This solicitation is for the design-build construction of a Squadron Operations and Aircraft Maintenance Facility at Beale Air Force Base in California. The estimated construction cost is between $25-100 million, with NAICS code 236220 and a small business size standard of $39.5 million. This is a full and open competitive procurement requiring compliance with HUBZone price evaluation procedures. Offerors must be registered in SAM and comply with various CCR/ORCA requirements. Technical inquiries must be submitted through ProjNet, with a site visit planned for August 19, 2022. Proposals are due by September 12, 2022. The project involves construction of a two-story, 45,000 square foot administrative and industrial complex combining squadron operations and aircraft maintenance functions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912QR22R0064-0002.pdf | ||
| Sign-In Sheet AMU Squad OPS Site Walk 29Aug2022.pdf | ||
| J and A for Sole Source_Trane redacted.pdf | ||
| J and A for Sole Source_Monaco redacted.pdf | ||
| J and A for Sole Source_Vindicator redacted.pdf | ||
| J and A for Sole Source_Best Coremax redacted.pdf | ||
| J and A for Sole Source_FFE redacted.pdf | ||
| J and A for Sole Source_Siemens redacted.pdf | ||
| W912QR22R0064-0001.pdf | ||
| W912QR22R0064_Specs_Vol2-0000.pdf | ||
| W912QR22R0064_Plans-0000.pdf | ||
| Solicitation Attachment_Site Visit_EAL Form SAMPLE.xlsx | XLSX spreadsheet | |
| W912QR22R0064_Specs_Vol4-0000.pdf | ||
| W912QR22R0064_SID-0000.pdf | ||
| W912QR22R0064_FFE-0000.pdf | ||
| W912QR22R0064_Specs_Vol3-0000.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For 940 ARW Squad Ops & AMU Complex, Beale AFB CA
P2: 473244
Design-Bid-Build
Specifications Vol. 1 of 4 Div. 00-01 Certified Final Design
12 August 2022
W912QR22R0064
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR22R0064_Specs_Vol1-0000
940 ARW SQUADRON OPERATIONS & AMU COMPLEX CERTIFIED FINAL SUBMITTAL
BEALE AFB, CALIFORNIA, P2#473244
THIS PAGE INTENTIONALLY LEFT BLANK
Design/Bid/Build for the construction of a Squadron Operations and Aircraft Maintenance Facility at Beale Air Force Base, California.
Estimated Construction Cost is betw een $25,000,000.00 and $100,000,000.00.
NAICS Code is 236220. Size Determination is $39.5M. Please note that business size in SAM is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM the business w ill be considered other than a small business.
This is a full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.
Central Contractor Registration and ORCA are available through the System for Aw ard Management (SAM), available at w w w .sam.gov.
Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM. PLEASE NOTE: SAM is completely free of charge for both registrants and users.
Please see Section 00 10 00, SF1442 BLOCK 10 CONTINUATION for further instructions.
LEVI R SPETH 502.315.6199
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Aug-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________12 Sep 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:
W912QR22R0064 118
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912QR22R0064
Section 00 10 00 - Solicitation
BLOCK 10 CONTINUATION PAGE
Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 00, ProjNet Instructions for further guidance.
Please see FAR 52.236-27 for Site Visit information.
The term bid and proposal are used interchangeably in industry and may be used interchangeably throughout this solicitation.
Please note, page numbering in this document may not be accurate.
All days are to be considered calendar days unless otherwise noted.
940 ARW SQUAD OPS & AMU COMPLEX (P2-473244)
BEALE AFB, CA
PRICE BREAKOUT SCHEDULE
PROJECT:
LOCATION:
OFFEROR’S NAME:
BASE PROPOSAL
Item
No.
Description Quantity Unit Amount
0001 New Construction, SQ OPS and AMU 1 Job $_______________
0002 Site Work 1 Job $_______________
TOTAL BASE PROPOSAL: $_______________
PROPOSAL OPTIONS
Item
No.
Description Quantity Unit Amount
0003 Option 1: FF&E – CFCI 1 Job $_______________
Option 2: Replace Sealed Concrete with
LVT1 - In Corridors 1 Job $_______________
Option 3: Replace Sealed Concrete with
Epoxy EP1- In Maintenance and Equip
Rooms
1 Job $_______________
Option 4: Add 8 Government Parking
Spaces and Sidewalk to Entrance 1 Job $_______________
Option 5: Add Removable Bollards at
North Driveways
1 Job $_______________
Option 6: Increase sidewalk width to 6 feet
1 Job $_______________
Option 7: Add
Destratification Fans
1 Job $_______________
0010 Option 8: Add Scrolling LED Text Signs 1 Job $_______________
0011 Option 9: Add Blast Fence 1 Job $_______________
0012 Option 10: Add Sloped Floors and Fixed Seating in Briefing Rooms (2)
1 Job $_______________
0013 Option 11: Add Concrete Pad for Storage Containers
1 Job $_______________
Option 12: Add Wing Wall at Exterior Facade 1 Job $_______________
0015 Option 13: Add Storefront and Air Force Logo at Exterior
1 Job $_______________
0016 Option 14: Add Split Face CMU Wainscot
1 Job $_______________
0017 Option 15: Add Dumpster/Trash Enclosure
1 Job $_______________
0018 Option 16: Remove Existing Test Stand 1 Job $_______________
TOTAL OPTIONS: $_______________
TOTAL BASE AND ALL OPTIONS: $_______________
GENERAL:
This section comprises an explanation of the items identified in the Price Breakout Schedule.
This section is a general scope of work for the items described in the Price Breakout Schedule and is not intended to be all encompassing in the description. All work specified herein shall be accomplished in accordance with the procedures prescribed in the technical provisions of the specifications and the plans/details as shown on the contract drawings. The contractor shall propose each type of work under the applicable price breakout item. Measurement for payment shall not be made. Payment described for the various items shall be full compensation for all labor, materials, and equipment required to complete the work. Compensation for any item of work described in the contract but not listed in the Price Breakout Schedule shall be included in the payment for the item of work to which it is made subsidiary.
BASE PROPOSAL
1. Payment under Item No. 0001 "New Construction, SQ OPS and AMU" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the design requirements of the 940 ARW SQUAD OPS & AMU
COMPLEX as required by the contract document drawings and specifications.
2. Payment under Item No. 0002 "Site work" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the relocation and installation of utilities, AT/FP protective measures, and all other items more than
5-feet outside of the building envelope included as approved design items as determined during design phase.
OPTIONS (OPTs)
1. Payment under Option 1 "FF&E - CFCI" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete FF&E as required by the contract documents and specifications. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
2. Payment under Option 2 “Replace Sealed Concrete with LVT1 - In Corridors" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of LVT in lieu of sealed concrete in corridors, as indicated in the contract documents drawings. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
3. Payment under Option 3 “Replace Sealed Concrete with Epoxy EP1- In Maintenance and
Equip Rooms" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the furnishing and installation of LVT in lieu of sealed concrete in Maintenance and Equip Rooms, as indicated in the contract documents drawings. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
4. Payment under Option 4 “Add 8 Government Parking Spaces and Sidewalk to Entrance" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the eight parking spaces with associated curb and gutter and sidewalk between the spaces and the building entrance, as indicated in the contract
5. Payment under Option 5 “Add Removable Bollards at North Driveways" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the construction of removable bollards at the northern project driveways, as indicated in the contract documents drawings. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
6. Payment under Option 6 “Increase sidewalk width to 6 feet" shall constitute full necessary to provide six foot wide sidewalks throughout the project, as indicated in the contract
7. Payment under Option 7 “Add Destratification Fans" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the construction of destratification fans, as indicated in the contract documents drawings. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
8. Payment under Option 8 “Add Scrolling LED Text Signs" shall constitute full necessary to complete the construction of Scrolling LED Text Signs, as indicated in the contract documents drawings. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
9. Payment under Option 9 “Add Blast Fence" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the construction of the blast fence, as indicated in the contract documents drawings.
The Government may exercise this option by written notice to the contract within 60 days from the time of award.
10. Payment under Option 10 “Add Sloped Floors and Fixed Seating in Briefing Rooms (2)" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the construction of sloped flooring and fixed seating in the two briefing rooms, as indicated in the contract documents drawings. The
Government may exercise this option by written notice to the contract within 60 days from the time of award.
11. Payment under Option 11 “Add Concrete Pad for Storage Containers" shall constitute full necessary to complete the construction of a concrete pad at the storage container location, as indicated in the contract documents drawings. The Government may exercise this option by written notice to the contract within 60 days from the time of award.
12. Payment under Option 12 “Add Wing Wall at Exterior Facade " shall constitute full necessary to complete the construction of a concrete pad at the wing wall at the exterior facade, as indicated in the contract documents drawings. The Government may exercise this option by
13. Payment under Option 13 “Add Storefront and Air Force Logo at Exterior Facade" shall constitute full compensation for furnishing all materials, tools, labor costs, and other associated incidentals necessary to complete the construction of storefront and the Air Force Logo, as indicated in the contract documents drawings. The Government may exercise this option by
14. Payment under Option 14 “Add Split Face CMU Wainscot" shall constitute full necessary to complete the construction of split face CMU wainscot, as indicated in the contract
15. Payment under Option 15 “Add Dumpster/Trash Enclosure" shall constitute full necessary to complete the construction of the dumpster enclosure, as indicated in the contract
16. Payment under Option 16 “Remove Existing Test Stand" shall constitute full necessary to complete the removal of the existing test stand, as indicated in the contract
NOTES FOR PROPOSAL SCHEDULE
1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest proposal schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to proposal items, all proposers should state their revised prices for each item. The company name should be indicated on the face of the proposal schedule to preclude being misplaced.
2. Proposers must insert a price on all numbered items of the Proposal Schedule. The price may be zero dollars or a deduct amount. Failure to do so may disqualify the proposal.
3. If a modification to a proposal is submitted which provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price in the proposal schedule must be stated or, if it is not stated, the proposer agrees that the lump-sum adjustment shall be applied on a pro-rata basis to every proposal item in the proposal schedule.
5. CONDITIONS GOVERNING EVALUATION OF PROPOSALS AND AWARD OF
CONTRACT.
One contract only will be awarded on this project and evaluation will be made on the Total Base
Plus Option Amounts exercised fully, in accordance with the paragraph entitled "Evaluation Of
Options" in the Instructions to Offerors. The Government may require the delivery of the numbered line items, identified in the schedule as Additive Proposal items, in the quantity and at the price stated in the schedule.
6. Description of Proposal Items - The general outline of the principal features of each item as listed does not in any way limit the responsibility of the proposer for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the proposal form.
Section 00 21 00 - Instructions
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR22R0064 The Bidder Inquiry Key is: Z6CRUT-4AARZN Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your
SecretQuestion.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the closing date stated in the solicitation.
ELECTRONIC SUBMISSION
Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php).
Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.
a. Levi Speth, Contract Specialist at Levi.R.Speth@usace.army.mil
b. Marcel Hull, Contracting Officer at Marcel.D.Hull@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two (2) business days prior to the proposal due date.
3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter W912QR22R0064-FIRMNAME.
4. Click Upload button to send documents. Note: all files should be uploaded at the same time as the link only allows one upload occurrence.
5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).
File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
W912QR22R0064-FIRMNAME-VOLUME I
W912QR22R0064-FIRMNAME-VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.217-5 Evaluation Of Options JUL 1990 252.215-7008 Only One Offer JUL 2019 252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
JAN 2018
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of provision)
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers
CELRL-CT, Rm 821 ATTN: Marcel Hull 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202-2239
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visit is scheduled for 19 August 2022 at 9:30 AM Pacific Time:
POC: Ulysses Gomez Cell #: 916-208-0734
Entry Access List, EAL form is required to be filled (see attached EAL Form for ABC Construction) before the site visit, 3-days of processing no exception. Shorter than three days will not be processed in time. This is a SAMPLE EAL form but my information and ID # is already included and are GOOD. They MUST complete the blank including the Project #, SSN, Driver’s License # and issuing state, DOB, hours to get it, and the period of access – must not exceed 29 days for EXAMPLE: June 6, 2022 to July 5, 2022. Or if the site walk is for two days then just put two days.
Site Address: (see map attached – 02.jpg) West of Arnold Avenue, North of Curtis Street (follow map) Beale AFB, CA 95903
USACE Beale Project Office location (see map attached – Beale AFB USACE Office.jpg) 2551 B Street (Inside 9CES Compound) Beale AFB, CA 95903 https://www.acquisition.gov/browse/index/far
The full text of DFARS clauses and provisions (numbered as 252.XXX-XX) can be found at this site:
https://www.acq.osd.mil/dpap/dars/dfarspgi/current/
(End of provision)
52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
(b) The use in this solicitation of any Defenese Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions (numbered as 52.XXX-XX) can be found at this site:
Section 00 22 00 - Supplementary Instructions
SECTION 00 22 12
00 22 12 – PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA
1. Overview.
1.1 The intent of this solicitation W912QR22R0064 is to select one contractor for the Design-Bid-Build of the
Squadron Operation and Aircraft Maintenance Unit (AMU) complex located at Beale Air Force Base, California. The basis of award is the Best Value Trade-Off process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award a firm-fixed-price contract to the responsible offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
1.2 This project includes construction of a two-story administrative and industrial complex that combine two functions in one building. The first floor will house the aircraft maintenance unit comprised of about 30,000SF of industrial use space, parts storage, administrative offices, conference rooms, breakrooms and associated restrooms and circulation space. The second floor will be comprised of about 15,000 SF of command control area, administrative offices, conference rooms, an auditorium, breakrooms and associated restrooms and circulation space.
1.3 The target ceiling for contract award is $30,000,000.00 based on the funds made available for this project.
The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.
2. Submittal of offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.
2.2 Offerors shall submit their proposals electronically in accordance with the Electronic Submittal Instructions via DoD Safe to the U.S. Army Corps of Engineers – Louisville District, not later than the time and date specified in Block 13 of the Standard Form 1442. Mark your proposal submission to the attention of Levi Speth Levi.R.Speth@usace.army.mil. NOTE: The Louisville District is in the Eastern Time Zone. Hard copy of proposals will not be accepted. Offerors are encouraged to save a copy of their confirmation of upload in the event there is a technical issue to show proof of upload.
2.3 Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. The sections should parallel the submission requirements identified herein.
2.4 Volume I shall include the following information:
Volume I – Factor I: Past Performance Volume I – Factor II: Management Plan Volume I – Factor III: Small Business Participation Plan (All Offerors)
*NOTE: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED
ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE.
Authentication is handled via email. Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mi/about.php).
2.5 Volume II shall be submitted as a separate file from Volume I and shall include the following information:
Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan (Large Businesses)
NOTE: Volume II shall be submitted electronically via DoD Safe. Failure to place the required submission information under the appropriate tab (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.
3. Proposal Evaluation Process.
3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals (Volume I) will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.
Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.
3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.
3.2.1 Proposal Compliance/Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete, that both a technical and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the offeror’s performance. Factor II – Management Plan will be rated using Table 3 below. Factor III – Small Business Participation Plan will be rated using Table 4.
3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.
3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors.
4.1 Proposals will be evaluated in accordance with the factors and subfactors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
4.2 Volume I – Factor I – Past Performance 1st
4.3 Volume I – Factor II – Management Plan 2nd
4.4 Volume I – Factor III – Small Business Participation Plan 3rd
4.5 Volume II - Price and Pro Forma Information
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreement Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability
Tab D Pre-Award Information Not Rated
Tab E Subcontracting Plan Acceptable / Unacceptable
4.6 Ratings
Evaluators will apply the l rating for the definition that most closely matches the evaluation.
TABLE 1
Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
TABLE 2
Performance Confidence Assessments
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
TABLE 3
Management Plan Ratings
Adjectival Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
TABLE 4
Small Business Ratings
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.
Unacceptable Proposal does not meet the small business objectives.
4.7 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
4. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
5. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
6. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
7. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.
5.0 Volume I – Factor I: Past Performance
5.1 Submission Requirements:
5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime
Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
5.1.2 Projects considered similar in size to this project include new construction of facilities of at least 35,000
Square Feet (sf)
5.1.3 Projects considered similar in scope to this project include:
a) Construction adjacent to active flight line.
b) Construction within a highly active seismic zone.
c) Construction of a multi-story facility housing administrative and/or maintenance components.
d) Construction of pre-engineered buildings and renovation projects shall not be considered.
5.1.4 The prime contractor must have self-performed at least 20 percent of the direct contract labor (including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.
5.1.5 Additional consideration may be given for projects that contain the following features:
a) Experience at Beale Air Force Base, CA
b) Experience with construction in Northern California seismic zone
c) Experience with airfield blast fence installation
d) Experience with USACE or NAVFAC construction projects
e) Experience with construction of secure areas following ICD 705 standards
f) Projects that experience both administrative and maintenance combined
5.1.6 The following information shall be provided for each project:
a) Project Title, Location, and Contract Number/Unique Identifier
b) Current percentage of construction complete and the date it was or will be complete. For projects that are not yet complete, provide description of work remaining to be completed.
c) Scope of the project, to include purpose/use of facility.
d) Size of the project, differentiating the square footage of new construction versus renovation if the project includes both.
e) Type and percentage of work that was self-performed.
f) The name and current phone number for at least two independent references. References must be a representative of the owner or prime contractor on the submitted project and must not be affiliated with the offeror.
5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number (formerly known as DUNS) with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).
5.2 Evaluation Criteria:
5.2.1 The SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.
5.2.2 The SSEB will next review how well the offeror performed on those projects. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.
The Government also reserves the right to not contact the provided references. In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .