical and access panels, and piping and conduit adjacent to wall surfaces unless otherwise specified. Paint items not specified in other paragraphs to match adjacent wall surface. Provide wall materials to match the colors listed below.
2.3.3.1 Paint
PT1: Sherwin Williams, SW7015 Repose Gray, Eggshell; Basis of Design
PT1E: Sherwin Williams, Epoxy Paint, SW7015 Repose Gray, Eggshell;
Basis of Design
PT3: Sherwin Williams, SW7025 Backdrop, Eggshell; Basis of Design
2.3.3.2 Acoustical Wall Tile
AWT1: TURF, Slash Tile, 01 Cream, 6.375"W x 11.75"H x 9MM T; Basis of Design AWT2: TURF, Slash Tile, 48 Light Brown, 6.375"W x 11.75"H x 9MM T;
Basis of Design
2.3.3.3 Porcelain Tile
PRC2A; Daltile, Chord, Canon Grey CH22, 12 by 24 inches; Basis of Design
PRC3: Crossville Studios, Retro Active 2.0 & Patterns, RET01 Antico Taupe, 3 by 12 inches, Basis of Design
2.3.3.4 Grout
GRT1: Mapei, Kerapoxy, color 02 Pewter; Basis of Design
GRT2: Mapei, Kerapoxy, color 103 Cobblestone, Basis of Design
2.3.3.5 Exposed Structural Columns
Match PT1
SECTION 09 06 00 Page 5
2.3.4 Interior Ceiling Finishes
Apply ceiling colors to ceiling surfaces including soffits, furred down areas, grilles, diffusers, registers, and access panels. In addition, apply ceiling color to joists, underside of roof deck, and conduit and piping where joists and deck are exposed and required to be painted.
Provide ceiling materials to match the colors listed below.
2.3.4.1 Acoustical Tile and Grid
ACT1: Armstrong, Ultima, #1911, Beveled Tegular, 15/16: Grid, White; Basis of Design
2.3.4.2 Paint (Ceilings)
PT2: Sherwin Williams, SW7008 Alabaster, Flat; Basis of Design
2.3.4.3 Paint (Soffits)
Match PT2
2.3.4.4 Metal Deck
Match PT2
2.3.4.5 Structural Framing
Match PT2
2.3.5 Interior Trim
Provide interior trim to match the colors listed below.
2.3.5.1 Steel Doors
PT3: Sherwin Williams, SW7025 Backdrop, Semi Gloss; Basis of Design
2.3.5.2 Steel Door Frames
Match PT3, Semi Gloss
2.3.5.3 Wood Doors
WD1: VT Architectural Doors, stain to match Minwax MW413; Basis of Design
2.3.5.4 Wood Stain
Match WD1
2.3.5.5 Fire Extinguisher Cabinets
White
2.3.5.6 Handrails
Match PT3
SECTION 09 06 00 Page 6
2.3.5.7 Guardrails
Match PT3
2.3.5.8 Ladders
Match PT3
2.3.5.9 Metal Stairs; include underside of stairs only
Match PT3
2.3.5.10 Exposed Ductwork
Match PT2
2.3.5.11 Bollards
Safety Yellow
2.3.6 Interior Window Treatment
Provide window treatments to match the colors listed below.
2.3.6.1 Window Shades
RWS1: Mechoshade, manual shade, EcoVeil Sheer 6850 Series, 1% Openness Factor, color 6857 Timber; Basis of Design
RWS2: Mechoshade, motorized shade, EcoVeil Sheer 6850 Series, 1% Openness Factor, color 6857 Timber; Basis of Design
2.3.7 Interior Miscellaneous
Provide miscellaneous items to match the colors listed below.
2.3.7.1 Toilet Partitions and Urinal Screens
TP1: Scranton, Hiney Hiders, Texture Hammered, Color Stainless;
Basis of Design
2.3.7.2 Plastic Laminate
PLAM1: Wilsonart, Phantom Cocoa, 8213; Basis of Design
2.3.7.3 Solid Surfacing Material
SSM1: Wilsonart, Dusk Ice, 9203 CE, Matte Finish; Basis of Design
2.3.7.4 Window Sills (Solid Surface)
Match SSM1
2.3.7.5 Rolling Counter Door
Match PT3
SECTION 09 06 00 Page 7
2.3.7.6 Corner Guards
CG1: Koroseal, Korogard, G100 Vinyl Corner Guard, color Lava;
Basis of Design
CG2: Construction Specialties SCO-8 Type 304 Stainless Steel Corner Guard #4 Satin Finish; Basis of Design
2.3.7.7 Protective Wall Covering/Panel
FRP1: Marlite, FRP Class A, P100 White; Basis of Design
2.3.7.8 Signage Message Color
SG1: 2/90 Sign Systems, Soft White 708; Basis of Design
2.3.7.9 Signage Background Color
SG2: 2/90 Sign Systems; Duranodic 785; Basis of Design
2.3.7.10 Signage Frame
SG3: 2/90 Signage Systems, Satin 101; Basis of Design
2.3.7.11 Lockers
Penco Lockers, 073 Champagne
2.3.7.12 Wall Switch Handles and Standard Receptacle Bodies
White Switches & Bodies
2.3.7.13 Electrical Device Cover Plates
White
2.3.7.14 Electrical Panels
White
2.3.7.15 Shower Curtain
White
2.3.7.16 Shower Wall Kits, Trim and Shower Pan
White
2.3.7.16.1 Elevator and Associated Trim and Components
Stainless Steel 4SS
2.3.7.16.2 Elevator Wall Panels
Wall B,C & D to be laminate Earth L421
2.3.7.17 Elevator Wall Panels
Wall B,C & D to be laminate Earth L421
SECTION 09 06 00 Page 8
2.3.7.17.1 Sinks
Brushed Stainless Steel
2.3.7.17.1.1 Auditorium Seating (BID OPTION)
Plastic Arms: Black Metal Frame: Black Tablet: Wilsonart, Phantom Cocoa Fabric: Keystone Brothers, pattern Olympus, color Slate
-- End of Section --
SECTION 09 06 00 Page 9
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 09 06 00 Page 10
940 ARW Squad Ops & AMU Complex Beale Air Force Base, California
CPT1: Carpet Tile
CPT1 INSTALLATION
CPT2: Carpet Tile
CPT2 INSTALLATION
USACE LOUISVILLE
ACT1: Acoustical Ceiling Tile
ACT1 INSTALLATION
LVT1: Luxury Vinyl Tile
LVT1 INSTALLATION
PLAM2: Plastic Laminate – Elevator Finish
SS1: Stainless Steel – Elevator FinishTP1: Toilet Partitions
PLAM1: Plastic Laminate
SSM1: Solid Surface CG1: Corner Guard – Vinyl
PT1: Field Paint
PT2: Ceiling Paint
PT3: Door/ Door Trim Paint
EF1: Entrance Flooring
RAF1: Sports Flooring
EP1: Epoxy Flooring
RST1/RSL1:
Rubber Stair Tread
RB1: Resilient Base
SG1: Signage Background Color
SG2: Signage Message Color
CG2: Corner Guard – Stainless Steel
FRP1: Fiberglass Reinforced Panels
RWS1 : Roller Window Shade
SG3: Signage Frame
PRC1A: Porcelain Tile - Floors PRC1A & PRC2A INSTALL
PRC2A: Porcelain Tile - Walls
PRC1: Porcelain Wall Tile
GRT1: Grout
PRC1C: Porcelain Tile Mosaic
– Shower Floors
GRT2: Grout
AS01: Auditorium Seating – Irwin Seating Co. - Stellar
Auditorium Seat Upholstery
PLAM1: End Panel & Tablet
AWT1: Acoustic Wall Tile
AWT2: Acoustic Wall Tile
Acoustic Wall Tile Shape
WD1: Wood Doors
LK1: Lockers
FINISH NOTES
A. MANUFACTURERS REFERENCED ARE INTENDED TO
ESTABLISH DESIGN INTENT ONLY, AND ARE NOT
INTENDED TO LIMIT SELECTIONS FROM OTHER
MANUFACTURERS. WHEN ALTERNATE SELECTIONS
ARE SUBMITTED, SUBMITTAL SHALL INCLUDE
COLOR SAMPLES OF MATERIALS FOR
COMPARISON.
B. REFER TO SPECIFICATIONS 09 06 00 FOR FINISHES
AND SPECIAL ITEMS.
C. ALL DOOR FRAMES ARE TO BE PAINTED, (PT3) UNO
D. ALL CORNERS TO RECEIVE CORNER GUARDS.
E. ALL WINDOWS T RECEIVE WINDOW SHADES.
F. REFER TO SHEETS IN110 THROUGH IN122 FOR
FINISH FLOOR PATTERNS.
ABBREVIATION LEGEND
ACT ACOUSTICAL CEILING TILE
AWT ACOUSTICAL WALL TILE
CONC SEALED CONCRETE
CPT CARPET TILE
DW DEMOUNTABLE WALL
EF ENTRANCE FLOORING
EP EPOXY FLOORING
EXP EXPOSED
GYP BD GYPSUM BOARD
FRP FIBERGLASS REINFORCED PANEL
LVT LUXURY VINYL FLOORING
PLAM PLASTIC LAMINATE
PT PAINT
PTE EPOXY PAINT
PRC PORCELAIN TILE
RB RESILIENT BASE
RSL RESILIENT STAIR LANDING
RST RUBBER STAIR TREAD
RAF RUBBER ATHLETIC FLOORING
SS STAINLESS STEEL
STRUCT STRUCTURE
FINISH SCHEDULE NOTES
1. INSTALL FRP1 FROM TOP OF BASE TO 4'-4" AFF
WITH EPOXY PAINT ABOVE.
2. EXPOSED PANELS AND STRUCTURES TO BE
PAINTED (PT1).
3. FLOOR FINISH- BASE BID: CONC; BID OPTION: LVT1
4. FLOOR FINISH- BASE BID: CONC; BID OPTION: EP1
1 2 3 4 5
A
B
C
D
SHEET ID
P ar kw ay
L an e, S ui te
Pe ac ht re e C or ne rs , G
A
Ph on e (6
) 3
-7
Fa x
(6
) 3
-7
SI
ZE
AN
SI
D
FI
LE
N
AM
E:
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
A C
T N
O
FI
LE
N U
M
BE
R
US Army Corps of Engineers ® Louisville District
W
2Q R
-1 9-
F-
W
2Q R
-1 8-
D -0
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
LO
IU
SV
IL
LE
D
IS
TR
IC
T
BE
AL
E
AI
R F
O R
C E
BA
SE
6/
/2
3:
:5
PM
C :\U se rs
\d ap
\D oc um en ts \9
_A rc h_ da vi da pa lm er .rv t
AE610
CERTIFIED FINAL SUBMITTAL
R O
O M
F
IN
IS
H
S C
H
ED
U
LE
G
R O
U N
D F
LO
O
R
AR
W
S Q
U
AD
R O
N O
PE
R
AT
IO
N S
A
M U
C O
M
PL
EX
Be al e
AF
B, C A
BD
P
TC
C
TC
C
TD
B
J
U N
E
ROOM FINISH SCHEDULE - GROUND FLOOR
ROOM
NUMBER. ROOM NAME FLOOR FINISH BASE FINISH
WALL FINISHES
CEILING FINISH
CEILING
HEIGHT NOTESNORTH SOUTH EAST WEST
100 VEST. EF1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
101 LOBBY CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
102 CORRIDOR CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
103 AMU OFFICER/ FLIGHT CHIEF CPT2 RB1 -- PT1 -- PT1 ACT1 9'-0"
104 MNT. OPS OFFICER CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
105 SUPPORT FLIGHT CHIEF & SUPER CPT2 RB1 -- PT1 PT1 -- ACT1 9'-0"
106 1ST SGT. CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
107 SQUAD COMMANDER CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
108 COPY CPT2 RB1 PT1 PT1 PT1 -- ACT1 9'-0"
109 SIPR CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
110 BRIEFING CONF. CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
111 COMPUTER WORKSTATION CPT2 RB1 PT1 -- PT1 -- ACT1 9'-0"
112 CSS & AMU SUPER CPT2 RB1 PT1 -- -- PT1 ACT1 9'-0"
113 CORRIDOR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
114 ELEV. LVT1 SS1 SS1 SS1 SS1 PLAM2 SS1 9'-0"
115 STORAGE CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
116 BRIEFING ROOM CPT2 RB1 PT1 PT1 PT1/AWT1/AWT2 PT1/AWT1/AWT2 ACT1 9'-10"
117 ELEC CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
118 COMPRESSOR ROOM CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
119 COMM/SERVER CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
120 MECH CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
121 VEST. EF1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
122 CORRIDOR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
123 NVD CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4
124 CONF. RM CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
125 W/D CONC RB1 PT1 PT1 PT1 PT1 ACT1 EXP 2,4
126 O2 ROOM CONC RB1 PT1 PT1 PT1 PT1 ACT1 EXP 2,4
127 AIRCREW SUPPORT SECTION CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4
128 AIRCRAFT SUPPORT SECTION CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4
129 CORR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
130 EQUIPMENT CPT1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
131 AFE ADMIN CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
132 CONTINUATION CLASSROOM TRAINING CPT1 RB1 PT1 PT1 PT1 PT1 ACT1/GYP -PT2 9'-0" / 8'-11"
133 MOBILITY STORAGE CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4
134 AFIN CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
135 HYDRAULICS CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
136 PROPULSION CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
137 COM-NAV CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
138 MAINT. BRIEFING CPT1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
139 E&E CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
140 SUPPORT CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
141 CREW CHIEF CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
142 SECTION SUPER CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
143 EXPEDITOR, PRODUCTION & PROD. SUPERV. CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
144 CORR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
145 TECH ORDER LIBRARY CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4
146 SUPPORT SUPER CONC RB1 - - PT1 PT1 - - EXP STRUCT - PT2 EXP 2,4
147 SUPPORT EQUIP. MX CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4
148 TAIL NO. BINS CONC RB1 - - PT1 - - PT1 EXP STRUCT - PT2 EXP 2,4
149 TOOL ROOM CONC RB1 PT1 - - PT1 - - EXP STRUCT - PT2 EXP 2,4
150 ALT. MISSION EQUIPMENT CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4
151 COMM CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
152 ELEC CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2
153 MEN'S RESTROOM PRC1A PRC1B PRC2A/PT1E PRC2A/PT1E PT1E PT1E GYP BD - PT2E 9'-0"
154 MEN'S LOCKERS PRC1A PRC1B PT1E PT1E PT1E PT1E GYP BD - PT2E 9'-0"
155 MEN'S SHOWERS PRC1A/PRC1C PRC1B PRC2A PRC2A PRC2A PRC2A GYP BD - PT2E 9'-0"
156 WOMEN'S RESTROOM PRC1A PRC1B PRC2A/PT1E PRC2A/PT1E PT1E PT1E GYP BD - PT2E 9'-0" 157 WOMEN'S SHOWERS PRC1A/PRC1C PRC1B PRC2A PRC2A PRC2A PRC2A GYP BD - PT2E 9'-0"
158 WOMEN'S LOCKERS PRC1A PRC1B PT1E PT1E PT1E PT1E GYP BD - PT2E 9'-0"
159 JAN. CONC RB1 FRP1/PT1E FRP1/PT1E FRP1/PT1E FRP1/PT1E EXP STRUCT - PT2 EXP 1,2
160 BREAK PRC1A PRC1B PT1 PT1 PT1, PRC3 PT1 ACT1 9'-0"
161 PRINTER CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3
162 LACTATION/HUDDLE ROOM CPT1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"
163 SERVICE COUNTER CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4
164 HELMET STORAGE CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4
165 AFEO CONC RB1 PT1 PT1 - - PT1 ACT1 9'-0" 3
166 NCOIC CONC RB1 PT1 PT1 PT1 - - ACT1 9'-0" 3
S1…
This is the start of the file's text. The full file is on GovTribe.