W912QR22R0064_SID-0000.pdf

PDF 13 MB Posted

Attached to
Squadron Operations and AMU complex Federal contract opportunity
Solicitation number
W912QR22R0064
Issued by
Department of the Army Corps of Engineers Engineering District Louisville

About this file

This solicitation is for the design, bid, and construction of a Squadron Operations and Aircraft Maintenance Facility at Beale Air Force Base in California. The estimated construction cost is between $25 million and $100 million. The NAICS code is 236220 and the size standard is $39.5 million. This is a full and open procurement requiring compliance with System for Award Management registration requirements. Technical inquiries should be submitted through the ProjNet bidder inquiry system. Site visits are available and described in FAR 52.236-27. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville. The HUBZone price evaluation preference applies in accordance with FAR 19.1307. Responses are due as specified on ProjNet.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For 940 ARW Squad Ops & AMU Complex, Beale AFB CA

P2: 473244

Design-Bid-Build

Specifications - SID Certified Final Design

12 August 2022

W912QR22R0064

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR22R0064_SID-0000

940 ARW Squad Ops & AMU Complex Structural Interior Design Beale Air Force Base, California 17 JUNE 2022

Table of Contents

1. Narrative of Interior Design Objective ...................................................................................Tab 1

2. Floor Plan..............................................................................................................................Tab 2

3. Reflected Ceiling Plan........................................................................................................... Tab 3

4. Schedule for Finishes ........................................................................................................... Tab 4

5. Interior Color Boards .............................................................................................................Tab 5

6. Room Finish Schedule ...........................................................................................................Tab 6

7. Finish Plans ...........................................................................................................................Tab 7

8. Signage Plans and Details ......................................................................................................Tab 8

9. Interior Elevations .................................................................................................................Tab 9

10. Exterior Elevations .............................................................................................................. Tab 10

11. Exterior Color Boards .......................................................................................................... Tab 11

940 ARW Squad Ops & AMU Complex Corrected Final Design Submittal Beale AFB, California 17 JUNE 2022

Statement of Interior Design Objective This project consists of the construction of a new Squadron Operations (SQ OPS) and Aircraft Maintenance Unit (AMU) at Beale Air Force Base, California for the Air Force Reserves 940th Air Refueling Wing (940 ARW). These two squadron functions will be combined in the new two-story facility with the AMU (23,118SF) on the ground floor and the SQ OPS (18,400SF) on the second floor. This squadron operates throughout the United States and around the world in carrying out the aerial refueling mission. Eight KC-135 Stratotanker aircraft are currently assigned to the facility.

The design team’s main focus for the interior design is to provide a comfortable environment for the 940 ARW personnel to perform their administrative and light industrial functions. A structural interior design (SID) package is provided which addresses floors, walls, ceilings, and miscellaneous interior finishes.

The overall color palette is neutral and modern without being trendy. All finish selections will be in accordance with all applicable codes and Beale Air Force Base Installation Facilities Standards.

The majority of the interior spaces will be provided with painted gypsum wallboard.

Demountable walls (part of the FF&E package) are provided for flexibility in reconfiguring for the future. Porcelain wall tile will be provided in restrooms for ease of maintenance. Briefing rooms will have felt acoustical tiles to reduce reverberation and painted walls. Wall protection such as corner guards will be provided where required.

The floor finishes throughout the facility are durable and enhance the design whenever possible. The office areas and conference rooms are carpeted in a medium toned carpet. Rubber athletic tiles are used in the fitness room. Sealed concrete floors are to be provided in janitorial closets, mechanical rooms, comm rooms and electrical rooms.

Corridors will have sealed concreate flooring as the Base Bid with Luxury Vinyl Tile as a Bid Option. Maintenance and Equipment rooms will have sealed concrete flooring as the Base Bid and either Luxury Vinyl Tile or a 3-Coat Fuel Resistive Resinous Flooring system as a Bid Option as indicated on the Floor Finish Plans.

The restrooms have 12” x 24” neutral colored porcelain floor tile as well as a 12” x 24” porcelain wall tile with a subtle textured pattern. Floor tile will have a dark grout color, selected for ease of maintenance. The countertops in the restrooms will be a solid surface material. Locker rooms will have a porcelain floor and tile base with painted walls. Shower rooms will have fiberglass shower pan and wall. Toilet partitions are to be textured solid plastic.

Interior doors are stained white birch with painted hollow metal frames to match. The wood stain and hollow metal frame paint color are selected to coordinate with other finishes and furnishings in the building.

940 ARW Squad Ops & AMU Complex Corrected Final Design Submittal Beale AFB, California 17 JUNE 2022

Signage will be designed in accordance with UFC 3-120-01 and Beale Air Force Base IFS. They will be professionally made and appropriately sized for viewing distance and provided with tactical lettering (braille) as required for ABA standards.

Ceilings will be primarily 2’ x 2’ lay-in acoustical ceiling tiles with tegular edge. Toilets and wet areas will be provided with an epoxy paint finish on a suspended gypsum board ceiling.

The design shall deliver a professional environment that is aesthetically pleasing, sustainable, efficient, and can be easily maintained. Our objective is to instill pride in the facility and promote productivity and excellence within the user.

W D

D W

UP

B1

AE202

C1

AE202

B1

AE201

C1

AE201

STAIR

S1

VEST.

LOBBY

AMU

OFFICER/

FLIGHT

CHIEF

MNT. OPS

OFFICER

104SUPPORT

FLIGHT

CHIEF &

SUPER

1ST SGT.

SQUAD

COMMANDER

BREAK

MEN'S

RESTROOM

COM-NAV

MAINT.

BRIEFING

PROPULSION

HYDRAULICS

AFIN

CONTINUATION

CLASSROOM

TRAINING

AFE ADMIN

EQUIPMENT

COMM/SERVER

ELEC

476 SF

MECH

BRIEFING

ROOM

116 ELEV.

STORAGE

CORRIDOR

COMPUTER

WORKSTATION

SIPR

BRIEFING

CONF.

CORRIDOR

CORR

E&E

CREW CHIEF

SECTION

SUPER

EXPEDITOR,

PRODUCTION

& PROD.

SUPERV.

STAIR

S2

MOBILITY

STORAGE

CORR

AIRCREW

SUPPORT

SECTION

SUPPORT

EQUIP. MX

ALT.

MISSION

EQUIPMENT

CSS & AMU

SUPER

NVD

CONF. RM

W/D

COMPRESSOR

ROOM

O2 ROOM

ELEC

COMM

AIRCRAFT

SUPPORT

SECTION

TAIL NO.

BINS

TOOL ROOM

SUPPORT

SUPER

JAN.

(40)(14)

WOMEN'S

LOCKERS

SUPPORT

COPY

AE301

B1

AE301

B1

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

A

A

B

B

C

C

D

D

F

F

G

G

H

H

J

J

E

E

28' - 6" 28' - 6" 28' - 6" 27' - 5" 29' - 0" 28' - 0" 29' - 0" 28' - 0"

3'

0"

7'

1"

1'

/8

4'

7" 9 9

1' - 10 5/8" 226' - 11" 1' - 10 5/8"

VEST.

CORRIDOR

D.3

D.3

D.4

D.4

D.7

D.7

E.5

E.5

E.8

E.8

F.5

F.5

G.1

G.1

B.9

B.9

5.4 5.4

AE301

C1

AE301

C1

AE302

C1

AE302

C1

AE301

A1

AE301

A1

AE301

B3

AE301

B3

A1

AE401

MEN'S

LOCKERS

2' - 0"

AE305

A1

AE305

A4

AE307

A1

7'

4"

1'

/8

2'

1/ 4"

7'

1"

1'

/8

8'

6"

1'

/8

1' - 10 5/8" 226' - 11" 1' - 10 5/8"

WOMEN'S

RESTROOM

F.8

MEN'S

SHOWERS

WOMEN'S

SHOWERS

PRINTER

MECHANICAL

ENCLOSURE

0.8

0.5

D.1

TECH

ORDER

LIBRARY

LACTATION/HUDDLE

ROOM

HELMET

STORAGE

SERVICE

COUNTER

AFEO

NCOIC

(88)

TRASH

ENCLOSURE

AE307

A5

A1

AE406

B1

AE502

C3

AE401

AE504

A1

D3

AE407

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:2

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE110

CERTIFIED FINAL SUBMITTAL

C O

M

PO

SI

TE

P

LA

N

G R

O U

N D

F

LO

O R

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 3/32" = 1'-0"

COMPOSITE PLAN - GROUND FLOORA1 SCALE: = 1'-0"3/32"

0 8 16 248

1. 8" CONCRETE FILLED BOLLARD. RE:

CIVIL

2. SHOWN FOR REFERENCE ONLY IN

APPROXIMATE LOCATION. REFER TO

CIVIL FOR LOCATION OF ENCLOSURE.

3. PROVIDE A BID OPTION TO ADD

DUMPSTER ENCLOSURE AS SHOWN

ON PLAN.

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C H

D W

AE301

B1

AE301

B1

A B C D E

PROPULSION

HYDRAULICS

AFIN

CONTINUATION

CLASSROOM

TRAINING

AFE ADMIN

SECTION

SUPER

MOBILITY

STORAGE

AIRCREW

SUPPORT

SECTION

CONF. RM

W/D

O2 ROOM

AIRCRAFT

SUPPORT

SECTION

D.3 D.4 D.7B.9

M

AT

C H

LI

N

E

SE

E A

AE

MATCHLINE

SEE A1 /

AE113

5.4

AE301

C1

AE301

C1

AE302

C1

AE302

C1

AE301

B3

AE301

B3

129A

163A

128A

128B

135A

142A

125A

126A

136A

134A

133A

132B

132A

124A

133C 133B

A4

A4

A4

D1

A2

A2

A4

A4

A4

A4

A4

A4

A4A4

A4

A4

A4

A4 A4

A4

A4

AE307

A1

1'-10 5/8" 28'-6" 26'-6" 2'-0" 28'-6" 10'-0" 2'-0" 6'-9" 8'-8"

9 1/8" 27'-5" 1'-1" 15'-3" 11'-3" 9" 1'-3"

5'-6" 23'-0" 8'-0" 2'-0" 17'-5" 8"

3' -0

'-4

/8

1/

8"

'-5

5'

-7

7' -6

'-1 1"

1' -1

'-4

9 1/8" 27'-5" 1'-1" 26'-6" 9" 1'-3"10'-8" 17'-10" 8'-0" 2'-0"

2'-0" 6'-9" 8'-8" 8 3/8"

5' -2

5'

-3

8' -1

2'

-8

'-6

5'

-7

'-2

/4

7'

-2

/4

3' -0

1/ 8"

3' -0

'-0

'-6

1/

8" 3'

-0

9' -8

'-4

'-9

'-9

8' -4

7'

-8

5'-6" 5'-2" 17'-10" 10'-0" 2'-0" 6'-9" 2'-2"

6'-6"

3'-3 3/4"

8 3/8" A4

A4

A4 A2 A2

D1

A2

D1

D2

D1

5'-11" 6'-4" 2'-0" 12'-0" 2'-3" 26'-6" 2'-0" 1'-11" 3'-4" 23'-3" 11" 3'-4" 2'-8" 12'-0" 8'-6"

C

D2 D1

A1

AE500

4' -0

CORR

PRINTER

SERVICE

COUNTER

AE500 B3

6' -0

1'

-6

5' -0

166A

AFEO

NCOIC

HELMET

STORAGE

127B

A4

142A

127A

33 3

1/

8"

8"

AE401

C4

A2

A4

A4

A2

A2

A2

A4

163B

123A

131A 131B

A2

2'-3" 9"

A4

A4

A4

AE504

A1

NVD

A4

D1

A4

D2

A4 A4

A1

A1

A1

A1

D2

A4

A4 A4

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

EXTENT OF MECHANICAL PLATFORM ABOVE

REF. C3/AE404

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:3

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE111

CERTIFIED FINAL SUBMITTAL

G R

O U

N D

F

LO

O R

P

LA

N

SE

C

TO

R

A

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 1/8" = 1'-0"

GROUND FLOOR PLAN - SECTOR AA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR

FACE OF MASONRY.

B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,

FACE OF CMU OR FACE OF STUD.

C. PROVIDE SUPPORT BLOCKING AT ALL WALL

MOUNTED EQUIPMENT INCLUDING MILLWORK,

MARKER BOARDS, PROJECTION SCREENS AND

ALL OTHER ITEMS REQUIRING BLOCKING.

D. CENTER TRANSITION STRIPS UNDER DOORS,

TYP.

E. PROVIDE BLINDS IN ALL EXTERIOR WINDOWS

UNO.

F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.

G. REFER TO SHEET AE001 AND FURNITURE PLANS

FOR MONITOR MOUNTING REQUIREMENTS.

1. 5" X 5" PREFINISHED METAL DOWNSPOUT.

2. ALIGN FINISH FACE.

3. 8" CONCRETE FILLED BOLLARD. RE:

STRUCTURAL A4/S-005.

4. SHOP SINK.

5. FAUCET/EYEWASH COMBO.

6. DOORBELL.

7. RAFT LAYOUT AREA.

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

UP

C1

AE202

F G H JE

COM-NAV

MAINT.

BRIEFING

AFIN

E&E

CREW CHIEF

SECTION

SUPER

EXPEDITOR,

PRODUCTION

& PROD.

SUPERV.

STAIR

S2

SUPPORT

EQUIP. MX

TAIL NO.

BINS

TOOL ROOM

SUPPORT

SUPER

SUPPORT

E.5 E.8 F.5 G.1

M

AT

C H

LI

N

E

SE

E A

AE

MATCHLINE

SEE A1 /

AE114

5.4

AE301

C1

AE301

C1

AE301

A1

AE301

A1

B1

AE403

S2B

S2A

147A

146A

148A

141B

141A

137A 138A

140A

139A

143A

147B

A2

A2 B3

A2

A2

A4

A4

A4

A2

A4

A4

A4

1/

8" 3'

-0

9' -8

'-4

'-9

'-9

8' -4

7'

-8

15'-0" 10'-3" 3'-9" 14'-0" 8'-0" 6'-0" 2'-0" 27'-0" 28'-0" 1'-10 5/8"

3'-3 3/4"

6'-0" 6'-0" 12'-0" 25'-8 7/8" 3'-4" 2'-6"

10'-8" 6'-0" 12'-0" 6'-4" 22'-0"

3' -0

1'

-1

5/ 8"

'-8

3'

-4

1' -6

1' -1

5/

8" 3'

-0

'-0

'-6

'-0

4' -5

'-0

'-6

1/ 8"

14'-0" 19'-4" 8'-8" 7'-11" 6'-1" 9 1/8"

1'-2 7/8" 55'-0" 9 1/8"

1/ 8"

'-8

7'

-1

8' -3

'-8

'-1

0" 9'

-3

6' -9

1/ 4"

10'-0" 5'-0" 18'-0" 24'-9"

8 3/8" 10'-2" 5'-2" 9'-2 5/8" 9" 7'-11" 9'-1"

7'-11"

6'-1" 3'-9"

53'-3"

A4

D2D2

A4A4

A4

11C D

F.8

CORR

PRINTER

147C

145A

TECH

ORDER

LIBRARY

142A

4 4

1/

8"

8"

A1

AE406

3'-0" 7'-0" 19'-4" 7'-0"

A4

A4

A2

A2

A2

A4

A4

A4

A4

A4

A4

A4

A2

A4 13'-9"

AE407

A3

D2 D2

A4 A4

147D

7' -6

C

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

EXTENT OF MECHANICAL PLATFORM ABOVE

REF. C3/AE404

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:0

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE112

CERTIFIED FINAL SUBMITTAL

G R

O U

N D

F

LO

O R

P

LA

N

SE

C

TO

R

B

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 1/8" = 1'-0"

GROUND FLOOR PLAN - SECTOR BA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR

FACE OF MASONRY.

B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,

FACE OF CMU OR FACE OF STUD.

C. PROVIDE SUPPORT BLOCKING AT ALL WALL

MOUNTED EQUIPMENT INCLUDING MILLWORK,

MARKER BOARDS, PROJECTION SCREENS AND

ALL OTHER ITEMS REQUIRING BLOCKING.

D. CENTER TRANSITION STRIPS UNDER DOORS,

TYP.

E. PROVIDE BLINDS IN ALL WINDOWS UNO.

F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.

G. REFER TO SHEET AE001 AND FURNITURE PLANS

FOR MONITOR MOUNTING REQUIREMENTS.

1. 5" X 5" PREFINISHED METAL DOWNSPOUT.

2. SHOP SINK.

3. FAUCET/EYEWASH COMBO.

4. 8" CONCRETE FILLED BOLLARD. RE:

STRUCTURAL A4/S-005.

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

B1

AE201

A B C D E

STAIR

S1

VEST.

LOBBY

AMU

OFFICER/

FLIGHT

CHIEF

BREAK

MEN'S

RESTROOM

EQUIPMENT

COMM/SERVER

ELEC

MECH

BRIEFING

ROOM

ELEV.

STORAGE

CORRIDOR

CORR

AIRCREW

SUPPORT

SECTION

CSS & AMU

SUPER

COMPRESSOR

ROOM

WOMEN'S

LOCKERS

D.3 D.4 D.7

MATCHLINE

SEE A1 /

AE111

M

AT

C H

LI

N

E

SE

E

A

AE

AE302

C1

AE302

C1

AE301

B3

AE301

B3

B1

AE402

S1A

115A

116B 116A

121A

120A

117A

130A

162A

156A

100B

121B

119A

118A

100A

E1

A4

A4 A4

A4 A4

A4

A4

E1

E1

E1

VEST.

WOMEN'S

RESTROOM

A1

AE401

Sim

AE305

A1

AE305

A4

1' -1

5/

8"

'-1

/8

'-0

'-9

7' -1

28'-6" 28'-6" 28'-6" 10'-0" 2'-0" 6'-9" 8'-8" 1'-10 5/8" 26'-7 3/8" 1'-10 5/8" 26'-7 3/8" 1'-10 5/8" 4'-11 1/2" 7'-7 5/8" 2'-0" 8'-10" 2'-0"

1'-11 7/8" 1'-10 5/8"

1' -3

/8

'-2

'-6

1' -4

"15 '-1

1/

2" 9'

-3

/2

3' -1

0"

9 1/8"

1'-3" 5'-6"

A4

A4

1 1

1 1

B

A

G

7' -1

'-9

1' -1

5/

8" 3'

-1

1/ 4"

6' -4

6'

-4

6' -4

5'

-0

4' -6

6'

-4

1'-10 5/8" 26'-7 3/8"

160A

1'-3" 4'-5" 17'-2" 5'-8" 12'-10" 10'-7"

A4

A4

A4

A4

A4

EQ 16'-0" EQ 3

MECHANICAL

ENCLOSURE

0.8

0.5

D.1

WOMEN'S

SHOWERS

MEN'S

SHOWERS

AE407D1 AE407 C1

122A

CORRIDOR

LACTATION/HUDDLE

ROOM

166A

4 4

4 4

127A

E1

AE404

A3

22'-0" CLR

AE307

A5

2'-0 1/4" D1

AE502

D3

AE504

A2

4' -6

6"

A4 D4

A2

D2

NCOIC

AFEO

A4 A4 A4

D5

'-0

" C

LR

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

EXTENT OF MECHANICAL PLATFORM ABOVE

REF. C3/AE404

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:1

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE113

CERTIFIED FINAL SUBMITTAL

G R

O U

N D

F

LO

O R

P

LA

N

SE

C

TO

R

C

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 1/8" = 1'-0"

GROUND FLOOR PLAN - SECTOR CA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR

FACE OF MASONRY.

B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,

FACE OF CMU OR FACE OF STUD.

C. PROVIDE SUPPORT BLOCKING AT ALL WALL

MOUNTED EQUIPMENT INCLUDING MILLWORK,

MARKER BOARDS, PROJECTION SCREENS AND

ALL OTHER ITEMS REQUIRING BLOCKING.

D. CENTER TRANSITION STRIPS UNDER DOORS,

TYP.

E. PROVIDE BLINDS IN ALL WINDOWS UNO.

F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.

G. REFER TO SHEET AE001 AND FURNITURE PLANS

FOR MONITOR MOUNTING REQUIREMENTS.

1. 5" X 5" PREFINISHED METAL DOWNSPOUT.

2. MASONRY ENCLOSURE W/ REMOVEABLE WIRE

MESH CAP. REFER TO CIVIL FOR LOCATION.

3. WALL LADDER TO MECHANICAL PLATFORM.

4. ABA WHEELCHAIR SPACE.

5. RECESSED KNOX BOX.

6. PROVIDE A BID OPTION TO ADD A SLOPED

CONCRETE FLOOR AND FIXED SEATING AS

SHOWN ON PLAN.

7. PROVIDE A BID OPTION TO ADD WING WALL AS

SHOWN ON PLAN.

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

B1

AE202

C1

AE201

F G H JE

AMU

OFFICER/

FLIGHT

CHIEF

MNT. OPS

OFFICER

SUPPORT

FLIGHT

CHIEF &

SUPER

1ST SGT.

SQUAD

COMMANDER

MEN'S

RESTROOM

MEN'S

LOCKERS

COM-NAV

MAINT.

BRIEFING

COMPUTER

WORKSTATION

SIPR

BRIEFING

CONF.

CORRIDOR

CORR

ALT.

MISSION

EQUIPMENT

CSS & AMU

SUPER

ELEC

COMM

JAN.

COPY

E.5 E.8 F.5

M

AT

C H

LI

N

E

SE

E A

AE

MATCHLINE

SEE A1 /

AE112

AE301

A1

AE301

A1

110A

102A

150C

150B 150A

104A

153A

159A

151A

152A

107A106A

109A

A4

A5

A4

A5

A5

A5

A4

A5

A4

A4

A5

A5

A5

1'-10 5/8"

1'-6 5/8" 6'-0" 3'-6" 6'-0" 3'-6" 6'-0" 6'-0" 6'-0" 6'-0" 6'-0" 4'-6 3/4" 1'-10 5/8" 55'-1 3/8" 1'-10 5/8"

57' - 0" 57' - 0"

1'

/8

1"

4'

1" 1'

3'

4"

2' -2

/2

9'

-9

1' -1

9'

-8

5' -9

/2

/2

7' -1

/2

'-1 1"

4' -6

'-1 0"

A4

A5

A5 A5

C C C C C

F.8

'-3

3'

-2

7' -1

'-9

/2

CORRIDOR

MEN'S

SHOWERS

A1

AE401

Sim

EQ

12'-0"

EQ

20'-0" CLR

2'- 0"

TRASH

ENCLOSURE

'-0

'-0

AE404

A4

A4

A4

A4

A4

A5

A4

A4 A4

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

EXTENT OF MECHANICAL PLATFORM ABOVE

REF. C3/AE404

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:2

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE114

CERTIFIED FINAL SUBMITTAL

G R

O U

N D

F

LO

O R

P

LA

N

SE

C

TO

R

D

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 1/8" = 1'-0"

GROUND FLOOR PLAN - SECTOR DA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR

FACE OF MASONRY.

B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,

FACE OF CMU OR FACE OF STUD.

C. PROVIDE SUPPORT BLOCKING AT ALL WALL

MOUNTED EQUIPMENT INCLUDING MILLWORK,

MARKER BOARDS, PROJECTION SCREENS AND

ALL OTHER ITEMS REQUIRING BLOCKING.

D. CENTER TRANSITION STRIPS UNDER DOORS,

TYP.

E. PROVIDE BLINDS IN ALL WINDOWS UNO.

F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.

G. REFER TO SHEET AE001 AND FURNITURE PLANS

FOR MONITOR MOUNTING REQUIREMENTS.

1. 5" X 5" PREFINISHED METAL DOWNSPOUT.

2. 8" CONCRETE FILLED BOLLARD. RE:

STRUCTURAL A4/S-005.

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

H

R

H R

1 HR1 HR 1 HR

H

R

H R

H

R

H R

1 HR1 HR

2 HR

H

R

2 HR

H

R

H R

H

R

H R

2 HR

2 HR

H

R

H

R

B1

AE202

C1

AE202

B1

AE201

C1

AE201

STAIR

S2

D.O.

CORR

CORRIDOR

CORRIDOR

MOBILITY

TRAINING

TRAINING

PILOT/

ENGINEER

WORKROOM

AIRCREW

BRIEFING

MEN'S

RESTROOM

WOMEN'S

RESTROOM

FITNESS

209HERITAGE

ROOM

COMM/SERVER

STAIR

S1

STAND &

EVALUATION

TESTING

FLIP ROOM

COMBAT

CREW

COMM AREA

(CCC)

CORRIDOR

EXEC/SEC

COMMANDER

1ST SGT

SCHEDULING

CURRENT

OPS

SARM

CONFERENCE

A.D.O.

CSS

SUPERVISOR

SAFE ROOM/

KIT

BUILDING

SERE

OFFICE

SAFETY

GROUP

COMANDER

CHIEF BOOM

CHIEF PILOT

INTEL

OP PLANS

JAN.

MISSON

PLANNING

WEAPONS

AND

TACTICS

SIO OFFICE

SHREDDER

ROOM

(90)

COMMANDER

AE301

B1

AE301

B1

ELEV

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

A

A

B

B

C

C

D

D

F

F

G

G

H

H

J

J

ELEC

E

E

9 9

D.3

D.3

D.4

D.4

D.7

D.7

E.5

E.5

E.8

E.8

F.5

F.5

G.1

G.1

B.9

B.9

5.4 5.4

AE301

C1

AE301

C1

AE302

C1

AE302

C1

AE301

A1

AE301

A1

AE301

B3

AE301

B3

OFFICE

AREA

F.8

F.8

0.8

0.5

D.1

DN

ELEV.

ACCESS

1ST SGT

STORAGE

AE307

A5

B1

AE502

COMM

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

SECURE AREA BOUNDARY

TWO HOUR CONSTRUCTION2 HR

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:2

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE120

CERTIFIED FINAL SUBMITTAL

C O

M

PO

SI

TE

P

LA

N

SE

C

O N

D F

LO

O

R

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: = 1'-0"3/32"

0 8 16 248

SCALE: 3/32" = 1'-0"

COMPOSITE PLAN - SECOND FLOORA1

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

AE202

5 5

6 6

7 7

8 8

C D F GE

9 9

STAIR

S2

D.O.

CORRIDOR

CORRIDOR

MOBILITY

TRAINING

TRAINING

PILOT/

ENGINEER

WORKROOM

AIRCREW

BRIEFING

FITNESS

HERITAGE

ROOM

FLIP ROOM

CORRIDOR

EXEC/SEC

COMMANDER

1ST SGT

SCHEDULING

CURRENT

OPS

SARM

CONFERENCE

A.D.O.

CSS

SUPERVISOR

SERE

OFFICE

SAFETY

225 GROUP

COMANDER

CHIEF BOOM

CHIEF PILOT

OP PLANS

MISSON

PLANNING

WEAPONS

AND

TACTICS

COMMANDER

ELEC

D.3 D.4 D.7 E.5 E.8 F.5 G.1B.9

5.4 5.4

AE301

C1

AE301

C1

AE302

C1

AE302

C1

AE301

A1

AE301

A1

C1

AE403

S2C222A 223A 224A

231B

226A

210A

247A247B

228A227A

212A

232A

236A

235A

241A

233A 231A

234A

219A

220A 221A218A 246A

209A

213A

DM

B3

A4

A4

A4

DM

A4

DMDM

DM

DM

DM

A2

DM

A4

C1

DM A4

A4

DM

DM

C1

A4

A4

A4

C1

C1

A4

A4

A4

A4

A2

DM

DM

DM

DM

A4A4

A4

E1

OFFICE

AREA

MATCHLINE

SEE A1 /

AE122

DM DM DM DM

DM

DM

A2

A4

A4

C1

A4

A4

C1

C1

AE406

B1

F F F F F F F F

F.8

1'-3 1/8" 9'-2 1/2" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 6'-0" 4'-0" 29'-8 1/2" 1'-3 1/8"

115'-5 1/4"

1' -3

/8

'-6

13'-9" 9'-8" 9'-11" 12'-4" 12'-6" 16'-6" 14'-3" 14'-10" 9'-2"

6" 14'-6" 12'-9" 10'-9"

1'-9"

6'-4" 9'-4" 7" 18'-8" 9'-10" 21'-11" 6'-0"

'-8

20'-8 1/2" 1'-1" 16'-9" 1'-6"

10'-7" 12'-9" 3'-0" 14'-3" 4'-2"

'-8

5'

-6

9' -1

0" 4'

-7

7' -1

1"

'-0

3' -0

6'

-7

'-5

7'

-0

1' -0

1'

-2

'-1

1" 6'

-7

3' -2

'-8

'-2

5' -7

7' -3

9"

3' -2

4'-10" 12'-3" 9'-3"

6'-1" 20'-0" 5'-8 1/2" 6 1/4"

AE407B1 A1

233B

DM

212B

DM

C1C1

C1

A4

2 2

2 2

1ST SGT

DM

STORAGE

B3

AE504

B5

AE504

AE501

A4

E1E1

E1

A4A4E1

A4

DM

D1

D2

A4

A4

ALIGN

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

SECURE AREA BOUNDARY

TWO HOUR CONSTRUCTION2 HR

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M B

ER

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

S

VI

LL

E

D

IS

TR

IC

T

BE

AL

E

AI

R

F O

R C

E

BA

SE

6/

/2

:0 9:

P

M C

:\U se rs \tb

\D oc um en ts \M y R ev it\

0_ Ar ch _T

Br un ga rd

.rv t

AE121

CERTIFIED FINAL SUBMITTAL

SE

C

O N

D F

LO

O

R P

LA

N

SE

C

TO

R S

A

B

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - SECTORS A & BA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR

FACE OF STUD.

B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,

FACE OF CMU OR FACE OF STUD.

C. PROVIDE SUPPORT BLOCKING AT ALL WALL

MOUNTED EQUIPMENT INCLUDING MILLWORK,

MARKER BOARDS, PROJECTION SCREENS AND

ALL OTHER ITEMS REQUIRING BLOCKING.

D. CENTER TRANSITION STRIPS UNDER DOORS,

TYP.

E. PROVIDE BLINDS IN ALL WINDOWS UNO.

F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.

G. REFER TO SHEET AE001 AND FURNITURE PLANS

FOR MONITOR MOUNTING REQUIREMENTS.

1. 5" X 5" PREFINISHED METAL DOWNSPOUT.

2. ABA WHEELCHAIR SPACE.

3. PROVIDE A BID OPTION TO ADD A SLOPED

CONCRETE FLOOR AND FIXED SEATING AS

SHOWN ON PLAN.

4. WALL SPANNING BELOW ROOF DECK TO 2ND

FLOOR SLAB IS TO BE 1-HR RATED:

- AT NON-SECURE AREAS MATCH PARTITION

TYPE B3

- AT SECURE AREAS MATCH PARTITION

TYPE C2

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

1 1

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

AE201

1 1

2 2

3 3

4 4

5 5

C D F GE

CORR

MEN'S

RESTROOM

WOMEN'S

RESTROOM

COMM/SERVER

STAIR

S1

STAND &

EVALUATION

TESTING

FLIP ROOM

COMBAT

CREW

COMM AREA

(CCC)

SUPERVISOR

SAFE ROOM/

KIT

BUILDING

INTEL

243JAN.

WEAPONS

AND

TACTICS

SIO OFFICE

SHREDDER

ROOM

ELEV

D.3 D.4 D.7 E.5 E.8 F.5 G.1B.9

AE302

C1

AE302

C1

AE301

A1

AE301

A1

B2

AE402

C1

AE401

206A

207A

205A

S1B

200A

201A

243A

242A

234A

244A

204A

209A

208A

A4

E1

A4

C1

A2

A4

C1 A4

A2

A2

A4

A2

A2

A4

A4A4

OFFICE

AREA

MATCHLINE

SEE A1 /

AE121 A4C1

B3B3

E

F.8

CORR

7' -0

1'

-0

1' -2

7' -3

9"

4'-10" 35'-3" 7'-1" 12'-6" 13'-2" 18'-7" 12'-3" 9'-3"

'-9

'-0

/2

'-2

9'

-5

'-5

/8

'-0

1'

-3

/8

'-6

/8

1'

-3

/8

6' -3

1/

1'-3 1/8" 27'-2 7/8" 1'-3 1/8" 4'-11 1/2"

7'-7 5/8" 12'-10" 3'-3" 55'-8 7/8" 1'-3 1/8"

'-0

'-0

'-9

7'

-1

1' -1

5/

8"

4' -7

"0.8 0.8

0.5 0.5

D.1

HERITAGE

ROOM

FITNESS

S1C

ELEV.

ACCESS

AE307

A5

B1

AE504

B2

AE504

BELOW ROOF1'

-3

/8

A4

11 1

E1

E1

D2D2D2D2

COMM

'-0

237A

A4

A4

A4A4

6"6"6"

FLOOR PLAN LEGEND

ONE HOUR CONSTRUCTION1 HR

SECURE AREA BOUNDARY

TWO HOUR CONSTRUCTION2 HR

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:5

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE122

CERTIFIED FINAL SUBMITTAL

SE

C

O N

D F

LO

O

R P

LA

N

SE

C

TO

R S

C

D

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLAN - SECTORS C & DA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. EXTERIOR DIMENSIONS ARE FROM GRIDLINE OR

FACE OF MASONRY.

B. INTERIOR DIMENSIONS ARE FROM GRIDLINE,

FACE OF CMU OR FACE OF STUD.

C. PROVIDE SUPPORT BLOCKING AT ALL WALL

MOUNTED EQUIPMENT INCLUDING MILLWORK,

MARKER BOARDS, PROJECTION SCREENS AND

ALL OTHER ITEMS REQUIRING BLOCKING.

D. CENTER TRANSITION STRIPS UNDER DOORS,

TYP.

E. PROVIDE BLINDS IN ALL WINDOWS UNO.

F. DIMENSIONS AT MASONRY ARE NOMINAL, UNO.

G. REFER TO SHEET AE001 AND FURNITURE PLANS

FOR MONITOR MOUNTING REQUIREMENTS.

1. 5" X 5" PREFINISHED METAL DOWNSPOUT.

2. FIRE HOSE CABINET. REF. NOTE 2 ON SHEET

F-102.

3. PROVIDE A BID OPTION TO ADD WING WALL AS

SHOWN ON PLAN.

4. PROVIDE A BID OPTION TO ADD GLAZING TYPE E

AS SHOWN ON PLAN IN LIEU OF GLAZING TYPE

D (BASE BID).

5. WALL SPANNING BELOW ROOF DECK TO 2ND

FLOOR SLAB IS TO BE 1-HR RATED:

- AT NON-SECURE AREAS MATCH PARTITION

TYPE B3

- AT SECURE AREAS MATCH PARTITION

TYPE C2

SHEET KEYNOTES

NOTE:

FURNITURE SHOWN FOR REFERENCE

ONLY. RE: IF SHEETS

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

J J

J J

S1

103 104105 106 107

160 153

142 143 S2133

4 4

157 155 121 122

165 166

AE500

B2

5 4

6 6

AE504

A1

TYPICAL CEILING LEGEND

2' x 2' CEILING GRID

GYP BD CEILING

2' x 2' LED FIXTURE - EMERGENCY

RECESSED DOWNLIGHT

EXIT SIGNS

WALL MTD EXTERIOR LIGHT

SUPPLY AIR DIFFUSERS

RETURN AIR GRILLES

2' x 2' LED FIXTURE

LED FIXTURE - SUSPENDED

WALL MTD EXTERIOR LIGHT - EMERGENCY

RECESSED DOWNLIGHT - EMERGENCY

ACCESS DOORS

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:1

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE140

CERTIFIED FINAL SUBMITTAL

C O

M

PO

SI

TE

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

G

R O

U N

D

FL

O O

R

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 3/32" = 1'-0"

COMPOSITE REFLECTED CEILING PLAN - GROUND FLOORA1

SCALE: = 1'-0"3/32"

0 8 16 248

ROOM NAME - 1ST FL

RM # ROOM NAME

134 AFIN

135 HYDRAULICS

136 PROPULSION

137 COM-NAV

138 MAINT. BRIEFING

139 E&E

140 SUPPORT

141 CREW CHIEF

142 SECTION SUPER

143 EXPEDITOR, PRODUCTION &

PROD. SUPERV.

144 CORR

145 TECH ORDER LIBRARY

146 SUPPORT SUPER

147 SUPPORT EQUIP. MX

148 TAIL NO. BINS

149 TOOL ROOM

150 ALT. MISSION EQUIPMENT

151 COMM

152 ELEC

153 MEN'S RESTROOM

154 MEN'S LOCKERS

155 MEN'S SHOWERS

156 WOMEN'S RESTROOM

157 WOMEN'S SHOWERS

158 WOMEN'S LOCKERS

159 JAN.

160 BREAK

161 PRINTER

161 PRINTER

162 LACTATION/HUDDLE ROOM

163 SERVICE COUNTER

164 HELMET STORAGE

165 AFEO

166 NCOIC

ROOM NAME - 1ST FL

RM # ROOM NAME

100 VEST.

101 LOBBY

102 CORRIDOR

103 AMU OFFICER/ FLIGHT CHIEF

104 MNT. OPS OFFICER

105 SUPPORT FLIGHT CHIEF &

SUPER

106 1ST SGT.

107 SQUAD COMMANDER

108 COPY

109 SIPR

110 BRIEFING CONF.

111 COMPUTER WORKSTATION

112 CSS & AMU SUPER

113 CORRIDOR

114 ELEV.

115 STORAGE

116 BRIEFING ROOM

117 ELEC

118 COMPRESSOR ROOM

119 COMM/SERVER

120 MECH

121 VEST.

122 CORRIDOR

123 NVD

124 CONF. RM

125 W/D

126 O2 ROOM

127 AIRCREW SUPPORT SECTION

128 AIRCRAFT SUPPORT SECTION

129 CORR

130 EQUIPMENT

131 AFE ADMIN

132 CONTINUATION CLASSROOM

TRAINING

133 MOBILITY STORAGE

GENERAL NOTES

A. ALL CEILINGS TO BE 9'-0" AFF UNO.

B. ALL ACT TO BE 2 x 2 UNO.

C. INSTALL ACCESS PANELS AS REQUIRED IN ALL

GYP BD CEILINGS. LOCATION AND QUANTITIES

TO BE COORDINATED WITH INSTALLED

EQUIPMENT NEEDING ACCESS.

SHEET KEYNOTES

1. PAINTED EXPOSED STRUCTURE.

2. CABLE TRAY.

3. CANOPY.

4. 8" x 8" PREFINISHED METAL GUTTER AND

DOWNSPOUT.

5. PRE-FINISHED METAL SOFFIT PANEL WITH 2-

INCH CONTINUOUS SOFFIT VENTILATION

6. ADD LAYER OF 6" UNFACED ACOUSTICAL BATTS

ABOVE CEILING. OVERHANG INSULATION 2'-0"

AT ALL PERIMETER WALLS BELOW.

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

S2

S1

223222

215216

5 44

4 45 5

13' - 0"

6 6 6 6 6

9 9 9 9 9 9

CEILING OPEN

TO STRUCTURE.

RE: SHEET AE140

CEILING OPEN

TO STRUCTURE.

RE: SHEET AE140

4 4 4 45 5

88 236

TYPICAL CEILING LEGEND

2' x 2' CEILING GRID

GYP BD CEILING

2' x 2' LED FIXTURE - EMERGENCY

RECESSED DOWNLIGHT

EXIT SIGNS

WALL MTD EXTERIOR LIGHT

SUPPLY AIR DIFFUSERS

RETURN AIR GRILLES

2' x 2' LED FIXTURE

LED FIXTURE - SUSPENDED

WALL MTD EXTERIOR LIGHT - EMERGENCY

RECESSED DOWNLIGHT - EMERGENCY

ACCESS DOORS

KEYPLAN

NTS

BA

DC

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

NORTH

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:2

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE141

CERTIFIED FINAL SUBMITTAL

C O

M

PO

SI

TE

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

SE

C O

N D

FL

O

O R

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

D

AP

D

AP

JM

I

J

U N

E

SCALE: 3/32" = 1'-0"

COMPOSITE REFLECTED CEILING PLAN - SECOND FLOORA1

SCALE: = 1'-0"3/32"

0 8 16 248

ROOM NAME - 2ND FL

RM # ROOM NAME

200 STAND & EVALUATION

201 TESTING

202 CORR

203 ELEV

204 COMM/SERVER

205 WOMEN'S RESTROOM

206 MEN'S RESTROOM

207 JAN.

208 HERITAGE ROOM

209 FITNESS

210 TRAINING

211 MOBILITY TRAINING

212 PILOT/ ENGINEER WORKROOM

213 ELEC

214 CHIEF BOOM

215 SCHEDULING CURRENT OPS

216 SARM

217 CORRIDOR

218 A.D.O.

219 CHIEF PILOT

220 D.O.

221 COMMANDER

222 COMMANDER

223 EXEC/SEC

224 GROUP COMANDER

225 SAFETY

226 CSS

227 1ST SGT

228 CONFERENCE

229 CORRIDOR

230 CORRIDOR

231 AIRCREW BRIEFING

232 MISSON PLANNING

233 SERE OFFICE

234 WEAPONS AND TACTICS

234 WEAPONS AND TACTICS

235 OP PLANS

236 OFFICE AREA

237 COMM

238 SUPERVISOR

239 SHREDDER ROOM

240 SAFE ROOM/ KIT BUILDING

241 FLIP ROOM

242 COMBAT CREW COMM AREA

(CCC)

243 INTEL

244 SIO OFFICE

245 ELEV. ACCESS

246 1ST SGT

247 STORAGE

GENERAL NOTES

A. ALL CEILINGS TO BE 9'-0" AFF UNO.

B. ALL ACT TO BE 2 x 2 UNO.

C. INSTALL ACCESS PANELS AS REQUIRED IN ALL

GYP BD CEILINGS. LOCATION AND QUANTITIES

TO BE COORDINATED WITH INSTALLED

EQUIPMENT NEEDING ACCESS.

D. REF. STRUCTURAL SHEETS SF111 & SF112 FOR

STRUCTURAL GRID INFORMATION.

SHEET KEYNOTES

1. PAINTED EXPOSED STRUCTURE.

2. CABLE TRAY.

3. CANOPY.

4. 8" x 8" PREFINISHED METAL GUTTER AND

DOWNSPOUT.

5. PRE-FINISHED METAL SOFFIT PANEL WITH 2-

INCH CONTINUOUS SOFFIT VENTILATION

6. GYP BD WINDOW HEAD POCKET. RE: D4/AE501

7. INSTALL 2-HR RATED LID PER DETAIL A2, SHEET

AE002.

8. INSTALL SECURE LID PER DETAIL A3, SHEET

AE002.

9. ADD LAYER OF 6" UNFACED ACOUSTICAL BATTS

ABOVE CEILING. OVERHANG INSULATION 2'-0"

AT ALL PERIMETER WALLS BELOW.

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

SHEET ID

PR

O

JE

C

T N

O

Q

JK

L1

P2

: 3

M

SP

A

ER

IA

L

PO

R

T

FA

C

IL

IT

Y

M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U

L

IA

P

AR

S M

IN

N

ES

O

TA

CERTIFIED FINAL DESIGN SUBMITTAL

G-002

SH

EE

T

IN

D E

X

RICHARD S.

JOHNSON

B.

P

AR

SO

N

D . P

AL

M

ER

D . P

AL

M

ER

J.

IS

C

BEALE AFB, CALIFORNIA, P2#473244 CERTIFIED FINAL SUBMITTAL

940 ARW SQUADRON OPERATIONS & AMU COMPLEX 17 JUNE 2022

SECTION 09 06 00

SCHEDULES FOR FINISHES

05/09, CHG 1: 11/13

PART 1 GENERAL

1.1 SUMMARY

This section covers only the color of exterior and interior materials and products that are exposed to view in the finished construction. The word "color", as used herein, includes surface color and pattern. Requirements for quality, product specifications, and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings if not identified in this specification. Items not designated for color in this section may be specified in other sections. When color is not designated for items, propose a color for approval.

PART 2 PRODUCTS

2.1 COLOR SCHEDULE

The color schedule information provided in the following paragraphs lists the colors, patterns and textures required for exterior and interior finishes, including both factory applied and field applied colors. Where color is shown as being specific to one manufacturer, an equivalent color by another manufacturer may be submitted for approval. Manufacturers and materials specified are not intended to limit the selection of equal colors from other manufacturers. In the case of difference between the drawings and specifications, colors identified in this specification govern.

2.2 EXTERIOR FINISHES

Reference drawings for manufacturer and color information.

2.2.1 Exterior Walls

Exterior wall colors apply to exterior wall surfaces including recesses at entrances and projecting vestibules. When applicable, paint conduit to closely match the adjacent surface color. Provide wall colors to match the colors listed below.

2.2.1.1 Mortar

Grey

2.2.1.2 Concrete Masonry Units (Rock/Split-Faced)

Dolese 4" Split Faced CMU, Hartshorne Gray, Basis-of-Design

2.2.1.3 Metal Wall Panels, Hardware, and Associated Trim

IMWP1: Centria, Formawall Dimension Series, color to match 142 Surrey Beige, Basis-of-Design

SECTION 09 06 00 Page 1

IMWP2: Centria, Formawall Dimension Series, color to match Spartan-Bronze, Basis-of-Design

IMSP3: Centria, Formawall Dimension Series, color to match Kingspan-Champagne Gold, Basis-of-Design

IMWP4: Centria, Formawall Dimension Series, color to match Spartan-Bronze, Basis-of-Design

2.2.1.4 Glass and Glazing

PPG Solarban z50 (2) Optiblue + Clear Glass Insulating Glass Unit, Basis-of-Design

2.2.1.5 Screen Wall

Dolese 4" Split Faced CMU, Hartshorne Gray, Basis-of-Design

2.2.2 Exterior Trim

Provide exterior trim to match the colors listed below.

2.2.2.1 Steel Doors and Door Frames

Painted: Spartan-Bronze (to match IMWP2)

2.2.2.2 Aluminum Doors and Door Frames

Kawneer, 451T Entrances and Storefronts,Permanodic - Anodized, Clear 14, Basis-of-Design

2.2.2.3 Aluminum Windows (mullion, muntin, sash, trim, and sill)

Kawneer, 415T Entrances and Storefronts, Permanodic - Anodized, Clear 14, Basis-of-Design

2.2.2.4 Fascia

Color to Match: Federal Standard 595b #30108 Dark Brown

2.2.2.5 Soffits and Ceilings

Color to Match: Federal Standard 595b #20108 Dark Brown

2.2.2.6 Overhangs

Color to Match: Federal Standard 595b #20108 Dark Brown

2.2.2.7 Downspouts and Gutters

Color to Match: Federal Standard 595b #20108 Dark Brown

2.2.2.8 Scuppers

Color to Match: Federal Standard 595b #20108 Dark Brown

2.2.2.9 Louvers

Match adjacent material in color.

SECTION 09 06 00 Page 2

2.2.2.10 Flashings

Match adjacent material in color.

2.2.2.11 Architectural Precast Stone

Match adjacent ent CMU color.

2.2.2.12 Caulking and Sealants

Match adjacent material in color.

2.2.2.13 Bollards

Painted: Safety Yellow

2.2.2.14 Sun Shades

Kawneer, Permanodic - Anodized, Clear 14, Basis-of-Design

2.2.2.15 Control Joints

Match adjacent material in color.

2.2.2.16 Expansion Joint and/or Covers

Match adjacent material in color.

2.2.3 Exterior Roof

Apply roof color to exterior roof surfaces including sheet metal flashings and copings, snow guards, mechanical units, mechanical penthouses, roof trim, pipes, conduits, electrical appurtenances, and similar items.

Provide roof color to match the colors listed below.

2.2.3.1 Metal

Color Number Federal Standard 595b #330108 Dark Brown

2.2.3.2 Penetrations

Match roof in color.

2.3 INTERIOR FINISHES

2.3.1 Interior Floor Finishes

Provide flooring materials to match the colors listed below.

2.3.1.1 Carpet Tile

CPT1: Shaw Contract, Hand Drawn Collection, Fine Point Tile 5T113, Gouache 13761, 18 by 36 inches, Ashlar Installation; Basis of Design.

CPT2: Shaw Contract, Hand Drawn Collection, Stipple Tile 5T116, Gouache 13761, 18 by 36 inches, Boxed In Installation; Basis of Design.

SECTION 09 06 00 Page 3

2.3.1.2 Luxury Vinyl Tile

LVT1 (BID OPTION): Shaw Contract, Surface + Strand, Strand 0516V, Clay 16761, 18 by 36 inches, Ashlar Installation; Basis of Design

2.3.1.3 Stair Flooring

RST1: Roppe, #92 Low Profile Raised Circular Tread & Riser, color 178 Pewter; Basis of Design

2.3.1.4 Stair Landings

RSL1: Roppe, #992 Low Profile Circular Tile, color 178 Pewter, 19 11/16 by 19 11/16 inches, Basis of Design

2.3.1.5 Porcelain Tile

PRC1A: Daltile, Chord, Forte Gray CH25, 12 by 24 inches; Basis of Design

PRC1B: Daltile, Chord, Forte Gray CH25, 6 by 12 inches Cove Base;

Basis of Design

PRC1C: Daltile, Chord, Forte Gray CH25, 3 inch Triangle Mosaic;

Basis of Design

2.3.1.6 Grout

GRT1: Mapei, Kerapoxy, color 02 Pewter; Basis of Design

GRT2: Mapei, Kerapoxy, color 103 Cobblestone; Basis of Design

2.3.1.7 Stainless Steel Transition

TR1: Schluter Systems, Reno-U, Stainless Steel; Basis of Design

TR2: Schluter Systems, Reno-TK, Stainless Steel; Basis of Design

TR4: Schluter Systems, Schiene, Stainless Steel; Basis of Design

TR5: Schluter Systems,Dilex-AHK, Clear Anodized Aluminum

TR6: Schluter Systems, Rondec, Clear Anodized Aluminum

2.3.1.8 Entrance Flooring

EF1: Milliken, Obex Tile, Cut, Thread, TDC145 Mocha, 50cm x 50 cm, Quarter Turn Installation; Basis of Design

2.3.1.9 Resilient Athletic Flooring

RAF1: Ecore, Econight, Total Eclipse 626, 23 by 23 inches Interlocking Tile; Basis of Design

2.3.1.10 Concrete (Sealed)

CONC

SECTION 09 06 00 Page 4

2.3.1.11 Industrial Floor Coating

EP1: Stonclad GS/GS4, color Cool Shale with Texture 2; Basis of Design

2.3.2 Interior Base Finishes

Provide base materials to match the colors listed below.

2.3.2.1 Resilient Base and Moldings

RB1: Roppe, color 178 Pewter; Basis of Design

TR3: Roppe,#43 Edge Guard, color 178 Pewter; Basis of Design

2.3.3 Interior Wall Finishes

Apply interior wall color to the entire wall surface, including reveals, vertical furred spaces and columns, grilles, diffusers, electrical and access panels, and piping and conduit adjacent to wall surfaces unless otherwise specified. Paint items not specified in other paragraphs to match adjacent wall surface. Provide wall materials to match the colors listed below.

2.3.3.1 Paint

PT1: Sherwin Williams, SW7015 Repose Gray, Eggshell; Basis of Design

PT1E: Sherwin Williams, Epoxy Paint, SW7015 Repose Gray, Eggshell;

Basis of Design

PT3: Sherwin Williams, SW7025 Backdrop, Eggshell; Basis of Design

2.3.3.2 Acoustical Wall Tile

AWT1: TURF, Slash Tile, 01 Cream, 6.375"W x 11.75"H x 9MM T; Basis of Design AWT2: TURF, Slash Tile, 48 Light Brown, 6.375"W x 11.75"H x 9MM T;

Basis of Design

2.3.3.3 Porcelain Tile

PRC2A; Daltile, Chord, Canon Grey CH22, 12 by 24 inches; Basis of Design

PRC3: Crossville Studios, Retro Active 2.0 & Patterns, RET01 Antico Taupe, 3 by 12 inches, Basis of Design

2.3.3.4 Grout

GRT1: Mapei, Kerapoxy, color 02 Pewter; Basis of Design

GRT2: Mapei, Kerapoxy, color 103 Cobblestone, Basis of Design

2.3.3.5 Exposed Structural Columns

Match PT1

SECTION 09 06 00 Page 5

2.3.4 Interior Ceiling Finishes

Apply ceiling colors to ceiling surfaces including soffits, furred down areas, grilles, diffusers, registers, and access panels. In addition, apply ceiling color to joists, underside of roof deck, and conduit and piping where joists and deck are exposed and required to be painted.

Provide ceiling materials to match the colors listed below.

2.3.4.1 Acoustical Tile and Grid

ACT1: Armstrong, Ultima, #1911, Beveled Tegular, 15/16: Grid, White; Basis of Design

2.3.4.2 Paint (Ceilings)

PT2: Sherwin Williams, SW7008 Alabaster, Flat; Basis of Design

2.3.4.3 Paint (Soffits)

Match PT2

2.3.4.4 Metal Deck

Match PT2

2.3.4.5 Structural Framing

Match PT2

2.3.5 Interior Trim

Provide interior trim to match the colors listed below.

2.3.5.1 Steel Doors

PT3: Sherwin Williams, SW7025 Backdrop, Semi Gloss; Basis of Design

2.3.5.2 Steel Door Frames

Match PT3, Semi Gloss

2.3.5.3 Wood Doors

WD1: VT Architectural Doors, stain to match Minwax MW413; Basis of Design

2.3.5.4 Wood Stain

Match WD1

2.3.5.5 Fire Extinguisher Cabinets

White

2.3.5.6 Handrails

Match PT3

SECTION 09 06 00 Page 6

2.3.5.7 Guardrails

Match PT3

2.3.5.8 Ladders

Match PT3

2.3.5.9 Metal Stairs; include underside of stairs only

Match PT3

2.3.5.10 Exposed Ductwork

Match PT2

2.3.5.11 Bollards

Safety Yellow

2.3.6 Interior Window Treatment

Provide window treatments to match the colors listed below.

2.3.6.1 Window Shades

RWS1: Mechoshade, manual shade, EcoVeil Sheer 6850 Series, 1% Openness Factor, color 6857 Timber; Basis of Design

RWS2: Mechoshade, motorized shade, EcoVeil Sheer 6850 Series, 1% Openness Factor, color 6857 Timber; Basis of Design

2.3.7 Interior Miscellaneous

Provide miscellaneous items to match the colors listed below.

2.3.7.1 Toilet Partitions and Urinal Screens

TP1: Scranton, Hiney Hiders, Texture Hammered, Color Stainless;

Basis of Design

2.3.7.2 Plastic Laminate

PLAM1: Wilsonart, Phantom Cocoa, 8213; Basis of Design

2.3.7.3 Solid Surfacing Material

SSM1: Wilsonart, Dusk Ice, 9203 CE, Matte Finish; Basis of Design

2.3.7.4 Window Sills (Solid Surface)

Match SSM1

2.3.7.5 Rolling Counter Door

Match PT3

SECTION 09 06 00 Page 7

2.3.7.6 Corner Guards

CG1: Koroseal, Korogard, G100 Vinyl Corner Guard, color Lava;

Basis of Design

CG2: Construction Specialties SCO-8 Type 304 Stainless Steel Corner Guard #4 Satin Finish; Basis of Design

2.3.7.7 Protective Wall Covering/Panel

FRP1: Marlite, FRP Class A, P100 White; Basis of Design

2.3.7.8 Signage Message Color

SG1: 2/90 Sign Systems, Soft White 708; Basis of Design

2.3.7.9 Signage Background Color

SG2: 2/90 Sign Systems; Duranodic 785; Basis of Design

2.3.7.10 Signage Frame

SG3: 2/90 Signage Systems, Satin 101; Basis of Design

2.3.7.11 Lockers

Penco Lockers, 073 Champagne

2.3.7.12 Wall Switch Handles and Standard Receptacle Bodies

White Switches & Bodies

2.3.7.13 Electrical Device Cover Plates

White

2.3.7.14 Electrical Panels

White

2.3.7.15 Shower Curtain

White

2.3.7.16 Shower Wall Kits, Trim and Shower Pan

White

2.3.7.16.1 Elevator and Associated Trim and Components

Stainless Steel 4SS

2.3.7.16.2 Elevator Wall Panels

Wall B,C & D to be laminate Earth L421

2.3.7.17 Elevator Wall Panels

Wall B,C & D to be laminate Earth L421

SECTION 09 06 00 Page 8

2.3.7.17.1 Sinks

Brushed Stainless Steel

2.3.7.17.1.1 Auditorium Seating (BID OPTION)

Plastic Arms: Black Metal Frame: Black Tablet: Wilsonart, Phantom Cocoa Fabric: Keystone Brothers, pattern Olympus, color Slate

-- End of Section --

SECTION 09 06 00 Page 9

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 09 06 00 Page 10

940 ARW Squad Ops & AMU Complex Beale Air Force Base, California

CPT1: Carpet Tile

CPT1 INSTALLATION

CPT2: Carpet Tile

CPT2 INSTALLATION

USACE LOUISVILLE

ACT1: Acoustical Ceiling Tile

ACT1 INSTALLATION

LVT1: Luxury Vinyl Tile

LVT1 INSTALLATION

PLAM2: Plastic Laminate – Elevator Finish

SS1: Stainless Steel – Elevator FinishTP1: Toilet Partitions

PLAM1: Plastic Laminate

SSM1: Solid Surface CG1: Corner Guard – Vinyl

PT1: Field Paint

PT2: Ceiling Paint

PT3: Door/ Door Trim Paint

EF1: Entrance Flooring

RAF1: Sports Flooring

EP1: Epoxy Flooring

RST1/RSL1:

Rubber Stair Tread

RB1: Resilient Base

SG1: Signage Background Color

SG2: Signage Message Color

CG2: Corner Guard – Stainless Steel

FRP1: Fiberglass Reinforced Panels

RWS1 : Roller Window Shade

SG3: Signage Frame

PRC1A: Porcelain Tile - Floors PRC1A & PRC2A INSTALL

PRC2A: Porcelain Tile - Walls

PRC1: Porcelain Wall Tile

GRT1: Grout

PRC1C: Porcelain Tile Mosaic

– Shower Floors

GRT2: Grout

AS01: Auditorium Seating – Irwin Seating Co. - Stellar

Auditorium Seat Upholstery

PLAM1: End Panel & Tablet

AWT1: Acoustic Wall Tile

AWT2: Acoustic Wall Tile

Acoustic Wall Tile Shape

WD1: Wood Doors

LK1: Lockers

FINISH NOTES

A. MANUFACTURERS REFERENCED ARE INTENDED TO

ESTABLISH DESIGN INTENT ONLY, AND ARE NOT

INTENDED TO LIMIT SELECTIONS FROM OTHER

MANUFACTURERS. WHEN ALTERNATE SELECTIONS

ARE SUBMITTED, SUBMITTAL SHALL INCLUDE

COLOR SAMPLES OF MATERIALS FOR

COMPARISON.

B. REFER TO SPECIFICATIONS 09 06 00 FOR FINISHES

AND SPECIAL ITEMS.

C. ALL DOOR FRAMES ARE TO BE PAINTED, (PT3) UNO

D. ALL CORNERS TO RECEIVE CORNER GUARDS.

E. ALL WINDOWS T RECEIVE WINDOW SHADES.

F. REFER TO SHEETS IN110 THROUGH IN122 FOR

FINISH FLOOR PATTERNS.

ABBREVIATION LEGEND

ACT ACOUSTICAL CEILING TILE

AWT ACOUSTICAL WALL TILE

CONC SEALED CONCRETE

CPT CARPET TILE

DW DEMOUNTABLE WALL

EF ENTRANCE FLOORING

EP EPOXY FLOORING

EXP EXPOSED

GYP BD GYPSUM BOARD

FRP FIBERGLASS REINFORCED PANEL

LVT LUXURY VINYL FLOORING

PLAM PLASTIC LAMINATE

PT PAINT

PTE EPOXY PAINT

PRC PORCELAIN TILE

RB RESILIENT BASE

RSL RESILIENT STAIR LANDING

RST RUBBER STAIR TREAD

RAF RUBBER ATHLETIC FLOORING

SS STAINLESS STEEL

STRUCT STRUCTURE

FINISH SCHEDULE NOTES

1. INSTALL FRP1 FROM TOP OF BASE TO 4'-4" AFF

WITH EPOXY PAINT ABOVE.

2. EXPOSED PANELS AND STRUCTURES TO BE

PAINTED (PT1).

3. FLOOR FINISH- BASE BID: CONC; BID OPTION: LVT1

4. FLOOR FINISH- BASE BID: CONC; BID OPTION: EP1

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

W

2Q R

-1 9-

F-

W

2Q R

-1 8-

D -0

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

IU

SV

IL

LE

D

IS

TR

IC

T

BE

AL

E

AI

R F

O R

C E

BA

SE

6/

/2

3:

:5

PM

C :\U se rs

\d ap

\D oc um en ts \9

_A rc h_ da vi da pa lm er .rv t

AE610

CERTIFIED FINAL SUBMITTAL

R O

O M

F

IN

IS

H

S C

H

ED

U

LE

G

R O

U N

D F

LO

O

R

AR

W

S Q

U

AD

R O

N O

PE

R

AT

IO

N S

A

M U

C O

M

PL

EX

Be al e

AF

B, C A

BD

P

TC

C

TC

C

TD

B

J

U N

E

ROOM FINISH SCHEDULE - GROUND FLOOR

ROOM

NUMBER. ROOM NAME FLOOR FINISH BASE FINISH

WALL FINISHES

CEILING FINISH

CEILING

HEIGHT NOTESNORTH SOUTH EAST WEST

100 VEST. EF1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

101 LOBBY CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

102 CORRIDOR CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

103 AMU OFFICER/ FLIGHT CHIEF CPT2 RB1 -- PT1 -- PT1 ACT1 9'-0"

104 MNT. OPS OFFICER CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

105 SUPPORT FLIGHT CHIEF & SUPER CPT2 RB1 -- PT1 PT1 -- ACT1 9'-0"

106 1ST SGT. CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

107 SQUAD COMMANDER CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

108 COPY CPT2 RB1 PT1 PT1 PT1 -- ACT1 9'-0"

109 SIPR CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

110 BRIEFING CONF. CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

111 COMPUTER WORKSTATION CPT2 RB1 PT1 -- PT1 -- ACT1 9'-0"

112 CSS & AMU SUPER CPT2 RB1 PT1 -- -- PT1 ACT1 9'-0"

113 CORRIDOR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

114 ELEV. LVT1 SS1 SS1 SS1 SS1 PLAM2 SS1 9'-0"

115 STORAGE CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

116 BRIEFING ROOM CPT2 RB1 PT1 PT1 PT1/AWT1/AWT2 PT1/AWT1/AWT2 ACT1 9'-10"

117 ELEC CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

118 COMPRESSOR ROOM CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

119 COMM/SERVER CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

120 MECH CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

121 VEST. EF1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

122 CORRIDOR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

123 NVD CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4

124 CONF. RM CPT2 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

125 W/D CONC RB1 PT1 PT1 PT1 PT1 ACT1 EXP 2,4

126 O2 ROOM CONC RB1 PT1 PT1 PT1 PT1 ACT1 EXP 2,4

127 AIRCREW SUPPORT SECTION CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4

128 AIRCRAFT SUPPORT SECTION CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4

129 CORR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

130 EQUIPMENT CPT1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

131 AFE ADMIN CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

132 CONTINUATION CLASSROOM TRAINING CPT1 RB1 PT1 PT1 PT1 PT1 ACT1/GYP -PT2 9'-0" / 8'-11"

133 MOBILITY STORAGE CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4

134 AFIN CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

135 HYDRAULICS CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

136 PROPULSION CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

137 COM-NAV CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

138 MAINT. BRIEFING CPT1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

139 E&E CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

140 SUPPORT CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

141 CREW CHIEF CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

142 SECTION SUPER CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

143 EXPEDITOR, PRODUCTION & PROD. SUPERV. CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

144 CORR CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

145 TECH ORDER LIBRARY CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4

146 SUPPORT SUPER CONC RB1 - - PT1 PT1 - - EXP STRUCT - PT2 EXP 2,4

147 SUPPORT EQUIP. MX CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4

148 TAIL NO. BINS CONC RB1 - - PT1 - - PT1 EXP STRUCT - PT2 EXP 2,4

149 TOOL ROOM CONC RB1 PT1 - - PT1 - - EXP STRUCT - PT2 EXP 2,4

150 ALT. MISSION EQUIPMENT CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2,4

151 COMM CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

152 ELEC CONC RB1 PT1 PT1 PT1 PT1 EXP STRUCT - PT2 EXP 2

153 MEN'S RESTROOM PRC1A PRC1B PRC2A/PT1E PRC2A/PT1E PT1E PT1E GYP BD - PT2E 9'-0"

154 MEN'S LOCKERS PRC1A PRC1B PT1E PT1E PT1E PT1E GYP BD - PT2E 9'-0"

155 MEN'S SHOWERS PRC1A/PRC1C PRC1B PRC2A PRC2A PRC2A PRC2A GYP BD - PT2E 9'-0"

156 WOMEN'S RESTROOM PRC1A PRC1B PRC2A/PT1E PRC2A/PT1E PT1E PT1E GYP BD - PT2E 9'-0" 157 WOMEN'S SHOWERS PRC1A/PRC1C PRC1B PRC2A PRC2A PRC2A PRC2A GYP BD - PT2E 9'-0"

158 WOMEN'S LOCKERS PRC1A PRC1B PT1E PT1E PT1E PT1E GYP BD - PT2E 9'-0"

159 JAN. CONC RB1 FRP1/PT1E FRP1/PT1E FRP1/PT1E FRP1/PT1E EXP STRUCT - PT2 EXP 1,2

160 BREAK PRC1A PRC1B PT1 PT1 PT1, PRC3 PT1 ACT1 9'-0"

161 PRINTER CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 3

162 LACTATION/HUDDLE ROOM CPT1 RB1 PT1 PT1 PT1 PT1 ACT1 9'-0"

163 SERVICE COUNTER CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4

164 HELMET STORAGE CONC RB1 PT1 PT1 PT1 PT1 ACT1 9'-0" 4

165 AFEO CONC RB1 PT1 PT1 - - PT1 ACT1 9'-0" 3

166 NCOIC CONC RB1 PT1 PT1 PT1 - - ACT1 9'-0" 3

S1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .